CN102704508B - 沉管底端叉车式纠偏精调系统及其调节工艺 - Google Patents

沉管底端叉车式纠偏精调系统及其调节工艺 Download PDF

Info

Publication number
CN102704508B
CN102704508B CN201210187198.XA CN201210187198A CN102704508B CN 102704508 B CN102704508 B CN 102704508B CN 201210187198 A CN201210187198 A CN 201210187198A CN 102704508 B CN102704508 B CN 102704508B
Authority
CN
China
Prior art keywords
immersed tube
jack
accurate adjustment
lift type
adjustment system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210187198.XA
Other languages
English (en)
Other versions
CN102704508A (zh
Inventor
刘德进
林鸣
曲俐俐
冯海暴
李增军
李德钊
杨瑞亮
陆连洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201210187198.XA priority Critical patent/CN102704508B/zh
Publication of CN102704508A publication Critical patent/CN102704508A/zh
Application granted granted Critical
Publication of CN102704508B publication Critical patent/CN102704508B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ship Loading And Unloading (AREA)
  • Jib Cranes (AREA)

Abstract

本发明涉及一种沉管底端叉车式纠偏精调系统及其调节工艺,该系统包括控制系统和机械系统,机械系统包括液压泵站、配重箱和安装在配重箱一侧的轨道,轨道上设置有可沿轨道运行的水平定位顶推机构,该水平定位顶推机构包括安装在在轨道上的底板和安装在底板上的水平顶推千斤顶,水平顶推千斤顶的一端与配重箱连接;底板上安装有垂直顶升机构,该垂直顶升机构包括竖向顶升千斤顶和和安装在竖向顶升千斤顶顶端的升降架,竖向顶升千斤顶安装在底板上,升降架的一侧设置有用于承载沉管的升降台,升降台上安装有水平横移机构。本发明纠偏精调系统结构简单合理、操作方便,定位准确,安装精度高,受波浪、水流、风等自然条件影响小,稳定性高。

Description

沉管底端叉车式纠偏精调系统及其调节工艺
技术领域
本发明涉及沉管隧道施工技术,具体地说,涉及一种沉管隧道施工过程中沉管底端纠偏调节系统及其调节工艺。
背景技术
沉管法是在水底建筑隧道的一种施工方法。沉管隧道就是将若干个预制段分别浮运到海面(河面)现场,并一个接一个地沉放安装在已疏浚好的基槽内,以此方法修建的水下隧道。目前,沉管隧道施工过程中,为了提高沟槽底面的平整性,绝大多数建成的水底隧道均采用垫平的方法。其中,早期大多采用的垫平方法为一种在管段沉放之前先铺砂石作为垫层的先铺法,它是在作业船上通过卷扬机和钢索操纵特制的刮铺机或钢犁,沿着沟槽底面两侧设置的、具有规定标高和坡度的导轨,将放下的垫料往复刮平,该法缺点较多;另一种垫平的方法为后填法,即先将管段沉放在沟槽底上的临时支座上,并使管底形成一定的空间(管段底板内预设液压千斤顶,在定位时可以顶向支座,调节管段高程),随后用垫层材料充填密实。上述两种方法中,处理沉放管段基础的目的是使沟槽底面平整,而不是为了提高地基的承载力,在水下开挖的沟槽,其底面凹凸不平,如不加以整平,管段沉放后会因地基受力不均匀而导致局部破坏,或因不均匀沉陷而开裂。
适合于沉管法施工的主要条件是:水道河床稳定和水流并不过急。在水深大、沉管长宽比大时,需要明显增大千斤顶配置,通常采用沉放驳辅助提供向上吊力以减小沉管对基床摩擦力,通过沉放驳辅助安装对波高要求比较严格,一般作业波高要求≤0.4m。目前,采用沉放驳辅助安装的案例只有釜山-巨济沉管隧道和厄勒海峡沉管隧道,其中,釜山-巨济沉管隧道对作业波高要求≤0.4m;厄勒海峡沉管隧道施工中,从地图可以看出,施工现场四周形成了掩护,海况较好。而对于波高要求大于0.4m时,由于受波浪、水流、风等自然条件的影响,采用沉放驳辅助安装时,吊力变化幅度很大,对安装控制影响较大,千斤顶推力大,控制困难,且安装精度不准确,需要时间进行调整,费时费力。
发明内容
本发明针对现有沉管隧道施工过程中沉管安装时受波浪、水流、风等自然条件影响存在的推力大、控制困难、费时费力等上述问题,提供了一种沉管底端叉车式纠偏精调系统及其调节工艺,该系统使用时位于待安装沉管尾部底端,具有自主顶升纠偏的功能,适用于沉管隧道施工时的沉管纠偏。
本发明的技术方案是:一种沉管底端叉车式纠偏精调系统,该系统包括控制系统和机械系统,机械系统包括液压泵站、配重箱和安装在配重箱一侧的轨道,轨道上设置有可沿轨道运行的水平定位顶推机构,该水平定位顶推机构包括安装在轨道上的底板和安装在底板上的水平顶推千斤顶,水平顶推千斤顶的一端与配重箱连接;底板上安装有垂直顶升机构,该垂直顶升机构包括竖向顶升千斤顶和和安装在竖向顶升千斤顶顶端的升降架,竖向顶升千斤顶安装在底板上,升降架的一侧设置有用于承载沉管的升降台,另一侧设置有门架支撑结构,升降台和门架支撑结构分别与升降架连接为一体;升降台上安装有水平横移机构。
优选的是,水平横移机构包括水平横移千斤顶和沉管承载机构,水平横移千斤顶设置有两个,分别安装在升降台的两端,沉管承载机构放置在升降台的上部。
优选的是,沉管承载机构包括设置在底部的承载水平移动台和安装在承载水平移动台上的承载移动梁,承载水平移动台的两端分别与一个水平横移千斤顶连接。
优选的是,底板与轨道之间设置有橡胶垫。
本发明的另一目的在于提供了一种沉管底端纠偏调节工艺,采用沉管底端叉车式纠偏精调系统进行调节,其调节工艺步骤为:
(1)基础要求:沉管底端叉车式纠偏精调系统的液压泵站和控制系统都位于潜水起重船上,该系统机械系统基础需要将待安装沉管尾部碎石基础设置为比基床整平标高低70cm,轴线长度为8m,沉管底端叉车式纠偏精调系统的机械系统进入沉管底端部分高度为60cm,便于机械系统就位;
(2)轴线复测:沉管水力压接完成后,打开钢封门测量孔进行贯通测量;
(3)沉放、就位:沉管底端叉车式纠偏精调系统的机械系统沉放通过钢丝绳导向,在距离沉管端部2m处进行沉放,沉管底端叉车式纠偏精调系统的机械系统首先着床,然后再吊起30cm,通过预设在沉管端部的钢丝绳拉动沉管底端叉车式纠偏精调系统的机械系统贴紧沉管端部,然后再落下着地,利用沉管底端叉车式纠偏精调系统的机械系统自身的水平顶推千斤顶顶推垂直顶升机构就位;
