CN102829544B - A kind of hand selects the Instant heating type pipeline heater at water source - Google Patents

A kind of hand selects the Instant heating type pipeline heater at water source Download PDF

Info

Publication number
CN102829544B
CN102829544B CN201210372763.XA CN201210372763A CN102829544B CN 102829544 B CN102829544 B CN 102829544B CN 201210372763 A CN201210372763 A CN 201210372763A CN 102829544 B CN102829544 B CN 102829544B
Authority
CN
China
Prior art keywords
water supply
branch road
water
supply branch
tributary interface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210372763.XA
Other languages
Chinese (zh)
Other versions
CN102829544A (en
Inventor
冯海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan City Four Seasons Tea Set Co., Ltd.
Original Assignee
Foshan City Four Seasons Tea Set Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan City Four Seasons Tea Set Co Ltd filed Critical Foshan City Four Seasons Tea Set Co Ltd
Priority to CN201210372763.XA priority Critical patent/CN102829544B/en
Publication of CN102829544A publication Critical patent/CN102829544A/en
Application granted granted Critical
Publication of CN102829544B publication Critical patent/CN102829544B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses the Instant heating type pipeline heater that a kind of hand selects water source, comprise housing, housing is provided with heating part and water supply part, water supply part comprises total road of supplying water, first water supply branch road and the second water supply branch road, first water supply branch road and the second water supply branch road are respectively as the entrance at two kinds of different water sources, described water supply total road entrance connects the first water supply branch road and the second water supply branch road respectively, its outlet section is communicated with heating part, also include linkage switch and hand push button/knob thereof, described linkage switch is while branch road is supplied water in closedown first, connect the second water supply branch road, or while connecting the first water supply branch road, close the second water supply branch road, hand push button/knob extends outside housing, this kind of pipeline heater, realize linkage switch while branch road is supplied water in closedown first, connect the second water supply branch road, or to connect while the first water supply branch road, close the second water supply branch road, greatly facilitate user and select the use on water source, and, simple and reasonable for structure.

