CN102809710A - 37-core reconnection line open-short testing method and test board for implementing same - Google Patents
37-core reconnection line open-short testing method and test board for implementing same Download PDFInfo
- Publication number
- CN102809710A CN102809710A CN2012102858361A CN201210285836A CN102809710A CN 102809710 A CN102809710 A CN 102809710A CN 2012102858361 A CN2012102858361 A CN 2012102858361A CN 201210285836 A CN201210285836 A CN 201210285836A CN 102809710 A CN102809710 A CN 102809710A
- Authority
- CN
- China
- Prior art keywords
- pilot lamp
- socket
- translocation
- switch
- heavy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention relates to the technical field of a testing method and a testing device for implementing the same, in particular to a 37-core reconnection line open-short testing method and a test board for implementing the same. The method includes steps of firstly, mounting a tested line on a reconnection testing socket XS; secondly, turning a primary rotary switch S1 to a gear; thirdly, turning a secondary rotary switch S2 to be connected with a C1; and fourthly, judging the tested line. The 37-core reconnection line open-short testing method is convenient and efficient, open-short of the reconnection line is tested by the simplest method, the test board is simple, compact and reasonable in structure, conductivity of the reconnection line can be detected, a short state of the reconnection line can also be tested, and the 37-core reconnection line open-short testing method and the test board are easy to use and popularize.
Description
Technical field
The present invention relates to the technical field of a kind of method of testing and proving installation thereof, heavy on line open circuit short circuit test method of especially a kind of 37 cores and test board thereof.
Background technology
Because heavy on line is the wire harness that is fused into through connector, contact pin and lead; Be used for the firm mutually different situation of legend; Heavy on line often exists open circuit and problem of short-circuit; Existing method of testing to the heavy on line of 37 cores is to use the multimeter conducting, the test trouble, and the test result precision is lower.
Summary of the invention
In order to overcome the deficiency that the heavy on line method of testing of existing 37 cores is loaded down with trivial details and the accurate testing degree is low, the invention provides heavy on line open circuit short circuit test method of a kind of 37 cores and test board thereof.
The technical solution adopted for the present invention to solve the technical problems is: the heavy on line open circuit of a kind of 37 cores short circuit test method, and its method of testing may further comprise the steps:
One. with to be tested traditional thread binding on heavy translocation examination socket XS;
Two. rotation one-level rotary switch S1 to a gear;
Three. rotation secondary rotary switch S2 to C1;
Four. line to be tested is judged: 1. pilot lamp L1 is bright, and other pilot lamp do not work, and line to be tested is qualified; 2. all pilot lamp all do not work, or the bad terminal of line terminals crimping to be tested is not inserted into the position; 3. pilot lamp L1 does not work, and other pilot lamp are bright, line terminals wrong plug to be tested position; 4. pilot lamp L1 is bright, and simultaneously other pilot lamp are also bright, and line terminals to be tested crimping place flies silk and connects mill with other lines or the connector insulating part breaks.
The present invention solves the another kind of technical scheme that its technical matters adopts: the heavy on line open circuit of a kind of 37 cores short-circuit test platform; It comprises power supply, power switch S, heavily translocation tries socket XS, one-level switch S1, secondary switch S2, secondary switch S3 and 37 pilot lamp L1-L37; Power positive end+Vs and one-level switch S1 are connected in series; Power supply negative terminal-Vs and pilot lamp L1 are connected in series, and pilot lamp L1 and pilot lamp L2-L37 are connected in parallel, and are provided with power switch S between power positive end+Vs and the one-level switch S1; One-level switch S1 one end and secondary switch S2 are connected in series; The other end and secondary switch S3 are connected in series, and heavily translocation examination socket XS one end and secondary switch S2 and secondary switch S3 are connected in series, and the other end and 37 pilot lamp L1-L37 are connected in series.
