CN102776894A - 一种坝基扬压力调控装置 - Google Patents

一种坝基扬压力调控装置 Download PDF

Info

Publication number
CN102776894A
CN102776894A CN201210309387XA CN201210309387A CN102776894A CN 102776894 A CN102776894 A CN 102776894A CN 201210309387X A CN201210309387X A CN 201210309387XA CN 201210309387 A CN201210309387 A CN 201210309387A CN 102776894 A CN102776894 A CN 102776894A
Authority
CN
China
Prior art keywords
dam foundation
uplift pressure
dam
drain
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210309387XA
Other languages
English (en)
Other versions
CN102776894B (zh
Inventor
张永涛
冯树荣
潘江洋
邹阳生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina Zhongnan Engineering Corp
Original Assignee
Hydrochina Zhongnan Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Zhongnan Engineering Corp filed Critical Hydrochina Zhongnan Engineering Corp
Priority to CN201210309387.XA priority Critical patent/CN102776894B/zh
Publication of CN102776894A publication Critical patent/CN102776894A/zh
Application granted granted Critical
Publication of CN102776894B publication Critical patent/CN102776894B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Barrages (AREA)

Abstract

本发明公开了一种坝基扬压力调控装置,包括设置在坝基的扬压力监测装置和坝基排水廊道(2),坝基排水廊道(2)的侧壁底部设有至少一条排水沟(5),坝基排水廊道(2)底部设有多个排水孔(4),排水孔(4)孔口处设有孔口装置(6),孔口装置(6)与排水孔(4)孔口密封固定连接;在孔口装置(6)上设有可控阀门(3)。该装置可对坝基扬压力和坝基渗透稳定进行人为地控制,既保证坝基扬压力也不超标,满足大坝稳定应力要求,又能控制坝基排水孔渗漏量,以降低坝基软弱夹层渗透破坏的风险。