Description

A kind of hand selects the Instant heating type pipeline heater at water source
Technical field
The present invention relates to a kind of Instant heating type pipeline heater, is especially the Instant heating type pipeline heater that a kind of hand selects water source.
Background technology
Existing Instant heating type pipeline heater, as: instant electric kettle, instant electric boiler, tea tray or tea table etc. with Instant heating type tea-making facility, applicant not long ago, apply for a " electric water boiler of band double source ", its patent No. is: 201120391994.6, authorizes day: 2012.06.06, its structure comprises pedestal, pedestal is provided with storage tank, balanced reservoir, depotition cock and Instant heating type Glass tube heater, the electrothermal tube of Instant heating type Glass tube heater system glass outer wall plated film, it is the heating of pipe outer wall, tube cavity water flowing, storage tank is communicated with balanced reservoir water inlet, balanced reservoir delivery port is plugged into Instant heating type Glass tube heater, Instant heating type Glass tube heater is also connected with depotition cock, storage tank enters Instant heating type Glass tube heater as the first water source through balanced reservoir, described pedestal is also provided with external water source mouth, external water source mouth is plugged into the end that draws water of an outer water source water pump, the discharge ends of outer water source water pump is connected to balanced reservoir and/or storage tank, external water source mouth delivers to Instant heating type Glass tube heater by outer water source water pump through balanced reservoir or storage tank as second water source again, this kind of electric water boiler, has rational in infrastructure, not easily produces incrustation scale, mouthfeel is good, and double water source can be selected to drink as boiling advantages such as needing.
But the double water source electric water boiler of said structure, still has the following disadvantages: (1) controls the switch at two water sources and can only work alone, can not synchronous interaction, cause great inconvenience to the use of user; (2) control the switch at two water sources, in view of not having the spacing cooperation of switch, therefore, switch seal effect is poor, easily causes the mixing of double water source, and what affect user drinks mouthfeel.
Summary of the invention
The object of the invention is to overcome the defect that above-mentioned prior art uses inconvenience, and provide a kind of rational in infrastructure, hand easy to use selects the Instant heating type pipeline heater at water source.
The object of the present invention is achieved like this:
Hand selects the Instant heating type pipeline heater at water source, comprise housing, housing is provided with heating part and water supply part, water supply part comprises total road of supplying water, first water supply branch road and the second water supply branch road, first water supply branch road and the second water supply branch road are respectively as the entrance at two kinds of different water sources, described water supply total road entrance connects the first water supply branch road and the second water supply branch road respectively, its outlet section is communicated with heating part, it is characterized in that, also include linkage switch and hand push button/knob thereof, described linkage switch is while branch road is supplied water in closedown first, connect the second water supply branch road, or while connecting the first water supply branch road, close the second water supply branch road, hand push button/knob extends outside housing, this kind of pipeline heater, by installing linkage switch on two water sources, and manipulated by same hand push button/knob, with realize linkage switch while branch road is supplied water in closedown first, connect the second water supply branch road, or while connecting the first water supply branch road, close the second water supply branch road, greatly facilitate user and selecting the use on water source, and, simple and reasonable for structure.
Object of the present invention can also adopt following technical measures to solve:
As scheme more specifically, described water supply total road entrance is provided with three-way pipe with the junction of the first water supply branch road, the second water supply branch road and is connected, linkage switch is arranged on three-way pipe, and three-way pipe is for the connection of total road entrance that supplies water, the first water supply branch road and the second water supply branch road; Three-way pipe can be T-shaped three-way pipe, or the three-way pipe of other style.
As better scheme, first water supply tributary interface of described three-way pipe and the other linkage switch that is also respectively arranged with of the second water supply tributary interface coordinate spacing, to make linkage switch when tributary interface or the second water supply tributary interface are supplied water in sealing first, be in best closed condition, realize sealing completely.
As scheme wherein, described linkage switch can be a slide damper, the first water supply tributary interface in three-way pipe is adjacent with the second water supply tributary interface position and two interfaces are provided with slide rail, slide damper to be arranged on slide rail and to slide between the two interfaces, hand push button/one, knob system dial type button, its one end connects slide damper, and the other end extends housing; User promotes hand push button/knob, and slide damper is slided between first and second water supply tributary interface, when slide damper slides to the first water supply tributary interface position, just now closes the first water supply branch road, and now, the second water supply branch road is connected; On the contrary, when slide damper slides to the second water supply tributary interface position, just now closed the second water supply branch road, now, the first water supply branch road is connected, and the interlock realized between two water supply branch roads opens and closes.
