CN102788211B - For connecting the connection set of valve before gas cooker and stove - Google Patents

For connecting the connection set of valve before gas cooker and stove Download PDF

Info

Publication number
CN102788211B
CN102788211B CN201210278411.8A CN201210278411A CN102788211B CN 102788211 B CN102788211 B CN 102788211B CN 201210278411 A CN201210278411 A CN 201210278411A CN 102788211 B CN102788211 B CN 102788211B
Authority
CN
China
Prior art keywords
thread
stainless steel
nut
stove
gas cooker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210278411.8A
Other languages
Chinese (zh)
Other versions
CN102788211A (en
Inventor
谢家明
王文元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN MINGLE PIPE CO., LTD.
Original Assignee
SHENZHEN MINGLE PIPE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN MINGLE PIPE Co Ltd filed Critical SHENZHEN MINGLE PIPE Co Ltd
Priority to CN201210278411.8A priority Critical patent/CN102788211B/en
Publication of CN102788211A publication Critical patent/CN102788211A/en
Application granted granted Critical
Publication of CN102788211B publication Critical patent/CN102788211B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Feeding And Controlling Fuel (AREA)

Abstract

The invention discloses a kind of connection set for connecting valve before gas cooker and stove, comprise corrugated stainless steel tubing, it is characterized in that: mouth of pipe place, described corrugated stainless steel tubing two ends is arranged with stainless steel lasso respectively, this two stainless steel ring is plugged in corrugated stainless steel tubing two-port respectively two links with one end weld formation one seal ring at jointing, described two links connect through the outside thread of its other end the nut that has thickness pitch thread respectively, described two links through this two nut with thickness pitch thread respectively with gas cooker, before stove, valve connects, described have in the tool withdrawal groove that is provided with between the nut coarse thread of thickness pitch thread and fine thread be provided with guide sleeve.Connection set provided by the invention, can thoroughly avoid omitting the accident that seal ring causes gas leakage when valve and gas cooker before installing connection stove; Not easily aging, long service life, without the need to frequent replacing, cost-saving, and easy for installation.

Description

For connecting the connection set of valve before gas cooker and stove
Technical field
The present invention relates to connection pieces for gas pipeline, more particularly, relating to a kind of connection set for connecting valve before gas cooker and stove comprising corrugated stainless steel tubing.
Background technique
The connection set of valve and gas cooker before tradition connection gas pipeline stove, be generally soft rubber fuel tube or the two ends flexible corrugated stainless steel tubing respectively with a nut, soft rubber fuel tube or corrugated stainless steel tubing are connected with the air intake end of valve before the stove of gas pipeline and gas cooker respectively by joint.But there is following defect respectively in existing connection set:
Adopt existing corrugated stainless steel tubing to be connected with valve before stove as connection set to seal mainly by rubber seal rings for seal.Due to rubber seal easily aging or neglected loading seal ring when installing, interface is just easily made to reveal combustion gas, can to the threat using the personnel of combustion gas cause personal safety.
Adopt soft rubber fuel tube to be connected with valve before stove and gas cooker as connection set, general soft rubber fuel tube is easily aging, and working life is short, after exceeding the time limit, soft rubber fuel tube is easily hardening to become fragile, and in bending part for a long time by stress, easily breaks and causes gas leakage.Inner diameter is very little simultaneously, pressure drop can be caused excessive, make user just cannot commonly use gas after long.
Summary of the invention
Omit seal ring when installing and connecting valve and gas cooker before stove cause gas leakage to overcome people, or because valve and gas cooker before employing rubber fuel tube connection stove be not because changing for a long time, cause the aging breakage of soft rubber fuel tube, and then there is the problem of gas leakage, the invention provides a kind of easy for installation, and the not easily aging connection set for connecting valve before gas cooker and stove.
The technical solution adopted for the present invention to solve the technical problems is as described below: a kind of connection set for connecting valve before gas cooker and stove, comprise corrugated stainless steel tubing, it is characterized in that, mouth of pipe place, described corrugated stainless steel tubing two ends is arranged with stainless steel lasso respectively, this two stainless steel ring is plugged in corrugated stainless steel tubing two-port respectively two links with one end weld formation one seal ring at jointing, described two links connect through the outside thread of its other end the nut that has thickness pitch thread respectively, described two links through this two nut with thickness pitch thread respectively with gas cooker, before stove, valve connects, described have in the tool withdrawal groove that is provided with between the nut coarse thread of thickness pitch thread and fine thread be provided with guide sleeve.
According to above-mentioned the present invention, it is characterized in that, the outside thread of described link is fine thread, described in there is the nut of thickness pitch thread coarse thread be connected with valve before stove or gas cooker, fine thread is connected with the outside thread of link.
According to above-mentioned the present invention, it is characterized in that, described link be three layers stepped, bottom section is connected with stainless steel ripple, and middle interval is rhombus holding part, and high interval is outside thread linkage section.
According to above-mentioned the present invention, it is characterized in that, described in there is the nut of thickness pitch thread coarse thread pitch be the 2-3 of fine thread doubly.
According to above-mentioned the present invention, it is characterized in that, described in there is the nut of thickness pitch thread coarse thread spiral shell footpath be less than fine thread.
According to above-mentioned the present invention, it is characterized in that, described in have on the thickness pitch thread of the nut of thickness pitch thread and tool withdrawal groove and be equipped with aerobic sealing gel coating.
According to above-mentioned the present invention, it is characterized in that, described guide sleeve is red copper material seal guide sleeve, and its metal flexible, good seal performance are corrosion-resistant.
According to above-mentioned the present invention, it is characterized in that, described corrugated stainless steel tubing and link interface clamp and establishes a stainless steel protection overcoat.
According to above-mentioned the present invention, it is characterized in that, described corrugated stainless steel tubing is arranged with protection teleflex.
According to the present invention of said structure, its beneficial effect is, connection set provided by the invention, can thoroughly avoid omitting the accident that seal ring causes gas leakage when valve and gas cooker before installing connection stove; Not easily aging, long service life, without the need to frequent replacing, cost-saving, and easy for installation.
Accompanying drawing explanation
Below in conjunction with accompanying drawing and embodiment, the present invention is described further.
Fig. 1 is valve linkage structure explosive view before connection set of the present invention and gas cooker and stove;
Fig. 2 is valve linkage structure stereogram before connection set of the present invention and gas cooker and stove;
Fig. 3 is valve linkage structure sectional view before connection set of the present invention and stove;
Fig. 4 is the partial enlarged drawing of M in Fig. 3;
Fig. 5 is connecting-piece structure figure of the present invention;
Fig. 6 is guide sleeve structure figure of the present invention;
Fig. 7 is the nut structure figure that the present invention has thickness pitch thread.
In the drawings, 1. corrugated stainless steel tubing; 2. protect teleflex; 3,3 '. stainless steel lasso; 4,4 '. stainless steel protection overcoat; 5,5 '. link; 501. outside thread linkage sections; Interval in 502.; 503. bottom sections; 6,6 '. red copper seal guide sleeve; 7,7 '. there is the nut of thickness pitch thread; 701, tool withdrawal groove; 702. coarse thread; 703. fine thread; 8. valve before stove; 9. gas pipeline; 10. gas cooker; 11. seal rings; 12. aerobic sealing gel coatings;
Embodiment
Embodiment one
As shown in Figure 2; for connecting a connection set for valve before gas cooker and stove, it comprises nut 7,7 ' and two red copper seal guide sleeve 6,6 ' that stainless steel lasso 3,3 ', two stainless steel protection overcoats 4,4 ', two links 5,5 ' and two that a corrugated stainless steel tubing 1, PVC for the protection of corrugated stainless steel tubing 1 protects teleflex 2, two auxiliary corrugated stainless steel tubings 1 to weld with link 5,5 ' argon welding have thickness pitch thread.Described coarse thread 702 pitch with the nut 7,7 ' of thickness pitch thread is 2-3 times of fine thread 703, and coarse thread 702 spiral shell footpath is less than fine thread 703.Described link 5,5 ' be three layers stepped, bottom section 503 is connected with corrugated stainless steel tubing 1, and middle interval 502 is the anistree holding part of rhombus, and high interval is outside thread linkage section 501.
Two links 5,5 ' are plugged in corrugated stainless steel tubing 1 two ends respectively, overlap stainless steel sleeve circle 3,3 ' outward at port again, by argon welding corrugated stainless steel tubing 1, link 5,5 ' and stainless steel lasso 3,3 ' be welding as one and form weld joint close seal 11 at jointing.Again two stainless steel protection overcoats 4,4 ' are enclosed within soldered interface position respectively, by card pressing tongs, stainless steel protection overcoat 4,4 ' card compressive strain are fixed on weld, play the effect of protection corrugated stainless steel tubing.
Finally two red copper seal guide sleeves 6,6 ' are placed into respectively in two tool withdrawal grooves 701 had between the coarse thread 702 of the nut 7,7 ' of thickness pitch thread and fine thread 703, then the port of nut 7, the 7 ' fine thread 703 two with thickness pitch thread screws respectively on the outside thread linkage section 501 of the stainless steel closely-pitched external thread connector 5,5 ' at stainless steel corrugated flexible hose 1 two ends.
Installation attended operation (use) process of the present invention is as described below:
First by the nut 7 with thickness pitch thread of corrugated stainless steel tubing 1 two ends connection, 7 ' revolves to move back and unloads, check the nut 7 with thickness pitch thread, with or without neglected loading red copper seal guide sleeve 6 in the tool withdrawal groove 701 of 7 ', confirm do not have neglected loading and installation direction errorless after, then there is the nut 7 of thickness pitch thread, the screw thread of 7 ' evenly coats aerobic sealing gel coating 12, or aerobic sealing gel coating 12 is evenly coated at the screw thread position of the screw thread position of valve 8 connecting port and the combustion gas input port of gas cooker 10 before the stove of the gas pipeline that need connect, the nut 7 of thickness pitch thread will be had again, the fine thread 703 hole bit alignment of 7 ' be connected with corrugated stainless steel tubing 1 link 5, the port head of the outside thread linkage section 501 of 5 ', turn clockwise and there is the nut 7 of thickness pitch thread, 7 ' the outside thread linkage section 501 being screwed into link 5, screw and make outside thread linkage section 501 top push up red copper seal guide sleeve 6 (to there is the nut 7 of thickness pitch thread, 7 ' stretches out outside thread linkage section 501 end and covers middle interval one segment distance) till.And then will the nut 7 of thickness pitch thread be had, before 7 ' the other end coarse thread 702 aims at the stove of gas pipeline, normal mounting is carried out in the connecting port of valve 8 or gas ring 10, after connection, be rotated counterclockwise the nut 7 with thickness pitch thread, 7 ', because the pitch of thickness tooth is different, make link 5, 5 ' with the stove of gas pipeline 9 before valve 8 or the coaxial rotating Vortex of gas ring 10 chase after into, screw into the nut 7 with thickness pitch thread, during 7 ' middle part, before the stove of gas pipeline 9 output tube of valve 8 or gas ring 10 port by be placed in the nut 7 with thickness pitch thread in advance, red copper seal guide sleeve 6 in 7 ', 6 ' contact, and with link 5, the port of 5 ' mutually dock chase after sting closely sealed, form first sealing Leakproof connection structure, also make the nut 7 with thickness pitch thread simultaneously, 7 ' corresponding being rotated in place and tightening.Aerobic sealing gel coating 12 is rotating in the process that is screwed into, be filled into there is thickness pitch thread nut 7,7 ' and link 5,5 ' in the gap everywhere that is connected of external screw thread, solidify within a certain period of time, the effect that second seals anti-leak is played in formation.Thus thoroughly avoid operator in installation process, because of omit install rubber seal or or the aging breakage of seal ring, or cause the danger of gas leakage because of the aging breakage of soft rubber fuel tube.
Although invention describes with reference to the above embodiments; but those of ordinary skill in the art very clearly can recognize that above embodiment is only for illustration of invention completely; wherein can make various changes and revise and not depart from invention in a broad sense; so not as the restriction to invention; as long as in essence of an invention scope, the change of above-described embodiment, distortion all will be fallen within protection domain that invention requires.