Description

一种坝基扬压力调控装置
技术领域
本发明涉及一种坝基扬压力调控装置,适用于水利水电行业需要人为控制坝基渗透压力和扬压力的混凝土坝。
背景技术
混凝土坝坝基渗控体系一般由防渗体系和排水体系组成,其主要目的是减小坝基岩体的浮托力、渗透压力和渗透坡降,降低渗漏量。防渗体系常采用水平防渗、垂直防渗。水平防渗一般采用铺盖,铺盖材料包括粘土、土工织物、混凝土等;垂直防渗一般有水泥灌浆帷幕,混凝土防渗墙、混凝土截水墙等。排水体系分为水平排水体系、垂直排水体系等。
一般情况下,常规混凝土坝均采用防渗和排水相结合的体系,坝基排水孔一般处于自由出流状态。排水孔孔口自由溢出的渗水,顺着大坝廊道内排水沟,自流出坝外,或集中引入集水井后用水泵抽排出坝外。从理论上讲,排水孔管口与大坝建基面的高差,就是该部位坝基的扬压力。考虑到坝基排水孔一般布置于坝基廊道内,而坝基廊道的数量是有限的,另外排水孔也不是连续分布的,间隔3m左右,故理论分析,排水孔部位会形成一个漏斗状的降水曲线,而其余部位的坝基扬压力则会稍微高一些。
综合考虑地基渗流的复杂性、排水孔布置的孔排距,并参照长期的设计经验和实测资料,规范规定了不同帷幕和排水设计的扬压力设计图形和相应的折减系数。即按照规范规定的帷幕和排水孔的布置进行坝基渗控设计,就可以按照规范假定的设计扬压力图形进行相应的大坝稳定应力计算分析。实践证明,按规范规定的帷幕和排水孔的布置进行坝基渗控设计,实际的扬压力不会超过设计值,并有一定的富裕,按此扬压力设计的大坝,是能够保证安全的。
发明内容
本发明要解决的技术问题是:在下覆软弱夹层比较多的混凝土坝坝基,当坝基排水孔渗漏量过大,坝基软弱夹层渗透稳定问题比较突出时,怎样才能对坝基渗透稳定进行人为地控制的问题,既保证坝基扬压力也不超标,满足大坝稳定应力要求,又能控制坝基排水孔渗漏量,以降低坝基软弱夹层渗透破坏的风险。
为解决上述技术问题,本发明所采用的技术方案是:
一种坝基扬压力调控装置,包括设置在坝基内的扬压力监测装置和坝基排水廊道,所述扬压力监测装置为埋设在坝基建基面的扬压力渗压计和/或设置在坝基排水廊道的扬压力测压管;所述坝基排水廊道的侧壁底部设有至少一条排水沟,坝基排水廊道底部设有多个排水孔,排水孔孔口处设有孔口装置,孔口装置与排水孔孔口密封固定连接;在孔口装置上设有可控阀门。
所述可控阀门优选自动控制阀门,所述自动控制阀门通过电缆与操控设备连接。(也可以是手动控制阀门)
所述排水孔之间的间距优选为2m-3m。
下面对本发明做进一步的解释和说明:
每个排水孔的孔口装置将水导向排水沟排除。
本发明将所有坝基排水孔均设置阀门,然后通过调节阀门开度的大小,来控制坝基排水孔的渗漏量,继而人为调节坝基软弱夹层的水力梯度在容许范围之内,人为调节坝基扬压力在许可范围之内。也就是说,通过人为调节排水孔阀门开度,达到坝基渗透破坏、渗漏量、坝基扬压力之间的平衡。
与常规混凝土坝坝基排水孔对比,本发明将坝基所有排水孔均设置了阀门,可以通过人为控制阀门的开度,加大或减小坝基排水孔的渗漏水量,从而控制坝基岩体的水力梯度不超过容许值;另外,坝基排水孔的渗漏水量通过调节阀门开度改变后,坝基扬压力同样也有所变化,可以通过埋设在建基面的坝基扬压力监测仪器测量坝基扬压力的大小,进行计算分析大坝的稳定应力。并按照计算分析成果,对坝基排水孔的阀门开度进行进一步的调整,可以人工手动调整,也可以自动调整。通过上述各个步骤的循环,调试出不同部位排水孔阀门的最佳开度,最终达到坝基抗滑稳定、应力应变、渗透稳定三者的综合平衡,为保证大坝的安全运行打下基础。
与现有技术相比,本发明的优势在于:
通过本发明的坝基扬压力调控装置,可以对坝基渗透稳定进行人为地控制,既保证坝基扬压力也不超标,满足大坝稳定应力要求,又能控制坝基排水孔渗漏量,以降低坝基软弱夹层渗透破坏的风险。
附图说明
图1 是本发明的一种坝基扬压力调控装置的结构示意图,其中,1——排水廊道侧壁,2——排水廊道,3——可控阀门,4——排水孔,5——排水沟,6——孔口装置,7——砂浆封堵。 
具体实施方式
下面结合附图和实施例对本发明做进一步的说明。
实施例1
一种坝基扬压力调控装置,包括设置在坝基内的扬压力监测装置和坝基排水廊道(2),所述扬压力监测装置为埋设在坝基建基面的扬压力渗压计和/或为设置在坝基排水廊道(2)的扬压力测压管;所述坝基排水廊道(2)的侧壁底部设有至少一条排水沟(5),坝基排水廊道(2)底部设有多个排水孔(4),排水孔(4)孔口处设有孔口装置(6),孔口装置(6)与排水孔(4)孔口密封固定连接;在孔口装置(6)上设有可控阀门(3)。所述排水孔(4)之间的间距为2m-3m。
实施例2
本发明的坝基扬压力控制结构已用于金沙江向家坝水电站,该电站大坝坝高162m,坝基软弱夹层发育。大坝基础开挖完成后,坝基深部仍保留有厚5m左右的挤压破碎带和近60m厚的挠曲核部破碎带。挤压破碎带、挠曲核部破碎带及软弱夹层抗渗透破坏能力低,坝基渗透稳定问题比较突出。
使用本发明实施例1的坝基扬压力调控装置后,通过调节阀门的开度,控制坝基排水孔的出水量,进而控制坝基的水力梯度,保证坝基不良地质体的渗透稳定。并通过对坝基扬压力的监测,获得坝基实际扬压力,再通过计算分析,复核大坝稳定应力。通过上述各个步骤的循环,调试出不同部位排水孔阀门的最佳开度,最终达到坝基抗滑稳定、应力应变、渗透稳定的综合平衡。

