CN102704493A - 浅坑底板与深坑支撑之传力装置及施工方法 - Google Patents

浅坑底板与深坑支撑之传力装置及施工方法 Download PDF

Info

Publication number
CN102704493A
CN102704493A CN2012102058915A CN201210205891A CN102704493A CN 102704493 A CN102704493 A CN 102704493A CN 2012102058915 A CN2012102058915 A CN 2012102058915A CN 201210205891 A CN201210205891 A CN 201210205891A CN 102704493 A CN102704493 A CN 102704493A
Authority
CN
China
Prior art keywords
base plate
dell
shallow hole
hole base
transfer device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102058915A
Other languages
English (en)
Other versions
CN102704493B (zh
Inventor
吴亦乐
朱佳君
刘亚涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201210205891.5A priority Critical patent/CN102704493B/zh
Publication of CN102704493A publication Critical patent/CN102704493A/zh
Application granted granted Critical
Publication of CN102704493B publication Critical patent/CN102704493B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

一种浅坑底板与深坑支撑之传力装置,设置在所述浅坑底板与所述深坑支撑之间,并位于所述浅坑底板下侧,所述传力装置具有呈一定预设坡度的附加落低段,以及形成在所述附加落低段底部的底板垫层和形成在所述附加落低段上表面的底板附加元件,所述预设坡度由所述附加落低段的水平段与斜坡段形成。本发明通过在所述浅坑底板与所述深坑支撑之间设置所述传力装置,在所述浅坑底板施工阶段同步施工,与所述深坑支撑形成有效传力,同时便于后续不需凿除深坑围护顶梁圈的前提下完成结构衔接,减轻后续结构衔接的施工难度。

