CN102752828B - A kind of method and system for realizing UE controls - Google Patents
A kind of method and system for realizing UE controls Download PDFInfo
- Publication number
- CN102752828B CN102752828B CN201110101091.4A CN201110101091A CN102752828B CN 102752828 B CN102752828 B CN 102752828B CN 201110101091 A CN201110101091 A CN 201110101091A CN 102752828 B CN102752828 B CN 102752828B
- Authority
- CN
- China
- Prior art keywords
- request
- trigger
- nas message
- triggering
- management unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
The invention discloses a kind of method and system for realizing UE controls, can perform following operation according to trigger policy after the request of triggering UE of application server initiation is received:The request for the triggering UE that application server described in refusal respond is initiated and/or return reason for rejection;Alternatively, responding the request for the triggering UE that the application server is initiated, triggering UE initiates NAS message request, and after mobility management unit receives the NAS message request, UE is controlled according to control strategy.The method of the present invention and system, can effectively solve the MTC device Trigger Problems with time control attribute.
Description
Technical field
The present invention relates to the communications field, and in particular to one kind realizes the method and system of user equipment (UE) control.
Background technology
At present, the communication service of machine to machine (Machine to Machine, M2M) is gradually used widely,
For example, applied in logistics system, remote meter reading, smart home etc..M2M service providers are mainly carried out using existing wireless network
M2M business, for example, General Packet Radio Service (General Packet Radio service, GPRS) network, evolution packet
The PS networks such as system (Evolved Packet System, EPS) network.Due to M2M business and interpersonal communication
(Human to Human, H2H) business has obvious otherness, therefore, it is necessary to carry out necessary optimization to network deployment, with
Meet to obtain optimal network management and network communications quality while M2M applications.
System Architecture Evolution (System Architecture Evolution, SAE) is proposed to so that evolution
Packet net (Evolved Packet System, EPS) can provide the transmission rate of higher, shorter transmission delay, optimization point
Group, and support UTRAN (Evolved UTRAN, E-UTRAN), UTRAN, WLAN (the Wireless Local of evolution
Area Network, WLAN) and other non-3 gpp access network between mobile management.
Fig. 1 is the Organization Chart of EPS, as shown in Figure 1, wherein, wireless access network (the Evolved Radio Access of evolution
Network, E-RAN) in the network element that includes be enode b (Evolved NodeB, eNodeB), for the access for user
Radio Resource is provided;Packet Data Network (Packet Data Network, PDN) is the network for the business that provides to the user;EPC is carried
Lower delay has been supplied, and has allowed more wireless access systems to access, it includes following network element:
Mobile management entity (Mobility Management Entity, MME), is chain of command functional entity, deposits temporarily
The server of user data is stored up, is responsible for and stores the context of UE (for example, user identifier, mobility management states, user
Security parameter etc.), distribute temporary mark for user;When UE quarters at the tracing area or the network, it is responsible for the user
Authenticated.
Gateway (Serving Gateway, SGW or S-GW), is a user entity, is responsible for user face data road
By handling, the downlink data of UE of the termination in idle (ECM_IDLE) state.Management and the SAE carryings (bearer) of storage UE
Context, such as IP bearer services parameter and network internal routing iinformation etc..SGW is the anchor point in 3GPP system internal user face,
One user can only have a SGW a moment.
Packet data network gateway (PDN Gateway, PGW or P-GW), is responsible for the gateway of UE access PDN, distributing user
IP address, and the mobility anchor of 3GPP and non-3 GPP access system, the function of PGW further include strategy implement, charging branch
Hold.User has access to multiple PGW in synchronization.Strategy implements functional entity (Policy and Charging with charging
Enforcement Function, PCEF) it also is located in PGW.
Strategy and charging regulation function entity (Policy and Charging Rules Function, PCRF), are responsible for
Policy control and charging regulation are provided to PCEF.
Home subscriber server (Home Subscriber Server, HSS), is responsible for permanently storing user contracting data,
The content of HSS storages includes international mobile subscriber identity (the International Mobile Subscriber of UE
Identification, IMSI), the IP address of PGW.
Physically, above-mentioned SGW and PGW may unify, and EPC system user plane network element includes SGW and PGW.
MTC server is mainly responsible for the work such as information gathering and the data storage/processing to MTC UE, and can be to MTC UE
Carry out necessary management.
MTC UE are generally responsible for collecting the information of some collectors, and by RAN node core network access, with MTC
Server interaction datas.
In Fig. 1, MTC UE are needed by EPS networks to MTC Server or others MTC UE transmitting data informations.
SAE networks establish the GTP tunnel between SGW-PGW for this transmission, and data message realizes transmitting by GTP tunnel.
Fig. 2 is under the prior art, and UE access to EPS networks simultaneously performs the flow chart in EPS network attachments.As shown in figure 3,
Related attachment flow mainly includes the following steps that:
S201, in order to be linked into SAE networks, UE initiates network attachment request to eNodeB, carries IMSI, UE wherein
Network accessibility, the information such as instruction of request distribution IP;
S202, eNodeB select a MME serviced for it for UE, and attach request is forwarded to the MME, while by UE
The important information such as mark be also carried to the MME;
S203, MME send authorization data request message (containing IMSI) to HSS, and HSS first determines whether the corresponding signings of IMSI
Data, have been put on the blacklist if searched less than any subscription data or IMSI, and HSS returns to authorization data to MME and rings
Suitable error reason and should be carried;If finding the corresponding subscription data of IMSI, HSS returns to authorization data response to MME
Message (contains authentication vector);
MME performs authorizing procedure to verify the legitimacy of terminal IMSI, and performs safe mode flow and connected with enabling safety
Connect.
