CN102819776A - Project integrity risk pre-warning system and architecture thereof - Google Patents

Project integrity risk pre-warning system and architecture thereof Download PDF

Info

Publication number
CN102819776A
CN102819776A CN2011101548522A CN201110154852A CN102819776A CN 102819776 A CN102819776 A CN 102819776A CN 2011101548522 A CN2011101548522 A CN 2011101548522A CN 201110154852 A CN201110154852 A CN 201110154852A CN 102819776 A CN102819776 A CN 102819776A
Authority
CN
China
Prior art keywords
risk
clean government
module
government
warning system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101548522A
Other languages
Chinese (zh)
Inventor
宋荣华
刘胜生
罗西干
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN2011101548522A priority Critical patent/CN102819776A/en
Publication of CN102819776A publication Critical patent/CN102819776A/en
Pending legal-status Critical Current

Links

Images

Abstract

A project integrity risk pre-warning system comprises an integrity risk investigating module, a storage module and an analyzing module. The integrity risk investigating module is used by a system user to fill in project integrity risk investigation data. The storage module is used for storing the project integrity risk investigation data input through the integrity risk investigating module. The analyzing module is used for performing integrity analysis to the project integrity risk investigation data in the storage module to generate an analyzing result. The project integrity risk pre-warning system uses information technology and software technology, combines project integrity risk preventing principles and project integrity risk control principles in modern project management fields, is based on informationization, provides a quantitative evaluation result as reference for project integrity risk pre-warning, improves pertinence, effectiveness and scientificalness in project integrity risk preventing, and actually implements pre-preventing, pre-monitoring and pre-resolving to project integrity risks.

