CN102811457A - User equipment (UE) and method for processing measurement task by UE - Google Patents

User equipment (UE) and method for processing measurement task by UE Download PDF

Info

Publication number
CN102811457A
CN102811457A CN2011101447216A CN201110144721A CN102811457A CN 102811457 A CN102811457 A CN 102811457A CN 2011101447216 A CN2011101447216 A CN 2011101447216A CN 201110144721 A CN201110144721 A CN 201110144721A CN 102811457 A CN102811457 A CN 102811457A
Authority
CN
China
Prior art keywords
task
measuring
report
measurement
measuring task
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101447216A
Other languages
Chinese (zh)
Inventor
周平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN2011101447216A priority Critical patent/CN102811457A/en
Priority to PCT/CN2012/074397 priority patent/WO2012163194A1/en
Publication of CN102811457A publication Critical patent/CN102811457A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/10Scheduling measurement reports ; Arrangements for measurement reports

Abstract

The invention relates to user equipment (UE) and a method for processing a measurement task by the UE. The UE comprises a judgment module, an entry generation module and a task execution module. The method comprises the following steps that when receiving the measurement task of a known measurement object, which is transmitted by a base station, the UE judges whether only a Cell For Which To Report cell global identity (CGI) attribute value of the known measurement object is revised by the measurement task; and if only the Cell For Which To Report CGI attribute value of the known measurement object is revised by the measurement task, the UE directly establishes a measurement entry is established for the measurement task and executes the measurement task. According to the UE and the method, the problems of UE redundant measurement and report are avoided, resources of the UE are saved, and workloads of the UE and the base station are reduced.

