CN102774332B - Tool cabinet and emergency breakdown truck - Google Patents
Tool cabinet and emergency breakdown truck Download PDFInfo
- Publication number
- CN102774332B CN102774332B CN201210296479.9A CN201210296479A CN102774332B CN 102774332 B CN102774332 B CN 102774332B CN 201210296479 A CN201210296479 A CN 201210296479A CN 102774332 B CN102774332 B CN 102774332B
- Authority
- CN
- China
- Prior art keywords
- subarea
- district
- tool
- production
- puts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000015556 catabolic process Effects 0.000 title abstract 2
- 238000004519 manufacturing process Methods 0.000 claims abstract description 40
- 240000008042 Zea mays Species 0.000 claims description 5
- 235000016383 Zea mays subsp huehuetenangensis Nutrition 0.000 claims description 5
- 235000002017 Zea mays subsp mays Nutrition 0.000 claims description 5
- 238000009413 insulation Methods 0.000 claims description 5
- 235000009973 maize Nutrition 0.000 claims description 5
- 239000000463 material Substances 0.000 claims description 5
- 238000003860 storage Methods 0.000 claims description 5
- 241001503987 Clematis vitalba Species 0.000 claims description 4
- 238000013016 damping Methods 0.000 claims description 4
- 238000000034 method Methods 0.000 description 4
- 238000002955 isolation Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005422 blasting Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005187 foaming Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Abstract
The invention discloses a tool cabinet which comprises a cabinet body, wherein a production tool placing area, a safe tool placing area and a flexible placing area are arranged in the cabinet body; multiple sub-areas are arranged in the production tool placing area, the safe tool placing area and the flexible placing area respectively; and at least one surface of the cabinet body is provided with a door. The invention also provides an emergency breakdown truck with the cabinet body. The tool cabinet provided by the invention realizes reasonable placement of tools.
Description
Technical field
The application relates to for electrical domain, relates in particular to a kind of tool chest and emergency first-aid repair engineering truck.
Background technology
When the current emergency first-aid repair of carrying out electrical equipment is worked, exist Work tool to receive link, affect the repairing time.Sometimes fault occurs in after midnight, employee's neurolysis, receive slow movement, part employee is because of reasons such as working experience is not enough, work carelessness, may exist Work tool to receive to check not in place, receive Work tool and omit, lead by mistake the situations such as nonconformity Work tool, after Work tool is received and rushed to repair and finishes simultaneously, because the reasons such as cruelty placement exist, destroy hidden danger, serious threat site safety is produced.The on-the-spot secondary accidents of some repairings show, site safety, produce the accurate complete of Work tool repairing work safety, efficiency and quality are existed greatly and affected.
Therefore, be necessary to study the tool chest that can rationally hold the required Work tool of emergency first-aid repair.
Summary of the invention
In view of this, the technical matters that the application will solve is, a kind of tool chest is provided, and can reasonably hold the required Work tool of emergency first-aid repair.
For this reason, the embodiment of the present application adopts following technical scheme:
A kind of tool chest, comprise cabinet, in described cabinet, be provided with that the tool of production is put district, security tool is put district and the motor-driven district of putting, the described tool of production is put district, described security tool puts district and the described motor-driven district of putting is respectively arranged with a plurality of subareas, and at least one side of described cabinet is provided with door.
Wherein, the described motor-driven district of putting is arranged on the described tool of production and puts the below that district and security tool are put district, the described tool of production put district and security tool put district described motor-driven put district above be set up in parallel, the described tool of production is put district and described security tool and is put district and be respectively and described motor-driven border of putting district, a complete side of described cabinet, part end face, two part sides and the described tool of production are put district and described security tool and are put the space that the border in district encloses, enclosing the described tool of production puts the complete side in district and encloses described security tool and put the complete side in district and be respectively arranged with door.
Wherein, the described tool of production is put district and is divided into from top to bottom three floor, last layer is ground floor, ground floor is provided with that climbers are put subarea, fence is put subarea and standby subarea, the second layer below ground floor is provided with that draw vice is put subarea and diagonal plier is put subarea, and below the second layer the 3rd layer is provided with that hydraulic tongs is put subarea and electric hammer is put subarea.
Wherein, described security tool is put district and is divided into from top to bottom three floor, last layer is ground floor, ground floor is provided with that insulating glove is put subarea, tool bag puts subarea and safety cap is put subarea, the second layer below ground floor is provided with safety strap and puts that subarea is put in subarea, voltage detector, multi-meter puts subarea and insulating boot is put subarea, and below the second layer the 3rd layer is provided with first aid box and puts subarea, transmit rope and put subarea, individual security grounding jumper and put subarea and band and leak and protect patching panel and put subarea.