As better improvement, described linkage switch coordinates the spacing locking groove being the first water supply tributary interface and the second water supply tributary interface side and arranging respectively, and the slide damper of the locking correspondence of locking groove difference, with the sealing optimum position making slide damper be in setting.
Alternatively, described linkage switch system lever two sealing-plug, it comprises lever and two sealing-plug thereof, the first water supply tributary interface in three-way pipe is adjacent with the second water supply tributary interface position and two interfaces sides are provided with fulcrum, lever is arranged on fulcrum, two sealing-plug is respectively towards first water supply tributary interface and the second tributary interface, and hand push button/knob is extended on sealing-plug top, two respectively; User presses hand push button/knob side, makes the relative side of lever press down one end of two sealing-plug, if the first water supply branch road is closed by the wherein sealing-plug of, the second water supply route is not in pressing down by the lever other end, and now, the second water supply branch road is connected; On the contrary, if the second water supply branch road is closed by the wherein sealing-plug of, the first water supply route is not in pressing down by the lever other end, and now, the first water supply branch road is connected, and the interlock that this structure can realize between two water supply branch roads equally opens and closes.
As the embodiment of above-mentioned employing lever two sealing-plug, it is the other locking groove arranged respectively of the first water supply tributary interface and the second water supply tributary interface that described linkage switch coordinates spacing, two sealing-plug of the locking correspondence of locking groove difference, with the sealing optimum position making two sealing-plug be in setting.
As better scheme, described linkage switch system tee ball valve, tee ball valve is arranged on the junction of supply water total road entrance and the first water supply branch road, the second water supply branch road, the rotation valve rod formation hand push button/knob on tee ball valve; Tee ball valve system is manipulated by same hand push button/knob, can realize while branch road is supplied water in closedown first equally, connect the second water supply branch road, or while connecting the first water supply branch road, closes the second water supply branch road, facilitate user selecting the use on water source; Wherein, the structure of tee ball valve, see China Patent No.: 201110251025.5, name is called: L-type tee ball valve, Authorization Notice No.: CN102313043A; Certainly, the structure of tee ball valve, also can be as China Patent No.: 201110251697.6, name be called: T-shaped tee ball valve, Authorization Notice No.: CN102305300A, no longer launches here to describe in detail.
In order to improve the security of product further, it also includes safety switch, and safety switch is arranged on linkage switch and coordinates spacing place, and safety switch and heating part are electrically connected; That is, only when linkage switch arrives default ideal position (as: linkage switch coordinates spacing, is in intact sealing state), safety switch just can close, and heating part is switched on power, and could start heating.
Certainly, safety switch also can be the stroke range two ends being arranged on hand push button/knob, and safety switch and heating part are electrically connected; Only move to each end position at hand push button/knob, now, safety switch just can close, and heating part is switched on power, and could start heating.
Beneficial effect of the present invention is as follows:
(1) this kind of pipeline heater, by installing linkage switch on two water sources, and manipulated by same hand push button/knob, with realize linkage switch while branch road is supplied water in closedown first, connect the second water supply branch road, or while connecting the first water supply branch road, close the second water supply branch road, greatly facilitate user and selecting the use on water source, and, simple and reasonable for structure;
(2) have again, for making water supply branch road when closing, be in best sealing state, first water supply tributary interface of described three-way pipe and the other linkage switch that is also respectively arranged with of the second water supply tributary interface coordinate spacing, to make linkage switch when tributary interface or the second water supply tributary interface are supplied water in sealing first, be in best closed condition, realize sealing completely;
(3) also have, it is also by setting up safety switch, and safety switch is arranged on the stroke range two ends that linkage switch coordinates spacing place or hand push button/knob, and safety switch and heating part are electrically connected; That is, only the stroke of linkage switch or hand push button/knob arrive preset ideal position time (as: linkage switch coordinates spacing, is in intact sealing state), safety switch just can close, heating part is switched on power, heating could be started.
Accompanying drawing explanation
Fig. 1 is the Instant heating type pipeline heater schematic diagram that invention hand selects water source.
Fig. 2 is the A place enlarged drawing of Fig. 1.
Fig. 3 is another embodiment schematic diagram of Fig. 2.
Fig. 4 is an embodiment schematic diagram again of Fig. 2.
Fig. 5 is the schematic diagram increasing safety switch in Fig. 2.
Detailed description of the invention
As depicted in figs. 1 and 2, hand selects the Instant heating type pipeline heater at water source, comprise housing 1, housing 1 is provided with heating part 2 and water supply part 3, water supply part 3 comprises supply water total road 4, first water supply branch road 5 and the second water supply branch road 6, first water supply branch road 5 and the second water supply branch road 6 respectively as the entrance at two kinds of different water sources, as: the first water supply branch road 5 connects storage tank or comprehensive water tank that heater carries, the external bottled water of the second water supply branch road 6 or dress water (mineral water) etc.; Described water supply total road 4 entrance 41 connects the first water supply branch road 5 and the second water supply branch road 6 respectively, its outlet section 42 is communicated with heating part 2, it is characterized in that, also include linkage switch 7 and hand push button/knob 8 thereof, described linkage switch 7 while branch road 5 is supplied water in closedown first, connect the second water supply branch road 6, or while connecting the first water supply branch road 5, close the second water supply branch road 6, hand push button/knob prolongs 8 and stretches out outside housing 1.
Above-mentioned water supply total road 4 entrance 41 is provided with three-way pipe 9 with the junction of the first water supply branch road 5, second water supply branch road 6 and is connected, and linkage switch 7 is arranged on three-way pipe 9.
First water supply tributary interface 51 of described three-way pipe 9 and the other linkage switch that is also respectively arranged with of the second water supply tributary interface 61 coordinate spacing 10, to make linkage switch 7 when tributary interface 51 or the second water supply tributary interface 61 are supplied water in sealing first, be in complete sealing state.
Described linkage switch 7 is a slide damper 71, the first water supply tributary interface 51 in three-way pipe 9 is adjacent with the second water supply tributary interface 61 position and two interface 51,61 places are provided with slide rail 72, slide damper 71 to be arranged on slide rail 72 and to slide between two interfaces 51,61, hand push button/knob 8 is a dial type button, its one end connects slide damper 71, and the other end extends housing 1.
Described linkage switch cooperation spacing 10 is the slide damper 71 of the other locking groove arranged respectively of the first water supply tributary interface 51 and the second water supply tributary interface 61, the locking correspondence of locking groove difference; To make linkage switch 7 when tributary interface 51 or the second water supply tributary interface 61 are supplied water in sealing first, be in best closed condition, realize sealing completely.
Operation principle: user promotes hand push button/knob 8, slide damper 71 is slided between first and second water supply tributary interface 51,61, when slide damper 71 slides to the first water supply tributary interface 51 position, just now closed the first water supply branch road 5, now, the second water supply branch road 6 is connected; On the contrary, when slide damper 71 slides to the second water supply tributary interface 61 position, just now closed the second water supply branch road 6, now, the first water supply branch road 5 is connected, and the interlock realized between two water supply branch roads 5,6 opens and closes.
As shown in Figure 3, as another embodiment of linkage switch, linkage switch 7 can be lever two sealing-plug, it comprises lever 73 and two sealing-plug 74,75 thereof, the first water supply tributary interface 51 in three-way pipe 9 is adjacent with the second water supply tributary interface 61 position and two interfaces 51,61 sides are provided with fulcrum 76, lever 73 is arranged on fulcrum 76, two sealing-plug 74,75 is respectively towards first water supply tributary interface 51 and the second water supply tributary interface 61, and hand push button/knob 8 is extended on two sealing-plug 74,75 top respectively.
Described linkage switch coordinates spacing 10 to be the other locking groove arranged respectively of the first water supply tributary interface 51 and the second water supply tributary interface 61, two sealing-plug 74,75 of the locking correspondence of locking groove difference, to make linkage switch 7 when tributary interface 51 or the second water supply tributary interface 61 are supplied water in sealing first, be in best closed condition, realize sealing completely.
Operation principle: user presses hand push button/knob 8 side, the relative side of lever 73 is made to press down one end of two sealing-plug, if the first water supply branch road 5 by wherein one sealing-plug close (thin passage), second supplies water route 6 owing to not pressing down by lever 73 other end, now, the second water supply branch road 6 is connected; On the contrary, if the second water supply branch road 6 by wherein one sealing-plug close (thin passage), first for water route 5 owing to not pressing down by lever 73 other end, now, first water supply branch road 5 is connected, and the interlock that this structure can realize between two water supply branch roads 5,6 equally opens and closes.
As another embodiment, as shown in Figure 4, described linkage switch 7 is tee ball valve 9, and tee ball valve 9 is arranged on the junction of supply water total road entrance 41 and the first water supply branch road 5, second water supply branch road 6, and the rotation valve rod on tee ball valve 9 forms hand push button/knob 8; Tee ball valve 9 is manipulate 8 by same hand push button/knob, same energy realizes while branch road 5 is supplied water in closedown first, connects the second water supply branch road 6, or while connecting the first water supply branch road 5, close the second water supply branch road 6, facilitate user selecting the use on water source; Wherein, the structure of tee ball valve 9, see China Patent No.: 201110251025.5, name is called: L-type tee ball valve, Authorization Notice No.: CN102313043A; Certainly, the structure of tee ball valve, also can be as China Patent No.: 201110251697.6, name be called: T-shaped tee ball valve, Authorization Notice No.: CN102305300A, no longer launches here to describe in detail.
In order to improve the security of product further, as shown in Figure 5, it also includes safety switch 12, and safety switch 12 is arranged on linkage switch and coordinates spacing 10 places, and safety switch 12 and heating part 2 are electrically connected; That is, only when linkage switch 7 arrives default ideal position (as: linkage switch coordinates spacing 10, is in intact sealing state), safety switch 12 just can close, and heating part 2 is switched on power, could start heating.
Certainly, safety switch 12 also can be the stroke range two ends being arranged on hand push button/knob 8, and safety switch 12 and heating part 2 are electrically connected; Only move to each end position at hand push button/knob 8, now, safety switch 12 just can close, and heating part 2 is switched on power, could start heating.