According to another embodiment of the invention; Comprise that further said heavy translocation examination socket XS comprises greatly heavily translocation examination socket XS1, greatly heavily translocation examination socket XS2, little heavy translocation examination socket XS3 and little heavy translocation try socket XS4; Greatly heavily translocation examination socket XS1 and little heavy translocation examination socket XS3 are connected in parallel, and greatly heavily translocation examination socket XS2 and little heavy translocation examination socket XS4 are connected in parallel.
According to another embodiment of the invention, comprise that further said secondary switch S2 and secondary switch S3 and greatly heavy translocation examination socket XS1 are connected in series, said 37 pilot lamp L1-L37 and greatly heavy translocation examination socket XS2 are connected in series.
The invention has the beneficial effects as follows; The heavy on line open circuit of this 37 cores short circuit test method is convenient and swift; Solved heavy on line open circuit problem of short-circuit with the simplest method, and its test board is simple in structure, compactness and reasonable, both can detect the conducting of heavy on line; Can detect the short-circuit condition of heavy on line again, be easy to use and promote.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is further specified.
Fig. 1 is the major loop schematic diagram of the heavy on line open circuit of the present invention's 37 cores short-circuit test platform.
Embodiment
The heavy on line open circuit of a kind of 37 cores short circuit test method, its method of testing may further comprise the steps:
One. with to be tested traditional thread binding on heavy translocation examination socket XS;
Two. rotation one-level rotary switch S1 to a gear;
Three. rotation secondary rotary switch S2 to C1;
Four. line to be tested is judged: 1. pilot lamp L1 is bright, and other pilot lamp do not work, and line to be tested is qualified; 2. all pilot lamp all do not work, or the bad terminal of line terminals crimping to be tested is not inserted into the position; 3. pilot lamp L1 does not work, and other pilot lamp are bright, line terminals wrong plug to be tested position; 4. pilot lamp L1 is bright, and simultaneously other pilot lamp are also bright, and line terminals to be tested crimping place flies silk and connects mill with other lines or the connector insulating part breaks.
This method of testing is fairly simple, and is not only convenient and swift, and improved the heavy on line open circuit of 37 cores short-circuit test result's precision, guaranteed the quality of product.
Like Fig. 1 is the major loop schematic diagram of the heavy on line open circuit of the present invention's 37 cores short-circuit test platform; The heavy on line open circuit of a kind of 37 cores short-circuit test platform; It comprises power supply, power switch S, heavily translocation tries socket XS, one-level switch S1, secondary switch S2, secondary switch S3 and 37 pilot lamp L1-L37; Power positive end+Vs and one-level switch S1 are connected in series, and power supply negative terminal-Vs and pilot lamp L1 are connected in series, and pilot lamp L1 and pilot lamp L2-L37 are connected in parallel; Be provided with power switch S between power positive end+Vs and the one-level switch S1; One-level switch S1 one end and secondary switch S2 are connected in series, and the other end and secondary switch S3 are connected in series, and heavily translocation examination socket XS one end and secondary switch S2 and secondary switch S3 are connected in series; The other end and 37 pilot lamp L1-L37 are connected in series; Said heavy translocation examination socket XS comprises greatly heavily translocation examination socket XS1, greatly heavily translocation examination socket XS2, little heavy translocation examination socket XS3 and little heavy translocation try socket XS4, and greatly heavily translocation examination socket XS1 and little heavy translocation examination socket XS3 are connected in parallel, and greatly heavily translocation examination socket XS2 and little heavy translocation examination socket XS4 are connected in parallel; Said secondary switch S2 and secondary switch S3 and greatly heavy translocation examination socket XS1 are connected in series, and said 37 pilot lamp L1-L37 and greatly heavy translocation examination socket XS2 are connected in series.This test board is simple in structure, only can judge that according to the state of pilot lamp on the test board whether qualified heavy on line is, has saved the time of test, has improved work efficiency.