(4)沉管底端叉车式纠偏精调系统纠偏:待沉管底端叉车式纠偏精调系统的机械系统就位后,通过监控设备观测沉管底端叉车式纠偏精调系统的机械系统就位情况,满足要求后,先启动竖向顶升千斤顶,竖向千斤顶通过设置在升降架一侧的升降台将顶升力传递给沉管承载机构,并通过沉管承载机构对沉管尾端施加600t顶升力,锁定竖向顶升千斤顶,启动连接在升降台上的水平横移千斤顶,水平横移千斤顶推动沉管承载机构横向移动进行沉管轴线纠偏;
(5)实时监测:纠偏操作期间利用全站仪通过测量孔观测沉管尾端纠偏情况;
(6)设备移出:纠偏完成后,加压载水带载溢流卸压,沉管底端叉车式纠偏精调系统的机械系统退出沉管底部,利用起重设备将沉管底端叉车式纠偏精调系统的机械系统吊至指定位置。
本发明的有益效果是:本发明纠偏精调系统结构简单合理、操作方便,在沉管安装时,放置于沉管底端,用于沉管的底端纠偏,定位准确,安装精度高,且整个调节过程通过控制系统自动完成,省时省力,受波浪、水流、风等自然条件影响小,在纠偏完成后,可直接卸载纠偏精调系统,稳定性高。
附图说明
附图1为本发明具体实施例的平面布置结构图。
附图2为本发明具体实施例的存放状态示意图。
附图3为本发明具体实施例的工作状态示意图。
附图4为本发明附图3中F-F剖面结构示意图。
具体实施方式
以下结合附图对本发明作进一步说明。
如图1至4所示,一种沉管底端叉车式纠偏精调系统,该系统包括控制系统和机械系统,机械系统包括液压泵站、配重箱1和安装在配重箱1一侧的轨道2,轨道2上设置有可沿轨道2运行的水平定位顶推机构,该水平定位顶推机构包括安装在轨道2上的底板3和安装在底板3上的水平顶推千斤顶4,底板3与轨道2之间设置有橡胶垫5,水平顶推千斤顶4的一端与配重箱1连接;底板3上安装有垂直顶升机构。垂直顶升机构包括竖向顶升千斤顶6和和安装在竖向顶升千斤顶6顶端的升降架7,竖向顶升千斤顶6安装在底板3上,升降架7的一侧设置有用于承载沉管的升降台8,另一侧设置有门架支撑结构9,升降台8和门架支撑结构9分别与升降架7连接为一体,门架支撑结构9与安装在底板3上的竖向顶升牵拉千斤顶10的顶端连接。升降台8上安装有水平横移机构,该水平横移机构包括水平横移千斤顶11和沉管承载机构,水平横移千斤顶11设置有两个,分别安装在升降台8的两端,沉管承载机构放置在升降台8的上部;沉管承载机构包括设置在底部的承载水平移动台12和安装在承载水平移动台12上的承载移动梁13,承载水平移动台12的两端分别与一个水平横移千斤顶11连接。
其调节工艺步骤如下:
(1)基础要求:沉管底端叉车式纠偏精调系统的液压泵站和控制系统都位于潜水起重船上,该系统机械系统基础需要将待安装沉管尾部碎石基础设置为比基床整平标高低70cm,轴线长度为8m,沉管底端叉车式纠偏精调系统的机械系统进入沉管底端部分高度为60cm,便于机械系统就位;
(2)轴线复测:沉管水力压接完成后,打开钢封门测量孔进行贯通测量;
(3)沉放、就位:沉管底端叉车式纠偏精调系统的机械系统沉放通过钢丝绳导向,在距离沉管端部2m处进行沉放,沉管底端叉车式纠偏精调系统的机械系统首先着床,然后再吊起30cm,通过预设在沉管端部的钢丝绳拉动沉管底端叉车式纠偏精调系统的机械系统贴紧沉管端部,然后再落下着地,利用沉管底端叉车式纠偏精调系统的机械系统自身的水平顶推千斤顶顶推垂直顶升机构就位;
(4)沉管底端叉车式纠偏精调系统纠偏:待沉管底端叉车式纠偏精调系统的机械系统就位后,通过监控设备观测沉管底端叉车式纠偏精调系统的机械系统就位情况,满足要求后,先启动竖向顶升千斤顶,竖向千斤顶通过设置在升降架一侧的升降台将顶升力传递给沉管承载机构,并通过沉管承载机构对沉管尾端施加600t顶升力,锁定竖向顶升千斤顶,启动连接在升降台上的水平横移千斤顶,水平横移千斤顶推动沉管承载机构横向移动进行沉管轴线纠偏;
(5)实时监测:纠偏操作期间利用全站仪通过测量孔观测沉管尾端纠偏情况;
(6)设备移出:纠偏完成后,加压载水带载溢流卸压,沉管底端叉车式纠偏精调系统的机械系统退出沉管底部,利用起重设备将沉管底端叉车式纠偏精调系统的机械系统吊至指定位置。
以上具体实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本发明技术方案的精神和范围,其均应涵盖在本发明的权利要求范围当中。