Claims (7)

1. hand selects the Instant heating type pipeline heater at water source, comprise housing (1), housing (1) is provided with heating part (2) and water supply part (3), water supply part (3) comprises total road (4) of supplying water, first water supply branch road (5) and the second water supply branch road (6), first water supply branch road (5) and the second water supply branch road (6) are respectively as the entrance at two kinds of different water sources, the total road of described water supply (4) entrance (41) connects the first water supply branch road (5) and the second water supply branch road (6) respectively, its outlet section (42) is communicated with heating part (2), it is characterized in that, also include linkage switch (7) and hand push button/knob (8) thereof, described linkage switch (7) is while branch road (5) is supplied water in closedown first, connect the second water supply branch road (6), or while connecting the first water supply branch road (5), close the second water supply branch road (6), hand push button/knob (8) extends housing (1) outward, the total road of described water supply (4) entrance (41) is provided with three-way pipe (9) with the junction of the first water supply branch road (5), the second water supply branch road (6) and is connected, and linkage switch (7) is arranged on three-way pipe (9), first water supply tributary interface (51) of described three-way pipe (9) and the other linkage switch that is also respectively arranged with of the second water supply tributary interface (61) coordinate spacing (10), to make linkage switch (7) when being supplied water in tributary interface (51) or second water supply tributary interface (61) in sealing first, be in complete sealing state, described linkage switch (7) is tee ball valve (9), tee ball valve (9) is arranged on the junction of supply water total road entrance (41) and the first water supply branch road (5), the second water supply branch road (6), and rotation valve rod on tee ball valve forms hand push button/knob (8).
2. hand selects the Instant heating type pipeline heater at water source according to claim 1, it is characterized in that, described linkage switch (7) is a slide damper (71), the first water supply tributary interface (51) in three-way pipe (9) is adjacent with the second water supply tributary interface (61) position, and two interfaces (51, 61) place is provided with slide rail (72), slide damper (71) is arranged on slide rail (72), and at two interfaces (51, 61) slide between, hand push button/knob (8) is a dial type button, its one end connects slide damper (71), the other end extends housing (1).
3. hand selects the Instant heating type pipeline heater at water source according to claim 2, it is characterized in that, described linkage switch cooperation spacing (10) is the slide damper (71) of the other locking groove arranged respectively of the first water supply tributary interface (51) and the second water supply tributary interface (61), the locking correspondence of locking groove difference.
4. hand selects the Instant heating type pipeline heater at water source according to claim 1, it is characterized in that, described linkage switch (7) is lever two sealing-plug, it comprises lever (73) and two sealing-plug (74 thereof, 75), the first water supply tributary interface (51) in three-way pipe (9) is adjacent with the second water supply tributary interface (61) position, and two interfaces (51, 61) side is provided with fulcrum (76), lever (73) is arranged on fulcrum (76), two sealing-plug (74, 75) respectively towards first water supply tributary interface (51) and the second water supply tributary interface (61), two sealing-plug (74, 75) hand push button/knob (8) is extended on top respectively.
5. hand selects the Instant heating type pipeline heater at water source according to claim 4, it is characterized in that, described linkage switch cooperation spacing (10) is two sealing-plug (74,75) of the other locking groove arranged respectively of the first water supply tributary interface (51) and the second water supply tributary interface (61), the locking correspondence of locking groove difference.
6. hand selects the Instant heating type pipeline heater at water source according to claim 1, it is characterized in that, also include safety switch (12), safety switch (12) is arranged on linkage switch and coordinates spacing (10) place, and safety switch (12) and heating part (2) are electrically connected.
7. hand selects the Instant heating type pipeline heater at water source according to claim 1, it is characterized in that, also include safety switch (12), safety switch (12) is arranged on the stroke range two ends of hand push button/knob (8), and safety switch (12) and heating part (2) are electrically connected.
CN201210372763.XA 2012-09-29 2012-09-29 A kind of hand selects the Instant heating type pipeline heater at water source Active CN102829544B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210372763.XA CN102829544B (en) 2012-09-29 2012-09-29 A kind of hand selects the Instant heating type pipeline heater at water source

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210372763.XA CN102829544B (en) 2012-09-29 2012-09-29 A kind of hand selects the Instant heating type pipeline heater at water source

Publications (2)

Publication Number Publication Date
CN102829544A CN102829544A (en) 2012-12-19
CN102829544B true CN102829544B (en) 2015-12-23

Family

ID=47332767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210372763.XA Active CN102829544B (en) 2012-09-29 2012-09-29 A kind of hand selects the Instant heating type pipeline heater at water source

Country Status (1)

Country Link
CN (1) CN102829544B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111374523A (en) * 2018-12-28 2020-07-07 浙江苏泊尔家电制造有限公司 Cooking utensil

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2566077Y (en) * 2002-08-30 2003-08-13 潘兆铿 Rotor type liquid tee valve
CN1648540A (en) * 2004-01-19 2005-08-03 张兆铭 Self control type bathing water circulation water heater
CN101021279A (en) * 2007-02-14 2007-08-22 律天龙 Three-way flow guide valve
CN102210252A (en) * 2011-04-26 2011-10-12 中国农业科学院农田灌溉研究所 Irrigation and drainage control valve of irrigation and drainage double-purpose underground water-saving irrigation system
CN202051527U (en) * 2011-03-09 2011-11-30 潘毅强 Multifunctional automatic brewing machine
CN202267197U (en) * 2011-10-16 2012-06-06 罗伟林 Electric heating water boiler with dual water sources
CN202302081U (en) * 2011-10-08 2012-07-04 深圳市强博金机电有限公司 Double-direction water supply switch valve
CN202813727U (en) * 2012-09-29 2013-03-20 冯海涛 Manual type water source selection instant heating type pipeline heater

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2566077Y (en) * 2002-08-30 2003-08-13 潘兆铿 Rotor type liquid tee valve
CN1648540A (en) * 2004-01-19 2005-08-03 张兆铭 Self control type bathing water circulation water heater
CN101021279A (en) * 2007-02-14 2007-08-22 律天龙 Three-way flow guide valve
CN202051527U (en) * 2011-03-09 2011-11-30 潘毅强 Multifunctional automatic brewing machine
CN102210252A (en) * 2011-04-26 2011-10-12 中国农业科学院农田灌溉研究所 Irrigation and drainage control valve of irrigation and drainage double-purpose underground water-saving irrigation system
CN202302081U (en) * 2011-10-08 2012-07-04 深圳市强博金机电有限公司 Double-direction water supply switch valve
CN202267197U (en) * 2011-10-16 2012-06-06 罗伟林 Electric heating water boiler with dual water sources
CN202813727U (en) * 2012-09-29 2013-03-20 冯海涛 Manual type water source selection instant heating type pipeline heater

Also Published As

Publication number Publication date
CN102829544A (en) 2012-12-19

Similar Documents

Publication Publication Date Title
CN102331080B (en) Electric heating water boiler with separated water storage tank
CN203182704U (en) Intelligent type milky tea combined making machine
CN202267197U (en) Electric heating water boiler with dual water sources
CN102829544B (en) A kind of hand selects the Instant heating type pipeline heater at water source
CN202562000U (en) Drinking water heating device provided with convenient water replenishing
CN102679531A (en) Drinking water heating device capable of conveniently supplementing water
CN202813727U (en) Manual type water source selection instant heating type pipeline heater
CN201253133Y (en) Coffee beverage drinking device
CN205144328U (en) Healthy control by temperature change water dispenser
CN103156514A (en) Drinking water heating device beneficial to water adding
CN206995100U (en) A kind of coffee machine automatic feeding water switching device
CN104110512B (en) Combination valve, hot-water heating system and hot-water heating system control method
CN104720588A (en) Water dispenser providing water of different temperatures
CN201764024U (en) Touch induction water-saving tap
CN201855116U (en) Inverted water dispenser
CN105300019A (en) Water dispenser structure for refrigerator
CN204260558U (en) A kind of multi-functional heater
CN204083372U (en) A kind of novel combination tap
CN202674391U (en) Faucet body of multifunctional direct-drinking faucet
CN203182694U (en) Multifunctional intelligent tea water fountain
CN202229388U (en) Electric heating boiler with separated water storage tank
CN202341782U (en) Beverage machine
CN201221620Y (en) Faucet
CN202408527U (en) Water dispenser water outlet device and water dispenser comprising same
CN202775875U (en) Double-end electric drinking water boiler with water fed automatically

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20151106

Address after: Comprehensive building opposite the 528315 Guangdong city of Foshan province Lecong Yongfa town Shunde District Lecong road Liang Jiao Industrial Zone Ma Kau East Arrow company

Applicant after: Foshan City Four Seasons Tea Set Co., Ltd.

Address before: 528316, No. three, Lane 1, Yi Town, Lecong Town, Foshan Town, Shunde District, Guangdong

Applicant before: Feng Haitao

C14 Grant of patent or utility model
GR01 Patent grant