Claims (3)

1.一种坝基扬压力调控装置,包括设置在坝基的扬压力监测装置和坝基排水廊道(2),所述扬压力监测装置为埋设在坝基建基面的扬压力渗压计和/或设置在坝基排水廊道(2)的扬压力测压管;所述坝基排水廊道(2)的侧壁底部设有至少一条排水沟(5),坝基排水廊道(2)底部设有多个排水孔(4),排水孔(4)孔口处设有孔口装置(6),孔口装置(6)与排水孔(4)孔口密封固定连接;其特征是,在孔口装置(6)上设有可控阀门(3)。
2.根据权利要求1所述坝基扬压力调控装置,其特征是,所述可控阀门(3)为自动控制阀门,所述自动控制阀门通过电缆与操控设备连接。
3.根据权利要求1所述坝基扬压力调控装置,其特征是,所述排水孔(4)之间的间距为2m-3m。
CN201210309387.XA 2012-08-28 2012-08-28 一种坝基扬压力调控装置 Active CN102776894B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210309387.XA CN102776894B (zh) 2012-08-28 2012-08-28 一种坝基扬压力调控装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210309387.XA CN102776894B (zh) 2012-08-28 2012-08-28 一种坝基扬压力调控装置

Publications (2)

Publication Number Publication Date
CN102776894A true CN102776894A (zh) 2012-11-14
CN102776894B CN102776894B (zh) 2015-03-04

Family

ID=47121990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210309387.XA Active CN102776894B (zh) 2012-08-28 2012-08-28 一种坝基扬压力调控装置

Country Status (1)

Country Link
CN (1) CN102776894B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106872080A (zh) * 2017-01-22 2017-06-20 中国水利水电科学研究院 一种混凝土坝坝踵有效压应力监测方法
CN107273564A (zh) * 2017-04-26 2017-10-20 中国电建集团西北勘测设计研究院有限公司 一种基于折减系数的渗流安全评价方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1587116A1 (ru) * 1988-10-10 1990-08-23 Украинское Отделение Всесоюзного Научно-Исследовательского И Проектно-Изыскательского Института "Гидропроект" Им.С.Я.Жука Бетонна плотина
CN1412390A (zh) * 2002-12-04 2003-04-23 刘燕翊 采用沙针导滤降低坝体浸润线的方法
CN201598619U (zh) * 2010-01-22 2010-10-06 中国水电顾问集团华东勘测设计研究院 坝体排水结构
CN201603437U (zh) * 2010-02-26 2010-10-13 昌吉市晶雨节水有限公司 纤维滤水逆止阀
CN102296572A (zh) * 2011-06-23 2011-12-28 中国水电顾问集团华东勘测设计研究院 坝后设弃渣场的土石坝坝体渗流监测结构及其施工方法
CN202730792U (zh) * 2012-08-28 2013-02-13 中国水电顾问集团中南勘测设计研究院 一种坝基扬压力调控装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1587116A1 (ru) * 1988-10-10 1990-08-23 Украинское Отделение Всесоюзного Научно-Исследовательского И Проектно-Изыскательского Института "Гидропроект" Им.С.Я.Жука Бетонна плотина
CN1412390A (zh) * 2002-12-04 2003-04-23 刘燕翊 采用沙针导滤降低坝体浸润线的方法
CN201598619U (zh) * 2010-01-22 2010-10-06 中国水电顾问集团华东勘测设计研究院 坝体排水结构
CN201603437U (zh) * 2010-02-26 2010-10-13 昌吉市晶雨节水有限公司 纤维滤水逆止阀
CN102296572A (zh) * 2011-06-23 2011-12-28 中国水电顾问集团华东勘测设计研究院 坝后设弃渣场的土石坝坝体渗流监测结构及其施工方法
CN202730792U (zh) * 2012-08-28 2013-02-13 中国水电顾问集团中南勘测设计研究院 一种坝基扬压力调控装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
袁培进,吴铭江,姜云辉,陈卓,李作成: "三峡工程大坝左厂(非)坝段渗流监测", 《大坝与安全》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106872080A (zh) * 2017-01-22 2017-06-20 中国水利水电科学研究院 一种混凝土坝坝踵有效压应力监测方法
CN107273564A (zh) * 2017-04-26 2017-10-20 中国电建集团西北勘测设计研究院有限公司 一种基于折减系数的渗流安全评价方法

Also Published As

Publication number Publication date
CN102776894B (zh) 2015-03-04

Similar Documents

Publication Publication Date Title
CN205077453U (zh) 一种面板堆石坝和上游围堰结合的坝体结构
CN218479104U (zh) 带基础扬压力监测兼紧急泄压装置的库岸面膜防渗结构
CN202730792U (zh) 一种坝基扬压力调控装置
CN103696402B (zh) 一种钢索网护底型泥石流排导槽及其应用和施工方法
CN209493918U (zh) 一种大坝防渗结构
CN215669631U (zh) 一种深厚覆盖层地基结构
CN102776894A (zh) 一种坝基扬压力调控装置
CN111764959B (zh) 一种深部富水采空区气液联动高浓度浆液注浆装置及方法
CN203603127U (zh) 一种渠道地下水逆止阀式排水系统
CN104652383B (zh) 尾矿库坝体自流排水装置
CN202450501U (zh) 消力池砖砌排水结构
CN209398357U (zh) 一种渗压计钻孔结构型式
CN104452746A (zh) 一种钻孔灌注桩的施工方法
CN103541330A (zh) 一种有效提前排水并延长澄清距离的尾矿库排洪系统
CN207159958U (zh) 非封闭无抽排水垫塘结构
CN107974875B (zh) 一种无损坎儿井功能的高速铁路地基加固结构及施工方法
CN211312563U (zh) 一种防渗抗冲过水围堰结构
CN204849791U (zh) 一种土石围堰防渗体系的结构
CN103938585A (zh) 土坝+重力坝混合坝型的布置结构
CN203096696U (zh) 一种高低复合型壅水堰
CN103741703B (zh) 一种辐射井用压水井式虹吸排水装置
CN109577287B (zh) 一种带逆止阀的双侧面板堆石调节坝及其施工方法
CN110332011B (zh) 一种基于接缝泄水降压的管片结构及隧道衬砌
CN208219557U (zh) 一种垂直防渗土工膜与基岩面的连接结构
CN209636839U (zh) 混凝土重力坝坝基排水孔结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16

Applicant after: Company limited of Central-South survey and design research institute of electricity Jian group of China

Address before: 410014, 9 camphor Road, Yuhua District, Hunan, Changsha

Applicant before: Zhongnan Prospecting Design Inst. China Hydrauelectric Consultant Group

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: ZHONGNAN PROSPECTING DESIGN INST. CHINA HYDRAUELECTRIC CONSULTANT GROUP TO: CHINA POWER GROUP ZHONGNAN INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD.

C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Yongtao

Inventor after: Peng Gang

Inventor after: Pan Jiangyang

Inventor after: Feng Shurong

Inventor after: Huang Canxin

Inventor after: Zou Yangsheng

Inventor before: Zhang Yongtao

Inventor before: Feng Shurong

Inventor before: Pan Jiangyang

Inventor before: Zou Yangsheng

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHANG YONGTAO FENG SHURONG PAN JIANGYANG ZOU YANGSHENG TO: ZHANG YONGTAO PENG GANG PAN JIANGYANG FENG SHURONG HUANG CANXIN ZOU YANGSHENG

C14 Grant of patent or utility model
GR01 Patent grant