CN102720487A CN2012102263939A CN201210226393A CN102720487A CN 102720487 A CN102720487 A CN 102720487A CN 2012102263939 A CN2012102263939 A CN 2012102263939A CN 201210226393 A CN201210226393 A CN 201210226393A CN 102720487 A CN102720487 A CN 102720487A
Authority
CN
China
Prior art keywords
gas
well
pressure
pressure gradient
wellbore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102263939A
Other languages
Chinese (zh)
Other versions
CN102720487B (en
Inventor
张明禄
卢涛
艾芳
王东旭
刘志军
张雅玲
兰义飞
张建国
郭辉
艾庆琳
何磊
伍勇
游良容
朱长荣
卞晓燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201210226393.9A priority Critical patent/CN102720487B/en
Publication of CN102720487A publication Critical patent/CN102720487A/en
Application granted granted Critical
Publication of CN102720487B publication Critical patent/CN102720487B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measuring Fluid Pressure (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a system and a method for acquiring formation pressure of a gas reservoir, belonging to the technical field of acquiring formation pressure of a gas field. And the contradiction between well closing pressure measurement and gas well production in gas field development is also solved.

Description

A kind of gas reservoir strata pressure system and method thereof obtained
Technical field
The invention belongs to the gas field and obtain the strata pressure technical field, relate to a kind of system and method thereof of obtaining the gas reservoir strata pressure.
Background technology
At present, in gas field development, obtaining the most reliable way of gas reservoir strata pressure is exactly full gas reservoir shut-in pressure survey (for example Sichuan, gas field, the Liaohe River etc.), and this method is under the condition of closing well, at the bottom of the pressure gauge lower going-into-well, directly acquires the gas well strata pressure.The acquisition methods shortcoming of this gas reservoir strata pressure is that one is to influence gas well production; The 2nd, increase cost; So can not obtain the present strata pressure of gas reservoir on a large scale; Especially self-contained gas field, realize full gas reservoir shut-in pressure survey hardly maybe, even local, carry out whole shut-in pressure survey work among a small circle and also influence gas well ordinary production and downstream air feed.
Calculate the theoretical formula of bottom pressure for known shut in to build up well head pressure:
P ws = P ts × e ( 0.03415 γ g H / TZ )
γ in this method g, T and Z be unknown quantity, be difficult for confirming, and along with the variation P of H Ws, γ g, T and Z also can change.Therefore, the part correlation parameter in the theoretical formula obtain and define certain degree of difficulty, increase computational complexity, operability receives certain limitation.
Summary of the invention
Technical problem to be solved by this invention provides a kind of closing well that need not again and obtains system that obtains the gas reservoir strata pressure and method thereof under the condition.
For solving the problems of the technologies described above, the invention provides a kind of system that obtains the gas reservoir strata pressure, comprise measurement of gas layer depth module, measuring well mouth pressure module, obtain the wellbore pressure gradient modules and obtain the strata pressure module;
Said measurement of gas layer depth module is used for the gas-bearing formation degree of depth of measurement of gas Tanaka gas well;
Said measuring well mouth pressure module is used to measure the well head pressure of gas well described in the said gas field;
Saidly obtain the wellbore pressure gradient that the wellbore pressure gradient modules is used to obtain gas well described in the said gas field;
The said strata pressure that obtains the strata pressure module according to the said gas-bearing formation degree of depth, said well head pressure and the said gas well of said wellbore pressure gradient calculation.
Further, a kind of method of obtaining the gas reservoir strata pressure specifically comprises the steps:
The gas-bearing formation degree of depth of A measurement of gas Tanaka gas well;
B measures the well head pressure of gas well described in the said gas field;
C obtains the wellbore pressure gradient of gas well described in the said gas field;