S204, MME send position updating request to the HSS of home network, and mark, the mark of UE of MME are carried in message, with
Inform the region that UE is currently accessed;
S205, HSS go out contracted user's data of UE according to the identifier lookup of UE, are then forwarded to MME.It is main in user data
Include the information such as default access point title (Access Point Name, APN), amount of bandwidth;
MME receives user data, checks whether UE is allowed access to network, is returned to HSS and receives user response;If
MME has found that UE has the problems such as roaming limitation or access restriction, and MME will forbid UE to adhere to, and notify HSS.
S206, HSS are sent to MME confirms location updating response;
S207, MME select a S-GW for UE, and are sent to establish the request of default bearing.In the request, MME
Inform the necessary information of S-GW:The mark of UE, the mark of MME, for UE distribute the indicating of IP address, default bandwidth information, PDN
GW addresses etc.;
S208, S-GW send the request for establishing default bearing to PDN GW.In the request, S-GW informs that PDN GW must
The information wanted:The address of S-GW, default bandwidth information, be instruction that UE distributes IP address etc.;
S209, if it is necessary, PDN GW are asked as the UE strategies configured and charging regulation, decision information to PCRF;
S210, PDN GW establish default bearer, and return to S-GW according to the PCRF strategies returned and charging decisions information
Response is established in carrying;
S211, S-GW send the response of default bearing foundation to MME;
S212, MME send attachment to eNodeB and receive response, show that UE is attached to the request of network and is received, wherein
Carry Serving GW addresses and TEID (Tunnel Endpoint Identifier, tunnel port mark);
S213, eNodeB send voice bearer to UE and establish request, it is desirable to which UE preserves the important information that carrying is established, and opens
Put corresponding port.Carried in the request message:Bearer network ID, PDN GW addresses, the IP address for distributing to UE, bandwidth letter
Breath etc.;
S214, UE send radio bearer to eNodeB and establish response;
S215, eNodeB notice MME attaching process are completed;
S216, MME send more new bearer request to S-GW, notify the mark for the UE eNodeB serviced, address;
S217, S-GW send the response of more new bearer to MME;
S218, is specified if PDN GW are not HSS, and MME sends notice request to HSS, and notice HSS is serviced by UE
PDN GW address information, HSS updates the information.
It can be received according to existing terminal devices such as the existing PS network architectures described in Fig. 1 and Fig. 2, mobile phones and wirelessly connect
Enter the wireless signal that network is sent, and be attached to by Radio Access Network in carrier network, then can carry out voice and lead to
The business such as words.
Fig. 3 is the system architecture diagram according to the UTMS of correlation technique.UTMS networks by Universal Mobile Communication System land without
Line access (Universal Terrestrial Radio Access Network, UTRAN), GPRS serving GPRS support nodes
(SERVICING GPRS SUPPORT NODE, SGSN), GPRS gateway support node (Gateway GPRS Support
Node, GGSN), attaching position register (Home Location Register, HLR) composition.
In figure 3, SGSN have this SGSN coverages end packet data packet by and forwarding capability, and with pair
Terminal carries out the functions such as mobile management.GGSN provides route and encapsulation of the data packet between GPRS nets and external data network.
PDN is the network for the business that provides to the user.HLR is used for storing user subscription data.Connect between SGSN and UTRAN using Iu-PS
Port communications, by interface SGSN completions and the communication between UTRAN systems, terminal, to complete grouped data transmission, mobility
Function in terms of management and session management.Foundation, release and the control of IP channels are completed between SGSN and GGSN by gn interface
Etc. function.Data of the SGSN by Gr interface from HLR acquirements on terminal, the HLR preserve GPRS user data and routing iinformation.
Gi interfaces are the interfaces between GPRS and outside PDN.GPRS is grouped net (such as Internet by Gi interfaces and the various public
Or ISDN (Integranted Services Digital, ISDN)) realize interconnection, needed on Gi interfaces into
When encapsulation/decapsulation of row agreement, address conversion (for example, privately owned net IP address conversion is publicly-owned net IP address), user access
Authentication and the operation such as certification.
The definition of M2M in the narrow sense is the communication of machine to machine, it is sensu lato definition be using machine terminal intelligent interaction as
Application and service of core, networking.It is to be based on intelligence machine terminal, using communication as access means, for visitor
The informatization resolve scheme that family provides, for meeting information of the client to monitoring, command scheduling, data acquisition and measurement etc.
Change demand.
An important factor for development of wireless technology is M2M market developments, it breaches the space-time limitation of conventional communication mode
With region obstacle, enterprise and the public has been broken away from cable constraint, allow client more effectively control cost, reduce mounting cost and
It is easy to use.Constantly advance in addition, growing demand driving M2M:With information processing capability and Netowrk tape
Wide constantly to increase paradoxically, the means of acquisition of information lag far behind.And M2M meets this demand of people very well, lead to
External environment condition can be monitored in real time by crossing its people, realize the information gathering of a wide range of automation.Therefore, M2M can be applied to go
Industry application, domestic applications, individual application etc..Sector application is such as:Traffic monitoring, warning system, rescue at sea, automatic vending machine,
Driving payment etc.;Domestic applications are such as:Automatic data logging, temperature control etc.;Individual application is such as:Life detection, remote diagnostics etc..
The communication object of M2M is Machine To Machine, Human-to-Machine.Data communication between one or more machines is defined as
MTC (Machine Type Communication, machine type communication), in this case less need for human-computer interaction.Participate in
The machine of MTC is defined as MTC device.MTC device is the terminal of MTC user, can be taken by PLMN networks and MTC device, MTC
Business device communicates.ME (Mobile Equipment) is the subsidiary functional block of MTC device, which is used for MTC device
It is linked into EPS systems.MTC server (MTC Server) is managed and monitors to MTC device.
Since MTC device is mostly the equipment of concrete application, different set is used as automatic data logging is detected from life
It is standby etc..The MTC device of different application has different characteristics, and there is such as elevator lifter apparatus Hypomobility, PS only to belong to
Property, and monitor, alert device in addition to Hypomobility, PS only, also with the attribute such as low data transfer and high availability.
Therefore different system optimizations is carried out for the MTC device of different application, effectively MTC device can be managed, monitored, paid
Take.
It is by time control to have a kind of communication of MTC applications, i.e., allows MTC device to connect within some specific periods
Enter network or carry out sending and receiving for data, allowing then limit MTC equipment progress aforesaid operations outside the period.In HSS
Contract time control:Access duration (access duration), it is allowed to period (grant time interval) and taboo
Only period (forbidden time interval).SGSN/MME is obtained during attachment, position/routing update from HSS
The signing information of time control is taken, and combines local policy as one call duration time window not less than access duration of device definition
(communication window), and this communication time window is handed down to MTC device.In order to prevent during the communication of large number of equipment
Between window is overlapping causes network congestion, network needs allowing randomized communication time window in the period.When SGSN/MME is by communication
Between window MTC device is accessed or Service control.MTC device whether is allowed to carry out Signalling exchange and receipts outside communication time window
Data are sent out, then are determined by carrier policy.There are two kinds of strategies in the prior art:One kind is refused outside time window, another
It is that can be accessed outside time window, but charging is different.
In MTC applications, there are some scenes to need MTC Server triggering MTC devices to initiate the communication with MTC Server
To carry out the transmission of data, such as:In the application of some supervision and reporting classes, except setting MTC equipment periodically on MTC Server
Reporting outside monitoring report, MTC Server also can aperiodically ask MTC equipment to measure reporting for data, in this case,
Just need MTC Server to MTC device send instruction with trigger MTC device be connected to network or establish data connection with MTC
Server communicates.MTC Server can be by area triggering, can also be by a group triggering.But in the prior art, if
Network is controlled MTC device according to call duration time window, and using the strategy refused outside time window, then it is all to be signed with time control
The equipment MTC SERVER of system have no idea to trigger.This cause the equipment with signing time control attribute can not by region or
By a group triggering.
Further, since the permission period of network contraction and disable time section are nonoverlapping periods, network is being forbidden
Can be set in period does not allow to trigger MTC device, and at this moment network needs to refuse the triggering of MTC device.Otherwise, MTC
Server has attempted to trigger request, can aggravate network burden, wastes Internet resources.
The content of the invention
In view of this, it is a primary object of the present invention to provide a kind of method and system for realizing UE controls, to solve to have
The MTC device Trigger Problems of having time controlled attribute.
To reach above-mentioned purpose, the technical proposal of the invention is realized in this way:
A kind of method for realizing UE controls, after the request for the triggering UE for receiving application server initiation, according to triggering plan
Slightly perform following operation:
The request for the triggering UE that application server described in refusal respond is initiated and/or return reason for rejection;
Alternatively, responding the request for the triggering UE that the application server is initiated, triggering UE initiates non access stratum NAS message please
Ask, after mobility management unit receives the NAS message request, UE is controlled according to control strategy.
The mobility management unit further knows that UE is that the request is initiated because of applications trigger, including:
Mobility management unit checks the NAS message request of UE, and the UE applications triggers in being asked according to the NAS message refer to
Show and know the request to receive the request after applications trigger;Alternatively,
Mobility management unit according to the UE information itself stored, know the request for UE receive after applications trigger please
Ask;Alternatively,
Mobility management unit checks the NAS message request of UE, and the UE applications triggers in being asked according to the NAS message refer to
Show and know the request with the UE information of itself storage to receive the request after applications trigger.
Mobility management unit according to the UE information itself stored, confirm the request for UE receive after applications trigger please
When asking, further judge whether UE initiates the request because of applications trigger to location information management unit application;Positional information
Administrative unit will determine that result is sent to mobility management unit.
In the trigger policy, the strategy of the triggering of application server described in refusal respond includes at least one of:
The request is used to trigger the UE with time control attribute, and the triggered time is located at the disable time section of UE signings
It is interior;
The request is used to trigger the UE with time control attribute, and the triggered time is in the permission period of UE signings
Outside, but migration efficiency determines that UE is allowing not allow to trigger outside the period;
The network congestion when request is used to trigger, migration efficiency determine to refuse non-emergent triggering.
The refusal or trigger action are performed according to the trigger policy, are by including home subscriber server and/or returning
What the location information management unit including category location register HSS/HLR determined;Alternatively, be by including mobile management entity and/
Or the mobility management unit decision including GPRS serving GPRS support nodes MME/SGSN;
Wherein, when the HSS/HLR determines to carry out the refusal operation, HSS/HLR sends refusal to application server and disappears
Breath;When the MME/SGSN determines to carry out the refusal operation, MME/SGSN is directly or indirectly sent to application server to be refused
Message.