Wherein, the described motor-driven district of putting is respectively arranged with and produces material and put subarea, insulation rod subarea, high-voltage grounding wire subarea, low-voltage grounding wire subarea, street lamp grounding jumper subarea, block ear of maize district, standby subarea, provide storage battery for oneself and put subarea and wheel guard shield subarea.
Wherein, between adjacent subarea, with baffle plate, isolate.
Wherein, the described tool of production puts that district is put in district, described security tool, described motor-driven putting between district isolated with baffle plate mutually.
Wherein, between described door and cabinet, use spring damping chain connection.
Wherein, at described cabinet top, be provided with insulating ladder emergency support, described insulating ladder is fixed on described insulating ladder emergency support.
An emergency first-aid repair engineering truck arranges above-mentioned tool chest on described emergency first-aid repair engineering truck.
Technique effect for technique scheme is analyzed as follows:
Due to the space that provides the tool of production, security tool to put respectively, so the tool chest of the embodiment of the present application can rationally hold the required Work tool of emergency first-aid repair with the engineering truck that is provided with tool chest.
Accompanying drawing explanation
Fig. 1 is the overall schematic of the tool chest of the embodiment of the present application;
Fig. 2 is the lateral plan of A direction of the tool chest of the embodiment of the present application;
Fig. 3 is the lateral plan of B direction of the tool chest of the embodiment of the present application;
Fig. 4 is the back view of the tool chest of the embodiment of the present application.
The specific embodiment
The overall technical architecture of paper the embodiment of the present application.
A kind of tool chest, comprise cabinet, in described cabinet, be provided with that the tool of production is put district, security tool is put district and the motor-driven district of putting, the described tool of production is put district, described security tool puts district and the described motor-driven district of putting is respectively arranged with a plurality of subareas, and at least one side of described cabinet is provided with door.
Wherein, the described motor-driven district of putting is arranged on the described tool of production and puts the below that district and security tool are put district, the described tool of production put district and security tool put district described motor-driven put district above be set up in parallel, the described tool of production is put district and described security tool and is put district and be respectively and described motor-driven border of putting district, a complete side of described cabinet, part end face, two part sides and the described tool of production are put district and described security tool and are put the space that the border in district encloses, enclosing the described tool of production puts the complete side in district and encloses described security tool and put the complete side in district and be respectively arranged with door.
Wherein, the described tool of production is put district and is divided into from top to bottom three floor, last layer is ground floor, ground floor is provided with that climbers are put subarea, fence is put subarea and standby subarea, the second layer below ground floor is provided with that draw vice is put subarea and diagonal plier is put subarea, and below the second layer the 3rd layer is provided with that hydraulic tongs is put subarea and electric hammer is put subarea.
Wherein, described security tool is put district and is divided into from top to bottom three floor, last layer is ground floor, ground floor is provided with that insulating glove is put subarea, tool bag puts subarea and safety cap is put subarea, the second layer below ground floor is provided with safety strap and puts that subarea is put in subarea, voltage detector, multi-meter puts subarea and insulating boot is put subarea, and below the second layer the 3rd layer is provided with first aid box and puts subarea, transmit rope and put subarea, individual security grounding jumper and put subarea and band and leak and protect patching panel and put subarea.
Wherein, the described motor-driven district of putting is respectively arranged with and produces material and put subarea, insulation rod subarea, high-voltage grounding wire subarea, low-voltage grounding wire subarea, street lamp grounding jumper subarea, block ear of maize district, standby subarea, provide storage battery for oneself and put subarea and wheel guard shield subarea.
Wherein, between adjacent subarea, with baffle plate, isolate.
Wherein, the described tool of production puts that district is put in district, described security tool, described motor-driven putting between district isolated with baffle plate mutually.
Wherein, between described door and cabinet, use spring damping chain connection.
Wherein, at described cabinet top, be provided with insulating ladder emergency support, described insulating ladder is fixed on described insulating ladder emergency support.
An emergency first-aid repair engineering truck arranges above-mentioned tool chest on described emergency first-aid repair engineering truck.
Wherein, the top of tool chest and the top of operator's compartment are parallel.