Description

浅坑底板与深坑支撑之传力装置及施工方法
技术领域
本发明涉及建筑工程技术领域,尤其涉及一种浅坑底板与深坑支撑之传力装置及施工方法。
背景技术
目前,随着建筑施工向着快节奏、高复杂性的方向发展,在基坑施工中,坑中坑、群坑施工广泛出现。但由于工期普遍紧张,按通常先深后浅的施工流程,显然已无法满足现有工期需要。
故针对现有技术存在的问题,本案设计人凭借从事此行业多年的经验,积极研究改良,于是有了发明浅坑底板与深坑支撑之传力装置及施工方法。
发明内容
本发明是针对现有技术中,传统的基坑施工中工期普遍紧张,无法满足现有工期需要等缺陷提供一种浅坑底板与深坑支撑之传力装置。
本发明之又一目的是针对现有技术中,传统的基坑施工中工期普遍紧张,无法满足现有工期需要等缺陷提供一种浅坑底板与深坑支撑施工方法。
为了解决上述问题,本发明提供一种浅坑底板与深坑支撑之传力装置,所述传力装置设置在所述浅坑底板与所述深坑支撑之间,并位于所述浅坑底板下侧,所述传力装置具有呈一定预设坡度的附加落低段,以及形成在所述附加落低段底部的底板垫层和形成在所述附加落低段上表面的底板附加元件,所述预设坡度由所述附加落低段的水平段与斜坡段形成。
可选的,所述浅坑底板包括设置在所述浅坑底板之浅坑底板面处的第一底板,以及设置在所述浅坑底板之异于所述浅坑底板面一侧的第二底板。
可选的,所述深坑支撑设置在所述传力装置之附加落低段的水平段之异于斜坡段的一侧,且所述深坑支撑的顶面与所述浅坑底板的第二底板具有相同的标高。
可选的,所述深坑支撑与所述传力装置之间进一步设置深坑围护顶圈梁。
可选的,所述第一底板和所述第二底板为钢筋材质。
可选的,所述预设坡度呈135°。
可选的,所述底板附加元件为钢筋材质。
为实现本发明之又一目的,本发明提供一种浅坑底板与深坑支撑的施工方法,包括以下步骤:
执行步骤S1:将所述浅坑底板挖至第一标高;
执行步骤S2:调整所述深坑支撑的第二标高,并将所述深坑支撑的第二标高调整至所述浅坑底板的第一标高;
执行步骤S3:在所述浅坑底板下侧与所述深坑支撑之间设置传力装置;
执行步骤S4:在所述深坑支撑与所述传力装置之间进一步设置深坑围护顶梁圈。
综上所述,本发明通过在所述浅坑底板与所述深坑支撑之间设置所述传力装置,在所述浅坑底板施工阶段同步施工,与所述深坑支撑形成有效传力,同时便于后续不需凿除深坑围护顶梁圈的前提下完成结构衔接,减轻后续结构衔接的施工难度。
附图说明
图1所示为本发明浅坑底板与深坑支撑之传力装置剖视结构示意图;
图2所示为本发明浅坑底板与深坑支撑的施工方法的流程图。
具体实施方式
为详细说明本发明创造的技术内容、构造特征、所达成目的及功效,下面将结合实施例并配合附图予以详细说明。
请参阅图1,图1所示为本发明浅坑底板与深坑支撑之传力装置剖视结构示意图。所述传力装置1设置在所述浅坑底板2与所述深坑支撑3之间。具体地,所述浅坑底板2包括设置在所述浅坑底板2之浅坑底板面20处的第一底板21,以及设置在所述浅坑底板2之异于所述浅坑底板面20一侧的第二底板22;所述传力装置1设置在所述浅坑底板2下侧,并具有呈一定预设坡度的附加落低段10,以及形成在所述附加落低段10底部的底板垫层11和形成在所述附加落低段10上表面的底板附加元件12。所述预设坡度由所述附加落低段10的水平段101与斜坡段102形成。所述深坑支撑3设置在所述传力装置1之附加落低段10的水平段101之异于斜坡段102的一侧,且所述深坑支撑3的顶面30与所述浅坑底板2的第二底板22具有相同的标高,并在所述深坑支撑3与所述传力装置1之间进一步设置深坑围护顶圈梁31。显然地,所述深坑支撑3的顶面30与所述浅坑底板2的第二底板22的标高也可具有一定的差异,所述差异属于本领域技术人员施工可接受的范围。
在本发明中,优选地,所述第一底板21和所述第二底板22为钢筋材质。所述预设坡度呈135°。所述底板附加元件12为钢筋材质。
请参阅图1,并结合参阅图2,图2所示为本发明浅坑底板与深坑支撑的施工方法的流程图。为减少后续地下结构施工工作量,现场结合结构形式,确定所述第二底板22在挖至标高后即与所述深坑支撑3开始同步施工的工况,并使所述第二底板22与所述深坑支撑3形成有效传力过度。在本发明中,所述浅坑底板2与所述深坑支撑3的施工方法包括以下步骤:
执行步骤S1:将所述浅坑底板2挖至第一标高;
执行步骤S2:调整所述深坑支撑3的第二标高,并将所述深坑支撑3的第二标高调整至所述浅坑底板2的第一标高;
执行步骤S3:在所述浅坑底板2下侧与所述深坑支撑3之间设置传力装置1;
执行步骤S4:在所述深坑支撑3与所述传力装置1之间进一步设置深坑围护顶梁圈31。
通过执行所述浅坑底板2与所述深坑支撑3的施工步骤,即适当调整所述深坑支撑3的第二标高,将所述深坑支撑3的顶面第二标高调整至所述第二底板23的第一标高,并在所述浅坑底板2与所述深坑支撑3之间设置传力装置1,在所述浅坑底板2施工阶段同步施工,与所述深坑支撑3形成有效传力,同时便于后续不需凿除深坑围护顶梁圈31的前提下完成结构衔接,减轻后续结构衔接的施工难度。
综上所述,本发明通过在所述浅坑底板与所述深坑支撑之间设置所述传力装置,在所述浅坑底板施工阶段同步施工,与所述深坑支撑形成有效传力,同时便于后续不需凿除深坑围护顶梁圈的前提下完成结构衔接,减轻后续结构衔接的施工难度。
本领域技术人员均应了解,在不脱离本发明的精神或范围的情况下,可以对本发明进行各种修改和变型。因而,如果任何修改或变型落入所附权利要求书及等同物的保护范围内时,认为本发明涵盖这些修改和变型。

Claims (8)

1.一种浅坑底板与深坑支撑之传力装置,其特征在于,所述传力装置设置在所述浅坑底板与所述深坑支撑之间,并位于所述浅坑底板下侧,所述传力装置具有呈一定预设坡度的附加落低段,以及形成在所述附加落低段底部的底板垫层和形成在所述附加落低段上表面的底板附加元件,所述预设坡度由所述附加落低段的水平段与斜坡段形成。
2.如权利要求1所述的浅坑底板与深坑支撑之传力装置,其特征在于,所述浅坑底板包括设置在所述浅坑底板之浅坑底板面处的第一底板,以及设置在所述浅坑底板之异于所述浅坑底板面一侧的第二底板。
3.如权利要求1所述的浅坑底板与深坑支撑之传力装置,其特征在于,所述深坑支撑设置在所述传力装置之附加落低段的水平段之异于斜坡段的一侧,且所述深坑支撑的顶面与所述浅坑底板的第二底板具有相同的标高。
4.如权利要求1所述的浅坑底板与深坑支撑之传力装置,其特征在于,所述深坑支撑与所述传力装置之间进一步设置深坑围护顶圈梁。
5.如权利要求1所述的浅坑底板与深坑支撑之传力装置,其特征在于,所述第一底板和所述第二底板为钢筋材质。
6.如权利要求1所述的浅坑底板与深坑支撑之传力装置,其特征在于,所述预设坡度呈135°。
7.如权利要求1所述的浅坑底板与深坑支撑之传力装置,其特征在于,所述底板附加元件为钢筋材质。
8.一种浅坑底板与深坑支撑的施工方法,其特征在于,包括以下步骤:
执行步骤S1:将所述浅坑底板挖至第一标高;
执行步骤S2:调整所述深坑支撑的第二标高,并将所述深坑支撑的第二标高调整至所述浅坑底板的第一标高;
执行步骤S3:在所述浅坑底板下侧与所述深坑支撑之间设置传力装置;
执行步骤S4:在所述深坑支撑与所述传力装置之间进一步设置深坑围护顶梁圈。
CN201210205891.5A 2012-06-20 2012-06-20 浅坑底板与深坑支撑之传力装置及施工方法 Active CN102704493B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210205891.5A CN102704493B (zh) 2012-06-20 2012-06-20 浅坑底板与深坑支撑之传力装置及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210205891.5A CN102704493B (zh) 2012-06-20 2012-06-20 浅坑底板与深坑支撑之传力装置及施工方法

Publications (2)

Publication Number Publication Date
CN102704493A true CN102704493A (zh) 2012-10-03
CN102704493B CN102704493B (zh) 2014-12-10

Family

ID=46897525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210205891.5A Active CN102704493B (zh) 2012-06-20 2012-06-20 浅坑底板与深坑支撑之传力装置及施工方法

Country Status (1)

Country Link
CN (1) CN102704493B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104975606A (zh) * 2015-06-29 2015-10-14 上海市基础工程集团有限公司 逆作基坑与相邻基坑相邻处高低跨处理方法
CN105951846A (zh) * 2016-06-21 2016-09-21 中铁第四勘察设计院集团有限公司 深基坑中隔围护结构的底板传力结构及其施工方法
CN107386298A (zh) * 2017-07-19 2017-11-24 中铁第四勘察设计院集团有限公司 一种具有防水功能的深浅坑复合支护结构及其施工方法
CN109440774A (zh) * 2018-12-27 2019-03-08 上海建工七建集团有限公司 一种基坑结构及其施工方法
CN112813983A (zh) * 2020-12-31 2021-05-18 长江勘测规划设计研究有限责任公司 一种坑中坑深浅同期实施的悬挑梁柱体系及施工方法
CN113482009A (zh) * 2021-07-20 2021-10-08 上海建工一建集团有限公司 内埋支撑的底板加固节点及其施工方法
CN113737857A (zh) * 2021-10-09 2021-12-03 中国建筑第二工程局有限公司 一种用于深管廊结构与主体结构回筑连接构造及其工法
CN114922199A (zh) * 2022-06-13 2022-08-19 上海市基础工程集团有限公司 深浅基坑围护施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2830264B1 (de) * 1978-07-10 1979-10-04 Bilfinger Berger Bau Verfahren zur Herstellung einer unmittelbar mit einem benachbarten Gebaeude fluchtend in den Baugrund einzubringenden,selbsttragenden Betonwand
CN101117805A (zh) * 2007-08-22 2008-02-06 浙江大学 一种地下工程中一桩多用半逆作法的方法
CN201326184Y (zh) * 2008-12-15 2009-10-14 上海建工股份有限公司 地铁站顶板与基坑底板的连接节点结构
CN201588220U (zh) * 2009-11-03 2010-09-22 浙江中成建工集团有限公司 地下室逆作法中两墙分离的传力节点结构
CN102031781A (zh) * 2009-09-24 2011-04-27 上海市第一建筑有限公司 一种群坑施工先浅后深的基坑加固技术
CN202767086U (zh) * 2012-06-20 2013-03-06 上海建工二建集团有限公司 浅坑底板与深坑支撑之传力装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2830264B1 (de) * 1978-07-10 1979-10-04 Bilfinger Berger Bau Verfahren zur Herstellung einer unmittelbar mit einem benachbarten Gebaeude fluchtend in den Baugrund einzubringenden,selbsttragenden Betonwand
CN101117805A (zh) * 2007-08-22 2008-02-06 浙江大学 一种地下工程中一桩多用半逆作法的方法
CN201326184Y (zh) * 2008-12-15 2009-10-14 上海建工股份有限公司 地铁站顶板与基坑底板的连接节点结构
CN102031781A (zh) * 2009-09-24 2011-04-27 上海市第一建筑有限公司 一种群坑施工先浅后深的基坑加固技术
CN201588220U (zh) * 2009-11-03 2010-09-22 浙江中成建工集团有限公司 地下室逆作法中两墙分离的传力节点结构
CN202767086U (zh) * 2012-06-20 2013-03-06 上海建工二建集团有限公司 浅坑底板与深坑支撑之传力装置

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
吴亦乐等: "上海世博会主题馆超大深基坑无支撑围护体系施工技术", 《建筑施工》 *
戴志杰等: "地铁一号线上海南站站改建工程相邻基坑开挖施工技术", 《建筑施工》 *
王卫东等: "上海地区建筑基坑工程的新进展与特点", 《地下空间与工程学报》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104975606A (zh) * 2015-06-29 2015-10-14 上海市基础工程集团有限公司 逆作基坑与相邻基坑相邻处高低跨处理方法
CN105951846A (zh) * 2016-06-21 2016-09-21 中铁第四勘察设计院集团有限公司 深基坑中隔围护结构的底板传力结构及其施工方法
CN107386298A (zh) * 2017-07-19 2017-11-24 中铁第四勘察设计院集团有限公司 一种具有防水功能的深浅坑复合支护结构及其施工方法
CN109440774A (zh) * 2018-12-27 2019-03-08 上海建工七建集团有限公司 一种基坑结构及其施工方法
CN112813983A (zh) * 2020-12-31 2021-05-18 长江勘测规划设计研究有限责任公司 一种坑中坑深浅同期实施的悬挑梁柱体系及施工方法
CN112813983B (zh) * 2020-12-31 2022-07-22 长江勘测规划设计研究有限责任公司 一种坑中坑深浅同期实施的悬挑梁柱体系及施工方法
CN113482009A (zh) * 2021-07-20 2021-10-08 上海建工一建集团有限公司 内埋支撑的底板加固节点及其施工方法
CN113737857A (zh) * 2021-10-09 2021-12-03 中国建筑第二工程局有限公司 一种用于深管廊结构与主体结构回筑连接构造及其工法
CN114922199A (zh) * 2022-06-13 2022-08-19 上海市基础工程集团有限公司 深浅基坑围护施工方法

Also Published As

Publication number Publication date
CN102704493B (zh) 2014-12-10

Similar Documents

Publication Publication Date Title
CN102704493A (zh) 浅坑底板与深坑支撑之传力装置及施工方法
AR092717A1 (es) Metodos y estructuras para moldear y mejorar las caracteristicas de control de espesor y planitud de juntas soldadas para celulas solares
MX342375B (es) Procedimiento de montaje de una torre telescopica.
EA201990910A1 (ru) Пластиковый поддон с опорными шашками, имеющими верхние стойки, и соответствующие способы
FI20126086L (fi) Offshore-rakenne
MX2019005920A (es) Tarima de plastico con bloques de soporte que tienen torres superior e inferior y metodos asociados.
CN106854941B (zh) 一种大截面看台斜梁及斜柱的施工方法
MY185057A (en) A tire assembly and a method of building a support structure in a marine environment using tires
MY172102A (en) Semi rigid precast wall system
CL2020000273A1 (es) Estructura de soporte para aerogeneradores.
CN204212450U (zh) 一种工具式安全便捷通道
CN106592843B (zh) 一种屋面钢结构及其分区施工方法
MX2017002211A (es) Construccion de hormigon en forma de construccion modular.
CN203569719U (zh) 一种混凝土楼梯的消能减震结构
CN104865033A (zh) 一种三向剪切模型箱装置
CN202767086U (zh) 浅坑底板与深坑支撑之传力装置
CN205116460U (zh) 隔震滑板支座
CN203742198U (zh) 建筑物整体移位滑移装置
CN207244854U (zh) 一种顶升支撑梁托换结构
CN204152527U (zh) 隐式中墙连拱隧道的组合式初期支护系统
CN207249988U (zh) 装配式混凝土模拟吊装装置
CN105040991B (zh) 大跨度钢结构分段吊装的支撑结构及支撑方法
JP2007278340A (ja) 免震構造物及び制振構造物のダンパー設置方法
CN204826282U (zh) 一种复合隔震支座
CN104722489A (zh) 一种振动筛的机座

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wu Yile

Inventor after: Zhu Jiajun

Inventor after: Mao Anji

Inventor after: Liu Yatao

Inventor before: Wu Yile

Inventor before: Zhu Jiajun

Inventor before: Liu Yatao

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WU YILE ZHU JIAJUN LIU YATAO TO: WU YILE ZHU JIAJUN MAO ANJI LIU YATAO