After the mobility management unit receives the NAS message request, UE is controlled according to control strategy, is wrapped
Include:
If it is the triggering because of application server that UE, which initiates the NAS message request, allows or refuse according to the control strategy
Exhausted UE initiates the NAS message request.
A kind of system for realizing UE controls, the system include UE trigger elements, applications trigger unit, control execution unit;
Wherein,
The UE trigger elements, for receive application server initiation triggering UE request after, according to trigger plan
Slightly, the request for the triggering UE that application server described in refusal respond is initiated and/or return reason for rejection;Should alternatively, response is described
The request of the triggering UE initiated with server, triggering UE initiate NAS message requests;
The applications trigger unit, for after the NAS message request is received, notifying control execution unit;
The control execution unit, for being controlled according to control strategy to UE.
The applications trigger unit is further used for knowing that UE is to initiate the request because of applications trigger, including:
Check the NAS message request of UE, the UE applications triggers instruction in being asked according to the NAS message knows that the request is
Receive the request after applications trigger;Alternatively,
According to the UE information that itself is stored, know that the request receives the request after applications trigger for UE;Alternatively,
Check the NAS message request of UE, the instruction of UE applications triggers and the UE itself stored in being asked according to the NAS message
Information knows that the request receives the request after applications trigger for UE.
For the applications trigger unit according to the UE information itself stored, it is after UE receives applications trigger to confirm the request
During request, it is further used for:Judge whether UE initiates the request because of applications trigger to location information management unit application;Touch
Send out location information management unit feedback judging result.
In the trigger policy, the strategy of the triggering of application server described in refusal respond includes at least one of:
The request is used to trigger the UE with time control attribute, and the triggered time is located at the disable time section of UE signings
It is interior;
The request is used to trigger the UE with time control attribute, and the triggered time is in the permission period of UE signings
Outside, but migration efficiency determines that UE is allowing not allow to trigger outside the period;
The network congestion when request is used to trigger, migration efficiency determine to refuse non-emergent triggering.
The refusal or trigger action are performed according to the trigger policy, are by the positional information including HSS/HLR
What administrative unit determined;Alternatively, determined by the mobility management unit including MME/SGSN;
Wherein, when the HSS/HLR determines to carry out the refusal operation, HSS/HLR, which is used to send to application server, to be refused
Exhausted message;When the MME/SGSN determines to carry out the refusal operation, MME/SGSN is used for directly or indirectly to application server
Send refuse information.
After the mobility management unit receives the NAS message request, when being controlled according to control strategy to UE, tool
Body is used for:
If it is the triggering because of application server that UE, which initiates the NAS message request, allows or refuse according to the control strategy
Exhausted UE initiates the NAS message request.
The method of the present invention and system, can be after the request of triggering UE of application server initiation be received, according to triggering
Strategy execution operates as follows:The request for the triggering UE that application server described in refusal respond is initiated and/or return reason for rejection;Or
Person, responds the request for the triggering UE that the application server is initiated, and triggering UE initiates Non-Access Stratum (NAS, Non-Access
Stratum) message request, after mobility management unit receives the NAS message request, controls UE according to control strategy
System.The method of the present invention and system, can effectively solve the MTC device Trigger Problems with time control attribute.
Brief description of the drawings
Fig. 1 is EPS network system architectures schematic diagram in the prior art;
Fig. 2 is the flow chart that MTC UE are adhered in EPS networks in the prior art;
Fig. 3 is UTMS network system architectures schematic diagram in the prior art;
Fig. 4 is the flow chart whether the Network Check triggering of the embodiment of the present invention one allows;
Fig. 5 is that the UE of the embodiment of the present invention two carries triggering mark but network does not confirm the flow chart of triggering;
Fig. 6 is the flow chart that the UE of the embodiment of the present invention three does not carry triggering mark but network validation triggering;
Fig. 7 is that the UE of the embodiment of the present invention four carries the flow chart of triggering mark and network validation triggering;
Fig. 8 is the general flow chart that UE controls are realized in the embodiment of the present invention.
Embodiment
Technical solution of the present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Applications trigger is to send triggering instruction to MTC device by network from application server, MTC device response triggering
A kind of behavior.But in some cases, network may refuse touching for MTC equipment response application servers for various reasons
Hair.Mainly there are following several situations:
1) triggering has the MTC device of time control attribute, and the triggered time is located at the disable time section of MTC device signing
It is interior;
2) MTC device of the triggering with time control attribute, triggered time are in the permission period of MTC device signing
Outside, but migration efficiency determines that MTC device is allowing not allow to trigger outside the period;
3) network congestion when triggering, migration efficiency determine whether the triggering (trigger) of application server urgent (such as:
Can be determined whether urgent by trigger values), if non-emergent trigger networks can be refused.
In addition, Network Check is not limited to case above, may there are other situations, network needs to refuse application service at this time
The trigger request of device.Fig. 4 is the flow chart whether the Network Check triggering of the embodiment of the present invention one allows.The inspection of network is divided into
Two kinds, one kind is that HSS/HLR checks whether triggering allows, and one kind is that MME/SGSN checks whether triggering allows.Specifically include as
Lower step:
Step 401a, application server is to HLR/HSS sending application trigger requests;
Step 402a, HSS/HLR check triggering of the application server to UE whether in the disable time section of UE, if
In disable time section, HSS/HLR sends refuse information by step 403a to application server;
HSS/HLR is also possible to check whether triggering of the application server to UE runs counter to migration efficiency, the HSS/HLR if running counter to
Refuse information is sent to application server by step 403a.Migration efficiency is such as:
A) being only allowed in allows period internal trigger, if then triggering allowed outside the period;
B) under particular case (such as:Network congestion etc.) if non-emergent trigger;
Step 403a, HSS/HLR return to reason for rejection (such as to application server:Send UE applications triggers refusal respond),
Wherein carry suitable cause value.
401b~403b is the embodiment that MME/SGSN is checked.
Step 401b, application server is directly or indirectly to MME/SGSN sending application trigger requests;
Step 402b, MME/SGSN checks triggering of the application server to UE whether in disable time section, if prohibited
Only in the period, MME/SGSN sends refuse information by step 403b to application server;
MME/SGSN is also possible to check whether triggering of the application server to UE runs counter to migration efficiency, the MME/ if running counter to
SGSN sends refuse information by step 403b to application server;Migration efficiency is such as:
A) being only allowed in allows period internal trigger, if then triggering allowed outside the period;
B) under particular case (such as:Network congestion etc.) if non-emergent trigger;
Step 403b, MME/SGSN directly or indirectly return to reason for rejection (such as to application server:Send UE applications triggers
Refusal respond), wherein carrying suitable cause value.
Due to the particularity of the UE such as MTC device applications, some applications do not require UE real-time onlines, only require on certain time
Count off evidence.This kind equipment most of time is in off-line state.At this moment triggering equipment, which is reached the standard grade, to be touched by broadcast triggering, short message
The mode of hair.Triggering equipment can know that it is application layer by broadcasting triggering mode or short message triggering mode or other modes
Triggering, by UE informing networks.Fig. 5 is the flow chart of the method for the invention.Specifically comprise the following steps:
Step 501, UE receives applications trigger request;
Step 502, UE sends NAS message request to eNodeB/RNC, and the instruction of UE applications triggers, the instruction are carried in request
It is to receive the NAS message request initiated after applications trigger to show UE;NAS message requests mainly include:Attach request, business
At least one of request, position updating request, routing update request.
Step 503, NAS message request is forwarded to MME/SGSN and (can be collectively referred to as mobile management list by eNodeB/RNC
Member), the instruction of UE applications triggers is carried in the message;
Step 504, MME/SGSN checks the NAS message request of UE, if the UE applications triggers instruction in NAS message request
It is the request received after applications trigger to show it, and then confirms that UE is that the request is initiated because of applications trigger, then MME/SGSN
The UE operation flows initiated are controlled according to migration efficiency, specific strategy is:
1st, the NAS message request time of UE initiations is checked in disable time section;
2nd, migration efficiency is run counter in the NAS message request for checking UE initiations, such as:
A) being only allowed in allows period internal trigger, but the NAS message request that UE is initiated occurs allowing outside the period;
B) under particular case (such as:Network congestion etc.) NAS message initiated for non-emergent applications trigger response asks
Ask;
MME/SGSN sends refuse information through eNodeB/RNC to UE, and suitable cause value is carried in message.
Step 505, if the NAS message request of UE passes through the inspection of step 504, after performing corresponding NAS message requests
Afterflow journey;
Step 506, if MME/SGSN according to strategy (such as UE response applications trigger NAS message request allow the time
In section but outside call duration time window;The non-emergent triggering of UE response applications) it is that UE regenerates a call duration time window,
Then UE can be handed down to by NAS message response.MME/SGSN sends NAS message response to eNodeB/RNC, in the response message
Carry new call duration time window;
NAS message response mainly includes:Attachment receives request, initialization context establishes request, location updating receives to disappear
Breath and route received message etc..
Step 407, eNodeB/RNC sends NAS message response to UE, and new call duration time is carried in the response message
Window.The replaceable original time window of the call duration time window or the call duration time window to use temporarily.
Another situation, network can know the equipment that needs trigger, the information for the UE to be triggered stored in network, works as UE
During to network request, network can judge that equipment is to initiate to ask because of triggering.Fig. 6 is the flow chart of the method for the invention.
Specifically comprise the following steps:
Step 601, UE sends NAS message request to eNodeB/RNC;NAS message request mainly includes:Attach request, industry
At least one of business request, position updating request, routing update request;
Step 602, NAS message request is forwarded to MME/SGSN by eNodeB/RNC;
Step 603, MME/SGSN checks the NAS message request of UE, if MME/SGSN is true according to the UE information itself stored
The request is recognized to receive the NAS message request after applications trigger, the then business that MME/SGSN initiates UE according to migration efficiency
Flow is controlled, and specific strategy is:
1st, the NAS message request time of UE initiations is checked in disable time section;
2nd, migration efficiency is run counter in the NAS message request for checking UE initiations, such as:
A) being only allowed in allows period internal trigger, but the NAS message request that UE is initiated occurs allowing outside the period;
B) under particular case (such as:Network congestion etc.) NAS message initiated for non-emergent applications trigger response asks
Ask;
MME/SGSN sends refuse information through eNodeB/RNC to UE, and suitable cause value is carried in message.
Step step 604, if MME/SGSN can not judge whether the NAS message request of UE is caused by response application triggering
Request, can apply judging, the request message by position updating request to HSS/HLR (can be collectively referred to as location information management unit)
In may be selected to carry the instruction of UE applications triggers;
Step 605, HSS/HLR judges whether UE initiates because response application triggers according to the triggering information locally preserved
Request, and by location updating response will determine that result is sent to MME/SGSN;
Step 606, the follow-up corresponding flow of NAS message request is performed;
Step 607a, deletes the information that the network preserved in MME/SGSN triggers UE.Such as:Timer can be set, and
Deleted in timer expiry;Or when receiving the flow response of request, triggering information is deleted by MME/SGSN;
Step 607b, deletes the information that the network preserved in HSS/HLR triggers UE.Such as:Timer can be set, and
Deleted during timer expiry;Or deleted after receiving the notification message of MME/SGSN;
Step 608, if MME/SGSN according to strategy (such as UE response applications trigger NAS message request allow the time
In section but outside call duration time window;The non-emergent triggering of UE response applications) it is that UE regenerates a call duration time window,
Then UE can be handed down to by NAS message response.MME/SGSN sends NAS message response to eNodeB/RNC, in the response message
Carry new call duration time window.
NAS message response mainly includes:Attachment receives request, initialization context establishes request, location updating receives to disappear
Breath and route received message etc..
Step 609, eNodeB/RNC sends NAS message response to UE, and new call duration time is carried in the response message
Window.The replaceable original time window of the call duration time window or the call duration time window to use temporarily.
Another situation, network can know the equipment that needs trigger, and the information for the UE to be triggered is stored in network.UE is received
To carrying triggering mark during network request after to trigger request, but the triggering mark that network is also required to UE checks, judges
Whether the request for going out equipment initiation is really caused by triggering.Fig. 7 is the flow chart of the method for the invention.Specifically include as follows
Step:
Step 701, UE sends NAS message request to eNodeB/RNC, and the instruction of UE applications triggers, the mark are carried in request
It is to receive the NAS message request initiated after applications trigger to show UE;NAS message requests mainly include:Attach request, business
At least one of request, position updating request, routing update request.
Step 702, NAS message request is forwarded to MME/SGSN by eNodeB/RNC, and UE applications triggers are carried in the message
Instruction;
Step 703, MME/SGSN checks the NAS message request of UE, if it is the request received after applications trigger, MME/
SGSN further judges whether UE initiates NAS message request because of applications trigger according to the triggering information being locally stored, and in root
It is judged that result determines that UE is that then MME/SGSN is according to migration efficiency pair when initiating NAS message request because of response application triggering
The operation flow that UE is initiated is controlled, and specific strategy is:
1st, the NAS message request time of UE initiations is checked in disable time section;
2nd, migration efficiency is run counter in the NAS message request for checking UE initiations, such as:
A) being only allowed in allows period internal trigger, but the NAS message request that UE is initiated occurs allowing outside the period;
B) under particular case (such as:Network congestion etc.) NAS message initiated for non-emergent applications trigger response asks
Ask;
MME/SGSN sends refuse information by eNodeB/RNC to UE, and suitable cause value is carried in message.
Step 704, if MME/SGSN can not judge UE is asked caused by whether really triggering according to locally store information,
It can also apply judging to HSS/HLR by position updating request, may be selected to carry the instruction of UE applications triggers in the request message;
Step 705, HSS/HLR judges whether UE initiates to ask because of triggering, and lead to according to the triggering information locally preserved
Cross location updating response and will determine that result is sent to MME/SGSN;
Step 706, the follow-up corresponding flow of NAS message request is performed;
Step 707a, deletes the information that the network preserved in MME/SGSN triggers UE.Such as:Timer can be set, and
Deleted in timer expiry;Or when receiving the flow response of request, triggering information is deleted by MME/SGSN;
Step 707b, deletes the information that the network preserved in HSS/HLR triggers UE.Such as:Timer can be set, and
Deleted during timer expiry.Or receive the notification message deletion triggering information of MME/SGSN;
Step 708, if MME/SGSN according to strategy (such as UE response applications trigger NAS message request allow the time
In section but outside call duration time window;The non-emergent triggering of UE response applications) generate a call duration time window again for UE, then
UE can be handed down to by NAS message response.MME/SGSN sends NAS message response to eNodeB/RNC, is taken in the response message
With new call duration time window.
NAS responses mainly include:Attachment receive request, initialization context establish request, location updating received message and
It route received message etc..
Step 709, eNodeB/RNC sends NAS message response to UE, and new call duration time is carried in the response message
Window.The replaceable original time window of the call duration time window or the call duration time window to use temporarily.
Above-mentioned NAS message request may include at least one in attach request, service request, TAU requests, RAU requests
Kind.
With reference to various embodiments above as it can be seen that the present invention realizes that the operation thinking of UE controls can represent the stream as shown in Fig. 8
Journey, the flow comprise the following steps:
Step 810:After the request for receiving the triggering UE of application server initiation, refusal is performed according to trigger policy or is touched
Send out the operation of UE;
Step 820:The request for the triggering UE that application server described in refusal respond is initiated and/or return reason for rejection;Or
Person, responds the request for the triggering UE that the application server is initiated, and triggering UE initiates NAS message requests, mobility management unit
After receiving the NAS message request, UE is controlled according to control strategy.
In practical applications, UE trigger elements can be in a network set, applications trigger unit can also be set in MME
And control execution unit, by UE trigger elements after the request of triggering UE of application server initiation is received, according to triggering plan
The slightly request for the triggering UE that application server described in refusal respond is initiated and/or return reason for rejection;Alternatively, respond the application
The request for the triggering UE that server is initiated, triggering UE initiate NAS message request.Applications trigger unit is receiving the NAS message
After request, notify control execution unit, UE is controlled according to control strategy by control execution unit.
In summary as it can be seen that either method or system, the present invention realize that the technology of UE controls can effectively solve the problem that tool
The MTC device Trigger Problems of having time controlled attribute.
The foregoing is only a preferred embodiment of the present invention, is not intended to limit the scope of the present invention.
Claims (12)
- A kind of 1. method for realizing user equipment (UE) control, it is characterised in that receive the triggering UE's of application server initiation After request, following operation is performed according to trigger policy:The request for the triggering UE that application server described in refusal respond is initiated and/or return reason for rejection;Alternatively, responding the request for the triggering UE that the application server is initiated, triggering UE initiates non access stratum NAS message request, After mobility management unit receives the NAS message request, UE is controlled according to control strategy;Wherein, the refusal or trigger action are performed according to the trigger policy, is by including home subscriber server and/or returning What the location information management unit including category location register HSS/HLR determined;Alternatively, be by including mobile management entity and/ Or the mobility management unit decision including GPRS serving GPRS support nodes MME/SGSN;When performing refusal operation according to the trigger policy, mobile management unit checks UE in disable time section or runs counter to operation Strategy;When performing response according to the trigger policy, mobile management unit checks attachment or the service request of UE, is being determined as answering After trigger request, check whether UE in disable time section or run counter to migration efficiency;Wherein, after the mobility management unit receives NAS message request, letter that mobile management unit is stored according to itself UE applications triggers instruction in breath and/or NAS message request confirms that UE is the request initiated by applications trigger, according to control System strategy is controlled UE.
- 2. according to the method described in claim 1, it is characterized in that, the mobility management unit further know UE be in response to The request is initiated with triggering, including:Mobility management unit checks the NAS message request of UE, and the UE applications triggers instruction in being asked according to the NAS message is known The request is to receive the request after applications trigger;Alternatively,Mobility management unit knows that the request receives the request after applications trigger for UE according to the UE information itself stored; Alternatively,Mobility management unit check UE NAS message request, according to the NAS message ask in UE applications triggers instruction and from The UE information of body storage knows the request to receive the request after applications trigger.
- 3. according to the method described in claim 2, it is characterized in that, mobility management unit according to the UE information itself stored, When confirming that the request receives the request after applications trigger for UE, further whether UE is judged to location information management unit application The request is initiated because of applications trigger;Location information management unit will determine that result is sent to mobility management unit.
- 4. method according to any one of claims 1 to 3, it is characterised in that in the trigger policy, described in refusal respond The strategy of the triggering of application server includes at least one of:The request is used to trigger the UE with time control attribute, and the triggered time is located in the disable time section of UE signings;The request is used to trigger the UE with time control attribute, and the triggered time was in outside the permission period of UE signings, but Migration efficiency determines that UE is allowing not allow to trigger outside the period;The network congestion when request is used to trigger, migration efficiency determine to refuse non-emergent triggering.
- 5. method according to any one of claims 1 to 3, it is characterised in that the HSS/HLR determines to carry out the refusal During operation, HSS/HLR sends refuse information to application server;When the MME/SGSN determines to carry out the refusal operation, MME/SGSN directly or indirectly sends refuse information to application server.
- 6. method according to any one of claims 1 to 3, it is characterised in that the mobility management unit receives described After NAS message request, UE is controlled according to control strategy, including:If it is the triggering because of application server that UE, which initiates the NAS message request, is allowed according to the control strategy or refuse UE Initiate the NAS message request.
- 7. a kind of system for realizing UE controls, it is characterised in that the system includes UE trigger elements, applications trigger unit, control Execution unit;Wherein,The UE trigger elements, for after the request of triggering UE of application server initiation is received, according to trigger policy, refusing Lost art answers the request of the triggering UE of the application server initiation and/or returns to reason for rejection;Alternatively, respond the application service The request for the triggering UE that device is initiated, triggering UE initiate NAS message request;The applications trigger unit, for after the NAS message request is received, notifying control execution unit;The control execution unit, for being controlled according to control strategy to UE;Wherein, the refusal or trigger action are performed according to the trigger policy, is by including home subscriber server and/or returning What the location information management unit including category location register HSS/HLR determined;Alternatively, be by including mobile management entity and/ Or the mobility management unit decision including GPRS serving GPRS support nodes MME/SGSN;When performing refusal operation according to the trigger policy, mobile management unit checks UE in disable time section or runs counter to operation Strategy;When performing response operation according to the trigger policy, mobile management unit checks attachment or the service request of UE, is determining After being asked for applications trigger, check whether UE in disable time section or run counter to migration efficiency;Wherein, after the mobility management unit receives NAS message request, letter that mobile management unit is stored according to itself UE applications triggers instruction in breath and/or NAS message request confirms that UE is the request initiated by applications trigger, according to control System strategy is controlled UE.
- 8. system according to claim 7, it is characterised in that the applications trigger unit be further used for knowing UE be because Applications trigger and initiate the request, including:Check the NAS message request of UE, the UE applications triggers instruction in being asked according to the NAS message knows the request to receive Request after applications trigger;Alternatively,According to the UE information that itself is stored, know that the request receives the request after applications trigger for UE;Alternatively,Check the NAS message request of UE, the instruction of UE applications triggers and the UE information itself stored in being asked according to the NAS message Know that the request receives the request after applications trigger for UE.
- 9. system according to claim 8, it is characterised in that the applications trigger unit is believed according to the UE itself stored Breath, when the confirmation request is the request after UE receives applications trigger, is further used for:Sentence to location information management unit application Whether disconnected UE initiates the request because of applications trigger;Trigger position information management unit feeds back judging result.
- 10. system according to any one of claims 7 to 9, it is characterised in that in the trigger policy, refusal respond institute Stating the strategy of the triggering of application server includes at least one of:The request is used to trigger the UE with time control attribute, and the triggered time is located in the disable time section of UE signings;The request is used to trigger the UE with time control attribute, and the triggered time was in outside the permission period of UE signings, but Migration efficiency determines that UE is allowing not allow to trigger outside the period;The network congestion when request is used to trigger, migration efficiency determine to refuse non-emergent triggering.
- 11. system according to any one of claims 7 to 9, it is characterised in that the HSS/HLR determines to refuse described in progress When operating absolutely, HSS/HLR is used to send refuse information to application server;The MME/SGSN determines to carry out the refusal operation When, MME/SGSN is used to directly or indirectly send refuse information to application server.
- 12. system according to any one of claims 7 to 9, it is characterised in that the mobility management unit receives described After NAS message request, when being controlled according to control strategy to UE, it is specifically used for:If it is the triggering because of application server that UE, which initiates the NAS message request, is allowed according to the control strategy or refuse UE Initiate the NAS message request.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110101091.4A CN102752828B (en) | 2011-04-21 | 2011-04-21 | A kind of method and system for realizing UE controls |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110101091.4A CN102752828B (en) | 2011-04-21 | 2011-04-21 | A kind of method and system for realizing UE controls |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102752828A CN102752828A (en) | 2012-10-24 |
CN102752828B true CN102752828B (en) | 2018-05-08 |
Family
ID=47032671
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110101091.4A Active CN102752828B (en) | 2011-04-21 | 2011-04-21 | A kind of method and system for realizing UE controls |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102752828B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102179105B1 (en) * | 2013-07-08 | 2020-11-16 | 삼성전자 주식회사 | Apparatus and method for controlling control overload in wlan systems |
CN104185138B (en) * | 2014-09-15 | 2018-08-24 | 中国通信建设集团设计院有限公司 | The data of mechanical type communication terminal report and handle, storage method and equipment |
CN105702005B (en) * | 2016-01-28 | 2020-09-29 | 高新兴物联科技有限公司 | Remote meter reading system and method |
CN107360582B (en) * | 2016-05-10 | 2019-11-26 | 宏达国际电子股份有限公司 | Handle the device and method of network-side feature |
CN105848106B (en) * | 2016-05-12 | 2019-04-19 | 山东闻远通信技术有限公司 | A kind of broadband cluster system group call region generates and method of adjustment and system |
CN109413085B (en) * | 2018-11-15 | 2021-05-04 | Oppo广东移动通信有限公司 | Method, device, equipment and storage medium for controlling VoLTE user registration |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102007053158A1 (en) * | 2007-11-08 | 2009-05-28 | T-Mobile International Ag | Call setup time reduction for mobile terminating calls with "Home Area" tariffs in the mobile network |
CN102014103A (en) * | 2009-09-07 | 2011-04-13 | 华为技术有限公司 | Machine type communication method and terminal |
-
2011
- 2011-04-21 CN CN201110101091.4A patent/CN102752828B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN102752828A (en) | 2012-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10382926B2 (en) | Coordinated grouping for machine type communications group based services | |
CN102457938B (en) | The method and system of terminal access restriction | |
CN102056140B (en) | Method and system for acquiring machine type communication terminal information | |
EP2566199B1 (en) | Method and system for transmitting small data packets | |
US9077723B2 (en) | Method, mobile management unit and gateway for restricting MTC device to access and communicate | |
CN102056266B (en) | Method and system for access control of machine type communication (MTC) terminal | |
CN102907042B (en) | For method, the system of the strategy that situation triggers | |
CN102595373B (en) | A kind of method and system to MTC terminal moving property management | |
CN102752828B (en) | A kind of method and system for realizing UE controls | |
CN105635944A (en) | Machine communication access control method and system and system | |
CN102045897B (en) | Group identification reporting method and device | |
CN102934489B (en) | Method, device and system for reporting location | |
CN102577449B (en) | Method, device and system for activation and deactivation of priority service | |
CN102724661B (en) | A kind of method and system obtaining machine type communication device IP address | |
CN102056128B (en) | Information acquisition method and system of machinery communication terminals | |
CN102480799B (en) | A kind of method of cordless communication network and notice equipment for machine type communication off-line thereof | |
CN102083172B (en) | Method, device and system for limiting moving times of machine type communication (MTC) equipment by network | |
CN102056247B (en) | Method for limiting maximum bit rate of MTC (Machine Type Communication) equipment group and access gateway | |
US20170318513A1 (en) | Communication device, communication method, communication system, and storage medium | |
CN103458499A (en) | Off-line processing method and equipment | |
CN102625420A (en) | Network access method and system | |
US20170332278A1 (en) | Base station, communication terminal, communication method, communication system, and storage medium | |
US20200107188A1 (en) | Communication device, communication method, communication system, and storage medium | |
CN102868976A (en) | Method, device and system for processing businesses of machinery communication equipment | |
KR20130016614A (en) | A method and apparatus of controlling mtc device access outside of grant time and forbidden time |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201225 Address after: 224700 Industrial Park, Jianyang Town, Jianhu County, Yancheng City, Jiangsu Province Patentee after: JIANGSU SHUANGXIN GROUP Co.,Ltd. Address before: 518057 Ministry of justice, Zhongxing building, South Science and technology road, Nanshan District hi tech Industrial Park, Shenzhen, Guangdong Patentee before: ZTE Corp. |
|
TR01 | Transfer of patent right |