Description

The method of UE and processing measuring task thereof
Technical field
The present invention relates to moving communicating field, relate in particular to the method for a kind of user terminal (UE) and processing measuring task thereof.
Background technology
In GSM, in order to guarantee quality of service, give the good business experience of user, when UE after certain sub-district and network connect, UE need measure the signal quality of Serving cell and neighbor cell.
With LTE (Long Term Evolution; Long Term Evolution) the intrasystem example that is measured as in the system; The base station is indicated measuring task to UE through measurement control message and is measured, and wherein, comprises in the above-mentioned measurement control message: measuring object (measurement object), measurement report configuration (report configuration) and measurement sign (measurement ID); The three combines and characterizes a unique measuring task; Wherein, measuring object is meant the frequency of LTE, specifically comprises attributes such as frequency, bandwidth, Neighboring Cell List, Cell For Which To Report CGI; Wherein, Cell For Which To Report CGI attribute representation base station requires UE to report the sub-district of CGI; Measurement report configuration is used for the attribute of allocating and measuring report, and for example, measurement report is reporting events or periodic report, report number of times and at interval etc.; Measuring sign is the sign of each concrete measuring task, and each measures the related measuring object of sign and a measurement report configuration.In addition, can also comprise in the measurement control message: represent the measurement thresholding (s-Measure) of the signal quality thresholding of persistent district, the measurement clearance configuration (measurement gap configuration) of indicating the measuring amount configuration (quantity configuration) of concrete measuring amount and being used for alien frequencies, isosystem measurement etc.
UE can know through the number of measuring sign and the number of measuring task dispose the attribute that obtains measuring task through measuring the corresponding measuring object of sign with measurement report, such as, should how to measure, should how to report etc.
After UE receives measurement control message, promptly begin to measure.For each measuring task, create corresponding measurement entity (measurement entry), in order to write down the real-time status of this measuring task.As: reported and the measurement result of sub-district instance to be reported, each sub-district and satisfy details such as the time quantum of report condition, number of times that measurement report has sent, cycle report timer instance.
LTE agreement regulation: network side can increase newly, revise and delete measuring task (comprise and measure sign, measuring object and measurement report configuration) as required.Other has regulation, and when UE received the modification order to existing measuring object, UE must remove all measuring task corresponding to this measuring object.Like this, UE will measure and reports to this measuring task again.
As shown in Figure 1; It is the method sketch map that existing UE handles measuring task; If the base station has issued five measuring task: M1, M2, M3, M4 and M5; And all corresponding measuring object O, corresponding respectively five measurement reports configuration: R1, R2, R3, R4 and R5, these five measuring task can be expressed as M1-O-R1, M2-O-R2, M3-O-R3, M4-O-R4 and M5-O-R5 respectively so; After UE receives,, and carry out, and dispose, the measurement report that obtains 1,2,3,4,5 is reported the base station according to the measurement report of each measuring task for these measuring task are set up the measurement entity respectively; This moment, the base station issued new measuring task a: M6-O-R6 again; Be used for reporting CGI (the Cell Global Identity of certain sub-district; Cell global identity), this measuring task has been revised the Cell For Which To Report CGI property value of measuring object O, need report corresponding PCI (the Physical Cell Identity in sub-district of CGI to specify this measuring object; The Physical Cell Identifier sign indicating number); This is revised does not influence other five measuring task fully, but but because of to same measuring object O, causes UE need empty the corresponding measurement entity of M1-O-R1, M2-O-R2, M3-O-R3, M4-O-R4 and M5-O-R5; Be M1-O-R1, M2-O-R2, M3-O-R3, M4-O-R4, M5-O-R5, M6-O-R6 foundation measurement entity then; And carry out, according to the measurement report configuration of each measuring task, the measurement report that obtains 1,2,3,4,5,6 is reported the base station again.
That is to say; If UE has accomplished measurement to the existing measuring task of certain measuring object and has reported; This does not have the entering of sub-district afterwards as again and leaves (affiliated each cell signal does not change), and then UE can not measure also reporting measurement reports to these measuring task again.In case and revise this measuring object the base station, whether relevant with existing measuring task regardless of the content of revising, UE must remove this existing measuring task, again to measuring behind these measuring task foundation measurement entities and reporting.Obviously, if irrelevant with existing measuring task in fact to the modification of measuring object, UE takes turns to carry out to second of existing measuring task and is equivalent to do idle work; Suppose to have originally 5 measuring task; Each measuring task is configured to report N time, be exactly that 5N measurement report reported the base station once more so, and the measurement report that these measurement reports and the first round report is identical; So these measurement reports are redundant for the base station; This has not only increased the processing burden of base station, has wasted the time null resource of system, and has increased the extra process time of UE.
Summary of the invention
The objective of the invention is, a kind of UE is provided and handles the method for measuring task, the redundant measurement that causes with the modification of avoiding owing to the measuring object attribute and reporting.
The invention provides the method that a kind of UE handles measuring task, comprising:
When UE receives the measuring task of the existing measuring object that the base station issues; Judge whether above-mentioned measuring task has only revised the Cell For Which To Report CGI property value of above-mentioned existing measuring object; If then directly set up and measure entity and carry out above-mentioned measuring task for above-mentioned measuring task.
Preferably; Whether above-mentioned user terminal is identical with each property value of above-mentioned existing measuring object through each property value of the measuring object that more above-mentioned measuring task is carried, judges whether above-mentioned measuring task has only revised the Cell For Which To Report CGI property value of above-mentioned existing measuring object.
Preferably, the attribute of above-mentioned measuring object comprises frequency, bandwidth, Neighboring Cell List and Cell For Which To Report CGI.
Preferably, said method also comprises the steps:
The measurement report that the above-mentioned measuring task of execution is obtained reports above-mentioned base station.
The present invention further provides a kind of UE, comprises that entity sets up module and task execution module, also comprises judge module,
Above-mentioned judge module is used for when receiving the measuring task of existing measuring object, judging whether above-mentioned measuring task has only revised the Cell For Which To Report CGI property value of above-mentioned existing measuring object; And when above-mentioned measuring task had only been revised the Cell For Which To Report CGI property value of above-mentioned existing measuring object, notifying above-mentioned entity to set up module was that above-mentioned measuring task is set up the measurement entity;
Above-mentioned entity is set up module, is used to measuring task and sets up the measurement entity, and notify above-mentioned task execution module to carry out above-mentioned measuring task;
Above-mentioned task execution module is used to carry out above-mentioned measuring task.
Preferably, above-mentioned judge module, whether each property value of the measuring object that carries that also is used for more above-mentioned measuring task is identical with each property value of above-mentioned existing measuring object.
Preferably, above-mentioned task execution module also is used for the measurement report that the execution measuring task obtains is reported the base station.
The invention enables the property value of measuring object to change when not influencing other measuring task of this measuring object; UE does not do any processing to existing measuring task; Be merely new measuring task and set up measurement entity and execution; Thereby the problem of having avoided the UE redundant measurement and having reported has not only been practiced thrift the resource of UE, and has reduced the workload of UE and base station.
Description of drawings
Accompanying drawing described herein is used to provide further understanding of the present invention, constitutes a part of the present invention, and illustrative examples of the present invention and explanation thereof are used to explain the present invention, does not constitute improper qualification of the present invention.In the accompanying drawings:
Fig. 1 is the method flow diagram that existing UE handles measuring task;
Fig. 2 is the method flow diagram that UE of the present invention handles measuring task;
Fig. 3 is the theory diagram of UE of the present invention.
Embodiment
In order to make technical problem to be solved by this invention, technical scheme and beneficial effect clearer, clear,, the present invention is further elaborated below in conjunction with accompanying drawing and embodiment.Should be appreciated that specific embodiment described herein only in order to explanation the present invention, and be not used in qualification the present invention.
As shown in Figure 2, be the method flow diagram that UE of the present invention handles measuring task, present embodiment may further comprise the steps:
Step S001: base station sending measuring task M1-O-R1, M2-O-R2, M3-O-R3, M4-O-R4, M5-O-R5;
The corresponding same measurement entity O of these measuring task.
Step S002:UE is respectively measuring task M1-O-R1, M2-O-R2, M3-O-R3, M4-O-R4, M5-O-R5 and sets up entity instance;
Step S003:UE carries out measuring task M1-O-R1, M2-O-R2, M3-O-R3, M4-O-R4, M5-O-R5, generates measurement report 1,2,3,4,5;
Step S004: report test report 1;
When measuring task M1-O-R1 satisfies report condition, according to the reporting number of times and report at interval and send measurement report 1 of R1 configuration to the base station, report completion after; UE continues to measure M1, if measurement result changes in a zone of reasonableness or is basicly stable, and the condition of leaving of unmet R1 configuration; Then can not trigger the reporting of measurement report 1 of measuring task M1-O-R1; Be that M1 is in stable state, i.e. the processing here is identical with prior art, and the present invention does not launch explanation.All the other test assignments are identical with test assignment M1-O-R1, no longer repeat.
Step S005: report test report 2;
Step S006: report test report 3;
Step S007: report test report 4;
Step S008: report test report 5;
The present invention explains for ease, supposes that each test report reports by sequence number successively, and actual might not be like this, as long as satisfy report condition, can report.
Step S009: the base station is according to certain measurement report of receiving; Find that it is 6 unknown cell that this measurement report contains PCI; The CGI under this sub-district need be known in the base station, because of the PCI indication is informed to UE through the Cell For Which To Report CGI attribute of measuring object, so the base station is revised as 6 with the value of the Cell For Which To Report CGI attribute of measuring object; Assign new measuring task M6-O-R6 to UE, it is the CGI of 6 sub-district that this measuring task requires UE to report PCI;
Step S010:UE receives measuring task M6-O-R6, judges the Cell For Which To Report CGI property value that this measuring task M6-O-R6 has only revised measuring object O;
In this step; The measuring object that UE carries according to measuring task M6-O-R6 learns that this measuring task M6-O-R6 is the measuring task to local existing measuring object O; Compare and measure each attribute of the measuring object that task M6-O-R6 carries and each attribute of measuring object O; Learn that in measuring task M6-O-R6, the attribute of measuring object O is modified, judge and learn that measuring task M6-O-R6 has only revised the Cell For Which To Report CGI property value of measuring object O.
Step S011:UE sets up entity instance for measuring task M6-O-R6;
Because of the modification of Cell For Which To Report CGI attribute can't influence other measuring task; So UE does not do any processing to other measuring task; Only new measuring task M6-O-R6 is set up the new measurement entity of a cover, measure entity and comprise and reporting and the measurement result of sub-district instance to be reported, each sub-district and satisfy details such as the time quantum of report condition, number of times that measurement report has sent, cycle report timer instance.
If can have influence on other measuring task to the measuring task of same measuring object to the modification of the property value of measuring object, then this moment, UE handled according to flow process shown in Figure 1.
Step S012: carry out measuring task M6-O-R6, obtain test report 6;
Step S013: report test report 6.
Like this; New measuring task to the Cell For Which To Report CGI property value that only changes measuring object to same measuring object; The present invention only carries out this new measuring task, can not carry out once more the measuring task that this measuring object executed finishes, thus the problem of having avoided the UE redundant measurement and having reported; Not only practice thrift the resource of UE, and reduced the workload of UE and base station.
As shown in Figure 3, be the theory diagram of UE of the present invention, specifically comprise judge module 01, entity generation module 02 and task execution module 03, wherein,
Judge module 01; Be used for when receiving the measuring task of existing measuring object; Whether each attribute of the measuring object that more above-mentioned measuring task is carried is identical with each attribute of above-mentioned existing measuring object, judges whether above-mentioned measuring task has only revised the Cell For Which To Report CGI attribute of above-mentioned existing measuring object; And when above-mentioned measuring task had only been revised the Cell For Which To Report CGI attribute of above-mentioned existing measuring object, notification entity was set up module 02 and is set up the measurement entity for above-mentioned measuring task;
Entity is set up module 02, be used to measuring task and set up the measurement entity, and notice task execution module 03 is carried out above-mentioned measuring task;
Task is carried out 03 of mould, is used to carry out measuring task, and reports the measurement report that obtains to give the base station.
Above-mentioned explanation illustrates and has described the preferred embodiments of the present invention; But as previously mentioned; Be to be understood that the present invention is not limited to the form that this paper discloses, should do not regard eliminating as, and can be used for various other combinations, modification and environment other embodiment; And can in invention contemplated scope described herein, change through the technology or the knowledge of above-mentioned instruction or association area.And change that those skilled in the art carried out and variation do not break away from the spirit and scope of the present invention, then all should be in the protection range of accompanying claims of the present invention.

Claims (7)

1. the method for a user terminal UE processing measuring task is characterized in that, comprising:
When UE receives the measuring task of the existing measuring object that the base station issues; Judge whether said measuring task has only revised the Cell For Which To Report CGI property value of said existing measuring object; If then directly set up and measure entity and carry out said measuring task for said measuring task.
2. method according to claim 1; It is characterized in that; Whether said user terminal is identical with each property value of said existing measuring object through each property value of the measuring object that more said measuring task is carried, judges whether said measuring task has only revised the Cell For Which To Report CGI property value of said existing measuring object.
3. method according to claim 2 is characterized in that, the attribute of said measuring object comprises frequency, bandwidth, Neighboring Cell List and Cell For Which To Report CGI.
4. according to each described method of claim 1-3, it is characterized in that said method also comprises the steps:
The measurement report that the said measuring task of execution is obtained reports said base station.
5. UE comprises that entity sets up module and task execution module, it is characterized in that said terminal also comprises judge module,
Said judge module is used for when receiving the measuring task of existing measuring object, judging whether said measuring task has only revised the Cell For Which To Report CGI property value of said existing measuring object; And when said measuring task had only been revised the Cell For Which To Report CGI property value of said existing measuring object, notifying said entity to set up module was that said measuring task is set up the measurement entity;
Said entity is set up module, is used to measuring task and sets up the measurement entity, and notify said task execution module to carry out said measuring task;
Said task execution module is used to carry out said measuring task.
6. UE according to claim 5 is characterized in that, said judge module, and whether each property value of the measuring object that carries that also is used for more said measuring task is identical with each property value of said existing measuring object.
7. according to claim 5 or 6 described UE, it is characterized in that said task execution module also is used for the measurement report that the execution measuring task obtains is reported the base station.
CN2011101447216A 2011-05-31 2011-05-31 User equipment (UE) and method for processing measurement task by UE Pending CN102811457A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2011101447216A CN102811457A (en) 2011-05-31 2011-05-31 User equipment (UE) and method for processing measurement task by UE
PCT/CN2012/074397 WO2012163194A1 (en) 2011-05-31 2012-04-19 Ue and measurement task processing method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101447216A CN102811457A (en) 2011-05-31 2011-05-31 User equipment (UE) and method for processing measurement task by UE

