CN102764858A - Fastening device for pre-buried pipelines - Google Patents
Fastening device for pre-buried pipelines Download PDFInfo
- Publication number
- CN102764858A CN102764858A CN2012102563346A CN201210256334A CN102764858A CN 102764858 A CN102764858 A CN 102764858A CN 2012102563346 A CN2012102563346 A CN 2012102563346A CN 201210256334 A CN201210256334 A CN 201210256334A CN 102764858 A CN102764858 A CN 102764858A
- Authority
- CN
- China
- Prior art keywords
- screw
- adjusting nut
- screw rod
- water pipe
- screwed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
A fastening device for pre-buried pipelines relates to the field of aluminum alloy casting tools and comprises a blocking seat provided with a U-shaped chuck on the upper part and a screw rod on the lower part, wherein a cross bar runs through the middle part of the U-shaped chuck, a stop screw is screwed in the top of the U-shaped chuck, the lower end of the screw rod is screwed in the upper end of an adjusting nut, a rolled-thread screw is screwed in the lower end of the adjusting nut, and a locking nut is arranged on the junction of the upper end of the adjusting nut and the screw rod. With the adoption of the fastening device, the rate of finished products is increased, the stress deformation is controlled, namely, a copper pipe can be replaced with a stainless steel pipe, and thus the manufacturing cost is greatly reduced; and the service life of a mould is also prolonged due to the fact that the corrosion resistance of the stainless steel is far higher than that of the copper pipe, thereby the competitiveness of the product is improved.
Description
Technical field:
The present invention relates to aluminium alloy casting frock field, relate in particular to a kind of pre-buried pipeline and use fastener.
Background technology:
The household electrical appliances mould in use; Mould need be with recirculated water to mold heated, and so just requiring will have water back in mould, and the technology of existing placement water back has two kinds; A kind of be the strand moulding after; Process the water pipe groove at the strand inner chamber, then water pipe is put into groove, with low-melting alloy that the tube seat envelope is flat again; The shortcoming of this technology is; The tube seat difficulty of processing is big, and water pipe is placed and limited by cavity shape, and time-consuming, effort, cost are high, so seldom adopt.Another kind is when the strand moulding, and water pipe is embedded in the strand, at first on wooden model, produces the water pipe groove, makes sand mold then, at last water pipe is fixed in the water pipe groove on the sand mold with U sections silk, just can mould assembling cast.What existing casting household electrical appliances mould strand was adopted is the green-sand casting technique, and the pre-buried water pipe material is a copper tube, and the intensity of the sand mold in this technology self is very low; If water pipe is fixed on the sand mold, the stress deformation that water pipe is heated and is produced when casting can make water pipe produce displacement and deformation again; Even be with sand mold to change together; Cause the sand mold avalanche, cause product rejection, even copper tube is like this; More nobody removes to use low, the corrosion resistant stainless steel waterpipe of price again, and reason is that the stress deformation after stainless steel tube is heated is far longer than copper tube; Comprehensive above problem draws, and the strand cost that this explained hereafter is come out is high, yield rate is low; If the stress deformation problem after way control water pipe is heated is arranged; With the qualification rate that improves strand greatly; Low price, corrosion resistant stainless steel waterpipe also can be used as pre-buried pipeline simultaneously, so just can reduce the cost of strand, have also improved the service life of mould.
Summary of the invention:
Technical problem to be solved by this invention is to overcome the defective of prior art, provides a kind of pre-buried pipeline simple to operate, broad-spectrum to use fastener, to solve and to control the stress deformation problem after water pipe is heated.
Technical problem to be solved by this invention adopts following technical scheme to realize.
A kind of pre-buried pipeline is used fastener; It is characterized in that: comprise that top is that U type dop bottom is the deck of screw rod; Pass cross bar in the middle of the said U type dop, said U type dop top screws in limit screw, and said screw rod lower end screws in the upper end of adjusting nut; Said adjusting nut lower end has the silk of bundle screw to screw in, and said adjusting nut upper end is provided with locking nut with the screw rod intersection; Said cross bar is a straight-bar, and it is inserted in the U type dop on deck top, is used for load on sandbox, and its length outline is longer than sandbox, is used for being connected on whole fastener and the sandbox; Limit screw is spun in the screw at U type dop top, is used for deck and cross bar is fastenedly connected, and said adjusting nut upper end is connected with the screw rod of deck bottom; Its turn up and down; Can change the length of whole device, thereby realize scalable, the bundle silk screw that said adjusting nut lower end screws in is convenient to fix the connection water pipe with the bundle silk of φ 1mm; And can make between water pipe and the device and form a slit; When casting, liquation can get into this slit, and the water pipe of device below can be wrapped to treat to solidify afterwards by liquation; Said locking nut is spun between the screw rod and adjusting nut of deck bottom, is used for locking adjusting nut, when preventing to prick the silk screw and screwing in adjusting nut, and adjusting nut rotation and influence the length of device.
Said limit screw is vertical with U type dop, and the outside at misalignment U type dop center, so limit screw can very firm fastening cross bar.
Beneficial effect of the present invention is: after 1. this device assembles each other and connects, formed an integral body, the lower end of water pipe and device is fastenedly connected with pricking silk; The top of device is connected with sandbox through cross bar, and the water pipe that makes, device, sandbox have formed integral body, when water pipe when casting is heated; The stress deformation power of its generation has been transferred to sandbox, has avoided the destruction of deformation force to sand mold, and this deformation force is not enough so that this device and sand mold generation deformation and displacement; So this deformation force just can not make water pipe that any change takes place, and has promptly guaranteed the shape and the position of water pipe; Guaranteed the shape of sand mold again, therefore, the yield rate of strand is improved; 2. because the application of this device makes stress deformation be able to control, also just can replace copper tube, because stainless price, makes that manufacturing cost has obtained reducing greatly far below copper tube with stainless steel tube; 3. the utilization of this device can be used as pre-buried pipeline with stainless steel tube, and stainless corrosion resistance is far above copper tube, thus improved the service life of mould, thus improved Enterprises'Competitiveness.
Description of drawings:
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the cutaway view of Fig. 1;
Fig. 3 is fixed on the sketch map in the sandbox for the present invention;
Fig. 4 is the sketch map of tight flask of the present invention and water pipe.
The specific embodiment:
For technological means, creation characteristic that the present invention is realized, reach purpose and effect and be easy to understand and understand, below in conjunction with concrete diagram, further set forth the present invention.
Shown in Fig. 1-4, a kind of pre-buried pipeline is used fastener, comprises that top is that U type dop 21 bottoms are the deck 2 of screw rod 22; Pass cross bar 3 in the middle of the U type dop 21; U type dop 21 tops screw in limit screw 1, and limit screw 1 is vertical with U type dop 21, and the outside at misalignment U type dop 21 centers; Limit screw 1 is the fastening cross bar 3 in jail very; Screw rod 22 lower ends screw in the upper end of adjusting nut 5, and adjusting nut 5 lower ends have the silk of bundle screw 6 to screw in, and adjusting nut 5 upper ends and screw rod 22 intersections are provided with locking nut 4; Cross bar 3 is straight-bars, and it is inserted in the U type dop 21 on deck 2 tops, is used for load on sandbox 7, and its length outline is longer than sandbox 7, is used for being connected on whole fastener and the sandbox 7; Limit screw 1 is spun in the screw at U type dop 21 tops, is used for deck 2 and is fastenedly connected with cross bar 3, and adjusting nut 5 upper ends are connected with the screw rod 22 of deck 2 bottoms; Its turn up and down; Can change the length of whole device, thereby realize scalable, the bundle silk screw 6 that adjusting nut 5 lower ends screw in is convenient to fix connection water pipe 8 with the bundle silk 9 of φ 1mm; And can make between water pipe 8 and the device and form a slit; During casting, liquation can get into this slit, and the water pipe 8 of device below can be wrapped to treat to solidify afterwards by liquation; Locking nut 4 is spun between the screw rod 22 and adjusting nut 5 of deck 2 bottoms, is used for locking adjusting nut 5, when preventing to prick silk screw 6 and screwing in adjusting nuts 5, and adjusting nut 5 rotations and influence the length of device.
More than show and described basic principle of the present invention, principal character and advantage of the present invention.The technical staff of the industry should understand; The present invention is not restricted to the described embodiments; That describes in the foregoing description and the specification just explains principle of the present invention; Under the prerequisite that does not break away from spirit and scope of the invention, the present invention also has various changes and modifications, and these variations and improvement all fall in the scope of the invention that requires protection.The present invention requires protection domain to be defined by appending claims and equivalent thereof.
Claims (2)
1. a pre-buried pipeline is used fastener; It is characterized in that: comprise that top is that U type dop bottom is the deck of screw rod; Pass cross bar in the middle of the said U type dop, said U type dop top screws in limit screw, and said screw rod lower end screws in the upper end of adjusting nut; Said adjusting nut lower end has the silk of bundle screw to screw in, and said adjusting nut upper end is provided with locking nut with the screw rod intersection.
2. pre-buried pipeline according to claim 1 is used fastener, it is characterized in that: said limit screw is vertical with U type dop, and the outside at misalignment U type dop center.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102563346A CN102764858A (en) | 2012-07-24 | 2012-07-24 | Fastening device for pre-buried pipelines |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102563346A CN102764858A (en) | 2012-07-24 | 2012-07-24 | Fastening device for pre-buried pipelines |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102764858A true CN102764858A (en) | 2012-11-07 |
Family
ID=47092555
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012102563346A Pending CN102764858A (en) | 2012-07-24 | 2012-07-24 | Fastening device for pre-buried pipelines |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102764858A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104384443A (en) * | 2014-11-07 | 2015-03-04 | 滁州金诺实业有限公司 | Process for fabricating template pipe-containing cast part in manner of pre-embedding stainless steel pipeline |
CN104399907A (en) * | 2014-11-07 | 2015-03-11 | 滁州金诺实业有限公司 | Mould plate type pipe-containing casting dedicated sandbox upper box fixing tool |
CN104399942A (en) * | 2014-11-07 | 2015-03-11 | 滁州金诺实业有限公司 | Template type pipe casting-containing stainless steel water pipe fixing structure |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09314308A (en) * | 1996-05-23 | 1997-12-09 | Daido Steel Co Ltd | Lost foam pattern casting method |
JP2935404B2 (en) * | 1994-03-01 | 1999-08-16 | 宇部興産株式会社 | Manufacturing method of molding die having heating / cooling holes and molding die |
JP3194560B2 (en) * | 1994-09-06 | 2001-07-30 | 本田技研工業株式会社 | Casting method for cooling water channel of gun arm |
US6460598B1 (en) * | 2000-11-27 | 2002-10-08 | Ceramic Process Systems Corporation | Heat exchanger cast in metal matrix composite and method of making the same |
CN2832358Y (en) * | 2005-11-17 | 2006-11-01 | 陕西柴油机重工有限公司 | Elongated through-hole casting device for metal casting |
CN101020225A (en) * | 2006-12-20 | 2007-08-22 | 天水星火机床有限责任公司 | Tube imbedding casting process to form bent cast hole |
JP2009236125A (en) * | 2008-03-25 | 2009-10-15 | Saeki Kinzoku Kk | Hanging bolt support |
CN202684034U (en) * | 2012-07-24 | 2013-01-23 | 滁州金诺实业有限公司 | Securing device for embedded pipeline |
-
2012
- 2012-07-24 CN CN2012102563346A patent/CN102764858A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2935404B2 (en) * | 1994-03-01 | 1999-08-16 | 宇部興産株式会社 | Manufacturing method of molding die having heating / cooling holes and molding die |
JP3194560B2 (en) * | 1994-09-06 | 2001-07-30 | 本田技研工業株式会社 | Casting method for cooling water channel of gun arm |
JPH09314308A (en) * | 1996-05-23 | 1997-12-09 | Daido Steel Co Ltd | Lost foam pattern casting method |
US6460598B1 (en) * | 2000-11-27 | 2002-10-08 | Ceramic Process Systems Corporation | Heat exchanger cast in metal matrix composite and method of making the same |
CN2832358Y (en) * | 2005-11-17 | 2006-11-01 | 陕西柴油机重工有限公司 | Elongated through-hole casting device for metal casting |
CN101020225A (en) * | 2006-12-20 | 2007-08-22 | 天水星火机床有限责任公司 | Tube imbedding casting process to form bent cast hole |
JP2009236125A (en) * | 2008-03-25 | 2009-10-15 | Saeki Kinzoku Kk | Hanging bolt support |
CN202684034U (en) * | 2012-07-24 | 2013-01-23 | 滁州金诺实业有限公司 | Securing device for embedded pipeline |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104384443A (en) * | 2014-11-07 | 2015-03-04 | 滁州金诺实业有限公司 | Process for fabricating template pipe-containing cast part in manner of pre-embedding stainless steel pipeline |
CN104399907A (en) * | 2014-11-07 | 2015-03-11 | 滁州金诺实业有限公司 | Mould plate type pipe-containing casting dedicated sandbox upper box fixing tool |
CN104399942A (en) * | 2014-11-07 | 2015-03-11 | 滁州金诺实业有限公司 | Template type pipe casting-containing stainless steel water pipe fixing structure |
CN104399942B (en) * | 2014-11-07 | 2016-09-14 | 滁州金诺实业有限公司 | Template class foundry goods stainless steel water pipe fixation structure Han pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202684034U (en) | Securing device for embedded pipeline | |
CN107263159A (en) | A kind of device for clamping mould | |
CN102764858A (en) | Fastening device for pre-buried pipelines | |
CN206998341U (en) | A kind of device for clamping mould | |
CN105436466A (en) | Sprue spreader spiral sufficient cooling structure for die-casting die | |
CN204770480U (en) | Refrigerator compression cylinder base foundry goods the gating system | |
CN204573343U (en) | A kind of Liftable double-layer pipeline elevator | |
CN102218510B (en) | Portable method for fixing core | |
CN202741692U (en) | Sand-casting mould casting locking fixture | |
CN205806676U (en) | A kind of many rotary types electrically operated valve quick switching device | |
CN204360843U (en) | A kind of aluminium bar threaded configuration | |
CN203530551U (en) | Creel with adjustable transverse width | |
CN203297318U (en) | Replaceable diesel engine connecting rod | |
CN204057588U (en) | The mounting structure of lift car pull bar | |
CN206589219U (en) | Plastic product forming mould | |
CN204152185U (en) | A kind of adjustable steel support top | |
CN204557231U (en) | Lead solution emission control system | |
CN204661222U (en) | Long Distances lift jack | |
CN204022286U (en) | Transfer crane is without corbel type door frame | |
CN203695919U (en) | Anti-deformation stiffener | |
CN203048427U (en) | Trench positioning plate improving structure of plating line crown block positioning system | |
CN204332683U (en) | Transformer wire ring mould | |
CN206522326U (en) | The standing screw of field facility | |
CN204544385U (en) | Grinding machine feeding pipeline vibrationproof stretching structure | |
CN205841427U (en) | Buckle-type bolt |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20121107 |