During use, 220V power positive end+Vs draws single line and is connected on the one-level switch S1, and the one-level switch S1 other end is drawn two lines; Be connected on respectively on secondary switch S2 and the secondary switch S3, secondary switch S2 and secondary switch S3 draw 37 lines and are connected on the greatly heavily translocation examination socket XS1, and greatly heavily translocation examination socket XS1 and little heavy translocation examination socket XS3 are connected in parallel; Power supply negative terminal-Vs draws 1 line and is connected on the pilot lamp L1; Other pilot lamp L2-L37 is parallelly connected with it, and 37 pilot lamp other ends are drawn 37 lines and are connected on the greatly heavily translocation examination socket XS2, and greatly heavily translocation examination socket XS2 and little heavy translocation examination socket XS4 are connected in parallel; At last with to be tested traditional thread binding on heavy translocation examination socket XS; Heavily translocation examination socket XS comprises greatly heavily translocation examination socket XS1, greatly heavily translocation examination socket XS2, little heavy translocation examination socket XS3 and little heavy translocation try socket XS4, and rotation one-level rotary switch S1 to a gear rotates secondary rotary switch S2 to C1 simultaneously; Finally judge that according to 37 pilot lamp whether qualified heavy on line is; If pilot lamp L1 is bright, other pilot lamp do not work, and line to be tested is qualified; If all pilot lamp all do not work, or the bad terminal of line terminals crimping to be tested is not inserted into the position; If pilot lamp L1 does not work, other pilot lamp are bright, line terminals wrong plug to be tested position; If pilot lamp L1 is bright, other pilot lamp are also bright simultaneously, and line terminals to be tested crimping place flies silk and connects mill with other lines or the connector insulating part breaks.The heavy on line open circuit of this 37 cores short circuit test method is convenient and swift; Solved heavy on line open circuit problem of short-circuit with the simplest method, and its test board is simple in structure, compactness and reasonable, both can detect the conducting of heavy on line; Can detect the short-circuit condition of heavy on line again, be easy to use and promote.
Claims (4)
1. a core weighs on line open circuit short circuit test method, it is characterized in that its method of testing may further comprise the steps:
One. with to be tested traditional thread binding on heavy translocation examination socket XS;
Two. rotation one-level rotary switch S1 to a gear;
Three. rotation secondary rotary switch S2 to C1;
Four. line to be tested is judged: 1. pilot lamp L1 is bright, and other pilot lamp do not work, and line to be tested is qualified; 2. all pilot lamp all do not work, or the bad terminal of line terminals crimping to be tested is not inserted into the position; 3. pilot lamp L1 does not work, and other pilot lamp are bright, line terminals wrong plug to be tested position; 4. pilot lamp L1 is bright, and simultaneously other pilot lamp are also bright, and line terminals to be tested crimping place flies silk and connects mill with other lines or the connector insulating part breaks.
2. a core weighs on line open circuit short-circuit test platform; It is characterized in that; Test board comprises power supply, power switch S, heavily translocation tries socket XS, one-level switch S1, secondary switch S2, secondary switch S3 and 37 pilot lamp L1-L37, and power positive end+Vs and one-level switch S1 are connected in series, and power supply negative terminal-Vs and pilot lamp L1 are connected in series; Pilot lamp L1 and pilot lamp L2-L37 are connected in parallel; Be provided with power switch S between power positive end+Vs and the one-level switch S1, one-level switch S1 one end and secondary switch S2 are connected in series, and the other end and secondary switch S3 are connected in series; Heavily translocation examination socket XS one end and secondary switch S2 and secondary switch S3 are connected in series, and the other end and 37 pilot lamp L1-L37 are connected in series.
3. 37 cores according to claim 2 reconnect line open circuit short-circuit test platform; It is characterized in that; Said heavy translocation examination socket XS comprises greatly heavily translocation examination socket XS1, greatly heavily translocation examination socket XS2, little heavy translocation examination socket XS3 and little heavy translocation try socket XS4; Greatly heavily translocation examination socket XS1 and little heavy translocation examination socket XS3 are connected in parallel, and greatly heavily translocation examination socket XS2 and little heavy translocation examination socket XS4 are connected in parallel.
