CN102732657A - Method for clearing away blocking of pressure-equalizing diffusion pipeline of blast furnace with double-bell type furnace top - Google Patents

Method for clearing away blocking of pressure-equalizing diffusion pipeline of blast furnace with double-bell type furnace top Download PDF

Info

Publication number
CN102732657A
CN102732657A CN2012102482921A CN201210248292A CN102732657A CN 102732657 A CN102732657 A CN 102732657A CN 2012102482921 A CN2012102482921 A CN 2012102482921A CN 201210248292 A CN201210248292 A CN 201210248292A CN 102732657 A CN102732657 A CN 102732657A
Authority
CN
China
Prior art keywords
pressure
pipeline
bell
big
clean
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102482921A
Other languages
Chinese (zh)
Inventor
赵晓东
宋宇辉
郝培瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinxing Ductile Iron Pipes Co Ltd
Original Assignee
Xinxing Ductile Iron Pipes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinxing Ductile Iron Pipes Co Ltd filed Critical Xinxing Ductile Iron Pipes Co Ltd
Priority to CN2012102482921A priority Critical patent/CN102732657A/en
Publication of CN102732657A publication Critical patent/CN102732657A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The invention relates to a method for clearing away blocking of a pressure-equalizing diffusion pipeline of a blast furnace with a double-bell type furnace top. The method comprises the following steps of: 1), closing a big bell and a small bell; opening a big pressure equalizing valve and a small pressure equalizing valve; and introducing strong-coal air current formed by half-clean gas into a pressure reduction pipeline through a half-clean gas pipeline and a pressurizing pipeline, and discharging the strong-coal air current through the small pressure equalizing valve and keeping for 20-60 seconds, wherein according to the process, the pressurizing pipeline and the pressure reduction pipeline can be blown to be clean; and 2) closing the big pressure equalizing valve, opening the big bell and keeping for 20-60 seconds; and closing the big bell and the small pressure equalizing valve, wherein according to the process, the blind end of one section of the pipeline communicated with a big bell chamber can be blown to be clean. The method is simple, free of addition of any equipment, and good in clearing effect.

Description

A kind of way of removing the two clock-type furnace roof pressure-equalizing and discharging line cloggings of blast furnace
Technical field
The present invention relates to a kind of removing way of line clogging, be particularly suitable for blast furnace pressure-equalizing and discharging pipeline.
Background technology
After blast furnace adopts high top pressure operation; The bell and the seal valve of the big upper bell of clock-type furnace roof, clock valve formula furnace roof and the unlatching of not having the feed bin upper-lower seal valve etc. of bell type furnace roof, all need bell, above the seal valve or below charge into or emit pressure coal gas all press.The coal gas that the pressure-equalizing and discharging system uses generally contains a large amount of dust and aqueous vapor, in pipeline, can be bonded to gradually on the inner-walls of duct during operation, and long time integration can be accused and caused internal diameter of the pipeline to diminish even accomplish obstruction.Top charging in this time system can't normally all press, and can cause the valve opening difficulty maybe can't open, and need overhaul dust stratification, dredging pipeline are cleared up in the line clogging position.
Summary of the invention
In order to overcome the shortcoming of prior art, the present invention provides a kind of way of removing the two clock-type furnace roof pressure-equalizing and discharging line cloggings of blast furnace, and its method is simple, need not increase any equipment, removes effective.
The present invention solves the technical scheme that its technical problem takes: comprise the following steps: 1), close great bell and little clock; Open big pressure-balance valve and little pressure-balance valve; The more than half clean coal tracheaes of strong coal air communication that half purified gas forms, pressure pipeline get into gas relief line; The back keeps 20-60 second through little pressure-balance valve emptying, and this process can purge pressure pipeline and gas relief line clean; 2), close big pressure-balance valve, open great bell, keep 20-60 second, close great bell and little pressure-balance valve, this process can purge the segment pipe cecum with great bell chamber UNICOM clean.
The inventive method is simple, need not increase any equipment, removes effective.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is further specified.
Accompanying drawing is a synoptic diagram of the present invention.
Embodiment
Shown in accompanying drawing; 1), close great bell 8 and little clock 7 the present invention includes the following step:; Open the more than half clean coal tracheae of strong coal air communication that big pressure-balance valve 5 and little pressure-balance valve 1, half purified gas form 3, pressure pipeline 4 gets into gas relief lines 2, the back is through little pressure-balance valve 1 emptying; Kept for 30 seconds, this process can purge pressure pipeline 4 and gas relief line 2 clean; 2), close big pressure-balance valve 5, open great bell 8, kept for 30 seconds, close great bell 8 and little pressure-balance valve 1, this process can purge the segment pipe cecum 6 with great bell chamber UNICOM clean.
Changing normal material loading program over to is all valves to be returned to purge preceding state, carries out works better.

