CN102752541B - A kind of generation method of in-situ match subtitle - Google Patents
A kind of generation method of in-situ match subtitle Download PDFInfo
- Publication number
- CN102752541B CN102752541B CN201210048381.1A CN201210048381A CN102752541B CN 102752541 B CN102752541 B CN 102752541B CN 201210048381 A CN201210048381 A CN 201210048381A CN 102752541 B CN102752541 B CN 102752541B
- Authority
- CN
- China
- Prior art keywords
- data
- score
- field
- subtitle
- scene
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The invention discloses a kind of generation method of in-situ match subtitle, specifically include:Receive timing and scoring system for field score data;Corresponding score field is obtained, receives the timing and scoring system for field score data, divided data is compared in generation;The scene score field is removed from the score field, obtains static fields, statistics, the instruction of the second data acquisition is sent to data output end;Output terminal obtains the scene score data to the timing and scoring system;Instructed according to second data acquisition, the statistics is obtained to the on-site score processing system;According to the field data title, the scene score data and statistics generation output subtitle file are combined.The present invention solves the problems, such as that field data subtitle cannot classify generation, improves subtitle aggregate velocity of the scene than divided data, reduces the data output load of on-site score processing system, improves the synthetic instruction of score subtitle.
Description
Technical field
The present invention relates to the field data output and statistics output of athletics sports match, applied to showing for athletic competition
The subtitle generation of field, more particularly to a kind of generation method of in-situ match subtitle.
Background technology
With the development of television relay technology, there is the weight that more sports event live broadcast class programs progressively become TV programme
Part is wanted, the television relay especially for timing class has obtained significant progress in recent years, its development is directed not only to
In television production field, and be widely related in distributed network and mobile field of storage, especially in more competition fields,
During matching the athletic competition of line length or the live of timing class program, it is also desirable to which data are quickly collected and are broadcast
Go out, TV subtitling is generated by live real time output data, in the prior art typically by TV data output terminal to from now
Field result processing system carries out synthesis and is made as subtitle file, but for needing the field device exported in real time, it usually needs it is right
Two class field datas are handled, and the first kind is the data that live timing and scoring system is gathered, and another kind of data are by existing
Field timing and scoring system acquisition data, the data after the synthesis of on-site score processing system, but the above two in the prior art
Class data export at the same time, due to the difference that it requires two class real-time properties, cannot meet that field data carries out
The needs of display.
In inventor realizes process of the present invention, discovery has following defect in the prior art, in the prior art scene output
The end unified data from the output of on-site score processing system of match caption data obtain, real-time for needing to carry out field data
In the case of output, then it cannot meet to export field data in real time the needs of simultaneously generated data, such as to live chronoscope fraction
According to single data-signal output is carried out, thus, since its independent data processing is defeated by influence on-site score processing system data
Enter the stability of data, while this partial data and overall data separating will be made, be unfavorable for the management of data, it is particularly existing
In technology, it is impossible to separation generation is carried out on demand to the subtitle of live chronoscope grouped data as needed, so as to limit data
Application.
The content of the invention
For the problem that in the prior art the defects of, the present invention, which solves field data subtitle, cannot classify generation.
In order to solve above technical problem the present invention provides a kind of generation method of in-situ match subtitle, specifically include:
Timing and scoring system for field score data are received, the scene score data include:Field data title and scene
Score field, the instruction of the first data acquisition is sent to data output end;
According to the field data name query on-site score processing system, score field is obtained, at the on-site score
Reason system receives the timing and scoring system for field score data and scores data generation than divided data by the scene, described
Score data include the score field;
The scene score field is removed from the score field, static fields, statistics is obtained, is exported to data
End sends the instruction of the second data acquisition;
The data output end instructs to the timing and scoring system according to first data acquisition and obtains the scene
Score data, instruct to the on-site score processing system according to second data acquisition and obtain the statistics;It is described
Data output end is according to the field data title, the scene score data and statistics generation output subtitle text
Part.
Wherein, the scene score data also specifically include:Score data acquisition time, score fraction, personal information.
Wherein, the combination scene score data are also wrapped after generating output subtitle Files step with the statistics
Include:
The scene score data point fraction of falling into a trap is ranked up, and the sequence includes:Ascending order arranges or descending arrangement.
Wherein, the combination scene score data also have after generating output subtitle Files step with the statistics
Body includes:
According to output subtitle file generated output subtitle database file.
Wherein, specifically included in the reception timing and scoring system for field score data step:
Timing and scoring system for field score data are received, the scene score data include:Field data title and scene
Score field, the instruction of the first data acquisition is sent to data output end;
First subtitle template file is generated according to the score field.
Wherein, institute obtains score field step and also has according to the field data name query on-site score processing system
Body includes:
According to the field data name query on-site score processing system, score field is obtained;
Second subtitle template file is generated according to the score field.
Wherein, the output terminal specifically includes:Television relay data output end, live on-screen data output terminal, commentator
Commentary Systems data output end and network data output terminal.
Wherein, the data output end is instructed to the timing and scoring system according to first data acquisition and obtained
The scene score data, instruct to the on-site score processing system according to second data acquisition and obtain the statistical number
According to;The data output end is according to the field data title, the scene score data and statistics generation output
Also specifically included in subtitle file step:
Output terminal is instructed according to first data acquisition, and the live number scoring is obtained to the timing and scoring system
According to;Instructed according to second data acquisition, the statistics is obtained to the on-site score processing system;
According to scene score first subtitle file of data and the first subtitle template file generated;
According to the second subtitle file of the statistics and the second subtitle template file generated;
According to the field data title, the first subtitle file and the second subtitle file generation output the subtitle text is combined
Part.
Wherein, the data output end also specifically includes:Output terminal label, the output terminal label are used for unique mark number
According to output terminal type.
Wherein, the instruction of the first data acquisition and/or the instruction of the second data acquisition specifically include:Data output end mark
Number.
Compared with prior art, the embodiment of the present invention has the following advantages:By to live chronoscope grouped data and now
The output data of field result processing system is separated, and selects different data to carry out caption data according to different data sources
Synthesis, many-sided can meet many-sided needs of field data subtitle output, it follows that the data separating side more than passing through
Two analogy divided datas can be carried out single subtitle synthesis by formula, improve subtitle aggregate velocity of the scene than divided data, meanwhile,
The data output load of on-site score processing system is reduced, while reducing data processing cost, improves score subtitle
Synthetic instruction, meeting scene contrast divided data needs the needs that handle in real time.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is attached drawing needed in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also
To obtain other attached drawings according to these attached drawings.
Fig. 1:It is a kind of schematic diagram of the generation method of in-situ match subtitle in the embodiment of the present invention 1;
Fig. 2:It is the schematic diagram of the generation method of another in-situ match subtitle in the embodiment of the present invention 2.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is part of the embodiment of the present invention, instead of all the embodiments.Based on the present invention
In embodiment, the every other implementation that those of ordinary skill in the art are obtained without creative efforts
Example, belongs to the scope of protection of the invention.
A kind of generation method of in-situ match subtitle is provided in the embodiment of the present invention 1, as shown in Figure 1, including following step
Suddenly:
S101:Receive timing and scoring system for field score data;
This step specifically includes:Timing and scoring system for field score data are received, the scene score data include:Scene
Data name and scene score field, the instruction of the first data acquisition is sent to data output end;
S102:Obtain corresponding score field;
This step specifically includes:According to the field data name query on-site score processing system, score field is obtained,
The on-site score processing system receives the timing and scoring system for field score data and is given birth to by the scene score data
Include the score field into than divided data, the score data;
S103:Obtain static fields and corresponding statistics;
This step specifically includes:The scene score field is removed from the score field, obtains static fields, statistics
Data, the instruction of the second data acquisition is sent to data output end;
S104:Generation output subtitle file;
This step specifically includes:The data output end is instructed to the timing and scoring system according to first data acquisition
System obtains the scene score data, is instructed according to second data acquisition described in being obtained to the on-site score processing system
Statistics;The data output end is given birth to according to the field data title, the scene score data and the statistics
Into output subtitle file;
The generation method of another in-situ match subtitle is provided in the embodiment of the present invention 2, as shown in Fig. 2, including following
Step:
S201:Receive timing and scoring system for field score data;
This step specifically includes:Timing and scoring system for field score data are received, the scene score data include:Scene
Data name and scene score field, the instruction of the first data acquisition is sent to data output end;
The scene score data also specifically include:Score data acquisition time, score fraction, personal information;
Specifically included in the reception timing and scoring system for field score data step:
Timing and scoring system for field score data are received, the scene score data include:Field data title and scene
Score field, the instruction of the first data acquisition is sent to data output end;
First subtitle template file is generated according to the score field;
The output terminal specifically includes:Television relay data output end, live on-screen data output terminal, commentator comment on system
System data output end and network data output terminal;
The data output end also specifically includes:Output terminal label, it is defeated that the output terminal label is used for unique identification data
Outlet type;
The instruction of first data acquisition and/or the instruction of the second data acquisition specifically include:Data output end label;
S202:The scene score data point fraction of falling into a trap is ranked up;
This step specifically includes:The combination scene score data and statistics generation output subtitle file
Further included after step:
The scene score data point fraction of falling into a trap is ranked up, and the sequence includes:Ascending order arranges or descending arrangement;
S203:Obtain corresponding score field;
This step specifically includes:According to the field data name query on-site score processing system, score field is obtained,
The on-site score processing system receives the timing and scoring system for field score data and is given birth to by the scene score data
Include the score field into than divided data, the score data;
Institute obtains score field step and also specifically wraps according to the field data name query on-site score processing system
Include:According to the field data name query on-site score processing system, score field is obtained;Generated according to the score field
Second subtitle template file;
S204:Obtain static fields and corresponding statistics;
This step specifically includes:The scene score field is removed from the score field, obtains static fields, statistics
Data, the instruction of the second data acquisition is sent to data output end;
S205:Generation output subtitle file;
This step specifically includes:The data output end is instructed to the timing and scoring system according to first data acquisition
System obtains the scene score data, is instructed according to second data acquisition described in being obtained to the on-site score processing system
Statistics;The data output end is given birth to according to the field data title, the scene score data and the statistics
Into output subtitle file;
The data output end is instructed to described in timing and scoring system acquisition according to first data acquisition
Scene score data, instruct to the on-site score processing system according to second data acquisition and obtain the statistics;
The data output end is according to the field data title, the scene score data and statistics generation output subtitle
Also specifically included in Files step:
Output terminal is instructed according to first data acquisition, and the live number scoring is obtained to the timing and scoring system
According to;Instructed according to second data acquisition, the statistics is obtained to the on-site score processing system;
According to scene score first subtitle file of data and the first subtitle template file generated;
According to the second subtitle file of the statistics and the second subtitle template file generated;
According to the field data title, the first subtitle file and the second subtitle file generation output the subtitle text is combined
Part;
S206:Generation output subtitle database file;
This step specifically includes:The combination scene score data and statistics generation output subtitle file
Also specifically included after step:According to output subtitle file generated output subtitle database file.
Through the above description of the embodiments, those skilled in the art can be understood that the present invention can lead to
Hardware realization is crossed, the mode of necessary general hardware platform can also be added by software to realize.Based on such understanding, this hair
Bright technical solution can be embodied in the form of software product, which can be stored in a non-volatile memories
In medium (can be CD-ROM, USB flash disk, mobile hard disk etc.), including some instructions are used so that a computer equipment (can be
Personal computer, server, or network equipment etc.) perform method described in each embodiment of the present invention.
It will be appreciated by those skilled in the art that attached drawing is the schematic diagram of a preferred embodiment, module or stream in attached drawing
Journey is not necessarily implemented necessary to the present invention.
It will be appreciated by those skilled in the art that the module in device in embodiment can describe be divided according to embodiment
It is distributed in the device of embodiment, respective change can also be carried out and be disposed other than in one or more devices of the present embodiment.On
The module for stating embodiment can be merged into a module, can also be further split into multiple submodule.
The embodiments of the present invention are for illustration only, do not represent the quality of embodiment.
Disclosed above is only several specific embodiments of the present invention, and still, the present invention is not limited to this, any ability
What the technical staff in domain can think change should all fall into protection scope of the present invention.
Claims (10)
- A kind of 1. generation method of in-situ match subtitle, it is characterised in that including:Timing and scoring system for field score data are received, the scene score data include:Field data title and scene are scored Field;The instruction of the first data acquisition is sent to data output end;According to the field data name query on-site score processing system, score field, the on-site score processing system are obtained System receives the timing and scoring system for field score data and scores data generation than divided data, the score by the scene Data include the score field;The scene score field is removed from the score field, static fields, statistics is obtained, is sent out to data output end The second data acquisition is sent to instruct;The data output end instructs to the timing and scoring system according to first data acquisition and obtains the scene score Data, instruct to the on-site score processing system according to second data acquisition and obtain the statistics;The data output end is according to the field data title, the scene score data and statistics generation output Subtitle file.
- 2. method as described in claim 1, it is characterised in that the scene score data also specifically include:Score data Acquisition time, score fraction, personal information.
- 3. the method as described in claim 1 or 2, it is characterised in that the reception timing and scoring system for field score data Further included after step:The scene score data point fraction of falling into a trap is ranked up, and the sequence includes:Ascending order arranges or descending arrangement.
- 4. method as described in claim 1, it is characterised in that the data output end according to the field data title, Further included after the scene score data and statistics generation output subtitle Files step:According to output subtitle file generated output subtitle database file.
- 5. method as described in claim 1, it is characterised in that the reception timing and scoring system for field score data step In specifically include:Timing and scoring system for field score data are received, the scene score data include:Field data title and scene are scored Field;The instruction of the first data acquisition is sent to data output end;First subtitle template file is generated according to the score field.
- 6. method as described in claim 5, it is characterised in that handled according to the field data name query on-site score System, obtains score field step and also specifically includes:According to the field data name query on-site score processing system, score field is obtained;Second subtitle template file is generated according to the score field.
- 7. method as described in claim 1, it is characterised in that the data output end specifically includes:Television relay data Output terminal, live on-screen data output terminal, commentator's Commentary Systems data output end and network data output terminal.
- 8. method as described in claim 6, it is characterised in that the data output end refers to according to first data acquisition Make to the timing and scoring system obtain it is described scene score data, according to second data acquisition instruct to it is described scene into Achievement processing system obtains the statistics;The data output end is according to the field data title, the live number scoring Also specifically included according to being generated with the statistics in output subtitle Files step:Output terminal is instructed according to first data acquisition, and the scene score data are obtained to the timing and scoring system;Root Instructed according to second data acquisition, the statistics is obtained to the on-site score processing system;According to the scene score data and first the first subtitle file of subtitle template file generated;According to the statistics and second the second subtitle file of subtitle template file generated;According to the field data title, the first subtitle file and the second subtitle file generation output subtitle file are combined.
- 9. the method as described in claim 1 or 7, it is characterised in that the data output end also specifically includes:Output terminal mark Number, the output terminal label is used for unique identification data output terminal type.
- 10. method as described in claim 1, it is characterised in that the first data acquisition instruction and/or the second data obtain Instruction fetch specifically includes:Data output end label.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210048381.1A CN102752541B (en) | 2012-02-28 | 2012-02-28 | A kind of generation method of in-situ match subtitle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210048381.1A CN102752541B (en) | 2012-02-28 | 2012-02-28 | A kind of generation method of in-situ match subtitle |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102752541A CN102752541A (en) | 2012-10-24 |
CN102752541B true CN102752541B (en) | 2018-05-04 |
Family
ID=47032422
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210048381.1A Expired - Fee Related CN102752541B (en) | 2012-02-28 | 2012-02-28 | A kind of generation method of in-situ match subtitle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102752541B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105893499A (en) * | 2016-03-30 | 2016-08-24 | 乐视控股(北京)有限公司 | Athletics competition data displaying method and device |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101000617A (en) * | 2006-12-06 | 2007-07-18 | 华为技术有限公司 | Medium contents management system and method |
CN102088567A (en) * | 2009-12-03 | 2011-06-08 | 新奥特(北京)视频技术有限公司 | Caption machine with financial and economic data caption producing and broadcasting function |
CN102098454A (en) * | 2009-12-09 | 2011-06-15 | 新奥特(北京)视频技术有限公司 | Real-time caption broadcasting system and method |
CN103260075A (en) * | 2012-02-17 | 2013-08-21 | 索尼公司 | Receiving apparatus and subtitle processing method |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7106381B2 (en) * | 2003-03-24 | 2006-09-12 | Sony Corporation | Position and time sensitive closed captioning |
-
2012
- 2012-02-28 CN CN201210048381.1A patent/CN102752541B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101000617A (en) * | 2006-12-06 | 2007-07-18 | 华为技术有限公司 | Medium contents management system and method |
CN102088567A (en) * | 2009-12-03 | 2011-06-08 | 新奥特(北京)视频技术有限公司 | Caption machine with financial and economic data caption producing and broadcasting function |
CN102098454A (en) * | 2009-12-09 | 2011-06-15 | 新奥特(北京)视频技术有限公司 | Real-time caption broadcasting system and method |
CN103260075A (en) * | 2012-02-17 | 2013-08-21 | 索尼公司 | Receiving apparatus and subtitle processing method |
Also Published As
Publication number | Publication date |
---|---|
CN102752541A (en) | 2012-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103442252B (en) | Method for processing video frequency and device | |
CN104244023B (en) | Video cloud editing system and method | |
CN103458275A (en) | Real-time interaction digital television information recommendation system and method | |
BR112018076452A2 (en) | method and system to automatically produce featured videos | |
RU2016140630A (en) | AUDIO-VISUAL CONTENT DATA FLOWS | |
WO2013177213A3 (en) | Enabling natural language processing | |
CN102752540A (en) | Automatic categorization method based on face recognition technology | |
WO2015191331A1 (en) | Method and system for generating references to related video | |
JP2022160519A (en) | Media environment-driven content distribution platform | |
CN102752541B (en) | A kind of generation method of in-situ match subtitle | |
CN103096131B (en) | A kind of live method for stream processing and device | |
CN102256177A (en) | Method and device for synchronizing multimedia publications between set top box and intelligent terminal | |
US8913874B2 (en) | Information processing apparatus, sameness determination system, sameness determination method, and computer program | |
CN104822087B (en) | A kind of processing method and processing device of video-frequency band | |
CN102722513B (en) | A kind of method of in-situ match data separating | |
CN104410873A (en) | Method and device of detecting number of television channel users | |
CN202068514U (en) | Video-on-demand server | |
CN104168502A (en) | Program information fusing method and device | |
CN102752553B (en) | The dynamic call generation method and system of database in a kind of scoring system | |
WO2013032407A3 (en) | An apparatus and a method for simplying and displaying information | |
CN106792202A (en) | Data of set top box adaptation method, device and system | |
CN102750302A (en) | Method for generating field technology statistics | |
JP2008104189A5 (en) | ||
JP2013114507A (en) | Information processor, image selection method, and program | |
CN102724389B (en) | A kind of monitor output intent between same platform NLE system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190321 Address after: 100195 No. 621, 6th floor, No. 1 Building, 131 North West Fourth Ring Road, Haidian District, Beijing Patentee after: Beijing Xinaote Intelligent Sports Innovation Development Co., Ltd. Address before: 100195 new technology building, 49 Wukesong Road, Haidian District, Beijing Patentee before: China Digital Video (Beijing) Limited |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180504 Termination date: 20210228 |