CN102722782A - Production tool information management system and management method - Google Patents

Production tool information management system and management method Download PDF

Info

Publication number
CN102722782A
CN102722782A CN2012101596412A CN201210159641A CN102722782A CN 102722782 A CN102722782 A CN 102722782A CN 2012101596412 A CN2012101596412 A CN 2012101596412A CN 201210159641 A CN201210159641 A CN 201210159641A CN 102722782 A CN102722782 A CN 102722782A
Authority
CN
China
Prior art keywords
tool
production
information
production information
effective
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101596412A
Other languages
Chinese (zh)
Other versions
CN102722782B (en
Inventor
王葛
汤有义
王毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MEIZHOU ZHIHAO ELECTRONIC-TECH CO LTD
Original Assignee
MEIZHOU ZHIHAO ELECTRONIC-TECH CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MEIZHOU ZHIHAO ELECTRONIC-TECH CO LTD filed Critical MEIZHOU ZHIHAO ELECTRONIC-TECH CO LTD
Priority to CN201210159641.2A priority Critical patent/CN102722782B/en
Publication of CN102722782A publication Critical patent/CN102722782A/en
Application granted granted Critical
Publication of CN102722782B publication Critical patent/CN102722782B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a production tool information management method. The method comprises the following steps of: 1, acquiring production tool information by using an information acquisition module; 2, detecting whether the production tool information meets predetermined requirements by using an information monitoring module, if so, executing the step 3 and detecting whether the production tool information is valid, and otherwise, executing the step 4 and starting an information reminding flow; and 3, when the production tool information is invalid, executing the step 31 and transferring an invalid production tool, and when the production tool information is valid, executing the step 32 and processing a valid production tool. The invention also provides a production tool information management system employing the production tool information management method. The production tool information management system and the production tool information management method have the advantages that the production tools can be automatically identified and can be automatically managed and controlled according to the predetermined requirements.

Description

Tool of production information management system and management method
Technical field
The present invention relates to a kind of tool of production information management system and management method.
Background technology
In the current enterprise production; The different production link often will be used the different production instrument; Even a lot of production links will often be changed the different production instrument, the graphic documentation of for example in the PCB process of manufacture, directly using, using indirectly, drilling program, gong tape program etc.For the orderly production of each product in guaranteeing to produce and version, need the tool of production that use in producing be control effectively.In practical operation, owing to there is not effective control method, version deposit position mistake can appear, situation that the inefficacy file is not in time handled at present.And that the version of the tool of production transmits is wrong, in time do not handle when bang path mistake and the tool of production lost efficacy, and all can cause producing wrong product, thereby cause the finished product of product or semi-manufacture to be scrapped, and increases the production cost of company.
Therefore; How can be in the production run of enterprise, Intelligent Recognition goes out the various tools of production, rejects the tool of production that does not meet production requirement; And the different editions of the various tools of production that accords with production is required is discerned automatically; Thereby guarantee to have only the tool of production of right version could get into production procedure, guarantee the qualification rate of product, become the technical matters that needs to be resolved hurrily.
Summary of the invention
The present invention provides a kind of tool of production approaches to IM, comprising: step S1, obtain tool of production information through the information acquisition module; Step S2 detects tool of production information through the information detection module and whether meets predetermined requirement, and whether as the testing result then execution in step S3 that meets the requirements, it is effective to detect tool of production information; As the undesirable then execution in step of testing result S4, get into the information reminding flow process; Among the step S3, when testing result when being invalid, execution in step S31 shifts the invalid tool of production; When testing result when being effective, execution in step S32 gets into effective tool of production treatment step.
According to a preferred embodiment of the invention, said step S31 further comprises: step S311 generates invalid tool of production bang path through tool of production information Control module; Step S312 cancels each operation rights of using of the invalid tool of production through invalid tool of production server control module; Step S313 shifts and stores invalid tool of production information through invalid tool of production server.
According to a preferred embodiment of the invention, the invalid tool of production information of storage comprises a primary storage and a back-up storage.
According to a preferred embodiment of the invention, said step S32 further comprises: step S321 generates effective tool of production bang path through tool of production information Control module; Step S322 is through each operation rights of using of the effective tool of production of effective tool of production information Control module settings; Step S323 transmits effective tool of production information through effective tool of production information server control module; Step S324 carries out and the recording operation daily record through effective tool of production information server; Step S325 accomplishes the transmission of effective tool of production information.
According to a preferred embodiment of the invention, the Operation Log of record comprises a primary storage and a back-up storage.
According to a preferred embodiment of the invention, said step S3 further comprises: step S301, transmit tool of production tabulation through effective tool of production server; Step S302 generates tool of production detection list through tool of production information detection module and goes forward side by side and circulate into tabulation; Step S303 is through the validity of the tool of production information detection module detection tool of production.
According to a preferred embodiment of the invention, said step S4 further comprises: step S41, change and return tool of production information through tool of production information detection module; Step S42 generates tool of production owner information through tool of production information person liable control module; Step S43 sends tool of production information to the responsible official through information sending module.
The present invention also provides a kind of tool of production information management system, comprising: tool of production information acquisition module, and it is used to obtain tool of production information; Tool of production information detection module, it is used to detect the tool of production information that said tool of production information acquisition module obtains and whether meets predetermined requirement, and whether detect satisfactory tool of production information effective; Tool of production information Control module, it is used to generate tool of production bang path; Invalid tool of production information server control module, it is used for according to tool of production bang path the invalid tool of production being carried out the setting of associated rights; Invalid tool of production server, it is used to store invalid tool of production information; Effective tool of production information server control module; It is used for according to tool of production bang path effective tool of production being carried out the setting of associated rights; Effective tool of production server, it is used for efficient in operation tool of production information, and the recording operation daily record.
According to a preferred embodiment of the invention, said tool of production information management system also comprises: tool of production information person liable control module, and it is used for the judged result according to tool of production information detection module, the corresponding owner information of editor's tool of production; Information sending module, it is used for the information that tool of production information person liable control module generates is sent to responsible official that should the tool of production.
Compared to prior art; Tool of production information management system of the present invention and management method thereof detect before the tool of production is issued to production run; Stop for file that does not meet set standard and file; And notify tool of production person liable in time to handle with modes such as mails, prevent that the wrong tool of production from getting into production run.
Simultaneously tool of production information management system and management method thereof can to the tool of production carry out validity detect, when detecting the tool of production of inefficacy; Immediately the tool of production is transferred to the inefficacy tool of production server from effective tool of production server, prevented that the tool of production that lost efficacy from getting into production run.
Tool of production information Management System primary storage, from storage control module; In the process of the transfer of at every turn carrying out the tool of production, transmission; Primary storage, carry out consistency operation, guarantee that every suit tool of production all has the complete backup of a cover, guarantees the safety of the tool of production from storage.
Tool of production information management system and management method thereof are set the production process rights of using to each tool of production, when production process does not have authority to this tool of production, also can't use this instrument to produce in the production run.
Description of drawings
Fig. 1 is the structural representation of tool of production information management system of the present invention.
Fig. 2 is the process flow diagram of the management method of tool of production information management system shown in Figure 1.
Fig. 3 is the schematic flow sheet of the part steps in the tool of production approaches to IM shown in Figure 2.
Embodiment
Specify embodiment of the present invention below in conjunction with accompanying drawing.
See also Fig. 1; Fig. 1 is the structural representation of tool of production information management system of the present invention, and said tool of production information management system 100 comprises tool of production information acquisition module 10, tool of production information detection module 11, tool of production information Control module 12, invalid tool of production server control module 13, invalid tool of production server 14, effective tool of production server control module 15, effective tool of production server 16, tool of production information person liable control module 17, information sending module 18.
Wherein, tool of production information acquisition module 10 is used to obtain tool of production information; Tool of production information detection module 11 is used to detect the tool of production information that said tool of production information acquisition module obtains and whether meets predetermined requirement, and whether detect satisfactory tool of production information effective; Tool of production information Control module 12 is used to generate tool of production bang path; Invalid tool of production server control module 13 is used for setting of according to tool of production bang path the invalid tool of production being carried out associated rights etc.; Invalid tool of production server 14 is used to store invalid tool of production information; Effectively tool of production server control module 15 is used for according to tool of production bang path effective tool of production being carried out the setting of associated rights; Effectively tool of production server 16 is used for efficient in operation tool of production information, and the recording operation daily record; The judged result that tool of production information person liable control module 17 is used for according to tool of production information detection module, the corresponding owner information of editor's tool of production; Information sending module 18 is used for the information that tool of production information person liable control module generates is sent to responsible official that should the tool of production.The tool of production information of indication can be the needed tool of production information of producing arbitrarily among the present invention, and for example the required various tools of production and the corresponding information thereof of printed circuit board industry is enumerated at this no longer one by one.
See also Fig. 2, the process flow diagram of the management method of Fig. 2 tool of production information management system shown in Figure 1, said management method specifically comprises:
Step S1 obtains tool of production information;
In this step; Tool of production information acquisition module 10 obtains the tool of production information that is generated by other tool of production modules; Tool of production information can obtain through the mode of manual input, also can obtain through the mode of automatic extracting predetermined content, can obtain tool of production information in every case and get final product.Said tool of production information can comprise various information such as the title, purposes, buying, cost control, human resources, finance of the tool of production, does not do concrete qualification at this.Then, tool of production information acquisition module 10 sends the tool of production that obtains to tool of production information detection module 11.
Whether step S2 detects tool of production information and meets the requirements;
In this step, the tool of production information that 11 pairs of tool of production information detection modules obtain detects, and judges whether this information meets the requirement of enterprise.For example, can be relatively with predetermined production tool information standard in tool of production information of obtaining and the system, particularly the name information of the tool of production judges whether it meets the established standards of predetermined tool of production information.If meet enterprise's predetermined information, be judged as " being ", whether effectively then direct then execution in step S3 gets into and detects tool of production information step; If do not meet enterprise's predetermined information established standards, be judged as " denying ", execution in step S4 then gets into the step of information reminding flow process.Wherein predetermined production tool information standard can be set up on their own by enterprise; For example can formulate standard respectively according to information such as the title of enterprise production instrument, purposes, buying, cost control, human resources, finance; Also can adopt the mode of dynamic setting, adjustment standard to form, not do concrete qualification at this.
Step S3, whether detect tool of production information effective;
In this step, 11 pairs of tool of production information of tool of production information detection module detect, and whether detect the tool of production effective.Concrete; This detection step comprises that the satisfactory tool of production information to just having received detects; Also comprise the tool of production information that is stored in effective tool of production server 16 that reads, and the tool of production information of having stored detected whether detect has the tool of production information that is lower than current production model; Wherein the validity of tool of production information comprises the validity of the version of the tool of production, the validity of tool of production information time etc.; Also can formulate different effective property standard according to the different production situation, not do concrete restriction at this, the validity with different editions in the present embodiment is that example is introduced.If there is the tool of production information of legacy version, then the tool of production information of this legacy version is invalid tool of production information, is judged as " denying ", and then execution in step S31 gets into and shifts invalid tool of production step; If the tool of production of effective version is judged as " being ", then direct then execution in step S32 gets into effective tool of production treatment step.
Wherein, step S31 further comprises:
Step S311 generates invalid tool of production bang path;
In this step, produce invalid tool of production information bang path by tool of production information Control module 12.
Step S312 cancels each operation rights of using of the invalid tool of production;
Invalid tool of production server control module 13 prevents that with invalid each operation production rights of using of tool of production information cancellation the invalid tool of production from getting into production procedure.Wherein, invalid tool of production server control module 13 can be through each operation production rights of using of the invalid tool of production of a tool of production rights of using setting module (figure does not show) cancellation.
Step S313 shifts and stores invalid tool of production information;
In this step; The invalid tool of production information bang path that invalid tool of production server control module 13 produces according to tool of production information Control module 12 is on invalid tool of production information transfer to the invalid tool of production server 14, and with invalid tool of production information stores on its corresponding memory 141.Wherein storer 141 can comprise primary memory and from storer, has a backup information consistent with primary memory information when guaranteeing the invalid tool of production information of same from storage.
Wherein, step S32 further comprises:
Step S321 generates effective tool of production bang path;
In this step, produce effective tool of production information bang path by tool of production information Control module 12.
Step S322 sets each operation rights of using of effective tool of production;
In this step; Effective tool of production is carried out the setting of associated rights by effective tool of production information Control module 15 according to effective tool of production bang path; What associated rights for example can comprise the tool of production takes authority, time authority, project authority etc., does not do concrete qualification at this.Wherein, effective tool of production server control module 15 can be set each operation production rights of using of effective tool of production through a tool of production rights of using setting module.
Step S323 transmits and stores effective tool of production information;
In this step; By the effective tool of production information bang path of effective tool of production server control module 15 bases; With the extremely effective tool of production information server 16 of effective tool of production information transmission; And with effective tool of production information stores on its corresponding memory 161, thereby the use that supplies the tool of production of actual production process.Wherein storer 161 can comprise primary memory and from storer, has a backup information consistent with primary memory information when guaranteeing the effective tool of production information of same from storage.When effective tool of production information stores after on the effective tool of production information server 16, can delete tool of production information in the tool of production information acquisition module 10.
Step S324 carries out and the recording operation daily record;
In this step; Effectively tool of production information server 16 is carried out the operational order of effective tool of production server control module 15; According to the concrete steps of this operation, write down this Operation Log to effective tool of production information server 16 corresponding memory 161.
Wherein, step S4 further comprises:
Step S41 changes and returns tool of production information;
In this step, step S1 is changed and returned to 11 judgements according to step S2 of tool of production information detection module with undesirable tool of production information, obtains new tool of production information again.
Step S42 generates tool of production owner information;
In this step; By tool of production information person liable control module 17 judgement information according to tool of production information detection module 11; Contents such as the owner information that editor's tool of production is corresponding, tool of production error message; Synthesize the information that meets that comprises above-mentioned information, and give information sending module 18 above-mentioned information transmission.
Step S43 sends tool of production information to the responsible official;
The information that information sending module 18 generates tool of production information person liable control module 17 is sent to responsible official that should the tool of production; Remind this responsible official that corresponding tool of production information is wrong; Thereby can in time understand tool of production information, and correspondence adjusts.
Step S4 accomplishes the information reminding flow process.
See also Fig. 3, Fig. 3 is the concrete operations process step figure of step S3 shown in Figure 2.Wherein step S3 further comprises:
Step S301 transmits tool of production tabulation;
In this step, effectively tool of production server 16 transmits tool of production list information to tool of production information detection module 11.
Step S302, generation tool of production detection list is gone forward side by side and is circulated into tabulation;
In this step, tool of production information detection module 11 generates tool of production detection list and goes forward side by side into the tabulation recurrent state.
Step S303, the validity of the detection tool of production.
In this step, tool of production information detection module 11 carries out validity with the detection content to the tool of production information of obtaining according to the detection rule of setting and detects.When testing result when being invalid, execution in step S31; When testing result when being effective, execution in step S32.
Compared to prior art; Tool of production information management system 100 of the present invention and management method thereof detect before the tool of production is issued to production run; Stop for file that does not meet set standard and file; And notify tool of production person liable in time to handle with modes such as mails, prevent that the wrong tool of production from getting into production run.
Simultaneously tool of production information management system 100 and management method thereof can to the tool of production carry out validity detect, when detecting the tool of production of inefficacy; Immediately the tool of production is transferred in the inefficacy tool of production server 14 from effective tool of production server 16, prevented that the tool of production that lost efficacy from getting into production run.
Tool of production information management system 100 design primary storages, from storage control module; In the process of the transfer of at every turn carrying out the tool of production, transmission; Primary storage, carry out consistency operation, guarantee that every suit tool of production all has the complete backup of a cover, guarantees the safety of the tool of production from storage.
Tool of production information management system 100 and management method thereof are set the production process rights of using to each tool of production, when production process does not have authority to this tool of production, also can't use this instrument to produce in the production run.
The above is merely preferred embodiments of the present invention; Protection scope of the present invention is not exceeded with above-mentioned embodiment; As long as the equivalence that those of ordinary skills do according to disclosed content is modified or changed, all should include in the protection domain of putting down in writing in claims.

Claims (9)

1. tool of production approaches to IM comprises:
Step S1 obtains tool of production information through the information acquisition module;
Step S2 detects tool of production information through the information detection module and whether meets predetermined requirement, and whether as the testing result then execution in step S3 that meets the requirements, it is effective to detect tool of production information; As the undesirable then execution in step of testing result S4, get into the information reminding flow process;
Step S3, when testing result when being invalid, execution in step S31 shifts the invalid tool of production; When testing result when being effective, execution in step S32 gets into effective tool of production treatment step.
2. tool of production approaches to IM according to claim 1 is characterized in that, said step S31 further comprises:
Step S311 generates invalid tool of production bang path through tool of production information Control module;
Step S312 cancels each operation rights of using of the invalid tool of production through invalid tool of production server control module;
Step S313 shifts and stores invalid tool of production information through invalid tool of production server.
3. tool of production approaches to IM according to claim 2 is characterized in that, the invalid tool of production information of storage comprises a primary storage and a back-up storage.
4. tool of production approaches to IM according to claim 3 is characterized in that, said step S32 further comprises:
Step S321 generates effective tool of production bang path through tool of production information Control module;
Step S322 is through each operation rights of using of the effective tool of production of effective tool of production information Control module settings;
Step S323 transmits effective tool of production information through effective tool of production information server control module;
Step S324 carries out and the recording operation daily record through effective tool of production information server.
5. tool of production approaches to IM according to claim 4 is characterized in that, the Operation Log of record comprises a primary storage and a back-up storage.
6. tool of production approaches to IM according to claim 1 is characterized in that, said step S3 further comprises:
Step S301 transmits tool of production tabulation through effective tool of production server;
Step S302 generates tool of production detection list through tool of production information detection module and goes forward side by side and circulate into tabulation;
Step S303 is through the validity of the tool of production information detection module detection tool of production.
7. tool of production approaches to IM according to claim 1 is characterized in that, said step S4 further comprises:
Step S41 changes and returns tool of production information through tool of production information detection module;
Step S42 generates tool of production owner information through tool of production information person liable control module;
Step S43 sends tool of production information to the responsible official through information sending module.
8. tool of production information management system comprises:
Tool of production information acquisition module, it is used to obtain tool of production information;
Tool of production information detection module, it is used to detect the tool of production information that said tool of production information acquisition module obtains and whether meets predetermined requirement, and whether detect satisfactory tool of production information effective;
Tool of production information Control module, it is used to generate tool of production bang path;
Invalid tool of production information server control module, it is used for according to tool of production bang path the invalid tool of production being carried out the setting of associated rights;
Invalid tool of production server, it is used to store invalid tool of production information;
Effective tool of production information server control module, it is used for according to tool of production bang path effective tool of production being carried out the setting of associated rights;
Effective tool of production server, it is used for efficient in operation tool of production information, and the recording operation daily record.
9. tool of production information management system according to claim 8 also comprises:
Tool of production information person liable control module, it is used for the judged result according to tool of production information detection module, the corresponding owner information of editor's tool of production;
Information sending module, it is used for the information that tool of production information person liable control module generates is sent to responsible official that should the tool of production.
CN201210159641.2A 2012-05-21 2012-05-21 Tool of production information management system and management method Active CN102722782B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210159641.2A CN102722782B (en) 2012-05-21 2012-05-21 Tool of production information management system and management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210159641.2A CN102722782B (en) 2012-05-21 2012-05-21 Tool of production information management system and management method

Publications (2)

Publication Number Publication Date
CN102722782A true CN102722782A (en) 2012-10-10
CN102722782B CN102722782B (en) 2016-06-22

Family

ID=46948530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210159641.2A Active CN102722782B (en) 2012-05-21 2012-05-21 Tool of production information management system and management method

Country Status (1)

Country Link
CN (1) CN102722782B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107784706A (en) * 2017-10-31 2018-03-09 合肥鑫晟光电科技有限公司 One kind production performs management system, production equipment and production executive system
CN112817927A (en) * 2021-01-26 2021-05-18 广州广合科技股份有限公司 Error-proofing method and device for production tool, electronic equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1369787A (en) * 2001-02-14 2002-09-18 英业达股份有限公司 Test tool loading and managing method for test system
CN101023430A (en) * 2004-09-22 2007-08-22 诺基亚公司 A method and system for the total decoupling of licenses from associated license protected configuration
CN101145216A (en) * 2006-09-15 2008-03-19 英业达股份有限公司 Electronic component examination and maintenance system and method
CN101281622A (en) * 2007-04-02 2008-10-08 英业达股份有限公司 Knowledge management system and method for implementing management software using the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1369787A (en) * 2001-02-14 2002-09-18 英业达股份有限公司 Test tool loading and managing method for test system
CN101023430A (en) * 2004-09-22 2007-08-22 诺基亚公司 A method and system for the total decoupling of licenses from associated license protected configuration
CN101145216A (en) * 2006-09-15 2008-03-19 英业达股份有限公司 Electronic component examination and maintenance system and method
CN101281622A (en) * 2007-04-02 2008-10-08 英业达股份有限公司 Knowledge management system and method for implementing management software using the same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107784706A (en) * 2017-10-31 2018-03-09 合肥鑫晟光电科技有限公司 One kind production performs management system, production equipment and production executive system
CN112817927A (en) * 2021-01-26 2021-05-18 广州广合科技股份有限公司 Error-proofing method and device for production tool, electronic equipment and storage medium

Also Published As

Publication number Publication date
CN102722782B (en) 2016-06-22

Similar Documents

Publication Publication Date Title
DE102018113625A1 (en) ERROR INJECTION TESTING DEVICE AND METHOD
CN105320854B (en) By signing, balance prevents automation component from being distorted by program
Eloranta et al. Designing distributed control systems: A pattern language approach
JP2016012172A (en) Communication system, programmable display, information processing device, operation control method, information processing method, and program
CN105278906A (en) Programmable indicator
CN102722782A (en) Production tool information management system and management method
CN102662784A (en) Method and equipment for repairing faults of built-in system
CN109144216A (en) A kind of electronic equipment uses the recording method and system of time for the first time
CN105279037A (en) Watchdog monitoring method and system
US9223740B2 (en) Detection method and apparatus for hot-swapping of SD card
CN113987393A (en) Web page operation recorder, system, device and method
CN106094738A (en) For running method and the automation equipment of automation equipment
CN103092745B (en) The control method of system journal record and device
KR101139888B1 (en) ???? middleware system for use in Container Security Device
CN205193541U (en) Industrial control system safety monitoring device
CN109491882A (en) A kind of chassis data processing method, system, equipment cabinets and readable storage medium storing program for executing
CN102455979B (en) Data protection method for damaged memory cell
CN104375452A (en) Product processing fool-proof system and method
JP5332583B2 (en) Supervisory control system, supervisory control method, and supervisory control program
CN104778035A (en) Method and device for processing parameter restriction and mutual exclusion of human-computer interaction interface software
CN109274509A (en) Broadcast state determines method, apparatus, electronic equipment and storage medium
CN115311825B (en) Method and device for pushing alarm data of PCB (printed circuit board) equipment, computer equipment and storage medium
EP4109194B1 (en) Sensor data generation for controlling an autonomous vehicle
Kumar et al. FMEAs using a functional modeling based approach
CN202167119U (en) Bank card reminding device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant