CN102767383A - Processing method of underground tunnel supporting column - Google Patents
Processing method of underground tunnel supporting column Download PDFInfo
- Publication number
- CN102767383A CN102767383A CN2012102687902A CN201210268790A CN102767383A CN 102767383 A CN102767383 A CN 102767383A CN 2012102687902 A CN2012102687902 A CN 2012102687902A CN 201210268790 A CN201210268790 A CN 201210268790A CN 102767383 A CN102767383 A CN 102767383A
- Authority
- CN
- China
- Prior art keywords
- bamboo
- silk
- bamboo silk
- glue
- processing method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention discloses a processing method of an underground tunnel supporting column. The underground tunnel supporting column is obtained mainly by cutoff process, bamboo chip forming process, bamboo filament pressing process, gumming process, drying process, loading process, pressing process, solidifying process and anti-corroding process. The processing method of the underground tunnel supporting column overcomes shortcomings that bamboo underground tunnel supporting columns do not exist on the domestic market, and the underground tunnel supporting column can be processed to 4 m; and simultaneously, energy is saved, the environment is protected, and environmental pollution is effectively reduced.
Description
Technical field
The present invention relates to a kind of processing method of pitprop.
Background technology
At present, the equal a large amount of pitprop of demand in this multiple industry, its production and processing method is also varied; But most cost of production is high, and does not have bamboo pitprop now, and general ore pillar length is at 2m; Length is short, in production and processing method, causes environment pollution simultaneously easily.
Summary of the invention
For deficiency and the defective of alleviating prior art, the object of the present invention is to provide a kind of processing method of pitprop.
The present invention adopts following technical scheme to achieve these goals:
The processing method of pitprop may further comprise the steps:
(1), fracture: clip the crooked termination that forms when former bamboo root is felled;
(2), hack, silk pressing: the thick bamboo tube behind the fracture is split into thin bamboo plate again, layering then, the bamboo chip after hacking is pressed into the bamboo silk, but the bamboo silk that bamboo filament fibre does not rupture;
(3), boiling: carried out boiling 28-32 hour, the control boiling temperature is 425-435 ℃, again should be below 10% through the moisture Control that is dried to the bamboo silk; Above process repeated multiple times;
(4), impregnation: the bamboo silk that drying is crossed is placed in the iron cage, forces to put into to fill the glue pond that modulates glue, and the bamboo silk all immerses glue; Glue composition: NaOH: 9-11%, formaldehyde: 9-11%, phenol: 58-62%; Water: 18-22%; Let the bamboo silk fully soak into, soak time is about 20 minutes, mentions the iron cage then and is placed on the dried unnecessary glue of drench on the glue pool side;
(5), drying: again the bamboo silk behind the impregnation is dried to moisture below 10%;
(6), charging, press: the bamboo silk is placed in the charger of press and delivers in the hopper of press; Under 3000-6000t pressure; Force the bamboo silk to be expressed in the U type die, will be out of shape the bamboo silk with cover plate and iron pin then and be locked in the mould, lock with bolt again after pulling out press;
(7), curing, anticorrosion: the bamboo silk square stock that suppresses is cured in mould, in mould, takes out then, and carries out preservative treatment, the final head warehouse-in of cutting out.
The processing method of reorganization bamboo, curing can adopt continous way drying room, fixed drying room, Steam Heating, fuel Heating or electrical heating to solidify in the described step (7).
Described glue composition: NaOH: 10%, formaldehyde: 10%, phenol: 60%, water: 20%.
Digestion process repeats repeatedly, can not have under the situation of charing, and bamboo wood can not be out of shape after solidifying.Its stress is fully discharged.
Advantage of the present invention: 1, the domestic market does not have bamboo pitprop now; 2, length: general ore pillar length is at 2m, and this technology can be machined to 4m; 3, remove carbonization technique, effectively reduced environment pollution.
Description of drawings
Fig. 1 process chart of the present invention.
The specific embodiment
Embodiment 1: the processing method of pitprop may further comprise the steps:
(1), fracture: clip the crooked termination that forms when former bamboo root is felled;
(2), hack, silk pressing: the thick bamboo tube behind the fracture is split into thin bamboo plate again, layering then, the bamboo chip after hacking is pressed into the bamboo silk, but the bamboo silk that bamboo filament fibre does not rupture;
(3), boiling: carried out boiling 28-32 hour, the control boiling temperature is 425-435 ℃, again should be below 10% through the moisture Control that is dried to the bamboo silk; Above boiling-dry run 3 times repeatedly;
(4), impregnation: the bamboo silk that drying is crossed is placed in the iron cage, forces to put into to fill the glue pond that modulates glue, and the bamboo silk all immerses glue; Glue composition: NaOH: 9-11%, formaldehyde: 9-11%, phenol: 58-62%; Water: 18-22%; Let the bamboo silk fully soak into, soak time is about 20 minutes, mentions the iron cage then and is placed on the dried unnecessary glue of drench on the glue pool side;
(5), drying: again the bamboo silk behind the impregnation is dried to moisture below 10%;
(6), charging, press: the bamboo silk is placed in the charger of press and delivers in the hopper of press; Under 3000-6000t pressure; Force the bamboo silk to be expressed in the U type die, will be out of shape the bamboo silk with cover plate and iron pin then and be locked in the mould, lock with bolt again after pulling out press;
(7), curing, anticorrosion: the bamboo silk square stock that suppresses is cured in mould, in mould, takes out then, and carries out preservative treatment, the final head warehouse-in of cutting out.
The processing method of reorganization bamboo, curing can adopt continous way drying room, fixed drying room, Steam Heating, fuel Heating or electrical heating to solidify in the described step (7).
Described glue composition: NaOH: 10%, formaldehyde: 10%, phenol: 60%, water: 20%.
The density of the pitprop that the present invention produces is 0.8-1.6, can be 50 years service time.
Claims (3)
1. the processing method of a pitprop is characterized in that may further comprise the steps:
(1), fracture: clip the crooked termination that forms when former bamboo root is felled;
(2), hack, silk pressing: the thick bamboo tube behind the fracture is split into thin bamboo plate again, layering then, the bamboo chip after hacking is pressed into the bamboo silk, but the bamboo silk that bamboo filament fibre does not rupture;
(3), boiling: carried out boiling 28-32 hour, the control boiling temperature is 425-435 ℃, again should be below 10% through the moisture Control that is dried to the bamboo silk; Above process repeated multiple times;
(4), impregnation: the bamboo silk that drying is crossed is placed in the iron cage, forces to put into to fill the glue pond that modulates glue, and the bamboo silk all immerses glue; Glue composition: NaOH: 9-11%, formaldehyde: 9-11%, phenol: 58-62%; Water: 18-22%; Let the bamboo silk fully soak into, soak time is about 20 minutes, mentions the iron cage then and is placed on the dried unnecessary glue of drench on the glue pool side;
(5), drying: again the bamboo silk behind the impregnation is dried to moisture below 10%;
(6), charging, press: the bamboo silk is placed in the charger of press and delivers in the hopper of press; Under 3000-6000t pressure; Force the bamboo silk to be expressed in the U type die, will be out of shape the bamboo silk with cover plate and iron pin then and be locked in the mould, lock with bolt again after pulling out press;
(7), curing, anticorrosion: the bamboo silk square stock that suppresses is cured in mould, in mould, takes out then, and carries out preservative treatment, the final head warehouse-in of cutting out.
2. according to the processing method of claims 1 described reorganization bamboo, it is characterized in that: curing can adopt continous way drying room, fixed drying room, Steam Heating, fuel Heating or electrical heating to solidify in the described step (7).
3. according to the processing method of claims 1 described reorganization bamboo, it is characterized in that: described glue composition: NaOH: 10%, formaldehyde: 10%, phenol: 60%, water: 20%.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210268790.2A CN102767383B (en) | 2012-07-31 | 2012-07-31 | Processing method of underground tunnel supporting column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210268790.2A CN102767383B (en) | 2012-07-31 | 2012-07-31 | Processing method of underground tunnel supporting column |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102767383A true CN102767383A (en) | 2012-11-07 |
CN102767383B CN102767383B (en) | 2014-08-13 |
Family
ID=47094923
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210268790.2A Expired - Fee Related CN102767383B (en) | 2012-07-31 | 2012-07-31 | Processing method of underground tunnel supporting column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102767383B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105150351A (en) * | 2015-08-31 | 2015-12-16 | 安徽宏宇竹业科技股份有限公司 | Bamboo pillar manufacturing technical method |
CN107021111A (en) * | 2015-06-23 | 2017-08-08 | 北京嘉孚科技有限公司 | A kind of stay and its manufacture method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2099197U (en) * | 1991-10-24 | 1992-03-18 | 煤炭科学研究总院杭州环境保护研究所 | Compound bamboo fibre backboard for mine |
CN1072991A (en) * | 1991-12-01 | 1993-06-09 | 煤炭科学研究总院杭州环境保护研究所 | Bamboo prop for mine |
JP2003106085A (en) * | 2001-09-28 | 2003-04-09 | Tonnel Kobo:Kk | Bamboo reinforcing member for stabilizing excavated surface of tunnel |
CN2599239Y (en) * | 2002-12-27 | 2004-01-14 | 杜弟林 | Supporting pillar for mine use |
CN102275200A (en) * | 2011-06-22 | 2011-12-14 | 浙江永裕竹业股份有限公司 | Method for manufacturing bamboo-fiber composite section |
-
2012
- 2012-07-31 CN CN201210268790.2A patent/CN102767383B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2099197U (en) * | 1991-10-24 | 1992-03-18 | 煤炭科学研究总院杭州环境保护研究所 | Compound bamboo fibre backboard for mine |
CN1072991A (en) * | 1991-12-01 | 1993-06-09 | 煤炭科学研究总院杭州环境保护研究所 | Bamboo prop for mine |
JP2003106085A (en) * | 2001-09-28 | 2003-04-09 | Tonnel Kobo:Kk | Bamboo reinforcing member for stabilizing excavated surface of tunnel |
CN2599239Y (en) * | 2002-12-27 | 2004-01-14 | 杜弟林 | Supporting pillar for mine use |
CN102275200A (en) * | 2011-06-22 | 2011-12-14 | 浙江永裕竹业股份有限公司 | Method for manufacturing bamboo-fiber composite section |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107021111A (en) * | 2015-06-23 | 2017-08-08 | 北京嘉孚科技有限公司 | A kind of stay and its manufacture method |
CN105150351A (en) * | 2015-08-31 | 2015-12-16 | 安徽宏宇竹业科技股份有限公司 | Bamboo pillar manufacturing technical method |
Also Published As
Publication number | Publication date |
---|---|
CN102767383B (en) | 2014-08-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100572009C (en) | Bamboo recombination sectional material and manufacture method thereof | |
CN101642924B (en) | Scrimber and manufacturing method thereof | |
CN100588518C (en) | Method for producing recombination module wood from secondary processing wood | |
CN105965638A (en) | Microwave treatment reconstructed material and preparing methods thereof | |
CN106049150A (en) | Manufacturing method of fiber board | |
CN107414981A (en) | The consecutive production method of stratiform compression wood | |
CN102837347A (en) | Poplar structural engineering material and manufacture method thereof | |
CN101015925A (en) | Method for drying yate | |
CN103991111A (en) | Large-scale high-density wood-based material and method for manufacturing same through microwave heating, pressing and gluing | |
CN102767383B (en) | Processing method of underground tunnel supporting column | |
CN103171013A (en) | Technique of wood deep carbonation | |
CN106584634A (en) | Wood surface layer compression method and wood surface layer compressed material thereof | |
CN103583714B (en) | Production method for Puer tea and special equipment of production method | |
CN107498656B (en) | Efficient production method of small-diameter wood composite material | |
CN108340461A (en) | A kind of novel recombination is wooden to make method | |
CN102674265A (en) | Method for producing insoluble sulfur by one-step water method | |
CN107813397A (en) | A kind of preparation method of the controllable lightweight bamboo and wood base fiberboard of density | |
CN105060894A (en) | Method for preparing zirconium carbide wood ceramic | |
CN102335945A (en) | Compound fiber board and manufacturing method thereof | |
CN103887060A (en) | Manufacturing method for lower end seal of dry type transformer low-voltage coil | |
JP2008274111A (en) | Method for producing biocoke and the production product | |
CN103895082A (en) | Wood plate compressing densification and carbonization technology | |
CN101774196A (en) | Process method for manufacturing hard wood by high-frequency warming and solidifying | |
CN108115789B (en) | A kind of windmill palm vine material low-melting alloy enhancing method of modifying | |
CN204585422U (en) | Scrimber compacting and facing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140813 Termination date: 20160731 |
|
CF01 | Termination of patent right due to non-payment of annual fee |