Description

Risk-warning system of engineering project clean government and framework thereof
Technical field
The present invention relates to Risk-warning system of engineering project clean government, relate in particular to a kind of framework of the computer information management that combines with modern clean government risk management theory based on the B/S structure.
Background technology
For further strengthening and guard engineering clean government risk; Deployment according to city discipline inspection commission is carried out the clean government's risk job requirement that advances exploration prediction early warning mechanism and guard engineering project with discipline inspection commission of (group) main office; In conjunction with subsidiary/member companies unit's actual conditions, build clean government's Risk-warning management system that a cover combines based on modern infotech means and management theory.
Traditional document instructs and there is following problem in manual statistical management,
1) correlation engineering unit disperses, and related data is gathered difficulty,
2) the gatherer process cycle longer, lack ageing,
3) gatherer process human intervention factor weight is more, and the collection factor not enough science of classifying can not comprehensive examination and evaluation early warning project clean government risk problem
4) analytic process statistics is complicated, is in manual statistical basically, and the statistics form is single, can not concentrated expression project clean government's risk situation and contrast situation, and availability is lower.
Therefore needs and The present computer technology combine; Appliance computer is characteristics and science statistical model calculating principle fast and accurately, gathers risk data quickly and easily, the technical Analysis result of efficiently and accurately; Explore the scientific of project management, normalized aggregative model.
And based on the construction of this system, thereby, adhere to treating both principal and secondary aspect of disease for thoroughly applying the Scientific Outlook on Development; Anti-developing simultaneously punished in the comprehensive regulation, pays attention to the policy of prevention; Further in-depth is punished and the construction of preventing corruption system, strengthens the risk profile early warning of engineering clean government, improves specific aim, validity, the science of the risk prevention of engineering project clean government; Real implementing accomplished to prevent formerly, monitors formerly, dissolved formerly engineering clean government risk, guarantees the engineering high-quality, and the cadre is outstanding
Summary of the invention
In view of deficiency and problem on the traditional mode, technical matters to be solved by this invention is the unfavorable factor that thoroughly changes traditional mode, and the combining information technology is connected means image data fast and accurately, the statistics and analysis data of science with network.The platform that provides a project clean government Risk-warning to analyze is from the decision support of side aid decision making layers such as health degree.
For realizing above-mentioned purpose; One aspect of the invention is Risk-warning system of a kind of engineering project clean government; It is characterized in that, comprising: clean government's risk investigation module, the user of said system fills in engineering clean government risk investigation data through said clean government risk investigation module; Memory module, its storage input is from the said clean government risk investigation data of said clean government risk investigation module; Analysis module, it carries out clean government according to the said clean government risk investigation data in the said memory module analyzes, to generate analysis result.
Among some embodiment, said clean government risk investigation module provides the data typing of the interface of clean government's risk investigation table with convenient said user.
Among some embodiment, Risk-warning system of said clean government comprises test pattern and formal pattern, and wherein said test pattern can carry out continuously, and wherein said formal pattern is reminded user's operating process with the step mode, the standard operation pattern.
Among some embodiment, said analysis module generates analysis result and comprises the risk investigation data generation data drawing list according to clean government.
Among some embodiment, said data drawing list comprises the early warning statistical investigation form, risk analysis reports, comparative analysis chart.
Among some embodiment, Risk-warning system of said engineering project clean government comprises that also the early warning flow process checks module, to browse the standard process of Risk-warning system of whole engineering project clean government.
Among some embodiment, Risk-warning system of said engineering project clean government also comprises the statistical summaries module, and to retrieve test and appraisal data of all formal test and appraisal, the data that view formal test and appraisal are detailed.
Among some embodiment, Risk-warning system of said engineering project clean government also comprises the configuring maintenance module, to carry out data configuration and management maintenance.
Another aspect of the invention is a kind of engineering project clean government Risk-warning framework; Comprise: server; Risk-warning system of operation engineering project as claimed in claim 1 clean government on it; And the port that can visit of open client, Risk-warning system of wherein said engineering project clean government realizes with the Webpage form; At least one client, operation has the browser software that can resolve said system on it; Wherein, connect said server and client side through LAN so that the user of said client via said LAN through the said engineering project cost management of said browser access system.
Among some embodiment, Risk-warning system of said engineering project clean government has set up the framework of the B/S pattern of cross-platform application based on the J2EE standard and through the java software development.
Because the present invention is the statistical study pattern of having used scientific management theory and science fully; Exploring construction with computer technology and network technology as application platform forms; Therefore can make full use of informationalized advantage, realize the effect of digital clean government forewarning management to a certain extent.
Description of drawings
With reference to the description and the accompanying drawing of the current preferred embodiment of hereinafter, can understand the present invention and purpose and advantage best.
Fig. 1 is the structural drawing according to the Risk-warning system of clean government of the embodiment of the invention;
Fig. 2-12 shows the synoptic diagram of each module of Risk-warning system of clean government;
Figure 13 shows the synoptic diagram of configuration management framework.
Embodiment
Referring to the accompanying drawing that the embodiment of the invention is shown, hereinafter will be described a plurality of embodiment of the present invention in more detail.
As shown in Figure 1, comprise clean government's risk investigation module according to the Risk-warning system of engineering project clean government of the embodiment of the invention.The user of said system fills in engineering clean government risk investigation data through said clean government risk investigation module.
Among some embodiment, said clean government risk investigation module provides the data typing of the interface of clean government's risk investigation table with convenient said user.Thus, provide the most convenient and engineering project clean government Risk-warning researching tool science, i.e. clean government's risk investigation table.That is to say that through the system user of authorizing, promptly company manager converts original manual paper-based management statistical work into based on the computer information mode automatic processor system.
Risk-warning system of said engineering project clean government also comprises memory module, and its storage input is from the said clean government risk investigation data of said clean government risk investigation module.The user fills in engineering clean government Risk-warning questionnaire, and these enquiry datas are preserved by said memory module.Database is the example of said memory module.
Risk-warning system of said engineering project clean government also comprises analysis module, and it carries out clean government according to the said clean government risk investigation data in the said memory module analyzes, to generate analysis result.Said memory module is based on the management philosophy and the requirement of clean government's risk; Use software development technique and computer hardware to combine; Can fast automatic fully analysis get access to the engineering project clean government Risk-warning enquiry data that client is sent to, generate various data drawing lists automatically.
Among some embodiment, said data drawing list comprises the early warning statistical investigation form, risk analysis reports, comparative analysis chart etc.
Risk-warning system of said clean government comprises test pattern and formal pattern, and wherein said test pattern can carry out continuously, and wherein said formal pattern is reminded user's operating process with the step mode, the standard operation pattern.The said model program of testing oneself is used to gather clean government's venture analysis data of engineering project body.Simulation is tested oneself and can be carried out continuously, and after the user filled in successfully, whether system can point out the user to proceed or the end simulation test and appraisal.For the difference of test and appraisal mark, system also can point out the user to check the early warning report simultaneously.
Said official testing pattern is reminded user's operating process with the step mode, standard operation pattern, the similar simulation test and appraisal of concrete operations step.
In the preferred embodiment, Risk-warning system of said clean government comprises that also alert flow process checks module, to browse the standard process of Risk-warning system of whole engineering project clean government.It allows user to browse the standard process of Risk-warning system of whole engineering project clean government.Prompting and exposition as management theory and management process.
In the preferred embodiment, Risk-warning system of said clean government also comprises the statistical summaries module, and to retrieve the test and appraisal data of all formal test and appraisal, the data that view formal test and appraisal are detailed.This module mainly comprises report form statistics and test and appraisal retrieval two parts function.
In the preferred embodiment, Risk-warning system of said clean government comprises that also the configuring maintenance module is to carry out data configuration and management maintenance.Said configuring maintenance module comprises administrator module and data configuration module.
Said administrator module mainly provides other operator of customer administrator's level (only administrator role can get into), carries out the work that administers and maintains of engineering project clean government test and appraisal.
The unit that said data configuration module provides the system manager need test and assess for system, engineering project is carried out data configuration and management maintenance with the test and appraisal participant.
Refer now to Fig. 2~12 and describe example in detail according to Risk-warning system of clean government of the present invention.
Overall system function homepage
The function menu of system operation is distributed in the left side of operation interface, comprises early warning flow process, operation instructions, simulation test and appraisal, formal test and appraisal, statistical summaries, keeper, logins these modules again.The user clicks menu, gets into the concrete operations interface of each module, and is as shown in Figure 3.
The early warning flow process is checked
Browse the standard process of Risk-warning system of whole engineering project clean government.As the prompting and the exposition of management theory and management process, as shown in Figure 3.
The simulation test and appraisal
The simulation self-test procedure, the clean government's venture analysis data that are used to gather the engineering project body, concrete steps are following:
1) locates to click selection and need simulate the engineering project of testing oneself on the interface; Click then and begin test and appraisal; The entering simulation problem of testing oneself is rolled up questionnaire and filled in step, and is as shown in Figure 4.
2) questionnaire that fills in questionnaires that is shown in the following figure is filled in and accomplished the back and click to submit to the questionnaire button to accomplish to simulate and test oneself, and is as shown in Figure 5.)
3) after submission is accomplished, system return success interface, the prompting user fills in successfully, and the user can click and check " the engineering project clean government risk assessment score-sheet (two) " that calculates automatically, checks the score that gathers, shown in Fig. 6 and 7.
4) simulation is tested oneself and can be carried out continuously, and after the user filled in successfully, whether system can point out the user to proceed or the end simulation test and appraisal.For the difference of test and appraisal mark, system also can point out the user to check the early warning report simultaneously.
Formal test and appraisal
Remind user's operating process with the step mode, the standard operation pattern, the similar simulation test and appraisal of concrete operations step, as shown in Figure 8
Statistical summaries
This module mainly comprises report form statistics and test and appraisal retrieval two parts function, and is as shown in Figure 9,
Report form statistics: the user clicks the form icon and just directly opens form and check statistics.
1) clean government's risk report
2) project clean government risk profile gathers (table four)
3) project clean government risk rectification Track Table (table five)
The test and appraisal retrieval: the user can retrieve all formal test and appraisal data of testing and assessing through this module, and the data that view formal test and appraisal are detailed