Technique effect for technique scheme is analyzed as follows:
Due to the space that provides the tool of production, security tool to put respectively, so the tool chest of the embodiment of the present application can rationally hold the required Work tool of emergency first-aid repair with the engineering truck that is provided with tool chest.
For making those of ordinary skills more accurately, clearly understand the embodiment of the present application, below in conjunction with accompanying drawing, the embodiment of the present application is elaborated.
Fig. 1 is the overall schematic of the tool chest of the embodiment of the present application.As shown in Figure 1, cabinet can Seal Design, and cabinet steel plate used can adopt the antirust processing of the sub-light of plastic-blasting, and cabinet inside can adopt the embedded cushion of high-foaming, and bottom can adopt rubber absorbing pad.In cabinet, be set side by side with that the tool of production is put district 10 and security tool is put district 20, the tool of production is put district 10 and security tool and is put district 20 three floor are set respectively from top to bottom, between levels, can use baffle plate isolation, the motor-driven district's (not illustrating in Fig. 1) of putting is arranged on that the tool of production is put district 10 and security tool is put 20 belows, district, and the tool of production is put district 10, security tool puts district 20 and motor-driven putting between district isolated with baffle plate mutually.Enclosing the tool of production puts district 10 and security tool and puts the side in district 20 and be respectively arranged with door 40, between door 40 and cabinet, can use spring damping chain connection, when need to maintaining open mode, door 40 can pass through automobile specified push rod 41 support doors 40, the surrounding of door 40 can arrange capillary groove, to guarantee water-tight.Cabinet top is provided with insulating ladder emergency support 50, and insulating ladder 60 is fixed on insulating ladder emergency support 50.
Fig. 2 be A shown in Fig. 1 to lateral plan.As shown in Figure 2, the tool of production is put district 10 and is set gradually from top to bottom three floor, topmost one deck is ground floor, ground floor is set up in parallel that climbers are put subarea 11, fence is put subarea 12 and standby subarea 13 successively, the second layer below ground floor is set side by side with that draw vice is put subarea 14 and diagonal plier is put subarea 15 successively, and below the second layer the 3rd layer is set side by side with that hydraulic tongs is put subarea 16 and electric hammer is put subarea 17 successively.The 3rd floor is the motor-driven district 30 of putting below, and the motor-driven district 30 of putting is provided with wheel guard shield subarea 31 and produces material and put subarea 32.Between adjacent subarea, can use baffle plate isolation.
Fig. 3 be B shown in Fig. 1 to lateral plan.As shown in Figure 3, security tool is put district 20 and is divided into successively from top to bottom three floor, last layer is ground floor, ground floor is set side by side with successively insulating glove and puts subarea 21, tool bag puts subarea 22 and two safety caps are put subarea 23, the quantity that safety cap is put subarea 23 can arrange according to actual needs, the second layer below ground floor is set side by side with successively safety strap and puts subarea 25, two voltage detectors are put subarea 26, multi-meter puts subarea 28 and insulating boot is put subarea 29, the quantity that voltage detector is put subarea 26 can arrange according to actual needs, the 3rd layer below the second layer is set side by side with successively first aid box and puts subarea 210, transmit rope and put subarea 211, individual's security grounding jumper is put subarea 212 and is with leakage to protect patching panel and puts subarea 213.The 3rd floor is also the motor-driven district 30 of putting below, and the motor-driven district 30 of putting is provided with wheel guard shield subarea 34 and provides storage battery for oneself and put subarea 33.Between adjacent subarea, can use baffle plate isolation.
Fig. 4 is the back view of tool chest.As shown in Figure 4, the motor-driven district 30 of putting is set side by side with successively and produces material and put subarea 32, insulation rod subarea 35, high-voltage grounding wire subarea 36, low-voltage grounding wire subarea 37, street lamp grounding jumper subarea 38, block ear of maize district 39, standby subarea 310 and provide storage battery for oneself and put subarea 33.In addition, insulation rod subarea 35, high-voltage grounding wire subarea 36, low-voltage grounding wire subarea 37, street lamp grounding jumper subarea 38, block the bottom in ear of maize district 39 and standby subarea 310, be also provided with guideboard and put subarea 311.
In addition, the tool chest of the embodiment of the present application can be arranged on emergency first-aid repair engineering truck, and the top of tool chest can be parallel with the top of engineering vehicle cab.
In the tool chest of the embodiment of the present application for the tool of production, security tool provide respectively placing space, further, tool of production placing space is again for the different tools of production provides independent placing space, security tool placing space is also for different security tools provides independent placing space, further, in tool chest also separately for other instruments provide placing space, minute space arrangement means due to the embodiment of the present application, tools sort is put rationally, avoid in prior art because not having classification to put the variety of issue that instrument causes.
In the accompanying drawing of the embodiment of the present application, marked the reference dimension of various piece, the unit of size is mm.But above-mentioned size is only example, in practical application, can size be specifically set according to environment for use, do not limit here.
The above is only the application's preferred implementation; it should be pointed out that for those skilled in the art, do not departing under the prerequisite of the application's principle; can also make some improvements and modifications, these improvements and modifications also should be considered as the application's protection domain.
Claims (9)
1. a tool chest, it is characterized in that, comprise cabinet, in described cabinet, be provided with that the tool of production is put district, security tool is put district and the motor-driven district of putting, the described tool of production is put district, described security tool puts district and the described motor-driven district of putting is respectively arranged with a plurality of subareas, and at least one side of described cabinet is provided with door, the described motor-driven district of putting is arranged on the described tool of production and puts the below that district and security tool are put district, the described tool of production put district and security tool put district described motor-driven put district above be set up in parallel, the described tool of production is put district and described security tool and is put district and be respectively and described motor-driven border of putting district, a complete side of described cabinet, part end face, two part sides and the described tool of production are put district and described security tool and are put the space that the border in district encloses, enclosing the described tool of production puts the complete side in district and encloses described security tool and put the complete side in district and be respectively arranged with door.
2. tool chest as claimed in claim 1, it is characterized in that, the described tool of production is put district and is divided into from top to bottom three floor, last layer is ground floor, ground floor is provided with that climbers are put subarea, fence is put subarea and standby subarea, the second layer below ground floor is provided with that draw vice is put subarea and diagonal plier is put subarea, and below the second layer the 3rd layer is provided with that hydraulic tongs is put subarea and electric hammer is put subarea.
3. tool chest as claimed in claim 1, it is characterized in that, described security tool is put district and is divided into from top to bottom three floor, last layer is ground floor, ground floor is provided with that insulating glove is put subarea, tool bag puts subarea and safety cap is put subarea, the second layer below ground floor is provided with safety strap and puts that subarea is put in subarea, voltage detector, multi-meter puts subarea and insulating boot is put subarea, and below the second layer the 3rd layer is provided with first aid box and puts subarea, transmit rope and put subarea, individual security grounding jumper and put subarea and band and leak and protect patching panel and put subarea.
4. tool chest as claimed in claim 1, it is characterized in that, the described motor-driven district of putting is respectively arranged with and produces material and put subarea, insulation rod subarea, high-voltage grounding wire subarea, low-voltage grounding wire subarea, street lamp grounding jumper subarea, block ear of maize district, standby subarea, provide storage battery for oneself and put subarea and wheel guard shield subarea.
5. the tool chest as described in claim 2,3 or 4, is characterized in that, between adjacent subarea, with baffle plate, isolates.
6. the tool chest as described in claim 1-4 any one, is characterized in that, the described tool of production puts that district is put in district, described security tool, described motor-driven putting between district isolated with baffle plate mutually.
7. the tool chest as described in claim 1-4 any one, is characterized in that, between described door and cabinet, uses spring damping chain connection.
8. the tool chest as described in claim 1-4 any one, is characterized in that, at described cabinet top, is provided with insulating ladder emergency support, and described insulating ladder is fixed on described insulating ladder emergency support.
9. an emergency first-aid repair engineering truck, is characterized in that, is provided with the tool chest described in claim 1-8 any one on described emergency first-aid repair engineering truck.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210296479.9A CN102774332B (en) | 2012-08-20 | 2012-08-20 | Tool cabinet and emergency breakdown truck |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210296479.9A CN102774332B (en) | 2012-08-20 | 2012-08-20 | Tool cabinet and emergency breakdown truck |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102774332A CN102774332A (en) | 2012-11-14 |
CN102774332B true CN102774332B (en) | 2014-11-26 |
Family
ID=47119504
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210296479.9A Active CN102774332B (en) | 2012-08-20 | 2012-08-20 | Tool cabinet and emergency breakdown truck |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102774332B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105059171A (en) * | 2015-08-17 | 2015-11-18 | 国网山东省电力公司枣庄供电公司 | Integrated mobile working platform |
CN107791930A (en) * | 2016-08-31 | 2018-03-13 | 车急修汽车科技有限公司 | Compartment rear with two-way integrated cabinet it is extending go out operation room mobile quick repairing vehicle |
CN107776466A (en) * | 2016-08-31 | 2018-03-09 | 车急修汽车科技有限公司 | Compartment rear with integrated cabinet it is extending go out operation room locomotive paint quick repairing vehicle |
CN106379287B (en) * | 2016-09-22 | 2018-12-21 | 新昌县瑞尚电子有限公司 | A kind of Moveable steam car washer |
CN107732736A (en) * | 2017-11-16 | 2018-02-23 | 广东电网有限责任公司应急抢修中心 | A kind of mobile platform for electric power apparatus examination |
CN107891797A (en) * | 2017-12-05 | 2018-04-10 | 国网江苏省电力公司南通供电公司 | A kind of distribution electric power rush-repair vehicle |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2908454Y (en) * | 2006-06-23 | 2007-06-06 | 马玉良 | Vehicle hot-line work movable tool storehouse |
CN201842005U (en) * | 2010-09-26 | 2011-05-25 | 广东信源物流设备有限公司 | Electric power rescue engineering truck |
CN202172234U (en) * | 2011-08-19 | 2012-03-21 | 马玉良 | Vehicle-mounted safety equipment box |
CN202337236U (en) * | 2011-12-16 | 2012-07-18 | 山东电力集团公司滨州供电公司 | Vehicle-mounted tool box for electric maintenance |
CN202764870U (en) * | 2012-08-20 | 2013-03-06 | 慈溪市供电局 | Tool cabinet and emergency rescue vehicle |
-
2012
- 2012-08-20 CN CN201210296479.9A patent/CN102774332B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2908454Y (en) * | 2006-06-23 | 2007-06-06 | 马玉良 | Vehicle hot-line work movable tool storehouse |
CN201842005U (en) * | 2010-09-26 | 2011-05-25 | 广东信源物流设备有限公司 | Electric power rescue engineering truck |
CN202172234U (en) * | 2011-08-19 | 2012-03-21 | 马玉良 | Vehicle-mounted safety equipment box |
CN202337236U (en) * | 2011-12-16 | 2012-07-18 | 山东电力集团公司滨州供电公司 | Vehicle-mounted tool box for electric maintenance |
CN202764870U (en) * | 2012-08-20 | 2013-03-06 | 慈溪市供电局 | Tool cabinet and emergency rescue vehicle |
Also Published As
Publication number | Publication date |
---|---|
CN102774332A (en) | 2012-11-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102774332B (en) | Tool cabinet and emergency breakdown truck | |
CN206671474U (en) | Vehicle-mounted removable electric-power safe instruments chamber | |
CN202764870U (en) | Tool cabinet and emergency rescue vehicle | |
Floyd | A practical guide for applying the hierarchy of controls to electrical hazards | |
CN211778706U (en) | Communication test instrument with prevent falling structure | |
WO2006086318A3 (en) | Safety shield for use with different diameter racking rods and an adaptor for use therewith | |
CN201184902Y (en) | Electric force test device | |
CN104901227A (en) | Hard insulating shield cover specialized for 35kV live operation | |
CN203267879U (en) | Electric power breakdown van | |
CN205375937U (en) | Safety arrangement is surveyed in electric -examination of electrical control slab band | |
CN204666660U (en) | Clamp are assisted in a kind of detachable electroscope night work | |
CN202205061U (en) | Remote control module for security inspection equipment | |
CN204304231U (en) | Faulty action preventing distribution power automation terminal equipment | |
CN204441759U (en) | Relay-protection pressing plate insulating protective cover | |
CN106841849A (en) | One kind is portable not to power off relay protection check dolly | |
CN214585544U (en) | Intelligent direct-current high-voltage generator | |
CN207582551U (en) | A kind of quartering hammer with anti-splashing tempering cover | |
CN205863050U (en) | A kind of communication equipment early warning press key protecting equipment | |
CN204126349U (en) | A kind of operations involving high pressure equipment adapting to faint light | |
CN204310979U (en) | A kind of detonator assembling safety guard | |
CN214996383U (en) | High-voltage equipment prefabricated cabin with high safety and high strength | |
CN202966166U (en) | Vehicle-mounted electric power emergency repair tool box | |
CN102514603A (en) | Relay protection test buggy for transformer station overhaul | |
CN210858182U (en) | Charging device for stereo garage | |
CN104155544A (en) | Special high-voltage test discharging rod on-site detection box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |