CN102704964A - Quick loading device for dismantling whole support in fully mechanized mining face - Google Patents

Quick loading device for dismantling whole support in fully mechanized mining face Download PDF

Info

Publication number
CN102704964A
CN102704964A CN2012101849079A CN201210184907A CN102704964A CN 102704964 A CN102704964 A CN 102704964A CN 2012101849079 A CN2012101849079 A CN 2012101849079A CN 201210184907 A CN201210184907 A CN 201210184907A CN 102704964 A CN102704964 A CN 102704964A
Authority
CN
China
Prior art keywords
framework
frame
mechanized mining
guardrail
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101849079A
Other languages
Chinese (zh)
Inventor
蒋永国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QIDONG COAL MINE ANHUI HENGYUAN COAL INDUSTRY AND ELECTRICITY POWER Co Ltd
Original Assignee
QIDONG COAL MINE ANHUI HENGYUAN COAL INDUSTRY AND ELECTRICITY POWER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QIDONG COAL MINE ANHUI HENGYUAN COAL INDUSTRY AND ELECTRICITY POWER Co Ltd filed Critical QIDONG COAL MINE ANHUI HENGYUAN COAL INDUSTRY AND ELECTRICITY POWER Co Ltd
Priority to CN2012101849079A priority Critical patent/CN102704964A/en
Publication of CN102704964A publication Critical patent/CN102704964A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a quick loading device for dismantling a whole support in a fully mechanized mining face, which includes a frame, wherein four rails are welded in parallel on the frame with two of the four rails serving as traffic rails; the rear end of the frame is hinged onto the foundation on a base plate through a pin, and a lifting jack hinged support mounted at the bottom of a mining machine is arranged at the front end of the frame; an inward-opened ground stop is mounted before the frame, and a connecting plate used for fixing a flat plate is fixedly welded on the lateral stop on the ground stop; and the parking section for the flatcar is arranged between the front end of the frame and the group stop. The quick loading device enables the operating process to be time-saving and labor-saving, can effectively improve the working efficiency, and ensures the safe production.

Description

The whole loading apparatus fast of coal mine fully-mechanized mining working striking
Technical field
The present invention relates to the whole loading apparatus fast of coal mine fully-mechanized mining working striking.
Background technology
At present; China's coal-mine is combined and is adopted the dismounting work plane, and down-hole driving and two kinds of methods of jack lifting are adopted in the support entrucking usually, and two kinds of methods all need be set up the assembling chamber and constructed; Chamber is length * wide * high 9m * 4.2m * 2.8m, and this all has higher requirement to height of tunnel and width.My ore deposit causes height and width all not enough because Tunnel Pressure is big, for needing artificially to tear group and caunch or act as a planted agent, set up H shaped steel shack and carry out the supporting of a beam four posts a bit, causes man power and material's waste thus.Simultaneously, in whole entrucking process, need constantly lifting and centering, exist very big potential safety hazard.
Summary of the invention
The present invention is for avoiding above-mentioned existing in prior technology weak point, provide a kind of operating process not only to save time but also laborsaving, can effectively increasing work efficiency, guarantee the whole loading apparatus fast of the coal mine fully-mechanized mining working striking of keeping the safety in production.
Technical scheme of the present invention:
The whole loading apparatus fast of coal mine fully-mechanized mining working striking comprises framework, it is characterized in that: parallelly on the framework be welded with four tracks, two in the middle of these four tracks are the track that is open to traffic; The rear end of framework is articulated on the basis on the base plate through bearing pin, and the front end of framework has the hinged support of liftable jack that is installed in the ore deposit motor spindle; The place ahead of described framework is equipped with the ground retaining of inward, on the strut rail of ground retaining, is fixedly welded with and is used for fixing dull and stereotyped junction plate; Be set to the flat car stop section between the front end of described framework and the ground retaining.
The whole loading apparatus fast of described coal mine fully-mechanized mining working striking, it is characterized in that: two of described stop section helps to be provided with foldable guardrail; The guardrail basic fixed is arranged on the base plate, and the top of guardrail support bar is equipped with can be to the support levelling jack of the inboard jacking of guardrail.
The whole loading apparatus fast of described coal mine fully-mechanized mining working striking, it is characterized in that: two sides of described framework are provided with station group.
Compared with present technology, effect of the present invention is embodied in:
1, the present invention's special-purpose entrucking chamber of need not constructing need not tear group, caunch or act as a planted agent, need not set up the H shaped steel shack of a beam four posts, has avoided a large amount of manpowers of input and material resources thus.
2, the present invention cooperates the winch traction to realize the support entrucking through the up-down to track, and whole entrucking process need not to carry out the support lifting, and receiving for the safety of fully-mechanized mining working provides guarantee.
3, the present invention can carry out the support entrucking when device rises, and when device falls, can realize the requirement that is open to traffic inside and outside the tunnel having versatility.
4, entrucking efficient of the present invention obviously improves, and adopts one of prior art entrucking to need 40 minutes approximately, and one of embodiment of the present invention entrucking approximately only needs 5 minutes.
5, the present invention is also suitable simultaneously uses as other big entrucking.
Description of drawings
Fig. 1 is master's TV structure sketch map of the present invention;
Fig. 2 is a vertical view of the present invention;
Fig. 3 is an entrucking view of the present invention;
Fig. 4 is a practical implementation structural layout plan of the present invention;
Label among the figure: 1 framework; 2 tracks; 3 station groups; 4 bearing pins; 5 bases; 6 jack; 7 ground retaining; 8 junction plates; 9 foldable guardrails; 10 guardrails basis; 11 guardrail support bars; 12 supports levelling jack; 13 winches at a slow speed; 14 slideways; 15 cut eye.
The specific embodiment
Referring to Fig. 1, Fig. 2, the whole form of structure of loading apparatus fast of coal mine fully-mechanized mining working striking is in the present embodiment:
Be employed on the framework 1 of i iron processing, the both sides of framework are provided with station group 3, are used for limit bracket can only in station group 3 scopes, advance, and two tracks in centre of 2, four tracks of four tracks of parallel welding are the track that is open to traffic on framework 1; Framework 1 is hinged on through bearing pin 4 on the basis 5 that is fixedly installed on the base plate at back segment, and the leading portion of framework 1 is by the liftable jack that is installed in base of frame 6 hinged supports, and jacking jack 6 can make the leading portion height of framework 1 be able to lifting; The ground retaining 7 of inward is installed in the place ahead of framework 1; Be set to the flat car stop section between the front end of framework 1 and the ground retaining 7; On the strut rail of ground retaining 7, be fixedly welded with and be used for fixing dull and stereotyped junction plate 8, flat car is fixedly connected with junction plate 8 so that hydraulic support is difficult for rocking and play at entrucking process middle plateform car.
In the practical implementation,, help to be provided with foldable guardrail 9 at two of stop section like Fig. 1, shown in Figure 2; Guardrail basis 10 adopts the 20mm steel plate to process; Utilize earth anchorage to be arranged on the base plate, the top of guardrail support bar 11 is equipped with can be to the support levelling jack 12 of the inboard jacking of guardrail, and support levelling jack 12 has two groups in the same side; Both sides are established four groups altogether; Adopt control valve to carry out remote feed flow operation, be used for after the support entrucking is accomplished, support being finely tuned, make support on flat car, be able to levelling.
Like Fig. 1 and, Fig. 3 and shown in Figure 4; Adopt the up-down of jack 6 and cooperate at a slow speed that winch 13 carries out the entrucking of hydraulic support; From cutting eye 15 positions to device, should on base plate, lay slideway 14, hydraulic support can only be advanced by the direction of regulation after coming out in eye 15 positions from cutting.

Claims (3)

1. the whole loading apparatus fast of coal mine fully-mechanized mining working striking comprises framework, it is characterized in that: parallelly on the framework be welded with four tracks, two in the middle of these four tracks are the track that is open to traffic; The rear end of framework is articulated on the basis on the base plate through bearing pin, and the front end of framework has the hinged support of liftable jack that is installed in the ore deposit motor spindle; The place ahead of described framework is equipped with the ground retaining of inward, on the strut rail of ground retaining, is fixedly welded with and is used for fixing dull and stereotyped junction plate; Be set to the flat car stop section between the front end of described framework and the ground retaining.
2. the whole loading apparatus fast of coal mine fully-mechanized mining working striking according to claim 1, it is characterized in that: two of described stop section helps to be provided with foldable guardrail; The guardrail basic fixed is arranged on the base plate, and the top of guardrail support bar is equipped with can be to the support levelling jack of the inboard jacking of guardrail.
3. the whole loading apparatus fast of coal mine fully-mechanized mining working striking according to claim 1, it is characterized in that: two sides of described framework are provided with station group.
CN2012101849079A 2012-06-06 2012-06-06 Quick loading device for dismantling whole support in fully mechanized mining face Pending CN102704964A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101849079A CN102704964A (en) 2012-06-06 2012-06-06 Quick loading device for dismantling whole support in fully mechanized mining face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101849079A CN102704964A (en) 2012-06-06 2012-06-06 Quick loading device for dismantling whole support in fully mechanized mining face

Publications (1)

Publication Number Publication Date
CN102704964A true CN102704964A (en) 2012-10-03

Family

ID=46897989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101849079A Pending CN102704964A (en) 2012-06-06 2012-06-06 Quick loading device for dismantling whole support in fully mechanized mining face

Country Status (1)

Country Link
CN (1) CN102704964A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103231336A (en) * 2013-04-16 2013-08-07 淮南矿业(集团)有限责任公司 Scraper conveyor chute installing platform and scraper conveyor chute installing system
CN104088655A (en) * 2014-06-27 2014-10-08 枣庄矿业(集团)有限责任公司田陈煤矿 Hydraulic support loading centering platform
CN104695997A (en) * 2015-02-26 2015-06-10 枣庄矿业(集团)有限责任公司柴里煤矿 Climbing frame device for transferring undercoal mine equipment
CN104963708A (en) * 2015-07-03 2015-10-07 淮南矿业(集团)有限责任公司 Weighting adjusting car and hydraulic support weighting adjusting system
CN105569697A (en) * 2016-01-15 2016-05-11 淮北矿业股份有限公司 Fully mechanized mining support removal platform

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103231336A (en) * 2013-04-16 2013-08-07 淮南矿业(集团)有限责任公司 Scraper conveyor chute installing platform and scraper conveyor chute installing system
CN104088655A (en) * 2014-06-27 2014-10-08 枣庄矿业(集团)有限责任公司田陈煤矿 Hydraulic support loading centering platform
CN104695997A (en) * 2015-02-26 2015-06-10 枣庄矿业(集团)有限责任公司柴里煤矿 Climbing frame device for transferring undercoal mine equipment
CN104963708A (en) * 2015-07-03 2015-10-07 淮南矿业(集团)有限责任公司 Weighting adjusting car and hydraulic support weighting adjusting system
CN105569697A (en) * 2016-01-15 2016-05-11 淮北矿业股份有限公司 Fully mechanized mining support removal platform

Similar Documents

Publication Publication Date Title
CN102704964A (en) Quick loading device for dismantling whole support in fully mechanized mining face
CN102337905B (en) Open type TBM (Tunnel Boring Machine) fullface synchronous lining trolley for hydraulictunnel
CN102518008A (en) Movable turnout platform used for shield tunnel
CN202245930U (en) Vehicle truck frame lifting device for rail transportation locomotive
CN208072110U (en) A kind of polishing trolley convenient for upper lower railway
CN104047630A (en) Technical method for mechanically mounting fully mechanized coal mining surface
CN104670838A (en) Open-pit mine belt conveyor head segment transverse moving device
CN103132463A (en) Movable hanger operating platform and manufacturing, installing, using and removing methods thereof
CN203638615U (en) Cross-rail transport assembly vehicle
CN202595586U (en) Movable turnout platform used for shield tunnel
CN102116155A (en) Method for supporting and coalmining in transition section of large-mining-height working face
CN202144748U (en) Underground truck loading platform of high-end hydraulic support for mining
CN202210668U (en) Coal mining tunnel cable vehicle
CN202659267U (en) Integral graded spanning-type walking bracket
CN203702212U (en) Suspension top beam hydraulic supporting device for shed roadway
CN202731951U (en) Whole support frame dismantling and quick loading device for coal mine fully mechanized coal mining face
CN202508557U (en) Shield single-well overall originating belt machine auxiliary device
CN202192091U (en) Roll changer for rolling mill
CN104265337A (en) Tunneling temporary support device
CN104088655A (en) Hydraulic support loading centering platform
CN204356659U (en) The rear auxiliary support apparatus of novel large-tonnage Bridge Erector
CN202300422U (en) Open type tunnel boring machine (TBM) full cross section synchronous lining building trolley for hydraulic tunnel
CN203939512U (en) Hydraulic support entrucking tuningout platform
CN201982128U (en) Immediate support device for retractable tunneling
CN203031768U (en) Coal mine underground concrete hydraumatic stirring device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121003