D is according to the strata pressure of the said gas-bearing formation degree of depth, said well head pressure and the said gas well of said wellbore pressure gradient calculation, and the computation model of said strata pressure is suc as formula shown in (1):
P Ws=P Ts+ D * H (1), wherein, P WsBe the strata pressure of gas well, unit is MPa;
P TsBe the well head pressure of gas well, unit is MPa;
D is the wellbore pressure gradient of gas well, and unit is MPa/100m;
H is the gas-bearing formation degree of depth of gas well, and unit is m.
Further, the said wellbore pressure gradient of obtaining also comprises the steps:
A measures the well head pressure of sample gas well in the said gas field;
B measures the wellbore pressure gradient of sample gas well described in the said gas field;
C is according to the well head pressure of said sample gas well and the wellbore pressure gradient of said sample gas well; Set up the wellbore pressure gradient calculation model of all gas wells in said gas field, draw the wellbore pressure gradient of all gas wells in said gas field according to said wellbore pressure gradient calculation Model Calculation.
Further, the wellbore pressure gradient calculation model of all gas wells in said gas field is suc as formula shown in (2):
D=0.00007069P ts+0.0001237
(2)
Wherein, D is the wellbore pressure gradient of gas well, and unit is MPa/100m;
P TsBe the well head pressure of gas well, unit is MPa.
Further, the computation model of said calculating wellbore pressure gradient is suc as formula shown in (3):
D=0.0000652P ts+0.0002659
(3)
Wherein, D is the wellbore pressure gradient of gas well, and unit is MPa/100m;
P TsBe the well head pressure of gas well, unit is MPa.
System and the method thereof of obtaining the gas reservoir strata pressure provided by the invention; Calculate the individual well pressure data through a large amount of gas well means of production; Thereby obtain abundant strata pressure data; Remedy the actual shortcoming that the formation pressure data amount is few, the process realization is loaded down with trivial details of obtaining, satisfy the needs of full gas field strata pressure evaluating data amount.Also solved the contradiction between shut-in pressure survey and gas well are produced in the gas field development.
Description of drawings
Wellbore pressure gradient and well head pressure relation curve that Fig. 1 provides for the embodiment of the invention;
Wellbore pressure gradient and well head pressure relation curve that Fig. 2 provides for the embodiment of the invention;
The northern falloff curve of distinguishing gas well in the gas field of pacifying the border region that Fig. 3 provides for the embodiment of the invention;
The falloff curve of gas well is distinguished in the south, gas field of pacifying the border region that Fig. 4 provides for the embodiment of the invention.
The specific embodiment
A kind of system that obtains the gas reservoir strata pressure that the embodiment of the invention provides comprises measurement of gas layer depth module, measuring well mouth pressure module, obtains the wellbore pressure gradient modules and obtains the strata pressure module;
Measurement of gas layer depth module is used for the gas-bearing formation degree of depth of measurement of gas Tanaka gas well;
Measuring well mouth pressure module is used for the well head pressure of measurement of gas Tanaka gas well;
Obtain the wellbore pressure gradient that the wellbore pressure gradient modules is used for obtaining the gas field gas well;
Obtain the strata pressure of strata pressure module according to the gas-bearing formation degree of depth, well head pressure and wellbore pressure gradient calculation gas well.
A kind of method of obtaining the gas reservoir strata pressure that the embodiment of the invention also provides specifically comprises the steps:
1, the gas-bearing formation degree of depth of measurement of gas Tanaka gas well;
2, the well head pressure of measurement of gas Tanaka gas well;
3, obtain the wellbore pressure gradient of gas well in the gas field;
4, according to the strata pressure of the gas-bearing formation degree of depth, well head pressure and the said gas well of wellbore pressure gradient calculation, the computation model of said strata pressure is suc as formula shown in (1):
P ws=P ts+D×H
(1)
Wherein, P WsBe the strata pressure of gas well, unit is MPa;
P TsBe the well head pressure of gas well, unit is MPa;
D is the wellbore pressure gradient of gas well, and unit is MPa/100m;
H is the gas-bearing formation degree of depth of gas well, and unit is m.
Wherein, in embodiments of the present invention, obtain the wellbore pressure gradient of gas well and can also can accomplish for directly measuring the wellbore pressure gradient of this gas well through following steps:
31 measure the well head pressure of this gas field sample gas well;
32 measure the wellbore pressure gradient of this gas field sample gas well;
33 according to the well head pressure of sample gas well and the wellbore pressure gradient of sample gas well, sets up the wellbore pressure gradient calculation model of all gas wells in gas field, draws the wellbore pressure gradient of all gas wells in gas field according to wellbore pressure gradient calculation Model Calculation.
The utilization relation (500 meters measuring points) between northern block gas well shut-in pressure survey static pressure gradient in gas field and the well head pressure of pacifying the border region has been set up the relation curve of closing well condition well-sinking barometric gradient and well head pressure, sees Fig. 1.
Regression data point has been set up the empirical formula of barometric gradient D and well head pressure Pts, utilizes this formula corresponding barometric gradient value under the present well head pressure of the northern block gas well in gas field of just can confirming to pacify the border region.
Wherein, the computation model of calculating wellbore pressure gradient is suc as formula shown in (2):
D=0.00007069P ts+0.0001237
(2)
Wherein, D is the wellbore pressure gradient of gas well, and unit is MPa/100m;
P TsBe the well head pressure of gas well, unit is MPa.
The table 1 gas field northern block individual well formation pressure calculation contrast table as a result of pacifying the border region
Figure BDA00001832677300051
Use the same method and set up the relation of pacifying the border region between gas field south block gas well shut-in pressure survey static pressure gradient and the well head pressure, see Fig. 2.
Regression data point has been set up the empirical formula of barometric gradient D and well head pressure Pts, utilizes this formula corresponding barometric gradient value under the present well head pressure of the northern block gas well in gas field of just can confirming to pacify the border region.
Wherein, the computation model of calculating wellbore pressure gradient is suc as formula shown in (3):
D=0.0000652P ts+0.0002659
(3)
Wherein, D is the wellbore pressure gradient of gas well, and unit is MPa/100m;
P TsBe the well head pressure of gas well, unit is MPa.
The table 2 gas field south block individual well formation pressure calculation contrast table as a result of pacifying the border region
Figure BDA00001832677300052
Figure BDA00001832677300061
Utilize the data of these number pressure strong points and corresponding cumulative gas thereof to set up the falloff curve of gas well; Referring to Fig. 3 and Fig. 4, wherein, Fig. 3 is the northern falloff curve figure that distinguishes in gas field that pacifies the border region respectively; Fig. 4 is the falloff curve figure in south, gas field, limit district; Can find out that from Fig. 3 and Fig. 4 the pressure of conversion almost completely overlaps with falloff curve, the bottom pressure of visible empirical formula method conversion still more accurately.After having set up the stable individual well falloff curve card of gas well, utilize this falloff curve, estimate the strata pressure under any cumulative production of gas well.
The present invention has broken traditional method-closing well that obtains the gas reservoir strata pressure and has obtained method; Farthest solved the contradiction between gas well production and the dynamic monitoring; Make on the basis that guarantees the gas well continous-stable; Still can effectively obtain the gas reservoir strata pressure through mathematical computations, and the result is more reliable.
It should be noted last that; The above specific embodiment is only unrestricted in order to technical scheme of the present invention to be described; Although with reference to instance the present invention is specified, those of ordinary skill in the art should be appreciated that and can make amendment or be equal to replacement technical scheme of the present invention; And not breaking away from the spirit and the scope of technical scheme of the present invention, it all should be encompassed in the middle of the claim scope of the present invention.

Claims (5)

1. a system that obtains the gas reservoir strata pressure is characterized in that, comprises measurement of gas layer depth module, measuring well mouth pressure module, obtains the wellbore pressure gradient modules and obtains the strata pressure module;
Said measurement of gas layer depth module is used for the gas-bearing formation degree of depth of measurement of gas Tanaka gas well;
Said measuring well mouth pressure module is used to measure the well head pressure of gas well described in the said gas field;
Saidly obtain the wellbore pressure gradient that the wellbore pressure gradient modules is used to obtain gas well described in the said gas field;
The said strata pressure that obtains the strata pressure module according to the said gas-bearing formation degree of depth, said well head pressure and the said gas well of said wellbore pressure gradient calculation.
2. a method of obtaining the gas reservoir strata pressure is characterized in that, specifically comprises the steps:
The gas-bearing formation degree of depth of A measurement of gas Tanaka gas well;
B measures the well head pressure of gas well described in the said gas field;
C obtains the wellbore pressure gradient of gas well described in the said gas field;
D is according to the strata pressure of the said gas-bearing formation degree of depth, said well head pressure and the said gas well of said wellbore pressure gradient calculation, and the computation model of said strata pressure is suc as formula shown in (1):
P Ws=P Ts+ D * H (1), wherein, P WsBe the strata pressure of gas well, unit is MPa;
P TsBe the well head pressure of gas well, unit is MPa;
D is the wellbore pressure gradient of gas well, and unit is MPa/100m;
H is the gas-bearing formation degree of depth of gas well, and unit is m.
3. method according to claim 2 is characterized in that, the said wellbore pressure gradient of obtaining also comprises the steps:
A measures the well head pressure of sample gas well in the said gas field;
B measures the wellbore pressure gradient of sample gas well described in the said gas field;
C is according to the well head pressure of said sample gas well and the wellbore pressure gradient of said sample gas well; Set up the wellbore pressure gradient calculation model of all gas wells in said gas field, draw the wellbore pressure gradient of all gas wells in said gas field according to said wellbore pressure gradient calculation Model Calculation.
4. method according to claim 3 is characterized in that, the wellbore pressure gradient calculation model of all gas wells in said gas field is suc as formula shown in (2):
D=0.00007069P ts+0.0001237
(2)
Wherein, D is the wellbore pressure gradient of gas well, and unit is MPa/100m;
P TsBe the well head pressure of gas well, unit is MPa.
5. method according to claim 3 is characterized in that, the computation model of said calculating wellbore pressure gradient is suc as formula shown in (3):
D=0.0000652P ts+0.0002659
(3)
Wherein, D is the wellbore pressure gradient of gas well, and unit is MPa/100m;
P TsBe the well head pressure of gas well, unit is MPa.
CN201210226393.9A 2012-06-29 2012-06-29 System and method for acquiring formation pressure of gas reservoir Active CN102720487B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210226393.9A CN102720487B (en) 2012-06-29 2012-06-29 System and method for acquiring formation pressure of gas reservoir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210226393.9A CN102720487B (en) 2012-06-29 2012-06-29 System and method for acquiring formation pressure of gas reservoir

Publications (2)

Publication Number Publication Date
CN102720487A true CN102720487A (en) 2012-10-10
CN102720487B CN102720487B (en) 2015-10-14

Family

ID=46946336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210226393.9A Active CN102720487B (en) 2012-06-29 2012-06-29 System and method for acquiring formation pressure of gas reservoir

Country Status (1)

Country Link
CN (1) CN102720487B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103244108A (en) * 2013-06-05 2013-08-14 中国石油大学(华东) Formation pressure determination method under condition of failure in wall shut-in during blowout
CN103912269A (en) * 2014-03-28 2014-07-09 中石化江汉石油工程有限公司测录井公司 Method for determining formation fracture pressure gradient logging of shale gas reservoir
CN104141490A (en) * 2014-07-17 2014-11-12 中国石油天然气股份有限公司 Method and device for judging water invasion condition of single well with water-gas reservoir and controlling gas well yield
CN104500030A (en) * 2014-11-21 2015-04-08 中国石油天然气股份有限公司 Ultrahigh pressure gas reservoir production dynamic abnormal data diagnosis and correction method
CN105464644A (en) * 2015-11-16 2016-04-06 中国海洋石油总公司 Wellhead pressure monitoring method and control system
CN114135276A (en) * 2020-08-12 2022-03-04 中国石油天然气集团有限公司 Method, device, processor and system for determining formation pressure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1648410A (en) * 2004-01-30 2005-08-03 施卢默格海外有限公司 Method for determining pressure of earth formations
CN101512100A (en) * 2006-08-07 2009-08-19 普拉德研究及开发股份有限公司 Method and system for pore pressure prediction
CN101560879A (en) * 2008-04-15 2009-10-21 中国石油大学(北京) Well test analysis control method for low permeability gas reservoir and method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1648410A (en) * 2004-01-30 2005-08-03 施卢默格海外有限公司 Method for determining pressure of earth formations
CN101512100A (en) * 2006-08-07 2009-08-19 普拉德研究及开发股份有限公司 Method and system for pore pressure prediction
CN101560879A (en) * 2008-04-15 2009-10-21 中国石油大学(北京) Well test analysis control method for low permeability gas reservoir and method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张文忠: "苏里格地区上古生界气田异常低压成因研究", 《中国博士学位论文全文数据库(基础科学辑)》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103244108A (en) * 2013-06-05 2013-08-14 中国石油大学(华东) Formation pressure determination method under condition of failure in wall shut-in during blowout
CN103244108B (en) * 2013-06-05 2014-06-25 中国石油大学(华东) Formation pressure determination method under condition of failure in wall shut-in during blowout
CN103912269A (en) * 2014-03-28 2014-07-09 中石化江汉石油工程有限公司测录井公司 Method for determining formation fracture pressure gradient logging of shale gas reservoir
CN103912269B (en) * 2014-03-28 2017-04-12 中石化江汉石油工程有限公司测录井公司 Method for determining formation fracture pressure gradient logging of shale gas reservoir
CN104141490A (en) * 2014-07-17 2014-11-12 中国石油天然气股份有限公司 Method and device for judging water invasion condition of single well with water-gas reservoir and controlling gas well yield
CN104141490B (en) * 2014-07-17 2016-08-31 中国石油天然气股份有限公司 Method and device for judging water invasion condition of single well with water-gas reservoir and controlling gas well yield
CN104500030A (en) * 2014-11-21 2015-04-08 中国石油天然气股份有限公司 Ultrahigh pressure gas reservoir production dynamic abnormal data diagnosis and correction method
CN105464644A (en) * 2015-11-16 2016-04-06 中国海洋石油总公司 Wellhead pressure monitoring method and control system
CN105464644B (en) * 2015-11-16 2018-03-23 中国海洋石油总公司 A kind of well head pressure monitoring method and control system
CN114135276A (en) * 2020-08-12 2022-03-04 中国石油天然气集团有限公司 Method, device, processor and system for determining formation pressure

Also Published As

Publication number Publication date
CN102720487B (en) 2015-10-14

Similar Documents

Publication Publication Date Title
CN102720487A (en) System and method for acquiring formation pressure of gas reservoir
CN103293562B (en) Method and equipment for determining carbonate reservoir geological reserve
CN108804819A (en) A kind of low permeability gas reservoirs dynamic holdup evaluation method
CN108241777B (en) Method for calculating seepage velocity field in hydrate sediment based on unstructured grid finite element method
CN106484933A (en) A kind of method and system for determining shale gas well well control dynamic holdup
CN103590812A (en) Calculation method, calculation device and determination method for gas well liquid accumulation amount
CN106599449A (en) Well test explanation method for cave volume calculation
CN105649616B (en) Method for evaluating dynamic reserve of gas well under underground throttling condition of low-permeability gas reservoir
FR2969206B1 (en) METHOD OF OPERATING A PETROLEUM STORAGE FROM A STANDARD FLOW MODEL USING SCALE PRESSURE AND SATURATION CARD SIZING
CN103778298B (en) The multi-level finite element modeling method of two dimension flow motion in the simulation porous media improved
CN106777628A (en) Consider the oil reservoir injectivity and productivity plate method for drafting of non-Darcy flow
CN112444470B (en) Method for determining permeability coefficient of underground aquifer based on stable flow group hole pumping test
CN109933860A (en) Shale gas pressure break horizontal well cluster spacing optimization method
CN103995961A (en) Production data analysis method for test well
CN110738001B (en) Unconventional reservoir fracturing yield-increasing transformation area calculation method
CN105298483B (en) Method and device for acquiring comprehensive damage of reservoir in water injection process
CN104463345B (en) Method and device for predicting stratum oil-water interface position
CN103162869B (en) Measuring method of deepwater reservoir vertical direction water temperature distribution
CN110929462A (en) Method for calculating true pressure and reserve of low-permeability gas reservoir by using production data
RU2014144308A (en) SYSTEM AND METHOD FOR ANALYSIS OF PRESSURE DATA IN A COLLECTOR
CN104405374A (en) Method for measuring stress sensitivity of tight gas reservoir
CN106127604A (en) Dynamic reserve calculation method and device
CN106909757A (en) A kind of Advance Water Injection in Low-Permeability Reservoir stratum Reasonable Pressure Level determines method
CN105260493B (en) A kind of oil well work(figure metering method based on semanteme
CN103334740B (en) Consider the method for the determination drainage front of free-boundary problem

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant