CN102766495B - Methane purifying tower - Google Patents

Methane purifying tower Download PDF

Info

Publication number
CN102766495B
CN102766495B CN201110120472.7A CN201110120472A CN102766495B CN 102766495 B CN102766495 B CN 102766495B CN 201110120472 A CN201110120472 A CN 201110120472A CN 102766495 B CN102766495 B CN 102766495B
Authority
CN
China
Prior art keywords
tower
purification
liquid
king
biogas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110120472.7A
Other languages
Chinese (zh)
Other versions
CN102766495A (en
Inventor
朱永彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangshui Guowei Bearing Pedestal Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201110120472.7A priority Critical patent/CN102766495B/en
Publication of CN102766495A publication Critical patent/CN102766495A/en
Application granted granted Critical
Publication of CN102766495B publication Critical patent/CN102766495B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Disinfection, Sterilisation Or Deodorisation Of Air (AREA)

Abstract

Methane purifying tower, the biogas produced by natural kinetic energy methane production synthesizing bank is filtered by this tower, removes impurity.Do not reach requirement as once filtered, can cascade filtration to up to standard.In case the biogas produced is without filtration, corrosion uses the object of biogas.To reach the not contaminated object of conservation of nature environment.

Description

Methane purifying tower
One, technical field
The present invention designs a kind of methane purifying tower.
Two, background technology
According to the golden project sunshine-agricultural synthesis technology series of Central Plains peasant press " biogas construction with utilize 300 to ask ", with reference to the new forms of energy book series " biogas practical technique guide " that Henan science tech publishing house publishes, through long-term research and exploration, to production technology reform and the innovation of this energy.On existing production technology basis, develop skill content, impels biogas output and quality greatly to improve.Moreover, also can reduce greenhouse gas emission, purify air, improve and protection of the environment.
Three, the content of invention methane purifying tower
The object of this invention:
Object of the present invention, is to provide a kind of methane purifying tower, and the biogas that natural kinetic energy methane production synthesizing bank is produced by this tower is filtered purification by this tower, removes impurity.Not reaching requirement as once filtered purification, can purify to up to standard by cascade filtration.In case the biogas produced is purified without filtration, heavy corrosion uses the object of biogas.Object is used not by breaking-up, the not contaminated object of physical environment to reach protection.
The technical scheme of the methane purifying tower that this invention provides:
Methane purifying tower provided by the invention, is characterized in that, this tower divides positive six prism moulding, also can be designed to cylinder, terrace with edge, the shape of other solids of the moulding such as pyramid and combination mutually thereof, but its effect is identical with method or close.This tower is divided into main purification tower, secondary purification tower, settling tank.By the gas produced in natural kinetic energy methane production synthesizing bank, flow through the lotus flower platform in king-tower, flow through tower liquid through lotus flower platform release aperture, discharge from tower top, be cleaner biogas, then store utilization.
Tower liquid flows through secondary tower from king-tower, then flows into settling tank by secondary tower.King-tower is flowed to again by settling tank.Recycle.
If primary purification purity is inadequate, can multistage purification.
The tower liquid that king-tower sprays into from top and the tower liquid that bottom high-pressure pump is extracted out want impartial.The tower liquid that secondary tower top flows into from king-tower and the tower liquid that its underpart high-pressure pump is extracted out want impartial.
Lotus flower platform in king-tower, diffluence room and emission surface, its moulding can be circular, also can be other geometrical shapies.
The brief introduction of methane purifying tower:
1. this tower king-tower, secondary tower all have employed hexagonal prism.Also other solids can be adopted, and the space multistory mutually combined of these solids.These can play identical or close function, functions and effects.
2. the biogas produced in natural kinetic energy biogas production synthetic tower, containing impurity such as a large amount of sulfide.Incendivity, but scent of.If for the power making machinery, perishable cylinder body.Meanwhile, due to thermophilic fermentation, when biogas flows out in tower, containing a certain amount of moisture, the temperature of certain value.Tower of the input of this biogas being withdrawn deposit can be removed, and purifies, cooling.As primary purification is unholiness, can multistage purification, until reach standard.
3. in this tower, middle part, bottom are all the lime aqueous solutions clarified, and top is intensive nebulization region, further purifying marsh gas, and the many spraying plants installed by wall spray and formed.Topmost has one to assemble biogas space, to make biogas progressively discharge.As unclean in once filtered, can cascade filtration.
4. lotus flower platform is placed in the appropriate location, bottom of purification tower, and surrounding and tower wall have certain gap, so that tower liquid is let out along Ta Bixia above.Purification tower inside forms upper and lower circulation system.Lotus flower platform can adopt circle, also can adopt other geometrical shapies, and the shape mutually combined of some solids.Its principle, function and effect are all identical or close.
5. the biogas will produced in natural kinetic energy biogas production synthetic tower, by pipeline, in the lotus flower platform in input purification tower, after shunting, is evenly discharged by many pin holes, is then purified by tower liquid and range of atomization in tower.
6. the tower liquid extracted out from the bottom position of purification tower by high-pressure hydraulic pump, enters secondary tower from secondary tower top.After remaining biogas is collected by secondary tower further, extracted out by high-pressure hydraulic pump and inject settling tank.
7. the tower liquid of turnover in major and minor tower wants impartial, to make the liquid in major and minor tower remain constant height and be the tower liquid constantly updated, prevents void tower.
8. the clear aqueous solution in settling tank is injected purification tower by the spraying area on purification tower top, make tower liquid entirety form recycle.
Beneficial effect of the present invention:
Utilize space multistory geometry, give full play to the active effect of biogas.Protection of the environment, improves people's quality of life, not causticize burner.
Four. accompanying drawing illustrates:
1. Fig. 1, the schematic diagram of purification tower.
Wherein: 1. intake ducting; 2. tower liquid pipeline is extracted; 3. hermatic door; 4. vision slit; 5. lotus flower platform; 6. spraying input house steward; 7. biogas hole is arranged.
2. Fig. 2, purification secondary tower structural representation.Wherein 8. secondary tower wall; 9. hole, natural pond is arranged; 10. tower fluid apertures is inputted; discharge tower fluid apertures.
3. Fig. 3, lotus flower platform structural representation.Wherein, pin hole face; biogas diffluence room.
4. Fig. 4, settling tank structural representation.Wherein: input tower liquid pipe; pool wall; at the bottom of pond.
Five, embodiment
Methane purifying tower Production Flow Chart:
1. the gas will produced in digestion anaerobic tower, flows through the lotus flower platform of purification tower, is then discharged in tower liquid by the release aperture of lotus flower platform, discharges collection storage utilization through the hole, natural pond that goes out of tower top.
2. tower liquid is vaporific from the top of king-tower sprays in tower, is extracted out by pump from bottom, then sends into secondary tower from top.Settling tank is sent into after being extracted out by pump bottom secondary tower.King-tower is entered again by settling tank pumping.The recycle of tower liquid.
3. the turnover of main and auxiliary tower wants impartial, makes to remain in tower constant tower liquid.

Claims (3)

1. methane purifying tower, is characterized in that: this tower divides positive six prism moulding, or is designed to cylinder, or terrace with edge, or pyramid, or the shape of its other solids mutually combined;
This tower is divided into main purification tower, secondary purification tower, settling tank; By the gas produced in natural kinetic energy methane production synthesizing bank, flow through the lotus flower platform in main purification tower, flow through tower liquid through lotus flower platform release aperture, discharge to tower top;
In this tower, middle part, bottom are all the lime aqueous solutions clarified, and top is intensive nebulization region, further purifying marsh gas, and the many spraying plants installed by wall spray and form; Topmost has one to assemble biogas space, to make biogas progressively discharge; Tower liquid is vaporific from the top of king-tower to be sprayed in tower;
Extract tower liquid by high-pressure hydraulic pump out from the bottom position of main purification tower, enter secondary tower from secondary tower top; After remaining biogas is collected by secondary tower further, extracted out by high-pressure hydraulic pump and inject settling tank;
Clear aqueous solution in settling tank is injected purification tower by the spraying area on purification tower top;
Tower liquid flows through secondary tower from king-tower, then flows into settling tank by secondary tower, then flows to king-tower by settling tank, recycle; If primary purification degree is inadequate, multistage purification;
Lotus flower platform is placed in the appropriate location, bottom of purification tower, above tower liquid let out along Ta Bixia; Lotus flower platform adopts circular, or adopts other geometrical shapies, and the shape mutually combined of some solids.
2. purification tower according to claim 1, is characterized in that: the tower liquid that king-tower sprays into from top and the tower liquid that bottom high-pressure pump is extracted out want impartial; The tower liquid that secondary tower top flows into from king-tower and the tower liquid that its underpart high-pressure pump is extracted out want impartial.
3. purification tower according to claim 1, is characterized in that: the lotus flower platform in king-tower, diffluence room and emission surface, and its moulding is circular, or other geometrical shapies.
CN201110120472.7A 2011-05-04 2011-05-04 Methane purifying tower Expired - Fee Related CN102766495B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110120472.7A CN102766495B (en) 2011-05-04 2011-05-04 Methane purifying tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110120472.7A CN102766495B (en) 2011-05-04 2011-05-04 Methane purifying tower