4. 37 cores according to claim 2 reconnect line open circuit short-circuit test platform; It is characterized in that; Said secondary switch S2 and secondary switch S3 and greatly heavy translocation examination socket XS1 are connected in series, and said 37 pilot lamp L1-L37 and greatly heavy translocation examination socket XS2 are connected in series.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102858361A CN102809710A (en) | 2012-08-13 | 2012-08-13 | 37-core reconnection line open-short testing method and test board for implementing same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102858361A CN102809710A (en) | 2012-08-13 | 2012-08-13 | 37-core reconnection line open-short testing method and test board for implementing same |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102809710A true CN102809710A (en) | 2012-12-05 |
Family
ID=47233466
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012102858361A Pending CN102809710A (en) | 2012-08-13 | 2012-08-13 | 37-core reconnection line open-short testing method and test board for implementing same |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102809710A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107907776A (en) * | 2017-10-26 | 2018-04-13 | 中国石油集团西部钻探工程有限公司 | The centralizer internal wiring testing cassete of directional tool |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4471293A (en) * | 1982-05-03 | 1984-09-11 | Otto Schnack | Multi-conductor cable test unit |
CN1831548A (en) * | 2005-03-12 | 2006-09-13 | 鸿富锦精密工业(深圳)有限公司 | Line open-short circuit tester |
CN1920586A (en) * | 2005-08-26 | 2007-02-28 | 鸿富锦精密工业(深圳)有限公司 | Wire short /open circuit test set |
-
2012
- 2012-08-13 CN CN2012102858361A patent/CN102809710A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4471293A (en) * | 1982-05-03 | 1984-09-11 | Otto Schnack | Multi-conductor cable test unit |
CN1831548A (en) * | 2005-03-12 | 2006-09-13 | 鸿富锦精密工业(深圳)有限公司 | Line open-short circuit tester |
CN1920586A (en) * | 2005-08-26 | 2007-02-28 | 鸿富锦精密工业(深圳)有限公司 | Wire short /open circuit test set |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107907776A (en) * | 2017-10-26 | 2018-04-13 | 中国石油集团西部钻探工程有限公司 | The centralizer internal wiring testing cassete of directional tool |
CN107907776B (en) * | 2017-10-26 | 2024-03-12 | 中国石油天然气集团有限公司 | Centralizer internal circuit test box of inclinometer while drilling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202854270U (en) | Circuit testing apparatus for signal transmission line | |
CN202421400U (en) | Checking tool for connection of multicore flat cables | |
CN201583616U (en) | Composite conductor short circuit tester | |
CN202339392U (en) | High-efficiency cable detector | |
CN202600084U (en) | Connecting line detector | |
CN102809710A (en) | 37-core reconnection line open-short testing method and test board for implementing same | |
CN201917630U (en) | Testing device for harness connector | |
CN204330821U (en) | A kind of 10kV vacuum circuit breaker loop resistance testing auxiliary device | |
CN203376429U (en) | Novel portable low-voltage circuit line checker | |
CN217385795U (en) | High-speed backplane connector conduction testing device | |
CN202075356U (en) | Detection device for multi-core plug base pin signal line | |
CN206235693U (en) | A kind of automatic correcting line machine | |
CN202453444U (en) | Automobile wire harness short-circuit detection device | |
CN104122481A (en) | Multifunction cable detection device | |
CN204789635U (en) | Secondary protection test terminal row adapter | |
CN203811771U (en) | Chip test device | |
CN202794230U (en) | Converter for detecting serial data plugs | |
CN203324414U (en) | Twisted-pair cable on-off tester | |
CN202486209U (en) | Technological equipment for testing energy consumption of mobile communication terminal | |
CN207051417U (en) | A kind of electric connector test device | |
CN102768156B (en) | Transient interruption testing machine for RJ45 module socket | |
CN201429669Y (en) | Signal wire breakage and short-circuit detector | |
CN105510764A (en) | Marine alternating-current socket test method | |
CN205385185U (en) | Quick detection device of many connectors | |
CN204758757U (en) | Signal line break -make detection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20121205 |