CN102798538A - Monitoring system used for large-scale box jacking construction - Google Patents
Monitoring system used for large-scale box jacking construction Download PDFInfo
- Publication number
- CN102798538A CN102798538A CN2012102780028A CN201210278002A CN102798538A CN 102798538 A CN102798538 A CN 102798538A CN 2012102780028 A CN2012102780028 A CN 2012102780028A CN 201210278002 A CN201210278002 A CN 201210278002A CN 102798538 A CN102798538 A CN 102798538A
- Authority
- CN
- China
- Prior art keywords
- size box
- sensors
- control device
- monitoring system
- jacking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Length Measuring Devices With Unspecified Measuring Means (AREA)
Abstract
The invention discloses a monitoring system used for large-scale box jacking construction. The system comprises two horizon sensors, a ranging sensor, two displacement sensors, a pressure transducer and a control device. The two horizon sensors are respectively disposed on a front end and a rear end of a central axis on an inner surface of the large-scale box's a top plate. The ranging sensor is disposed on a middle part of a baseplate rear face of the large-scale box. The two displacement sensors are disposed on a bottom rear end of an outer surface of a large-scale box's side. The pressure transducer is disposed on jacking equipment. The control device is connected with the sensors through data lines. The monitoring system uses a plurality of sensors disposed on the top plate, the baseplate, the outer side surface, and the jacking equipment to monitor propulsion form of the large-scale box, and corresponding data acquired is fed back to the control device to be processed, thereby forming a three-dimensional imaging monitor system. The detecting system can greatly reduce labor intensity of builders, construction difficulty and construction cost, improve construction precision, and effectively ensure normal operation of existing railways. The monitoring system uses a plurality of sensors disposed on the top plate, the baseplate, the outer side surface, and the jacking equipment to monitor propulsion form of the large-scale box, and corresponding data acquired is fed back to the control device to be processed, thereby forming a three-dimensional imaging monitor system. The detecting system can greatly reduce labor intensity of builders, construction difficulty and construction cost, improve construction precision, and effectively ensure normal operation of existing railways.
Description
Technical field
The invention belongs to the railway construction technical field, particularly relate to a kind of large-size box jacking construction and use monitoring system.
Background technology
Develop rapidly along with town and country construction; The recoverable amount of automobile increases year by year; So existing highway can't satisfy the requirement of traffic; Therefore just need under some existing railway lines, lay frame bridge sometimes, or existing old frame bridge is replaced with the new frame bridge, so that vehicle is current.At present; The method of under existing railway line, replacing old frame bridge with the new frame bridge adopts jacking usually; This method is earlier the soft soil foundation employing slip casting method of old frame bridge bottom to be reinforced; Existing railway line above reinforcing frame is built bridge simultaneously, the new frame bridge segmentation that utilizes many lifting jack as jacking equipment that are installed between old frame bridge and the new frame bridge will be positioned at existing railway line one side is then pushed up to existing railway line, simultaneously old frame bridge is ejected.But; There is following point in this construction method: because it is lower to wait to be provided with the foundation bearing capacity at frame bridge place, and the weight of large-size box is relatively large, thereby is easy to occur pricking phenomenons such as head and both sides landslide at the medium-and-large-sized casing of jack-in process; The result causes the designed elevation of frame bridge to be difficult to control; Therefore will there be certain deviation between frame bridge after in place and the design, thereby seriously influences construction quality, and also can influence the safe operation of train to a certain extent.But up to the present do not find to be used to detect the isolated plant of large-size box jack-in process as yet.
Summary of the invention
In order to address the above problem, the object of the present invention is to provide a kind of large-size box jacking construction that can effectively improve construction precision to use monitoring system.
In order to achieve the above object, large-size box jacking construction provided by the invention comprises two horizon sensors, distance measuring sensor, two displacement transducers, pressure transducer and control device with monitoring system; Wherein two horizon sensors are installed in the front and back end, large-size box top board inside surface axis of treating jacking respectively, are used for monitoring the integral level position of large-size box at jack-in process; Distance measuring sensor is installed in large-size box base plate rear end face middle part, is used to monitor the travel distance of large-size box; Two displacement transducer standoff distances are installed in rear end, large-size box one side external surface bottom, are used to monitor the integral level direction displacement of large-size box; Pressure transducer is installed on the jacking equipment, is used for monitoring the pressure of hydraulic oil in the jack-in process jacking equipment, obtains real-time top power thus; Control device then links to each other with above-mentioned all sensors through data line.
Described control device is a PC.
Large-size box jacking construction provided by the invention is to utilize a plurality of sensors that are installed on large-size box top board, base plate, lateral surface and the jacking equipment to come the propelling form of large-size box is monitored with monitoring system; And the corresponding data of gathering is fed back to control device handle, form the three-dimensional imaging monitoring system thus.This detection system can lower workmen's labour intensity, difficulty of construction and construction cost greatly, improves construction precision, has ensured the normal operation of existing railway effectively.
Description of drawings
Fig. 1 is that large-size box jacking construction provided by the invention is used the monitoring system structural representation.
Embodiment
Below in conjunction with accompanying drawing and specific embodiment large-size box jacking construction provided by the invention is elaborated with monitoring system.
As shown in Figure 1, large-size box jacking construction provided by the invention comprises two horizon sensors 1, distance measuring sensor 2, two displacement transducers 3, pressure transducer 4 and control device 5 with monitoring system; Wherein two horizon sensors 1 are installed in 7 front and back ends, large-size box 6 top board inside surface axis of treating jacking respectively, are used for monitoring the integral level position of large-size box 6 at jack-in process; Distance measuring sensor 2 is installed in large-size box 6 base plate rear end faces middle part, is used to monitor the travel distance of large-size box 6; Two displacement transducer 3 standoff distances are installed in rear end, large-size box 6 one side external surfaces bottom, are used to monitor the integral level direction displacement of large-size box 6; Pressure transducer 4 is installed on the jacking equipment, is used for monitoring the pressure of hydraulic oil in the jack-in process jacking equipment, obtains real-time top power thus; Control device 5 then links to each other with above-mentioned all sensors through data line.
Described control device 5 is a PC.
Large-size box jacking construction provided by the invention in the large-size box 6 jacking construction processes is set forth as follows with the monitoring system course of work: at first that displacement sensor 3 one sidewalls in installation position on the large-size box 6 are outside foundation pit side-wall bottom leveling at present; Make it axis 7 keeping parallelisms with large-size box 6, begin jacking then.In jack-in process; At first carry out the real-time collection of related data through above-mentioned each sensor; Wherein two horizon sensors 1 are used for gathering the integral level positional information of large-size box 6 at jack-in process; Distance measuring sensor 2 is used to gather the travel distance information of large-size box 6; Two displacement transducers 3 utilize the sidewall of the large-size box 6 of measuring its installation places whether to monitor the integral level direction displacement information of large-size box 6 with the mode of the above-mentioned foundation pit side-wall equidistance that has flattened; 4 of pressure transducers are used for gathering the pressure information of hydraulic oil in the jack-in process jacking equipment; The sensor feeds back to control device 5 with the data of gathering through data line in real time then, through the software that is installed in the control device 5 these data is handled afterwards, and on display, is demonstrated the 3-D view in large-size box 6 jack-in process; Operating personnel can in time rectify a deviation to large-size box 6 according to the methods such as whole top power, the distribution of top, large-size box 6 both sides power and large-size box 6 both sides move speeds of above-mentioned result utilization adjustment jacking equipment like this, up to accomplishing whole jack-in process.
Claims (2)
1. a large-size box jacking construction is used monitoring system, it is characterized in that: described large-size box jacking construction comprises two horizon sensors (1), distance measuring sensor (2), two displacement transducers (3), pressure transducer (4) and control device (5) with monitoring system; Wherein two horizon sensors (1) are installed in the front and back end, large-size box (6) top board inside surface axis (7) of treating jacking respectively, are used for monitoring the integral level position of large-size box (6) at jack-in process; Distance measuring sensor (2) is installed in large-size box (6) base plate rear end face middle part, is used to monitor the travel distance of large-size box (6); Two displacement transducers (3) standoff distance is installed in rear end, large-size box (6) one side external surfaces bottom, is used to monitor the integral level direction displacement of large-size box (6); Pressure transducer (4) is installed on the jacking equipment, is used for monitoring the pressure of hydraulic oil in the jack-in process jacking equipment, obtains real-time top power thus; Control device (5) then links to each other with above-mentioned all sensors through data line.
2. large-size box jacking construction according to claim 1 is used monitoring system, it is characterized in that: described control device (5) is a PC.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102780028A CN102798538A (en) | 2012-08-07 | 2012-08-07 | Monitoring system used for large-scale box jacking construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102780028A CN102798538A (en) | 2012-08-07 | 2012-08-07 | Monitoring system used for large-scale box jacking construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102798538A true CN102798538A (en) | 2012-11-28 |
Family
ID=47197720
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012102780028A Pending CN102798538A (en) | 2012-08-07 | 2012-08-07 | Monitoring system used for large-scale box jacking construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102798538A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104807422A (en) * | 2015-05-22 | 2015-07-29 | 中铁第五勘察设计院集团有限公司 | Automatic testing device and method for jacking bridge and culvert position |
CN111473760A (en) * | 2020-04-16 | 2020-07-31 | 西安市建总工程集团有限公司 | Automatic testing device for jacking bridge and culvert positions and control method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4674949A (en) * | 1982-01-11 | 1987-06-23 | International Robotic Engineering, Inc. | Robot with climbing feet |
CN102277880A (en) * | 2011-04-21 | 2011-12-14 | 中铁六局集团有限公司 | Large-sized box jacking control construction method capable of enhancing accuracy |
-
2012
- 2012-08-07 CN CN2012102780028A patent/CN102798538A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4674949A (en) * | 1982-01-11 | 1987-06-23 | International Robotic Engineering, Inc. | Robot with climbing feet |
CN102277880A (en) * | 2011-04-21 | 2011-12-14 | 中铁六局集团有限公司 | Large-sized box jacking control construction method capable of enhancing accuracy |
Non-Patent Citations (2)
Title |
---|
井浩等: "箱涵顶进施工安全监测与控制技术研究", 《地下空间与工程学报》 * |
刘汉斌: "某高速公路大桥钢箱梁顶推施工研究", 《广东建材》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104807422A (en) * | 2015-05-22 | 2015-07-29 | 中铁第五勘察设计院集团有限公司 | Automatic testing device and method for jacking bridge and culvert position |
CN111473760A (en) * | 2020-04-16 | 2020-07-31 | 西安市建总工程集团有限公司 | Automatic testing device for jacking bridge and culvert positions and control method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201103084Y (en) | Rail anchor point and construction clearance measuring apparatus | |
CN105865387A (en) | No-cable roadbed vertical displacement testing method and vertical displacement early warning system for | |
CN105863734A (en) | Device for simulating and monitoring existing tunnel during excavation of double-track tunnel | |
CN108050952B (en) | Method for monitoring tunnel section deformation by using tunnel section deformation monitoring system | |
CN206781779U (en) | Laser scanning rail gauge measuring apparatus under a kind of track checking car | |
CN103257080A (en) | Prototype test device for shield tunnel dual-layer lining structure and secondary lining pouring device | |
CN104932392A (en) | Rolling monitoring method and apparatus | |
CN102198695A (en) | Longitudinal moving method for outside die of box girder outer film | |
CN105092266A (en) | Tire hydroplaning performance dynamic test experiment table and experiment method | |
CN103669218B (en) | Novel steel-concrete combined section steel box girder module and assembling method thereof | |
CN204163126U (en) | Foundation three-freedom moving static loading experimental rig | |
CN104142135B (en) | Method and device for monitoring horizontal displacement of tunnel based on wireless tilt sensors | |
CN102798538A (en) | Monitoring system used for large-scale box jacking construction | |
CN103033851A (en) | Device of monitoring fissure deep fracture development by using geological radar and monitoring method | |
CN106012950B (en) | A kind of servo wave simulator and method for carrying real-time dynamic monitoring system | |
CN104294864A (en) | Shallow-foundation V-H-M space charge measurement experiment device | |
CN110341882A (en) | A kind of body section construction ground logistics system | |
CN202180835U (en) | Non-contact type track safety state detecting device | |
CN201738344U (en) | Vibration safety monitoring device for support blasting demolition in foundation pit | |
CN203173631U (en) | Coal mine vertical shaft equipment hoisting safety detection system | |
CN205654380U (en) | Existing tunnel of double -line tunnel excavation simulation monitoring devices | |
CN206531644U (en) | Vehicle side slipping testing stand | |
CN107065893B (en) | Sensor layout device for detecting damage power of foundation pile of high-pile wharf and using method thereof | |
CN212623073U (en) | High and steep slope detection device | |
CN212058718U (en) | Existing tunnel simulation monitoring devices of double-track tunnel excavation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20121128 |