Claims (1)

1. way of removing the two clock-type furnace roof pressure-equalizing and discharging line cloggings of blast furnace; It is characterized in that: comprise the following steps: 1), close great bell (8) and little clock (7); Open big pressure-balance valve (5) and little pressure-balance valve (1), the more than half clean coal tracheaes of strong coal air communication (3) that half purified gas forms, pressure pipeline (4) get into gas relief line (2), and the back is through little pressure-balance valve (1) emptying; Keep 20-60 second, this process can purge pressure pipeline (4) and gas relief line (2) clean; 2), close big pressure-balance valve (5), open great bell (8), keep 20-60 second, close great bell (8) and little pressure-balance valve (1), this process can purge the segment pipe cecum (6) with great bell chamber UNICOM clean.
CN2012102482921A 2012-07-17 2012-07-17 Method for clearing away blocking of pressure-equalizing diffusion pipeline of blast furnace with double-bell type furnace top Pending CN102732657A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102482921A CN102732657A (en) 2012-07-17 2012-07-17 Method for clearing away blocking of pressure-equalizing diffusion pipeline of blast furnace with double-bell type furnace top

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102482921A CN102732657A (en) 2012-07-17 2012-07-17 Method for clearing away blocking of pressure-equalizing diffusion pipeline of blast furnace with double-bell type furnace top

Publications (1)

Publication Number Publication Date
CN102732657A true CN102732657A (en) 2012-10-17

Family

ID=46988952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102482921A Pending CN102732657A (en) 2012-07-17 2012-07-17 Method for clearing away blocking of pressure-equalizing diffusion pipeline of blast furnace with double-bell type furnace top

Country Status (1)

Country Link
CN (1) CN102732657A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS552767A (en) * 1978-06-23 1980-01-10 Nippon Kokan Kk <Nkk> Blast furnace facilities
US4196892A (en) * 1976-03-17 1980-04-08 Air Pollution Industries Apparatus for equalizing top gas pressure in a blast furnace
JPH06179904A (en) * 1992-12-15 1994-06-28 Nippon Steel Corp Pressure equalizing method in charging device for bell type blast furnace
CN201321465Y (en) * 2008-12-23 2009-10-07 南京钢铁联合有限公司 Dust removing device for blast furnace gas pipe
CN201793589U (en) * 2010-06-30 2011-04-13 芜湖新兴铸管有限责任公司 Iron making blast furnace top pressure-balanced discharged waste gas and noise treatment system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4196892A (en) * 1976-03-17 1980-04-08 Air Pollution Industries Apparatus for equalizing top gas pressure in a blast furnace
JPS552767A (en) * 1978-06-23 1980-01-10 Nippon Kokan Kk <Nkk> Blast furnace facilities
JPH06179904A (en) * 1992-12-15 1994-06-28 Nippon Steel Corp Pressure equalizing method in charging device for bell type blast furnace
CN201321465Y (en) * 2008-12-23 2009-10-07 南京钢铁联合有限公司 Dust removing device for blast furnace gas pipe
CN201793589U (en) * 2010-06-30 2011-04-13 芜湖新兴铸管有限责任公司 Iron making blast furnace top pressure-balanced discharged waste gas and noise treatment system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李汉江等: "武钢1#高炉炉顶均压系统的改进", 《武汉工程职业技术学院学报》 *
罗成等: "马钢1号高炉炉顶均压系统的使用与维护", 《马钢技术》 *

Similar Documents

Publication Publication Date Title
CN102732656A (en) Method for cleaning blockage of bell-less furnace top pressure equalizing relief pipeline of blast furnace
CN101724722A (en) Blast-furnace pressure-discharging gas recovering device and method
CN102678959A (en) Ball valve device special for powder, ash and slag system
CN211255968U (en) Pressure-equalizing gas self-cleaning purifying and full-recovering device for blast furnace top charging bucket
CN102732657A (en) Method for clearing away blocking of pressure-equalizing diffusion pipeline of blast furnace with double-bell type furnace top
CN202348323U (en) Coal mine gas drainage drill combination hole-main pipe hole linkage structure
CN202195055U (en) Sealing structure on box body of dust remover
CN204684597U (en) A kind of transmitting-receiving ball system of ball washer and ball washer
CN103966374B (en) Blast furnace bucket blocks up tank blowback methodology
CN202561097U (en) Ball valve special for powder, dust and dreg system
CN202729345U (en) Pneumatic dedusting system
CN201179392Y (en) Improved upper-gas-intake blast furnace cloth bag dust remover
CN102504871A (en) Isolating device for blown gas reclaiming valve
CN104399717A (en) Flue dirt removing device and flue dirt removing method
CN202146681U (en) Automatic sweeping device of long-bag low-pressure pulse bag type dust remover
CN102296132B (en) Blast furnace coal injection system and dehumidification method thereof
CN202226868U (en) Pressure equalizing and discharging valve group at furnace top of serial-tank blast furnace
CN202322739U (en) Isolating device for blowing gas recovery valve
CN202430179U (en) Coal adding device for gas furnace
CN201692677U (en) Flash tank cleaning device
CN215828824U (en) Dry method dust removal box body diffuses and retrieves coal gas device
CN204060772U (en) To hole three anti-seal gas drawing station devices
CN202081072U (en) Jetting water seal
CN202302226U (en) Automatic pollution discharge device
CN201793587U (en) Automatic cleaning device for coal powder injection main pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121017