Publications (2)

Publication Number Publication Date
CN102766495A CN102766495A (en) 2012-11-07
CN102766495B true CN102766495B (en) 2016-02-03

Family

ID=47094080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110120472.7A Expired - Fee Related CN102766495B (en) 2011-05-04 2011-05-04 Methane purifying tower

Country Status (1)

Country Link
CN (1) CN102766495B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104560644A (en) * 2014-12-22 2015-04-29 朱永彪 Anaerobic power generation and gas supply station with film mixed wattle and steel structure

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4348211A (en) * 1981-02-06 1982-09-07 Zimmerman Edwin H Gas generating system
CN201104074Y (en) * 2007-11-06 2008-08-20 刘兴国 Skid mounted biogas purifying and liquefying device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4348211A (en) * 1981-02-06 1982-09-07 Zimmerman Edwin H Gas generating system
CN201104074Y (en) * 2007-11-06 2008-08-20 刘兴国 Skid mounted biogas purifying and liquefying device

Also Published As

Publication number Publication date
CN102766495A (en) 2012-11-07

Similar Documents

Publication Publication Date Title
CN103865768A (en) Automatic alarming glass reinforced plastic and steel mixed membrane anaerobic jar
CN102766495B (en) Methane purifying tower
CN101692782B (en) Fertigation facility of domestic sewage after biochemical treatment
CN202279808U (en) Methane purifying tower
CN201598286U (en) Methane tank integrating gas production and gas storage
CN203700029U (en) Novel greenhouse flower plant sewage treatment system
CN203469646U (en) Minitype centrifugal sand-settling-type drip irrigation filter
CN104087504B (en) A kind of methane holder and comprise the methane-generating pit of this gas storage holder
CN206260566U (en) A kind of fountain type circular biological fish jar
CN202785814U (en) Solar water body purification device
CN2603806Y (en) Methane generator
CN102311813A (en) Method for extracting liquid fuel by waste sewage
CN202968271U (en) Circulation system for sewage filtration of ecological garden landscape
CN204058404U (en) A kind of biogas purifier
CN202933695U (en) Digestion purifying tower
CN203215948U (en) Recycling device for condensate of air conditioner
CN203346387U (en) Biogas digester
CN201942602U (en) High-position discharge double-return methane fermentation device
CN103418315A (en) Digestion purification tower
CN205590525U (en) Circle island formula integration effluent water sump system
CN201997193U (en) Air filtering device
CN203821486U (en) Cellar ridge with sterilization and disinfection function
CN103224877B (en) Double-hydraulic-chamber marsh gas tank
CN204039394U (en) A kind of methane holder and comprise the methane-generating pit of this gas storage holder
CN203222587U (en) Double-water-pressure-room biogas digester

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 236000 Anhui city of Fuyang province Funan County Jiao Po Zhen Xu Peng Cun

Applicant after: Zhu Yongbiao

Address before: 236000 Beijing East Road Hedong law service center, Yingdong District, Fuyang, Anhui

Applicant before: Zhu Yongbiao

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201019

Address after: 224600 Jiangsu province Yancheng City Xiangshui Park Road No. 4, Xiangshui Bank of China real estate two floor

Patentee after: XIANGSHUI GESIQI TECHNOLOGY Co.,Ltd.

Address before: 236000 Anhui city of Fuyang province Funan County Jiao Po Zhen Xu Peng Cun

Patentee before: Zhu Yongbiao

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230413

Address after: 224600 north side of Xiangchen Road, Xiangshui County, Yancheng City, Jiangsu Province

Patentee after: Xiangshui Guowei bearing pedestal Co.,Ltd.

Address before: 224600 2nd floor, Xiangshui Zhongxing real estate, No.4, Shuangyuan Middle Road, Xiangshui County, Yancheng City, Jiangsu Province

Patentee before: XIANGSHUI GESIQI TECHNOLOGY CO.,LTD.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160203

CF01 Termination of patent right due to non-payment of annual fee