Claims (5)

1. one kind for connecting the connection set of valve before gas cooker and stove, comprise corrugated stainless steel tubing, it is characterized in that: mouth of pipe place, described corrugated stainless steel tubing two ends is arranged with stainless steel lasso respectively, this two stainless steel ring welds formation one seal ring with two links being plugged in corrugated stainless steel tubing two-port at jointing respectively, described two links connect through the outside thread of its other end the nut that has thickness pitch thread respectively, described two links through this two nut with thickness pitch thread respectively with gas cooker, before stove, valve connects, described have in the tool withdrawal groove that is provided with between the nut coarse thread of thickness pitch thread and fine thread be provided with guide sleeve, the outside thread of described link is fine thread, the described coarse thread with the nut of thickness pitch thread is connected with valve before stove or gas cooker, fine thread is connected with the outside thread of link, the described coarse thread spiral shell footpath with the nut of thickness pitch thread is less than fine thread, described there is the nut of thickness pitch thread thickness pitch thread and tool withdrawal groove on be equipped with aerobic sealing gel coating, described guide sleeve is red copper material seal guide sleeve.
2. the connection set for connecting valve before gas cooker and stove according to claim 1, is characterized in that: described link be three layers stepped, bottom section is connected with corrugated stainless steel tubing, and middle interval is rhombus holding part, and high interval is outside thread linkage section.
3. the connection set for connecting valve before gas cooker and stove according to claim 1, is characterized in that: described in there is the nut of thickness pitch thread coarse thread pitch be the 2-3 of fine thread doubly.
4. the connection set for connecting valve before gas cooker and stove according to claim 1, is characterized in that: described corrugated stainless steel tubing and link interface clamp and establishes a stainless steel protection overcoat.
5. the connection set for connecting valve before gas cooker and stove according to claim 1, is characterized in that: described corrugated stainless steel tubing is arranged with protection teleflex.
CN201210278411.8A 2012-08-07 2012-08-07 For connecting the connection set of valve before gas cooker and stove Active CN102788211B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210278411.8A CN102788211B (en) 2012-08-07 2012-08-07 For connecting the connection set of valve before gas cooker and stove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210278411.8A CN102788211B (en) 2012-08-07 2012-08-07 For connecting the connection set of valve before gas cooker and stove

Publications (2)

Publication Number Publication Date
CN102788211A CN102788211A (en) 2012-11-21
CN102788211B true CN102788211B (en) 2015-09-23

Family

ID=47153708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210278411.8A Active CN102788211B (en) 2012-08-07 2012-08-07 For connecting the connection set of valve before gas cooker and stove

Country Status (1)

Country Link
CN (1) CN102788211B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2572183Y (en) * 2002-09-18 2003-09-10 郑三会 Insertion type gas joint pipe
CN1473254A (en) * 2000-11-09 2004-02-04 ���ַ�˹�� Pipe joint reducing required tightening force, including tightening nut with two threaded sections whose pitches differ
CN201428869Y (en) * 2009-06-08 2010-03-24 李文 Novel hanging tool for hanging soft boards
CN201628045U (en) * 2010-02-26 2010-11-10 江苏晨光波纹管有限公司 Wear-resisting corrugated pipe compensator
CN202252453U (en) * 2011-10-17 2012-05-30 谷建伟 Non-fixed-size stove pipe
CN202733261U (en) * 2012-08-07 2013-02-13 谢家明 Connecting device used for connecting gas stove and stove upstream valve

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004301150A (en) * 2003-03-28 2004-10-28 Osaka Gas Co Ltd Joint structure of flexible pipe

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1473254A (en) * 2000-11-09 2004-02-04 ���ַ�˹�� Pipe joint reducing required tightening force, including tightening nut with two threaded sections whose pitches differ
CN2572183Y (en) * 2002-09-18 2003-09-10 郑三会 Insertion type gas joint pipe
CN201428869Y (en) * 2009-06-08 2010-03-24 李文 Novel hanging tool for hanging soft boards
CN201628045U (en) * 2010-02-26 2010-11-10 江苏晨光波纹管有限公司 Wear-resisting corrugated pipe compensator
CN202252453U (en) * 2011-10-17 2012-05-30 谷建伟 Non-fixed-size stove pipe
CN202733261U (en) * 2012-08-07 2013-02-13 谢家明 Connecting device used for connecting gas stove and stove upstream valve

Also Published As

Publication number Publication date
CN102788211A (en) 2012-11-21

Similar Documents

Publication Publication Date Title
CN109707945B (en) High-temperature-resistant high-pressure compensator
CN105465507B (en) A kind of compression type corrugated stainless steel tubing and its assemble method for gas pipeline
CN102788211B (en) For connecting the connection set of valve before gas cooker and stove
CN102269308A (en) Dental hoop pipe fitting and valve shell
CN202733261U (en) Connecting device used for connecting gas stove and stove upstream valve
CN101298893A (en) Abrasion-proof earthenware duct
US7159473B1 (en) Internal tube support for flow elements providing for tube expansion within the flow element shell
CN105370369A (en) Exhaust pipe snap ring type seal connecting piece
CN207034444U (en) Compound seal flared fitting
CN210920475U (en) Double-layer protective high-pressure oil pipe capable of steering
CN2924236Y (en) Pipeline connector
CN208634593U (en) A kind of gas metal pipe
CN207975356U (en) It is axially forced to formula tube joint assembly
CN206861084U (en) The flexible fuel pipe of aircraft engine reinforcing
CN108930852A (en) A kind of non-metal composite pipe connection component and operating method
CN201757232U (en) Stainless steel braided tube
CN200961726Y (en) Ball valve for refrigeration pipe system
CN205716155U (en) Flexible duct transition joint
CN204114285U (en) Pressure detection device
CN203614946U (en) Joint seal of oil inlet-outlet pipe of manifold block valve
CN205978946U (en) Broadside malleable cast iron tube coupling spare
CN203604201U (en) Gear pump oil suction pipe with sheath
CN102853195A (en) High-pressure movable elbow
CN106764172A (en) A kind of aero-engine metal hose
CN220792379U (en) Polytetrafluoroethylene pipeline gasket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHENZHEN MINLE PIPE INDUSTRY CO., LTD.

Free format text: FORMER OWNER: XIE JIAMING

Effective date: 20150728

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150728

Address after: 518000 Guangdong city of Shenzhen province Gongming Guangming New District Office heshuikou community Wen Ge Industrial Zone Fifth

Applicant after: SHENZHEN MINGLE PIPE CO., LTD.

Address before: 519015 Guangdong Province, Zhuhai city Xiangzhou District Jida Bailian Road No. 176 building 42 Room 501

Applicant before: Xie Jiaming

C14 Grant of patent or utility model
GR01 Patent grant