CN102828615B - Pattern plate system of overlapped shear wall and construction method thereof - Google Patents
Pattern plate system of overlapped shear wall and construction method thereof Download PDFInfo
- Publication number
- CN102828615B CN102828615B CN201210333738.0A CN201210333738A CN102828615B CN 102828615 B CN102828615 B CN 102828615B CN 201210333738 A CN201210333738 A CN 201210333738A CN 102828615 B CN102828615 B CN 102828615B
- Authority
- CN
- China
- Prior art keywords
- shear wall
- wall sheet
- connector
- pouring
- overlapping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The invention relates to a pattern plate system of an overlapped shear wall. Force bearing bars are arranged on the back of a detachable inner pattern plate of a post pouring shear wall at intervals. The inner pattern plate is connected with an outer pattern plate through a connecting device. The connecting device comprises a reducing screw, an isometric screw and a connecting piece. The connecting piece is fixedly arranged on the force bearing bars through bolts. The isometric screw is provided with a clip. The isometric screw passes through the outer pattern plate and the detachable inner pattern plate sequentially from the outer surface of a secondary keel and is screwed into the connecting piece. The clip on the isometric screw is fixedly arranged on the outer surface of the secondary keel. The reducing screw penetrating through the end part of a previous pouring shear wall piece extends into the connecting piece. According to the pattern plate system of the overlapped shear wall provided by the invention, under the condition that a normal pattern plate is used as the inner pattern plate, the inner pattern plate can be simply installed and disassembled without inner-joint operation. The pattern plate system of the overlapped shear wall provided by the invention has the advantages of simple supporting structure, accurate positioning and the like, and can be widely applied to construction of post pouring shear wall pieces of the overlapped shear wall.
Description
Technical field
The present invention relates to a kind of shear wall formwork system and construction method thereof, particularly a kind of overlapping shear wall formwork system and construction method thereof.
Background technology
Described overlapping shear wall comprises first builds shear wall sheet and after-pouring shear wall sheet, both be arranged in parallel, leave gap therebetween, at present, the construction method of overlapping shear wall is for first building a slice shear wall, then in gap, clog warming plate as after water shear wall inner side template, why with warming plate, double as inner side template, reason is that two gaps between wall are very little, if adopt conventional panel as inner side template, after shear wall moulding, cannot take out.But, because warming plate is generally plastic foamboard, its anti-side rigidity is less, adopt it as side form, in casting process, can cause shear wall medial surface uneven owing to lacking effective lateral resisting, even, because the lateral support of template is not strong, cause the inner appearance of shear wall cavity to be waited and build defect, thereby form potential safety hazard.
Summary of the invention
The object of this invention is to provide a kind of overlapping shear wall formwork system and construction method thereof, water after solving after overlapping shear wall construction shear wall with watered shear wall opposite face after water the technical problem that effect is built on shear wall surface; And solve employing typified form as inner side template, the problem of the technology of the fixing and dismounting of inner side template.
For achieving the above object, the present invention adopts following technical scheme:
A kind of overlapping shear wall formwork system, for formerly building the side of shear wall sheet, build after-pouring shear wall sheet, described first building between shear wall sheet and after-pouring shear wall sheet is reserved with gap, comprise exterior sheathing, drawknot device, secondary joist and main joist, described exterior sheathing is arranged on the lateral surface of after-pouring shear wall sheet, be close to exterior sheathing and be provided with secondary joist, perpendicular to secondary joist, be provided with main joist, also comprise removable inner formword, described removable inner formword is arranged on gap near after-pouring shear wall sheet inner wall position, its back side is arranged at intervals with load bar, described removable inner formword and exterior sheathing are by drawknot device drawknot, described drawknot device comprises diameter progressive screw, isometrical screw rod and connector, described connector is bolted on load bar, on described isometrical screw rod, be provided with clamp, described isometrical screw rod passes exterior sheathing and removable inner formword successively from secondary joist external surface, in screw-in connector, clamp on it fixes at main joist external surface, described diameter progressive screw stretches in connector through first building its end of shear wall sheet.
Described connector is by junction plate, form through long thread sleeve and the stiffening rib at junction plate center, described stiffening rib is radial and is arranged in the angle that long thread sleeve and junction plate end face form, and the length that described long thread sleeve exposes junction plate bottom surface equates with the thickness of load bar.
Described long thread sleeve diameter is not less than 16mm, and the base length of described terrace with edge shape contiguous block is not less than 200mm.
The described shear wall sheet of first building is embedded with the PVC sleeve pipe of end band short thread sleeve by position at isometrical screw rod.
Described removable inner formword is plank, bamboo clappers or steel plate.
Described gap is not less than 100mm.
Described diameter progressive screw is comprised of wide section and thin diameter section, and the hand of spiral of described wide section and thin diameter section is contrary, and the diameter of wide section is than the large 2mm of the diameter of thin diameter section.
Described main joist is two steel pipes, and described secondary joist is batten.
The overlapping shear wall construction method that adopts described overlapping shear wall formwork system, step is as follows:
Step 1, first builds the reinforcing bar binding of shear wall sheet;
Step 2, first builds installing of shear wall sheet concrete blinding, and the PVC sleeve pipe of the mounting end band short thread sleeve of holing in the template position of passing through at diameter progressive screw;
Step 3, builds the concrete of first building shear wall sheet;
Step 4, reaches after form removal condition until first building shear wall sheet, formerly builds the outside of shear wall sheet the removable inner formword connecting as one with load bar, connector is installed;
Step 5, wears diameter progressive screw from first building in the PVC sleeve pipe of shear wall sheet, twists counterclockwise diameter progressive screw, makes in the long thread sleeve on its connector that enters removable inner formword, and makes its termination equal with the outermost of long thread sleeve;
Step 6, completes after fixing on connector of all diameter progressive screws on whole face die plate, pins each diameter progressive screw clockwise shearing, makes diameter progressive screw start to enter short thread sleeve, and by along each diameter progressive screw of twisting counterclockwise, completes the rectification of template position;
Step 7, the reinforcing bar of colligation after-pouring shear wall sheet;
Step 8, the exterior sheathing of installation after-pouring shear wall sheet;
Step 9, installs isometrical screw rod, and regulates exterior sheathing position that all isometrical screw rods are all screwed in the connector on removable inner formword, and by complete the rectification of after-pouring shear wall sheet thickness along counterclockwise isometrical screw rod;
Step 10, builds the concrete of after-pouring shear wall sheet;
Step 11, after reaching form removal condition, makes it exit successively connector and after-pouring shear wall sheet to the isometrical screw rod of inner rotary;
Step 12, the exterior sheathing of dismounting after-pouring shear wall sheet;
Step 13, evenly twisting diameter progressive screw departs from the removable inner formword of after-pouring shear wall sheet and after-pouring shear wall sheet side counterclockwise, and when removable inner formword departs from after after-pouring shear wall sheet completely, diameter progressive screw and short thread sleeve are threaded off;
Step 14, reverse rotation diameter progressive screw make its with removable inner formword on connector disengaging;
Step 15, proposes the composite member of load bar, connector and removable inner formword from body of wall top by hanging device.
Compared with prior art the present invention has following characteristics and beneficial effect:
The connector being formed by terrace with edge shape contiguous block and the long thread sleeve that is positioned at terrace with edge shape contiguous block center by band is set, guaranteed in the installation and removal process of inner formword without stitching interior operation, when realization is reliable fixing, simplify working programme, lower difficulty of construction.
Isometrical screw rod by employing with clamp, in fixing inner side template, has realized fixing to exterior sheathing, has cancelled the support system of exterior sheathing, has simplified work progress, and has been convenient to the adjustment of template and correction.
By employing, with the diameter progressive screw of anti-silk and the PVC sleeve pipe of end band short thread sleeve, only need be twisted diameter progressive screw and can realize cleverly the fixing of inner formword and depart from, operation is simple, accurate positioning, the convenient template position of adjusting.
By having adopted such as plank, steel plate or bamboo clappers etc. have certain lateral strength as inner formword, can guarantee the smooth and good construction quality of after-pouring shear wall sheet inwall.
The present invention can be widely used in the construction of overlapping shear wall.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention will be further described in detail.
Fig. 1 is template installation schematic diagram.
Fig. 2 is diameter progressive screw detail drawing.
Fig. 3 is isometrical screw rod detail drawing.
Fig. 4 is connector detail drawing.
Fig. 5 is the right view of Fig. 4.
Fig. 6 is form removal procedure chart.
Fig. 7 is fixedly detail drawing of inner formword.
Reference numeral: 1-first builds shear wall sheet, 2-after-pouring shear wall sheet, the removable inner formword of 3-, 4-exterior sheathing, 5-load bar, 6-diameter progressive screw, 6.1-wide section, 6.2-thin diameter section, the isometrical screw rod of 7-, 8-PVC sleeve pipe, 9-clamp, 10-main joist, 11-secondary joist, 12-deformation joint, 13-connector, 13.1-terrace with edge shape contiguous block, 13.2-long thread sleeve, 14-short thread sleeve, 15-bolt.
The specific embodiment
Embodiment is referring to shown in Fig. 1 to Fig. 5, a kind of overlapping shear wall formwork system, for formerly building the side of shear wall sheet 1, build after-pouring shear wall sheet 2, described first building between shear wall sheet 1 and after-pouring shear wall sheet 2 is reserved with gap 12, comprise exterior sheathing 4, drawknot device, secondary joist 11 and main joist 10, described exterior sheathing 4 is arranged on the lateral surface of after-pouring shear wall sheet 2, be close to exterior sheathing 4 and be provided with secondary joist 11, perpendicular to secondary joist 11, be provided with main joist 10, it is characterized in that: also comprise removable inner formword 3, described removable inner formword 3 is arranged on gap 12 near after-pouring shear wall sheet 2 inner wall positions, its back side is arranged at intervals with load bar 5, described removable inner formword 3 and exterior sheathing 4 are by drawknot device drawknot, described drawknot device comprises diameter progressive screw 6, isometrical screw rod 7 and connector 13, described connector 13 is fixed on load bar 5 by bolt 15, on described isometrical screw rod 7, be provided with clamp 9, described isometrical screw rod 7 passes exterior sheathing 4 and removable inner formword 3 successively from secondary joist 11 external surfaces, screw in connector 13, clamp 9 on it fixes at main joist 10 external surfaces, described diameter progressive screw 6 stretches in connector 13 through first building shear wall sheet 1 its end.
Described connector 3 is by junction plate 13.1, form through long thread sleeve 13.2 and the stiffening rib 13.3 at junction plate 13.1 centers, described stiffening rib 13.3 is radial and is arranged in the angle that long thread sleeve 13.2 and junction plate 13.1 end faces form, and the length that described long thread sleeve 13.2 exposes junction plate 13.1 bottom surfaces equates with the thickness of load bar 5.
Described long thread sleeve 13.2 diameters are not less than 16mm, and the base length of described terrace with edge shape contiguous block 13.1 is not less than 200mm.
The described shear wall sheet 1 of first building is embedded with the PVC sleeve pipe 8 of end band short thread sleeve 14 by position at isometrical screw rod 7.
Described removable inner formword 3 is plank, bamboo clappers or steel plate.
Described gap 12 is not less than 100mm.
Described diameter progressive screw 6 is comprised of wide section 6.1 and thin diameter section 6.2, and the hand of spiral of described wide section 6.1 and thin diameter section 6.2 is contrary, and the diameter of wide section 6.1 is than the large 2mm of the diameter of thin diameter section 6.2.
Described main joist 10 is two steel pipes, and described secondary joist 11 is batten.
The overlapping shear wall construction method that adopts described overlapping shear wall formwork system, referring to Fig. 1, Fig. 6 and Fig. 7, step is as follows:
Step 1, first builds the reinforcing bar binding of shear wall sheet 1;
Step 2, first builds installing of shear wall sheet 1 concrete blinding, and the PVC sleeve pipe 8 of the mounting end band short thread sleeve 14 of holing in the template position of passing through at diameter progressive screw 6;
Step 3, builds the concrete of first building shear wall sheet 1;
Step 4, reaches after form removal condition until first building shear wall sheet 1, formerly builds the outside of shear wall sheet 1 the removable inner formword 3 connecting as one with load bar 5, connector 13 is installed;
Step 5, wears diameter progressive screw 6 from first building in the PVC sleeve pipe 8 of shear wall sheet 1, twists counterclockwise diameter progressive screw 6, makes in the long thread sleeve 13.2 on its connector that enters removable inner formword 3 13, and makes its termination equal with the outermost of long thread sleeve 13.2;
Step 6, complete after fixing on connector 13 of all diameter progressive screws 6 on whole face die plate, pin each diameter progressive screw 6 clockwise shearings, make diameter progressive screw 6 start to enter short thread sleeve 14, and by along twisting counterclockwise each diameter progressive screw 6, complete the rectification of template position;
Step 7, the reinforcing bar of colligation after-pouring shear wall sheet 2;
Step 8, the exterior sheathing 4 of installation after-pouring shear wall sheet 2;
Step 9, installs isometrical screw rod 7, and regulates exterior sheathing 4 positions that all isometrical screw rods 7 are all screwed in the connector 13 on removable inner formword 3, and by complete the rectification of after-pouring shear wall sheet 2 thickness along counterclockwise isometrical screw rod 7;
Step 10, builds the concrete of after-pouring shear wall sheet 2;
Step 11, after reaching form removal condition, makes it exit successively connector 13 and after-pouring shear wall sheet 2 to the isometrical screw rod 7 of inner rotary;
Step 12, the exterior sheathing 4 of dismounting after-pouring shear wall sheet 2;
Step 13, evenly twisting diameter progressive screw 6 departs from the removable inner formword 3 of after-pouring shear wall sheet 2 and after-pouring shear wall sheet 2 sides counterclockwise, and when removable inner formword 3 departs from after after-pouring shear wall sheet 2 completely, diameter progressive screw 6 is threaded off with short thread sleeve 14;
Step 14, reverse rotation diameter progressive screw 6 make its with removable inner formword 3 on connector 13 disengagings;
Step 15, proposes the composite member of load bar 5, connector 13 and removable inner formword 3 from body of wall top by hanging device.
Claims (8)
1. the overlapping shear wall construction method of an overlapping shear wall formwork system, it is characterized in that: described overlapping shear wall formwork system, for formerly building the side of shear wall sheet (1), build after-pouring shear wall sheet (2), described first building between shear wall sheet (1) and after-pouring shear wall sheet (2) is reserved with gap (12), comprise exterior sheathing (4), drawknot device, secondary joist (11) and main joist (10), described exterior sheathing (4) is arranged on the lateral surface of after-pouring shear wall sheet (2), be close to exterior sheathing (4) and be provided with secondary joist (11), perpendicular to secondary joist (11), be provided with main joist (10), also comprise removable inner formword (3), described removable inner formword (3) is arranged on gap (12) near after-pouring shear wall sheet (2) inner wall position, its back side is arranged at intervals with load bar (5), described removable inner formword (3) and exterior sheathing (4) are by drawknot device drawknot, described drawknot device comprises diameter progressive screw (6), isometrical screw rod (7) and connector (13), described connector (13) is fixed on load bar (5) by bolt (15), on described isometrical screw rod (7), be provided with clamp (9), described isometrical screw rod (7) passes exterior sheathing (4) and removable inner formword (3) successively from secondary joist (11) external surface, screw in connector (13), clamp on it (9) fixes at main joist (10) external surface, described diameter progressive screw (6) stretches in connector (13) through first building its end of shear wall sheet (1),
Described overlapping shear wall construction method step is as follows:
Step 1, first builds the reinforcing bar binding of shear wall sheet (1);
Step 2, first builds installing of shear wall sheet (1) concrete blinding, and the PVC sleeve pipe (8) of the mounting end band short thread sleeve (14) of holing in the template position of passing through at diameter progressive screw (6);
Step 3, builds the concrete of first building shear wall sheet (1);
Step 4, reaches after form removal condition until first building shear wall sheet (1), formerly builds the outside of shear wall sheet (1) the removable inner formword (3) connecting as one with load bar (5), connector (13) is installed;
Step 5, from first building in the PVC sleeve pipe (8) of shear wall sheet (1), wear diameter progressive screw (6), twist counterclockwise diameter progressive screw (6), make in the long thread sleeve (13.2) on its connector that enters removable inner formword (3) (13), and make its termination equal with the outermost of long thread sleeve (13.2);
Step 6, complete after fixing on connector (13) of all diameter progressive screws (6) on whole face die plate, pin each diameter progressive screw (6) clockwise shearing, make diameter progressive screw (6) start to enter short thread sleeve (14), and by along twisting counterclockwise each diameter progressive screw (6), complete the rectification of template position;
Step 7, the reinforcing bar of colligation after-pouring shear wall sheet (2);
Step 8, the exterior sheathing (4) of installation after-pouring shear wall sheet (2);
Step 9, isometrical screw rod (7) is installed, and regulate exterior sheathing (4) position that all isometrical screw rods (7) are all screwed in the connector (13) on removable inner formword (3), and by complete the rectification of after-pouring shear wall sheet (2) thickness along counterclockwise isometrical screw rod (7);
Step 10, builds the concrete of after-pouring shear wall sheet (2);
Step 11, after reaching form removal condition, makes it exit successively connector (13) and after-pouring shear wall sheet (2) to the isometrical screw rod of inner rotary (7);
Step 12, the exterior sheathing (4) of dismounting after-pouring shear wall sheet (2);
Step 13, evenly twisting diameter progressive screw (6) departs from the removable inner formword (3) of after-pouring shear wall sheet (2) and after-pouring shear wall sheet (2) side counterclockwise, when removable inner formword (3) departs from after after-pouring shear wall sheet (2) completely, diameter progressive screw (6) is threaded off with short thread sleeve (14);
Step 14, reverse rotation diameter progressive screw (6) make its with removable inner formword (3) on connector (13) disengaging;
Step 15, proposes the composite member of load bar (5), connector (13) and removable inner formword (3) from body of wall top by hanging device.
2. the overlapping shear wall construction method of overlapping shear wall formwork system according to claim 1, it is characterized in that: described connector (3) is by junction plate (13.1), form through long thread sleeve (13.2) and the stiffening rib (13.3) at junction plate (13.1) center, described stiffening rib (13.3) is radial and is arranged in the angle that long thread sleeve (13.2) and junction plate (13.1) end face form, and the length that described long thread sleeve (13.2) exposes junction plate (13.1) bottom surface equates with the thickness of load bar (5).
3. the overlapping shear wall construction method of overlapping shear wall formwork system according to claim 2, is characterized in that: described long thread sleeve (13.2) diameter is not less than 16mm, and the base length of described junction plate (13.1) is not less than 200mm.
4. the overlapping shear wall construction method of overlapping shear wall formwork system according to claim 1 and 2, is characterized in that: the described shear wall sheet (1) of first building is embedded with the PVC sleeve pipe (8) of end band short thread sleeve (14) by position at isometrical screw rod (7).
5. the overlapping shear wall construction method of overlapping shear wall formwork system according to claim 1 and 2, is characterized in that: described removable inner formword (3) is plank, bamboo clappers or steel plate.
6. the overlapping shear wall construction method of overlapping shear wall formwork system according to claim 1 and 2, is characterized in that: described gap (12) are not less than 100mm.
7. the overlapping shear wall construction method of overlapping shear wall formwork system according to claim 1 and 2, it is characterized in that: described diameter progressive screw (6) is comprised of wide section (6.1) and thin diameter section (6.2), the hand of spiral of described wide section (6.1) and thin diameter section (6.2) is contrary, and the diameter of wide section (6.1) is than the large 2mm of diameter of thin diameter section (6.2).
8. the overlapping shear wall construction method of overlapping shear wall formwork system according to claim 1 and 2, is characterized in that: described main joist (10) is two steel pipes, and described secondary joist (11) is batten.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210333738.0A CN102828615B (en) | 2012-09-11 | 2012-09-11 | Pattern plate system of overlapped shear wall and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210333738.0A CN102828615B (en) | 2012-09-11 | 2012-09-11 | Pattern plate system of overlapped shear wall and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102828615A CN102828615A (en) | 2012-12-19 |
CN102828615B true CN102828615B (en) | 2014-10-01 |
Family
ID=47331907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210333738.0A Expired - Fee Related CN102828615B (en) | 2012-09-11 | 2012-09-11 | Pattern plate system of overlapped shear wall and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102828615B (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106003367B (en) * | 2016-07-07 | 2019-09-27 | 泰州市梦之谷科技发展有限公司 | The method of interior external mold mold production environmental protection equipment |
CN107419869B (en) * | 2017-05-11 | 2020-05-22 | 深圳海外装饰工程有限公司 | Mounting method and mounting structure of wall panel |
CN108560732B (en) * | 2018-03-21 | 2023-08-01 | 中国建筑股份有限公司 | Outer wall connecting piece, outer wall system and construction method of outer wall system |
CN108824676B (en) * | 2018-09-11 | 2023-08-15 | 上海宝岳住宅工业有限公司 | Bottom joint structure of double-sided superimposed shear wall and installation construction method thereof |
CN110735528A (en) * | 2019-03-21 | 2020-01-31 | 孔祥利 | template for pouring sandwich plate in situ and mounting method |
CN110029813B (en) * | 2019-05-16 | 2023-06-20 | 江西国金建设集团有限公司 | Wall formwork construction method at deformation joint |
CN110836007A (en) * | 2019-10-29 | 2020-02-25 | 江苏兴厦建设工程集团有限公司 | Double-shear wall template system at deformation joint and mounting and dismounting method thereof |
CN113818684A (en) * | 2021-09-23 | 2021-12-21 | 上海建工七建集团有限公司 | Shear wall template system and using method thereof |
CN113931447B (en) * | 2021-11-17 | 2023-05-02 | 广东天凛高新科技有限公司 | Telescopic template pull rod mechanism |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1594781A (en) * | 1978-04-07 | 1981-08-05 | Kyoshin Sangyo Co Ltd | Concrete mould fastening device |
US4936540A (en) * | 1989-02-13 | 1990-06-26 | Boeshart Patrick E | Tie for concrete forms |
US5332189A (en) * | 1992-11-12 | 1994-07-26 | Tseng Cheng Tzu | Fastener of construction moldboard |
JP3867870B2 (en) * | 1997-03-24 | 2007-01-17 | 裕保 大岡 | Separator with extraction assisting member, cone with notch step and separator seat with notch step |
JP2002115396A (en) * | 2000-10-04 | 2002-04-19 | Yoshio Gunji | Reinforcing bar fixing separator |
JP2008127897A (en) * | 2006-11-22 | 2008-06-05 | Yoshiyuki Hayakawa | Mold holder, construction method of concrete structure using mold holder, and concrete structure constructed by the method |
CN201013082Y (en) * | 2006-11-24 | 2008-01-30 | 刘永恒 | Turnover connecting piece for building formwork system |
CN101349106A (en) * | 2008-08-26 | 2009-01-21 | 江苏南通二建集团有限公司 | Dual-shear force wall deformation slit formwork |
-
2012
- 2012-09-11 CN CN201210333738.0A patent/CN102828615B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN102828615A (en) | 2012-12-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102828615B (en) | Pattern plate system of overlapped shear wall and construction method thereof | |
CN103114717B (en) | A kind of both sides, shrinkage joint shear wall formwork system | |
CN205100547U (en) | A stupefied device of aluminum alloy template back of body for shear force wall | |
CN108340474A (en) | A kind of precast prestressed concrete exterior wall cladding process units and production installation method | |
CN205444456U (en) | Precast concrete lotus root roof beam rebar positioning board | |
CN105089192A (en) | Dismountable bottom formwork steel bar truss floor support plate and assembling method of dismountable bottom formwork steel bar truss floor support plate | |
CN204626966U (en) | A kind of deformation joint formwork erection device | |
CN205476065U (en) | Full assembled steel - precast concrete floor combination beam | |
CN217353554U (en) | Reinforcing mechanism of building peripheral boundary beam side template | |
CN201671339U (en) | Fixing device for wall bodies and beam column templates of buildings | |
CN211774410U (en) | Inspection shaft chute typical forms | |
CN210152254U (en) | Building deformation joint unilateral formwork setting template | |
CN205088861U (en) | Heat preservation wallboard connection structure | |
CN204781520U (en) | Detachable die block steel bar truss building carrier plate | |
KR101057551B1 (en) | Pillar formwork | |
CN103882840A (en) | Surge shaft cast-in-place concrete mountable formwork support and mounting method thereof | |
CN212224611U (en) | Shear force wall pouring template reinforcing apparatus | |
CN208759764U (en) | A kind of precast prestressed concrete exterior wall cladding process units | |
CN107060332B (en) | Unilateral Screw arbor with nut at both-ends system | |
CN207757815U (en) | The dies plate tap structure of Precast T-Beam | |
CN209353701U (en) | The constructing device of the hole to be provided of concrete structure | |
CN212053245U (en) | Embedded part for wall | |
CN206545269U (en) | The beam prefabricated floor connection structure of full assembled steel | |
CN2581619Y (en) | Building wood form clamp | |
CN203795856U (en) | Installation structure of shaping combination formwork |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141001 Termination date: 20170911 |
|
CF01 | Termination of patent right due to non-payment of annual fee |