Publications (1)

Publication Number Publication Date
CN102811457A true CN102811457A (en) 2012-12-05

Family

ID=47235006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101447216A Pending CN102811457A (en) 2011-05-31 2011-05-31 User equipment (UE) and method for processing measurement task by UE

Country Status (2)

Country Link
CN (1) CN102811457A (en)
WO (1) WO2012163194A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021026839A1 (en) * 2019-08-14 2021-02-18 华为技术有限公司 Communication method and apparatus
WO2023193708A1 (en) * 2022-04-08 2023-10-12 维沃移动通信有限公司 Information reporting method and apparatus, terminal and network side device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101516100A (en) * 2009-03-18 2009-08-26 华为技术有限公司 Measuring collocation method, device and system
WO2010087625A2 (en) * 2009-01-29 2010-08-05 Lg Electronics Inc. A method of reporting an aggregated measurement in wireless communication system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010087625A2 (en) * 2009-01-29 2010-08-05 Lg Electronics Inc. A method of reporting an aggregated measurement in wireless communication system
CN101516100A (en) * 2009-03-18 2009-08-26 华为技术有限公司 Measuring collocation method, device and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
R2-112867: "《3GPP TSG-RAN WG2 Meeting #74》", 13 May 2011, article "CHANGE REQUEST" *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021026839A1 (en) * 2019-08-14 2021-02-18 华为技术有限公司 Communication method and apparatus
CN114175713A (en) * 2019-08-14 2022-03-11 华为技术有限公司 Communication method and device
WO2023193708A1 (en) * 2022-04-08 2023-10-12 维沃移动通信有限公司 Information reporting method and apparatus, terminal and network side device

Also Published As

Publication number Publication date
WO2012163194A1 (en) 2012-12-06

Similar Documents

Publication Publication Date Title
AU2019251152B2 (en) Method and device for subscribing to service
CN102257846B (en) Resource measurement and reporting method in long term evolution system
WO2016173280A1 (en) Monitoring management method and apparatus
US11159934B2 (en) Presence reporting areas for the UE
WO2016112676A1 (en) Alarm processing method and device
CN102143510B (en) Method for interacting residual resources between heterogeneous networks
CN106161171B (en) Method and device for establishing network service instance
EP3897024A1 (en) Unmanned aerial vehicle communication method, device, and system
JP2013504954A (en) Base station and method for transmitting information of neighboring base station
KR20150095843A (en) System and method for opening network capabilities, and related network elements
KR20130140159A (en) Method and apparatus for performing cell reselection
WO2017088589A1 (en) Method and apparatus for reporting measurement report
WO2022268095A1 (en) Information transmission method and apparatus
CN109873730B (en) Network slice test management method and related product
CN105790976B (en) Realize that virtual network function describes the method and system of Automatic Update of File
US9974063B2 (en) Radio network control method and radio network controller
CN102811457A (en) User equipment (UE) and method for processing measurement task by UE
CN104796988A (en) Resource allocation method and device
WO2018137427A1 (en) Method and system for realizing measurement coordination, user equipment, and storage medium
CN104284356A (en) Method and system for judging network quality
US20170026924A1 (en) Air interface synchronization method and system
US20160360523A1 (en) Access system, device and method
WO2020063050A1 (en) Data transmission method and device
CN108521891B (en) Wireless backhaul connection method and apparatus
JP2022545498A (en) Abnormal Terminal Processing Method, Network Management Equipment, and Computer Readable Medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121205