Venture analysis
This module is mainly with the Macro or mass analysis result of the presented clean government risk investigation data of chart, and carries out relevant unit, the icon contrast of related data content.Same user can directly click the icon of the analysis project that is shown in the following figure, and just can directly open analysis diagram, and is shown in figure 10.
The keeper
This module mainly provides other operator of customer administrator's level (only administrator role can get into), carries out the work that administers and maintains of engineering project clean government test and appraisal.The function that here mainly comprises has, and is shown in figure 11:
1) start test and appraisal, the project configuration personnel that the management selection needs test and appraisal click start button then and formally start test and appraisal.Formally test and assess two types of branches of project: common test and appraisal and fast assessing.Fast assessing must once be accomplished, common test and appraisal can the distribution personnel after, select the time voluntarily by the participant and accomplish.
2) personnel revise, and are used to revise participant's administration module
3) finish test and appraisal, directly finish certain test and appraisal of carrying out engineering project
4) restart, the engineering project test and appraisal that finished can restart.
5) delete items, all data of certain certain test and appraisal of engineering project of direct physical deletion.
6) annotate: a project can be carried out three test and appraisal at most.
Data configuration
The unit that this mould provides the system manager need test and assess for system, engineering project is carried out data configuration and management maintenance with the test and appraisal participant, like Figure 12.
1) affiliated unit, the branch office's title under the allocation project project at first configures just further allocation project project information of these organizations.
2) the engineering project body that engineering project, configuration need be tested and assessed need be selected the affiliated unit of technical routine body during configuration project body, if there is not unit optional, please get back to " data management "-" affiliated unit " configuration section, imports.
Personnel configuration, the participant of configuration-system and user, user need the unit of binding or projects, the user can directly be set whether according to being equipped with administrator right here, and the System Privileges management only relates to two types of general user and keepers.
Existing the Risk-warning framework according to engineering project of the present invention clean government described.Said engineering project clean government Risk-warning framework comprises server, Risk-warning system of the aforementioned engineering project of operation clean government on it, and the port that can visit of open client.In the present embodiment, described in Risk-warning system of engineering project clean government realize with the Webpage form.
Said engineering project clean government Risk-warning framework also comprises at least one client, and operation has the browser software that can resolve said system on it.
In the present embodiment, connect said server and client side so that the user of said client via said LAN through the said engineering project of said browser access clean government Risk-warning is through network (LAN/WAN).
Refer now to Figure 13, existing explanation is according to first embodiment of engineering project of the present invention clean government early warning system 100.Shown in figure 13, system 100 comprises server 10 and a plurality of client 20.In the present embodiment, thereby being connected through LAN with a plurality of clients 20, server 10 forms total system 100, so that server 10 can carry out data interaction with client.
The existing setting of describing according to the server 10 of the embodiment of the invention.
At first, the keeper of server 10 installs necessary system running environment software on server:
1) Database Systems: more than the oracle8i
2) Java platform: more than the JDK1.5
3) application server software: more than the tomcat5.X
After above software environment is set up and is accomplished; Management can be disposed Risk-warning system of issue engineering project clean government, and the keeper got into system configuration block configuration system unit, project body after system's issue was accomplished; Contents such as operation user, then system can formally get into disclosed operation operation.More than operating system's mounting list file execution deployment of all installing in the invention product installation kit gets final product.
The client computer that uses as the user in addition continues to install the browser software that can move: recommend more than the IE7.The client user directly uses browser software, according to the operation instructions of user's operation manual, both can land this system, the corresponding function that the using system mandate is open.
Therefore native system is based on the networking version software systems of the foundation of B/S framework, as long as under the condition that networking UNICOM and Service-Port are opened, the client of access network all can directly be used this system of browser access.
In said framework, visit said system through URL, for example, start the IE browser, key in the correct URL address of native system, (http: // < server_ip >: < port >/lzfx), get into native system, as shown in Figure 2.
The foregoing description has following advantage.
(1) because the present invention is the statistical study pattern of having used scientific management theory and science fully; Exploring construction with computer software technology and network technology as application platform forms; Therefore can make full use of informationalized advantage, realize the effect of digital clean government forewarning management to a certain extent;
The system of (2) building based on computer network, the network edition is used, and has solved data acquisition unit and has disperseed, and gathers problems such as difficulty;
(3) input that uses a computer is gathered, and quick and precisely, the human intervention factor is few;
(4) factor index of science classification, more reasonably decomposition analysis project clean government risk situation;
Based on the automatic statistical analysis function of electronic operation, the express-analysis data result generates the statistical graph of all size, aid decision making fast;
(5) combine network to apply, better implement the theory practice that clean government's risk is built, the clean government of enterprise that also is based on new technology simultaneously manages the once successful exploration and practice of building.
Although with reference to certain embodiments spirit of the present invention is detailed, embodiment only is illustrative and unrestricted the present invention.The technician who should be understood that the present technique field can make a change and revise embodiment, and the scope of the present invention and the spirit that do not break away from accompanying claims and disclosed.

Claims (10)

1. a Risk-warning system of engineering project clean government is characterized in that, comprising:
Clean government's risk investigation module, the user of said system fills in engineering clean government risk investigation data through said clean government risk investigation module;
Memory module, its storage input is from the said clean government risk investigation data of said clean government risk investigation module;
Analysis module, it carries out clean government according to the said clean government risk investigation data in the said memory module analyzes, to generate analysis result.
2. engineering project cost management as claimed in claim 1 system is characterized in that, said clean government risk investigation module provides the data typing of the interface of clean government's risk investigation table with convenient said user.
3. Risk-warning system of clean government as claimed in claim 2; It is characterized in that Risk-warning system of said clean government comprises test pattern and formal pattern, wherein said test pattern can carry out continuously; And wherein said formal pattern is reminded user's operating process with the step mode, the standard operation pattern.
4. Risk-warning system of clean government as claimed in claim 1 is characterized in that, said analysis module generates analysis result and comprises the risk investigation data generation data drawing list according to clean government.
5. Risk-warning system of clean government as claimed in claim 4 is characterized in that said data drawing list comprises the early warning statistical investigation form, risk analysis reports, comparative analysis chart.
6. Risk-warning system of clean government as claimed in claim 1 comprises that also the early warning flow process checks module, to browse the standard process of Risk-warning system of whole engineering project clean government.
7. Risk-warning system of clean government as claimed in claim 1 also comprises the statistical summaries module, and to retrieve the test and appraisal data of all formal test and appraisal, the data that view formal test and appraisal are detailed.
8. Risk-warning system of clean government as claimed in claim 1 also comprises the configuring maintenance module, to carry out data configuration and management maintenance.
9. engineering project clean government Risk-warning framework comprises:
Server, Risk-warning system of operation worker's engineering project as claimed in claim 1 clean government on it, and the port that can visit of open client, Risk-warning system of wherein said engineering project clean government realizes with the Webpage form;
At least one client, operation has the browser software that can resolve said system on it; Wherein, connect said server and client side through LAN so that the user of said client via said LAN through the said engineering project cost management of said browser access system.
10. clean government as claimed in claim 9 Risk-warning framework is characterized in that, Risk-warning system of said engineering project clean government has set up the framework of the B/S pattern of cross-platform application based on the J2EE standard and through the java software development.
CN2011101548522A 2011-06-09 2011-06-09 Project integrity risk pre-warning system and architecture thereof Pending CN102819776A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101548522A CN102819776A (en) 2011-06-09 2011-06-09 Project integrity risk pre-warning system and architecture thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101548522A CN102819776A (en) 2011-06-09 2011-06-09 Project integrity risk pre-warning system and architecture thereof

Publications (1)

Publication Number Publication Date
CN102819776A true CN102819776A (en) 2012-12-12

Family

ID=47303884

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101548522A Pending CN102819776A (en) 2011-06-09 2011-06-09 Project integrity risk pre-warning system and architecture thereof

Country Status (1)

Country Link
CN (1) CN102819776A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103489147A (en) * 2013-08-26 2014-01-01 山东浪潮齐鲁软件产业股份有限公司 Platform cross-over type supervisory system
CN105205624A (en) * 2015-10-29 2015-12-30 云南电网有限责任公司昆明供电局 Enterprise probity risk monitoring system
CN109064032A (en) * 2018-08-06 2018-12-21 国网浙江杭州市临安区供电有限公司 The small micro- power honesty risk surveillance managing and control system of power supply station based on enterprise's cloud platform
CN109190893A (en) * 2018-07-30 2019-01-11 咪咕文化科技有限公司 Honest risk distribution figure generation and risk prevention system method, apparatus and storage medium
CN109190907A (en) * 2018-08-06 2019-01-11 国网浙江杭州市临安区供电有限公司 The small micro- power honesty risk index construction method of power supply station based on big data
CN110059912A (en) * 2019-02-20 2019-07-26 国网浙江省电力有限公司杭州供电公司 Honest risk hidden danger panorama management-control method and device based on wisdom map

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101551882A (en) * 2008-12-31 2009-10-07 东莞市天新企业管理咨询有限公司 Engineering management monitoring system and method
JP2009259019A (en) * 2008-04-17 2009-11-05 Mach 2:Kk Copyrighted work providing sever
CN101652789A (en) * 2007-02-12 2010-02-17 肖恩·奥沙利文 Share transportation system and service network
EP2267615A1 (en) * 2009-06-26 2010-12-29 Yatego GmbH Method of analysing and processing search term entries
CN101937527A (en) * 2009-04-22 2011-01-05 美国银行公司 Knowledge management system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101652789A (en) * 2007-02-12 2010-02-17 肖恩·奥沙利文 Share transportation system and service network
JP2009259019A (en) * 2008-04-17 2009-11-05 Mach 2:Kk Copyrighted work providing sever
CN101551882A (en) * 2008-12-31 2009-10-07 东莞市天新企业管理咨询有限公司 Engineering management monitoring system and method
CN101937527A (en) * 2009-04-22 2011-01-05 美国银行公司 Knowledge management system
EP2267615A1 (en) * 2009-06-26 2010-12-29 Yatego GmbH Method of analysing and processing search term entries

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵保强等: "我国工程总承包项目的采购风险预警研究", 《项目管理技术》, vol. 8, no. 4, 30 April 2010 (2010-04-30) *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103489147A (en) * 2013-08-26 2014-01-01 山东浪潮齐鲁软件产业股份有限公司 Platform cross-over type supervisory system
CN105205624A (en) * 2015-10-29 2015-12-30 云南电网有限责任公司昆明供电局 Enterprise probity risk monitoring system
CN109190893A (en) * 2018-07-30 2019-01-11 咪咕文化科技有限公司 Honest risk distribution figure generation and risk prevention system method, apparatus and storage medium
CN109064032A (en) * 2018-08-06 2018-12-21 国网浙江杭州市临安区供电有限公司 The small micro- power honesty risk surveillance managing and control system of power supply station based on enterprise's cloud platform
CN109190907A (en) * 2018-08-06 2019-01-11 国网浙江杭州市临安区供电有限公司 The small micro- power honesty risk index construction method of power supply station based on big data
CN110059912A (en) * 2019-02-20 2019-07-26 国网浙江省电力有限公司杭州供电公司 Honest risk hidden danger panorama management-control method and device based on wisdom map

Similar Documents

Publication Publication Date Title
Karuri et al. DHIS2: the tool to improve health data demand and use in Kenya
Hu et al. User influence analysis for github developer social networks
Germani et al. A QFD-based method to support SMEs in benchmarking co-design tools
CN102819776A (en) Project integrity risk pre-warning system and architecture thereof
US9031993B2 (en) Customizable library for information technology design and management using expert knowledge base
US20140101097A1 (en) Template based database analyzer
Kazman et al. From requirements negotiation to software architecture decisions
CN107169675A (en) Quality task creating method, apparatus and system
CN104699481A (en) Electronic collecting system for investigation data of health condition of old people
Jordan et al. Panel review of the USGS 2023 conterminous US time‐independent earthquake rupture forecast
Devos et al. SIGAPS a prototype of bibliographic tool for medical research evaluation
Joung et al. XML-based neutral schema for automated ergonomic analysis with digital human simulation and inline motion capture
CN106569956A (en) System and method for detecting human factor suitability of human-computer interaction interface
Candiello et al. KPI-supported PDCA model for innovation policy management in local government
Sandanayake et al. Impediments affecting a comprehensive emission assessment at the construction stage of a building
US20180260820A1 (en) System device and process for an educational regulatory electronic tool kit
de Paula et al. Cloud computing adoption, cost-benefit relationship and strategies for selecting providers: A systematic review
Arar et al. The Verification Cockpit–Creating the Dream Playground for Data Analytics over the Verification Process
Bai et al. Hybrid modeling and simulation for trustworthy software process management: a stakeholder‐oriented approach
Abdullah et al. Information systems research: Aligning to industry challenges in management of regulatory compliance
Adelmeyer et al. RisCC –A Risk Management Tool for Cloud Computing Environments
Jensen et al. Discovering, modeling, and re-enacting open source software development processes: a case study
US10389834B2 (en) Automated collaborative environment site viewer system
Wilda et al. Information System Application Alanysis And Design Web-Based Network Complaints Using Php And Bootsrap On Diskominfo
Arlitsch et al. Data-driven improvement to institutional repository discoverability and use

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20121212