CN102828489A - System for arranging piles to fix riverbed main stream - Google Patents

System for arranging piles to fix riverbed main stream Download PDF

Info

Publication number
CN102828489A
CN102828489A CN201210259899XA CN201210259899A CN102828489A CN 102828489 A CN102828489 A CN 102828489A CN 201210259899X A CN201210259899X A CN 201210259899XA CN 201210259899 A CN201210259899 A CN 201210259899A CN 102828489 A CN102828489 A CN 102828489A
Authority
CN
China
Prior art keywords
stake
riverbed
main flow
flow
suspension cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210259899XA
Other languages
Chinese (zh)
Other versions
CN102828489B (en
Inventor
杨俊柏
彭静
任江龙
杨乐乐
张逸潇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Institute of Water Resources and Hydropower Research
Original Assignee
China Institute of Water Resources and Hydropower Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Institute of Water Resources and Hydropower Research filed Critical China Institute of Water Resources and Hydropower Research
Priority to CN201210259899.XA priority Critical patent/CN102828489B/en
Publication of CN102828489A publication Critical patent/CN102828489A/en
Application granted granted Critical
Publication of CN102828489B publication Critical patent/CN102828489B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The invention discloses a system for arranging piles to fix a riverbed main stream, which can dredge flood, prevent rivers from swinging, enable channel main stream not to scour both sides of the river channel, prevent scouring and caving the river bank, and relive or even relieve flood prevention pressure to the both sides of the river channel. A row of upstream fixing piles is arranged on the upstream of the direction reach needing governance, and a row of downstream fixing piles is arranged on the downstream of the river reach; and a determined quantity of turbulence piles are arranged on the river channel according to determined row distance and line distance.

Description

The system of riverbed main flow is decided in the pendulum stake
Technical field
The invention belongs to the technical field of river regulation and flood protection works, relate to particularly and a kind ofly put stake and decide the system of riverbed main flow.
Background technology
In the more section of the middle and lower reaches silt in river, general cross-section face width is shallow, and current are at random, and major trough amplitude of fluctuation and swing speed are all very big; The river gesture changes violent, causes going around of riverbed, when being in strong alluvial state; The riverbed can constantly be raised, and aggravation is washed away the riverbank, and embankment can destroy by rush of water when serious; Cause big flood, and cause the waterlogging and the salination in area along the river, bring on a disaster for the littoral common people or the tremendous economic loss.
In the practice process of flood control and disaster reduction; The engineering measure that present stage dredges flood mainly relies on the thought of " returning "; Promptly build flood wall in the two sides, riverbed, the stability on the height of raising two sides, riverbed, shock strength and basis etc. are returned flood in the Shu Zaiyuan river course.But in the river, the shifting bed in downstream, the main flow of flood often changes to the position of washing away on riverbank, this has just caused very big difficulty to flood control.
When current are run into the pile of pendulum in the korneforos; Will produce reflexion and scour flow, reflexion and scour flow will produce disturbance to the bed material of pile foundation certain limit, and the flow velocity in the certain limit is higher than other parts around the stake because the existence of stake makes; Therefore can the bed material of disturbance be sent to downstream; And around stake, forming a low-lying scour hole, the scour hole that array pitch layout pile formed between utilization was certain links together and can form a low-lying main stem, reaches the purpose of guiding main flow and river training.
According to as above principle; For a change the river is in the going around property in middle and lower reaches alluvial plain district; Propose the pendulum stake and decide the riverbed mainstream technology; Make channel thread confirm certain position artificially, do not repulse or subdue the enemy the two sides, river course, and then prevent washing away, preventing collapse on the bank, alleviate even eliminate the pressure of flood of two sides, river course the riverbank at main stem.
Summary of the invention
Technology of the present invention is dealt with problems and is: overcome the deficiency of prior art, provide a kind of and dredge flood, prevent river swing, make channel thread not repulse or subdue the enemy the two sides, river course and then prevent the system of riverbed main flow is decided in the pendulum stake of the pressure of flood of washing away, prevent collapse on the bank, alleviate even eliminate the two sides, river course on riverbank.
Technical solution of the present invention is: the system of riverbed main flow is decided in this pendulum stake, and delegation's upper reaches spud pile is set at the upper reaches of section, and delegation's downstream spud pile is set in the downstream of section, the flow-disturbing stake of arranging specified quantity according to nominated bank's distance and row distance at the place, riverbed.
Because delegation's upper reaches spud pile is set at the upper reaches of section; Delegation's downstream spud pile is set in the downstream of section, and according to nominated bank's distance and the flow-disturbing stake of row apart from the layout specified quantity, the flow-disturbing stake strengthens the peripheral water flow velocity of stake at the place, riverbed; Wash away local riverbed, make the riverbed incision.When current are run into the flow-disturbing stake of pendulum in the riverbed; Will produce reflexion and scour flow; The interior flow velocity of certain limit is higher than other parts around making the flow-disturbing stake; Therefore can the bed material of disturbance be sent to downstream; And form a low-lying scour hole around the flow-disturbing stake, utilize certain between array pitch arrange that continuous scour hole that the flow-disturbing stake forms can make the riverbed at the position of having arranged the flow-disturbing stake reduce and becomes main stem, reach and dredge flood, prevent the river swing, make channel thread not repulse or subdue the enemy the two sides, river course and then prevent washing away, preventing collapse on the bank, alleviate even eliminate the purpose of the pressure of flood of two sides, river course the riverbank.
Description of drawings
Fig. 1 shows the vertical view that the system of riverbed main flow is decided in pendulum stake according to the present invention;
Fig. 2 shows the front view that the system of riverbed main flow is decided in pendulum stake according to the present invention.
The specific embodiment
Shown in Fig. 1-2; The system of riverbed main flow is decided in this pendulum stake, and delegation's upper reaches spud pile is set at the upper reaches of section, and delegation's downstream spud pile is set in the downstream in river; 6 places are according to nominated bank's distance and the flow-disturbing stake of row apart from the layout specified quantity in the riverbed; The flow-disturbing stake strengthens the peripheral water flow velocity of stake, washes away local riverbed, makes the riverbed incision and forms the following passage of letting out of riverbed main flow.
Because delegation's upper reaches spud pile is set at the upper reaches of section; Delegation's downstream spud pile is set in the downstream of section; The flow-disturbing stake of arranging specified quantity according to nominated bank's distance and row distance at the place, riverbed; Thereby the flow-disturbing stake makes the riverbed incision form the following passage of letting out of riverbed main flow; When current are run into the flow-disturbing stake of pendulum in the riverbed, will produce reflexion and scour flow, make that the flow velocity in the certain limit is higher than other parts around the flow-disturbing stake; Therefore can the bed material of disturbance be sent to downstream; And form a low-lying scour hole around the flow-disturbing stake, utilize certain between array pitch arrange that continuous scour hole that the flow-disturbing stake forms can make the riverbed at the position of having arranged the flow-disturbing stake reduce and becomes main stem, reach and dredge flood, prevent the river swing, make channel thread not repulse or subdue the enemy the two sides, river course and then prevent washing away, preventing collapse on the bank, alleviate even eliminate the purpose of the pressure of flood of two sides, river course the riverbank.
Preferably, this system also comprises a plurality of internal fixation stakes 4 that are located at the place, riverbed.Upstream and downstream spud pile and internal fixation stake adopt buried depth to fix, and usefulness should adopt lanyard between stake and the stake, also can buried depth add lanyard or buried depth is fixed.The buried depth fibrous root of stake, also can rule of thumb be confirmed through calculating or test is confirmed according to the amount of water to be discharged in river, bed material size size etc.The implantation mode of described stake is good with modes such as prefabricated back use piling, also can be cast in situs.
Preferably, nominated bank's distance, specify columns distance are respectively according to S 1=4:8D, S 2=5:10D calculates,
S wherein 1Be line-spacing, S 2Be the row distance, D is the projection width of stake at upstream face.Further, nominated bank is apart from being 3-15 rice, and the specify columns distance is a 2-10 rice.The array pitch fibrous root, also can rule of thumb be confirmed through calculating or test is confirmed according to the concrete form in the diameter (area of cross section) of stake, former river, amount of water to be discharged, flow velocity, bed material size size etc. between concrete layout scope, stake.
Preferably, the quantity of stake is confirmed according to the concrete form in river, letdown flow etc.The diameter (basal area) of said stake needs the form, amount of water to be discharged according to the river etc. through calculating or test is confirmed, also can rule of thumb confirm.Stake is the diameter D of stake in the projection width of upstream face; Confirm according to
Figure BDA00001929124000041
; Wherein B is for needing the logical main flow width in whole river
The total line number and the columns of stake are:
N 1 = L S 1 , N 2 = B S 2
N wherein 1Be line number, N 2Be columns, L is for needing the section length of arrangement.
Preferably, said stake (upper reaches spud pile, internal fixation stake, downstream spud pile, flow-disturbing stake) is plastics stake, bamboo stake, timber, concrete pile, iron stake or matrix modification stake etc.
Preferably, said stake (upper reaches spud pile, internal fixation stake, downstream spud pile, flow-disturbing stake) is hollow pile or solid pile.
Preferably, the cross section of said stake (upper reaches spud pile, internal fixation stake, downstream spud pile, flow-disturbing stake) is circle, square, rectangle or polygon.
Preferably, as shown in Figure 2, this system also is provided with the vertically fixing suspension cable 5 that connects upper reaches spud pile 1, internal fixation stake 4, downstream spud pile 2, flow-disturbing stake 3 through the flow-disturbing stake fixedly suspension cable be fixed to vertical fixedly suspension cable.
Preferably, vertically fixedly arranging the crosswise fixed suspension cable between the suspension cable 5.
Preferably, said suspension cable is antiseptic and rustproof cable wire.
Preferably, the cross section of said suspension cable determines through calculating according to the intensity of bed knife and cord material.The area of the cross section of said suspension cable is according to computes,
F = N ρ v 2 hD f
Wherein F is the sectional area of suspension cable; ρ is the unit weight of water; V is the flow velocity of water; H is a maximum water depth; D is the diameter of stake or in upstream face projection width, and N is that suspension cable connected a stake is with number; F is the suspension cable strength of materials.
Concrete job practices is: in the river course scope that natural river course is artificially confirmed; Utilize upper reaches spud pile 1 and downstream spud pile 2 and internal fixation stake 4 in the river course of needs dredging upper and lower fixing vertical suspension cable 5; According to the diameter of the flow-disturbing stake 3 of field by using, confirm flow-disturbing stake 3 array pitch and the spacing vertical and river course of road upstream and downstream along the river, after 3 of flow-disturbing stakes, array pitch are definite; Utilize the flow-disturbing stake fixedly suspension cable the flow-disturbing stake is fixed in vertically fixedly on the suspension cable 5; For guaranteeing vertically the fixedly spacing of suspension cable 5, vertically fixedly arranging the crosswise fixed suspension cable between suspension cable, the stake layout is accomplished descendant worker channel thread is caused pendulum stake district, river course.
The above; It only is preferred embodiment of the present invention; Be not that the present invention is done any pro forma restriction, every foundation technical spirit of the present invention all still belongs to the protection domain of technical scheme of the present invention to any simple modification, equivalent variations and modification that above embodiment did.

Claims (10)

1. the system of riverbed main flow is decided in the pendulum stake; It is characterized in that: delegation's upper reaches spud pile (1) is set at the upper reaches of section; Delegation's downstream spud pile (2) is set, the flow-disturbing stake (3) of arranging specified quantity according to nominated bank's distance and row distance at the place, riverbed in the downstream of section.
2. the system of riverbed main flow is decided in pendulum stake according to claim 1, it is characterized in that: also comprise a plurality of internal fixation stakes (4) that are located at the place, riverbed.
3. the system of riverbed main flow is decided in pendulum stake according to claim 1, it is characterized in that: nominated bank's distance, specify columns distance are respectively according to S 1=4:8D, S 2=5:10D calculates,
S wherein 1Be line-spacing, S 2Be the row distance, D is the projection width of stake at upstream face.
4. the system of riverbed main flow is decided in pendulum stake according to claim 1; It is characterized in that: stake is the diameter D of stake in the projection width of upstream face; Confirm according to
Figure FDA00001929123900011
; Wherein B is for needing the logical main flow width in whole river
The total line number and the columns of stake are:
N 1 = L S 1 , N 2 = B S 2
N wherein 1Be line number, N 2Be columns, L is for needing the section length of arrangement.
5. the system of riverbed main flow is decided in each described pendulum stake according to claim 1-4, and it is characterized in that: said stake is plastics stake, bamboo stake, timber, concrete pile, iron stake or matrix modification stake.
6. the system of riverbed main flow is decided in each described pendulum stake according to claim 1-4, and it is characterized in that: said stake is hollow pile or solid pile.
7. the system of riverbed main flow is decided in each described pendulum stake according to claim 1-4, and it is characterized in that: the cross section of said stake is circle, square, rectangle or polygon.
8. the system of riverbed main flow is decided in pendulum stake according to claim 2; It is characterized in that: also be provided with the vertically fixing suspension cable (5) that connects upper reaches spud piles (1), internal fixation stake (4), downstream spud pile (2), flow-disturbing stake (3) through the flow-disturbing stake fixedly suspension cable be fixed to vertical fixedly suspension cable.
9. the system of riverbed main flow is decided in pendulum stake according to claim 8, it is characterized in that: vertically fixedly arranging the crosswise fixed suspension cable between the suspension cable (5).
According to Claim 8 or the stake of 9 described pendulum decide the system of riverbed main flow, it is characterized in that: the area of the cross section of said suspension cable is according to computes,
F = N ρ v 2 hD f
Wherein F is the sectional area of suspension cable; ρ is the unit weight of water; V is the flow velocity of water; H is a maximum water depth; D is the diameter of stake or in upstream face projection width, and N is that suspension cable connected a stake is with number; F is the suspension cable strength of materials.
CN201210259899.XA 2012-07-25 2012-07-25 System for arranging piles to fix riverbed main stream Expired - Fee Related CN102828489B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210259899.XA CN102828489B (en) 2012-07-25 2012-07-25 System for arranging piles to fix riverbed main stream

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210259899.XA CN102828489B (en) 2012-07-25 2012-07-25 System for arranging piles to fix riverbed main stream

Publications (2)

Publication Number Publication Date
CN102828489A true CN102828489A (en) 2012-12-19
CN102828489B CN102828489B (en) 2015-07-22

Family

ID=47331781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210259899.XA Expired - Fee Related CN102828489B (en) 2012-07-25 2012-07-25 System for arranging piles to fix riverbed main stream

Country Status (1)

Country Link
CN (1) CN102828489B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264626A (en) * 2014-09-02 2015-01-07 中国水利水电科学研究院 Structure for controlling and guiding river regime and stabilizing river mainstream
CN108166446A (en) * 2018-03-22 2018-06-15 黄河勘测规划设计有限公司 Rivers side bank hole tubular type energy dissipating bank protection
CN115467290A (en) * 2022-10-25 2022-12-13 成都市市政工程设计研究院有限公司 Ecological bed fixing piece, testing device and testing method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003129437A (en) * 2001-10-19 2003-05-08 Shibata Ind Co Ltd Structure for catching flow-down matter and energy absorption in river and mountain stream
CN101824810A (en) * 2010-04-08 2010-09-08 重庆交通大学 Method for protecting river bank by sand-river pile group and flexible mattresses
JP2011089250A (en) * 2009-10-20 2011-05-06 Kazutaka Sugimura Method for accelerating flow-down of sediment accumulated in river and the like
CN102220745A (en) * 2011-02-23 2011-10-19 河海大学 Small and medium straight river longitudinal winding form construction method
CN102535388A (en) * 2010-12-16 2012-07-04 孙利涵 Method and device for treating sediments in riverway by scouring of collected water
CN202899082U (en) * 2012-07-25 2013-04-24 中国水利水电科学研究院 System for defining riverbed mainstream by placing piles

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003129437A (en) * 2001-10-19 2003-05-08 Shibata Ind Co Ltd Structure for catching flow-down matter and energy absorption in river and mountain stream
JP2011089250A (en) * 2009-10-20 2011-05-06 Kazutaka Sugimura Method for accelerating flow-down of sediment accumulated in river and the like
CN101824810A (en) * 2010-04-08 2010-09-08 重庆交通大学 Method for protecting river bank by sand-river pile group and flexible mattresses
CN102535388A (en) * 2010-12-16 2012-07-04 孙利涵 Method and device for treating sediments in riverway by scouring of collected water
CN102220745A (en) * 2011-02-23 2011-10-19 河海大学 Small and medium straight river longitudinal winding form construction method
CN202899082U (en) * 2012-07-25 2013-04-24 中国水利水电科学研究院 System for defining riverbed mainstream by placing piles

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡江: "新疆宽浅游荡型河段防护工程研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》, no. 8, 15 August 2008 (2008-08-15) *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264626A (en) * 2014-09-02 2015-01-07 中国水利水电科学研究院 Structure for controlling and guiding river regime and stabilizing river mainstream
CN108166446A (en) * 2018-03-22 2018-06-15 黄河勘测规划设计有限公司 Rivers side bank hole tubular type energy dissipating bank protection
CN115467290A (en) * 2022-10-25 2022-12-13 成都市市政工程设计研究院有限公司 Ecological bed fixing piece, testing device and testing method thereof
CN115467290B (en) * 2022-10-25 2023-09-01 成都市市政工程设计研究院有限公司 Test method of ecological solid bed part test device

Also Published As

Publication number Publication date
CN102828489B (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN100577920C (en) Drainage system estuary pier bar swirl chamber composite energy dissipation method
CN1318702C (en) Installation for trapping sediment from riverbed and seabed promoting siltation and erosion protection
CN108978578A (en) A kind of control method of Highway in front of the mountains and training dyke based on shunting beam flow theory
CN104234013A (en) Reservoir dam
KR101250185B1 (en) Erosion Control Dam
CN102828489B (en) System for arranging piles to fix riverbed main stream
CN104594290A (en) Soft mattress sinking construction method
CN100347377C (en) Mould bag line curtain and method for preventing falldown of river bank
CN105155464B (en) A kind of kickboard device reinforced that promotees to become silted up for mattress sinking
CN202899082U (en) System for defining riverbed mainstream by placing piles
CN206693187U (en) A kind of spillway structure
CN102561260A (en) Water-permeable waterway improvement spur dike
CN101824809A (en) Large-gradient gravel river bank protective structure and river washout-resistant controlling method thereof
CN203668883U (en) Overhead type wave eliminating view platform structure
CN104264626A (en) Structure for controlling and guiding river regime and stabilizing river mainstream
CN204047317U (en) A kind of ecological management device for falling zone contour cultivation
CN105544462B (en) A kind of river disappears the bank protection method of wave
KR101170789B1 (en) Complex debris barrier of eco-friendly
CN103758080B (en) Overhead type disappears unrestrained sightseeing platform structure
KR101038488B1 (en) Connecting revetment structure using flow velocity reduction device
CN204097961U (en) The structure of river gesture and poised stream main flow is led in a kind of control
CN105256783B (en) Stacked assembly type guide pier structure
CN205116140U (en) Range upon range of assembled diversion pier structure
CN106480853A (en) The ground work sand bowel bag that can be arranged for erosion control with many
CN104612106A (en) Water permeable geotechnical soft mattress structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Yang Junbai

Inventor after: Zhang Guoxin

Inventor after: Ren Jianglong

Inventor after: Cao Wenhong

Inventor after: Yang Lele

Inventor after: Zhang Yixiao

Inventor after: Qiu Xinjiao

Inventor after: Hu Jian

Inventor before: Yang Junbai

Inventor before: Peng Jing

Inventor before: Ren Jianglong

Inventor before: Yang Lele

Inventor before: Zhang Yixiao

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: YANG JUNBAI PENG JING REN JIANGLONG YANG LELE ZHANG YIXIAO TO: YANG JUNBAI ZHANG GUOXIN REN JIANGLONG CAO WENHONG YANG LELE ZHANG YIXIAO QIU XINJIAO HU JIAN

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150722

Termination date: 20170725

CF01 Termination of patent right due to non-payment of annual fee