Claims (4)

1.一种沉管底端叉车式纠偏精调系统,其特征在于:该系统包括控制系统和机械系统,机械系统包括液压泵站、配重箱和安装在配重箱一侧的轨道,轨道上设置有可沿轨道运行的水平定位顶推机构,该水平定位顶推机构包括安装在轨道上的底板和安装在底板上的水平顶推千斤顶,水平顶推千斤顶的一端与配重箱连接;底板上安装有垂直顶升机构,该垂直顶升机构包括竖向顶升千斤顶和和安装在竖向顶升千斤顶顶端的升降架,竖向顶升千斤顶安装在底板上,升降架的一侧设置有用于承载沉管的升降台,另一侧设置有门架支撑结构,升降台和门架支撑结构分别与升降架连接为一体;升降台上安装有水平横移机构,该水平横移机构包括水平横移千斤顶和沉管承载机构,水平横移千斤顶设置有两个,分别安装在升降台的两端,沉管承载机构放置在升降台的上部;沉管承载机构包括设置在底部的承载水平移动台和安装在承载水平移动台上的承载移动梁,承载水平移动台的两端分别与一个水平横移千斤顶连接。
2.如权利要求1所述的沉管底端叉车式纠偏精调系统,其特征在于:底板与轨道之间设置有橡胶垫。
3.如权利要求1所述的沉管底端叉车式纠偏精调系统,其特征在于:门架支撑结构与安装在底板上的竖向顶升牵拉千斤顶的顶端连接。
4.一种沉管底端纠偏调节工艺,其特征在于:采用如权利要求1所述的沉管底端叉车式纠偏精调系统进行调节,其调节工艺步骤为:
(1)基础要求:沉管底端叉车式纠偏精调系统的液压泵站和控制系统都位于潜水起重船上,该系统的机械系统基础需要将待安装沉管尾部碎石基础设置为比基床整平标高低70cm,轴线长度为8m,沉管底端叉车式纠偏精调系统的机械系统进入沉管底端部分高度为60cm,便于机械系统就位;
(2)轴线复测:沉管水力压接完成后,打开钢封门测量孔进行贯通测量;
(3)沉放、就位:沉管底端叉车式纠偏精调系统的机械系统沉放通过钢丝绳导向,在距离沉管端部2m处进行沉放,沉管底端叉车式纠偏精调系统的机械系统首先着床,然后再吊起30cm,通过预设在沉管端部的钢丝绳拉动沉管底端叉车式纠偏精调系统的机械系统贴紧沉管端部,然后再落下着地,利用沉管底端叉车式纠偏精调系统的机械系统自身的水平顶推千斤顶顶推垂直顶升机构就位;
(4)沉管底端叉车式纠偏精调系统纠偏:待沉管底端叉车式纠偏精调系统的机械系统就位后,通过监控设备观测沉管底端叉车式纠偏精调系统的机械系统就位情况,满足要求后,先启动竖向顶升千斤顶,竖向千斤顶通过设置在升降架一侧的升降台将顶升力传递给沉管承载机构,并通过沉管承载机构对沉管尾端施加600t顶升力,锁定竖向顶升千斤顶,启动连接在升降台上的水平横移千斤顶,水平横移千斤顶推动沉管承载机构横向移动进行沉管轴线纠偏;
(5)实时监测:纠偏操作期间利用全站仪通过测量孔观测沉管尾端纠偏情况;
(6)设备移出:纠偏完成后,加压载水带载溢流卸压,沉管底端叉车式纠偏精调系统的机械系统退出沉管底部,利用起重设备将沉管底端叉车式纠偏精调系统的机械系统吊至指定位置。
CN201210187198.XA 2012-05-29 2012-05-29 沉管底端叉车式纠偏精调系统及其调节工艺 Active CN102704508B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210187198.XA CN102704508B (zh) 2012-05-29 2012-05-29 沉管底端叉车式纠偏精调系统及其调节工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210187198.XA CN102704508B (zh) 2012-05-29 2012-05-29 沉管底端叉车式纠偏精调系统及其调节工艺

Publications (2)

Publication Number Publication Date
CN102704508A CN102704508A (zh) 2012-10-03
CN102704508B true CN102704508B (zh) 2014-06-25

Family

ID=46897540

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210187198.XA Active CN102704508B (zh) 2012-05-29 2012-05-29 沉管底端叉车式纠偏精调系统及其调节工艺

Country Status (1)

Country Link
CN (1) CN102704508B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912017B (zh) * 2013-01-05 2015-10-28 中交第一航务工程局有限公司 一种用于沉管隧道的纠偏方法
CN103924521B (zh) * 2014-04-14 2016-04-06 上海市机械施工集团有限公司 用于高架、桥梁安装的纠偏装置及其纠偏方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003049441A (ja) * 2001-08-03 2003-02-21 Toyo Constr Co Ltd 沈埋函の方向修正装置および方向修正方法
CN1696415A (zh) * 2004-05-12 2005-11-16 布伊古公共工程公司 在海底土壤上修建沉埋隧道的方法和设备
CN101586342A (zh) * 2009-06-15 2009-11-25 中交一航局第二工程有限公司 沉箱采用千斤顶水平移动车顶升工艺
KR20100070632A (ko) * 2008-12-18 2010-06-28 삼성중공업 주식회사 프리캐스트 콘크리트 블록의 해상연결장치 및 방법
CN101918644A (zh) * 2007-12-20 2010-12-15 斯特拉顿大众项目有限责任公司 用于对沉管隧道节段进行定位的设备
CN202787314U (zh) * 2012-05-29 2013-03-13 中交一航局第二工程有限公司 沉管底端叉车式纠偏精调系统

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003049441A (ja) * 2001-08-03 2003-02-21 Toyo Constr Co Ltd 沈埋函の方向修正装置および方向修正方法
CN1696415A (zh) * 2004-05-12 2005-11-16 布伊古公共工程公司 在海底土壤上修建沉埋隧道的方法和设备
CN101918644A (zh) * 2007-12-20 2010-12-15 斯特拉顿大众项目有限责任公司 用于对沉管隧道节段进行定位的设备
KR20100070632A (ko) * 2008-12-18 2010-06-28 삼성중공업 주식회사 프리캐스트 콘크리트 블록의 해상연결장치 및 방법
CN101586342A (zh) * 2009-06-15 2009-11-25 中交一航局第二工程有限公司 沉箱采用千斤顶水平移动车顶升工艺
CN202787314U (zh) * 2012-05-29 2013-03-13 中交一航局第二工程有限公司 沉管底端叉车式纠偏精调系统

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
大型沉管隧道管节工厂化预制关键技术;肖晓春;《隧道建设》;20111220;第31卷(第6期);第701-705页 *
肖晓春.大型沉管隧道管节工厂化预制关键技术.《隧道建设》.2011,第31卷(第6期),第701-705页.

Also Published As

Publication number Publication date
CN102704508A (zh) 2012-10-03

Similar Documents

Publication Publication Date Title
CN102691314B (zh) 沉管内部纠偏精调系统及其调节工艺
CN102251530B (zh) 黄河主河道水中墩承台施工用双壁钢围堰施工工艺
CN109629568A (zh) 海上风电导管架基础钢管桩用浮式稳桩平台的沉桩工艺
CN108952733A (zh) 分体始发盾构技术在城市排水工程中应用施工方法
CN102720222B (zh) 沉管尾端纠偏调节工艺
CN101907202A (zh) 移动支架式千斤顶管道安装施工工法
CN109594580A (zh) 一种非嵌岩后桩法斜桩导管架施工方法及系统
CN102704512B (zh) 沉管底端千斤顶式纠偏精调系统及其调节工艺
CN102720211B (zh) 沉管底端锲体式纠偏精调系统及其调节工艺
CN101806053B (zh) 自升式钻井平台悬臂梁的整体安装方法
CN102704508B (zh) 沉管底端叉车式纠偏精调系统及其调节工艺
CN102926388B (zh) 一种用于深基坑开挖的运土装置的运土方法
CN202787314U (zh) 沉管底端叉车式纠偏精调系统
CN202913431U (zh) 沉管底端千斤顶式纠偏精调系统
CN210827529U (zh) 海上风电抗冰结构单桩加固基础
CN208765711U (zh) 一种用于自动化监测的固定式测斜仪
CN202913427U (zh) 沉管底端胶囊充水式精调系统
CN102691313B (zh) 沉管底端胶囊充水式精调系统及其调节工艺
CN108118728B (zh) 异形深基坑高效挖土装置及挖土方法
CN202730737U (zh) 沉管基础施工用夯平系统
CN202787315U (zh) 沉管底端锲体式纠偏精调系统
CN206438538U (zh) 沉管隧道施工系统
CN202787339U (zh) 沉管内部纠偏精调系统
CN209636844U (zh) 一种非嵌岩后桩法斜桩导管架施工系统
CN104711984A (zh) 预制钢筋混凝土桩静压施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: CCCC FIRST HARBOR ENGINEERING COMPANY LTD.

Effective date: 20121019

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Dejin

Inventor after: Lin Ming

Inventor after: Qu Lili

Inventor after: Feng Haibao

Inventor after: Li Zengjun

Inventor after: Li Dezhao

Inventor after: Yang Ruiliang

Inventor after: Lu Lianzhou

Inventor before: Liu Dejin

Inventor before: Qu Lili

Inventor before: Feng Haibao

Inventor before: Li Dezhao

Inventor before: Yang Ruiliang

Inventor before: Lu Lianzhou

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU DEJIN QU LILI FENG HAIBAO LI DEZHAO YANG RUILIANG LU LIANZHOU TO: LIU DEJIN LIN MING QU LILI FENG HAIBAO LI ZENGJUN LI DEZHAO YANG RUILIANG LU LIANZHOU

TA01 Transfer of patent application right

Effective date of registration: 20121019

Address after: 266071 Shandong city of Qingdao province Fuzhou City Road No. 16 building in Hong Kong

Applicant after: The Second Engineering Co. of CCCC First Harbor Engineering Co., Ltd.

Applicant after: ENGINEERING COMPANY LTD. OF CCCC FIRST HARBOR ENGINEERING CO.,LTD.

Address before: 266071 Shandong city of Qingdao province Fuzhou City Road No. 16 building in Hong Kong

Applicant before: The Second Engineering Co. of CCCC First Harbor Engineering Co., Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CCCC FIRST HARBOR ENGINEERING CO., LTD.

Effective date: 20121204

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Dejin

Inventor after: Lin Ming

Inventor after: Qu Lili

Inventor after: Feng Haibao

Inventor after: Li Zengjun

Inventor after: Li Dezhao

Inventor after: Yang Ruiliang

Inventor after: Lu Lianzhou

Inventor before: Liu Dejin

Inventor before: Qu Lili

Inventor before: Feng Haibao

Inventor before: Li Dezhao

Inventor before: Yang Ruiliang

Inventor before: Lu Lianzhou

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU DEJIN QU LILI FENG HAIBAO LI DEZHAO YANG RUILIANG LU LIANZHOU TO: LIU DEJIN LIN MING QU LILI FENG HAIBAO LI ZENGJUN LI DEZHAO YANG RUILIANG LU LIANZHOU

TA01 Transfer of patent application right

Effective date of registration: 20121204

Address after: 266071 Shandong city of Qingdao province Fuzhou City Road No. 16 building in Hong Kong

Applicant after: The Second Engineering Co. of CCCC First Harbor Engineering Co., Ltd.

Applicant after: CCCC First Harbor Engineering Co., Ltd.

Address before: 266071 Shandong city of Qingdao province Fuzhou City Road No. 16 building in Hong Kong

Applicant before: The Second Engineering Co. of CCCC First Harbor Engineering Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant