CN102704363A - Integrated roadbed and pavement project based on steel slag - Google Patents

Integrated roadbed and pavement project based on steel slag Download PDF

Info

Publication number
CN102704363A
CN102704363A CN2012101978296A CN201210197829A CN102704363A CN 102704363 A CN102704363 A CN 102704363A CN 2012101978296 A CN2012101978296 A CN 2012101978296A CN 201210197829 A CN201210197829 A CN 201210197829A CN 102704363 A CN102704363 A CN 102704363A
Authority
CN
China
Prior art keywords
roadbed
steel slag
slag
pavement
subgrade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101978296A
Other languages
Chinese (zh)
Inventor
李伟
张晓铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN2012101978296A priority Critical patent/CN102704363A/en
Publication of CN102704363A publication Critical patent/CN102704363A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses an integrated roadbed and pavement project based on steel slag. The waste steel slag is used as a main material; a soft soil roadbed is reinforced by adopting a stirring compaction mode of the waste steel slag and field soil; a pavement is divided into four layers; the roadbed can be reinforced by adopting the stirring compaction mode of the untreated waste steel slag and the field soil during foundation treatment, or the roadbed can be reinforced by adopting the stirring compaction mode of crushed waste steel slag serving as a main component, a small amount of cement, lime and the like and the field soil during foundation treatment; and the pavement is made of a mixture of the steel slag and asphalt. According to different geological conditions, the roadbed can be treated in a form of (1) pure shallow roadbed treatment, (2) shallow layer and wall type combined concave roadbed treatment or (3) shallow layer, wall type and column combined treatment, so that the bearing capacity and the deformation resistance of the roadbed are improved. Through the project, mechanical property proximity between layers is realized, the overall affinity between the layers is improved, and aims of protecting environment and saving resources are fulfilled.

Description

Integrated subgrade and pavement engineering based on slag
Technical field
The present invention relates to the subgrade and pavement field of engineering technology, particularly relate to and a kind ofly handle the subgrade and pavement of material, pitch and rigid pavement blended materials as roadbed, realize one subgrade and pavement engineering based on steel slag with steel slag.
Background technology
Deepen continuously along with what recycling economy was familiar with, useless admittedly comprehensive utilization of resources is changed into building material has become the new focus of making ecocity.With industrial steel slag, industrial solid castoffs such as CHARACTERISTICS OF TAILINGS SAND and flyash are that raw material is applied to field of civil engineering, can fully save resource on the one hand, safeguard natural environment, can bring the remarkable economical effect simultaneously.With the building block of steel slag as the building stock, the making research aspect of brick etc. has obtained certain development, and Preliminary Applications is in construction work.
For mineral composition, physicochemical property and the basic mechanical characteristic thereof of steel slag, domestic and international many scholars have carried out big quantity research, have obtained a large amount of achievements in research simultaneously.In the utilization again for industrial steel slag, such as developed countries such as the Japanese U.S., steel slag fully is applied in the engineering construction, and its rate of recovery reaches 100% basically.And have only in the recycling of China for steel slag about external half, the research degree of depth and range are not enough, and the resource loss ratio is still not little.
The present invention is in line with the principle of resource circulation utilization, and in conjunction with the seemingly cement characteristics of slag, multipath exploitation ground is handled and the highway construction application form.
Summary of the invention
The object of the invention be to provide a kind of with steel slag carry out as stock that roadbed is handled and be the novel pavement of aggregate with the steel slag based on the integrated subgrade and pavement engineering of slag-.According to the mechanical property of steel slag, handle material with steel slag as roadbed, the weak soil layer of road bottom is carried out integral body or local ground is handled, improve the bearing capacity of roadbed, keep the long-term functional performance of road.Simultaneously, shown in accompanying drawing 1, each layer of road all adopts slag as main material, realizes interlayer mechanical property proximity, improves the whole compatibility of interlayer.And reach the protection environment, save the purpose of resource.
The present invention realizes through following technical scheme:
Based on the integrated subgrade and pavement engineering of slag, this subgrade and pavement engineering is that the employing steel slag carries out roadbed processing improvement, slag replacement rubble is pulverized in the roadbed employing up and down, the road surface employing is the integrated form of combined type subgrade and pavement of aggregate with the steel slag;
Above-mentioned integrated subgrade and pavement engineering based on slag, said subgrade and pavement engineering adopt steel slag as main material roadbed to be carried out part or whole improvement.
Above-mentioned integrated subgrade and pavement engineering based on slag, said subgrade and pavement engineering adopt with roadbed about the steel slag and pulverize slag replacement rubble.
Above-mentioned integrated subgrade and pavement engineering based on slag, said subgrade and pavement engineering is for being main aggregate with steel slag.
The advantage and the effect of patent of the present invention are:
1. patent of the present invention is owing to adopt steel slag to carry out the roadbed improvement, and the conditioned soil rigidity will descend than the rigidity of pile body to some extent, has relatively large viscosity and certain compressibilty simultaneously, can effectively absorb seismic wave energy, exempts to shake effect thereby reach.
2. patent of the present invention adopts steel slag, lime, and cement etc. stir with on-the-spot soil or the whitewashing forms of treatment is carried out, or directly on-the-spot soil is replaced easy construction.
3. patent of the present invention realizes the highway construction integrated construction, and the interlayer compatibility is strong, the road top layer should not occur and problem such as peel off.
4. patent of the present invention adopts steel slag to carry out roadbed and handles, and effectively reduces the water permeability of bottom soil layer, realizes, prevents the generation of capillarity, strengthens the integral anti-freezing performance of north cold area highway construction.
5. patent of the present invention as the civil construction material, reaches the refuse reclamation effect with steel slag, saves resource greatly.
Description of drawings
Fig. 1 is a slag road integral structure section general type
Fig. 2 road structure sectional drawing
Fig. 3 spill processing profiles figure
Fig. 4 wall column Combined Treatment form.
The specific embodiment
Integrated subgrade and pavement engineering based on slag can be undertaken by following form.
For highway construction, guaranteeing subgrade rating, when the Deformation control of roadbed is in claimed range, also need guarantees the road surface resistance to overturning, prevent pavement cracking, have certain friction, capability.
Under the general geological conditions, can closely implement by scheme shown in the accompanying drawing 2.(1) according to existing road construction benchmark, replace rubble as roadbed the steel slag of pulverizing, roadbed adds up to the degree of depth to be generally 15-40cm up and down.(2) according to existing road construction benchmark, steel slag is sieved, forms flexible pavement as aggregate, slag pitch amalgam is formed go up the road surface and down the road surface bed thickness be generally 5cm.
For the more shallow geological conditions of weak soil layer; (1) can adopt steel slag after the pulverizing that the roadbed of roadbed bottom is carried out the shallow-layer improvement through the stirring form of rolling and carry and resistance capacity to deformation to improve roadbed, stir and roll processing layer thickness at 1.0m (like Fig. 2) this moment.(2) still do not meet the demands like after treatment roadbed, can implement the wall formula by the roadbed to the roadbed bottom shown in Figure 3 and handle with shallow-layer and combine formation spill processing form.In the road both sides and inner roll, adopt through stirring pulverize steel slag and carry out the wall formula and handle; It is 0.5-2.0m that general wall formula ground is handled depth H 2; Its width need combine the road integral width to confirm, is generally about 1m, and the top shallow-layer is handled depth H 1 and is generally 0.5m.Outer enclosure wall formula processing intent is to prevent that subgrade soil from outwards extruding, and improves bearing capacity; Interior wall formula processing intent is for improving the roadbed resistance capacity to deformation.
For the darker geological conditions of weak soil layer, adopt shallow-layer and wall formula and shallow-layer to handle and combine to handle in the time of can not satisfying the roadbed requirement, as shown in Figure 4, can adopt shallow-layer, wall formula to combine common the processing with column.Wherein column is handled and is adopted the powder slag to stir formation through deep layer; In order to improve the non-deformability of roadbed, the column processing degree of depth is decided according to geological conditions, generally is not more than 10m; Column is handled diameter and is determined that by appointed condition intercolumniation generally directly is advisable with 4 times of posts; Adopt the pulverizing steel slag to roll formed wall formula through continuous stirring in the road both sides and handle, can effectively improve the globality and the stability of roadbed, it still is 0.5-2.0m that general wall formula ground is handled depth H 2, and its width is generally about 1m; The top shallow-layer is handled depth H 1 and is generally 0.5m, can play the interconnect function of wall column processing and road structure, realizes the subgrade and pavement integration.

Claims (2)

1. based on the integrated subgrade and pavement engineering of slag; It is characterized in that: the employing steel slag is a main material; Soft soil roadbed employing steel slag is stirred the compacting mode with on-the-spot soil carry out consolidation process, the road surface is divided four layers, when ground is handled, can adopt undressed steel slag to stir the compacting mode with on-the-spot soil and implement subgrade strengthening; It is main when ground is handled, can adopting the steel slag to pulverize; Little cement, lime etc. stir mode such as compacting and implement subgrade strengthening with on-the-spot soil, the road surface is the slag bituminous mixture.
2. the integrated subgrade and pavement engineering based on slag according to claim 1; It is characterized in that; According to different geological conditionss; Roadbed can adopt (1) to simple shallow-layer roadbed handle, (2) shallow-layer combines the processing of spill roadbed, (3) shallow-layer, wall formula to combine form such as common processings to implement with column with the wall formula, to improve roadbed carrying and resistance capacity to deformation.
CN2012101978296A 2011-10-24 2012-06-15 Integrated roadbed and pavement project based on steel slag Pending CN102704363A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101978296A CN102704363A (en) 2011-10-24 2012-06-15 Integrated roadbed and pavement project based on steel slag

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201110324223 2011-10-24
CN201110324223.X 2011-10-24
CN2012101978296A CN102704363A (en) 2011-10-24 2012-06-15 Integrated roadbed and pavement project based on steel slag

Publications (1)

Publication Number Publication Date
CN102704363A true CN102704363A (en) 2012-10-03

Family

ID=46897395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101978296A Pending CN102704363A (en) 2011-10-24 2012-06-15 Integrated roadbed and pavement project based on steel slag

Country Status (1)

Country Link
CN (1) CN102704363A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625137A (en) * 2016-03-14 2016-06-01 赵建林 Steel slag water-permeable pavement structure and construction method thereof
CN110593046A (en) * 2019-09-30 2019-12-20 上海市政工程设计研究总院(集团)有限公司 High-strength durable steel slag permeable asphalt pavement structure
CN111021173A (en) * 2019-12-31 2020-04-17 郑州一建集团有限公司 Construction method of municipal road sand-filled roadbed
CN111441210A (en) * 2020-04-24 2020-07-24 河北创意丰道桥工程有限公司 Method for applying steel slag to full-width roadbed pavement
CN111559900A (en) * 2020-05-08 2020-08-21 张延年 Road using industrial solid waste as material and preparation method of industrial solid waste material

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1350093A (en) * 2000-10-23 2002-05-22 安阳县交通局 Method of utilizing blast furnace slag in asphalt road and road bed
JP2003146732A (en) * 2001-11-15 2003-05-21 Kawasaki Steel Corp Method of producing slag hardened body
CN1970895A (en) * 2006-12-07 2007-05-30 沈阳建筑大学 Composite building foundation based on waste steel slag
CN101475352A (en) * 2008-12-19 2009-07-08 上海市第五建筑有限公司 Steel slag concrete formulation and concrete pavement construction method
JP4412096B2 (en) * 2004-07-30 2010-02-10 Jfeスチール株式会社 Roadbed material for road

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1350093A (en) * 2000-10-23 2002-05-22 安阳县交通局 Method of utilizing blast furnace slag in asphalt road and road bed
JP2003146732A (en) * 2001-11-15 2003-05-21 Kawasaki Steel Corp Method of producing slag hardened body
JP4412096B2 (en) * 2004-07-30 2010-02-10 Jfeスチール株式会社 Roadbed material for road
CN1970895A (en) * 2006-12-07 2007-05-30 沈阳建筑大学 Composite building foundation based on waste steel slag
CN101475352A (en) * 2008-12-19 2009-07-08 上海市第五建筑有限公司 Steel slag concrete formulation and concrete pavement construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625137A (en) * 2016-03-14 2016-06-01 赵建林 Steel slag water-permeable pavement structure and construction method thereof
CN110593046A (en) * 2019-09-30 2019-12-20 上海市政工程设计研究总院(集团)有限公司 High-strength durable steel slag permeable asphalt pavement structure
CN111021173A (en) * 2019-12-31 2020-04-17 郑州一建集团有限公司 Construction method of municipal road sand-filled roadbed
CN111441210A (en) * 2020-04-24 2020-07-24 河北创意丰道桥工程有限公司 Method for applying steel slag to full-width roadbed pavement
CN111559900A (en) * 2020-05-08 2020-08-21 张延年 Road using industrial solid waste as material and preparation method of industrial solid waste material

Similar Documents

Publication Publication Date Title
CN102092916B (en) Biological solidification and stabilization method of bottom mud in riverways and lakes
CN102704363A (en) Integrated roadbed and pavement project based on steel slag
CN106676999B (en) Red mud and broken stone combination formula basic unit road surface structure is stabilized to red mud
CN204875416U (en) Porous pavement structure
CN108118573A (en) A kind of resource regeneration full-transparency type asphalt pavement structure
CN109594445A (en) A kind of ecology environmental protection color asphalt paving and its construction method
CN102493304A (en) Method for processing riverway sludge for filling subgrade by using construction wastes
CN106284495B (en) Collect rainfall pattern roof rain water garden
CN207619766U (en) A kind of asphalt pavement structure of complete thick formula high additive life garbage incinerator slag aggregate
CN110846968B (en) Permeable asphalt pavement structure
Pasupuleti et al. Effect of fiber on fly-ash stabilized sub grade layer thickness
CN102617078A (en) Harbor construction sea reclaimed material utilizing silt and preparation method thereof
Wang et al. Solid waste material reuse analysis: filling the road subgrade with riverway silt and sediment
CN207130558U (en) A kind of roadbed filling structure
CN100465390C (en) Composite building foundation based on waste steel slag
CN204803702U (en) Building rubbish road bed course structure
CN206359847U (en) A kind of asphalt pavement structure of clinker silty filler
CN205313932U (en) Sub -surface structure
CN210529400U (en) Solidified building residue soil road structure
CN1858356A (en) Method for preparing road surface structure layer comprehensive stable soil by using caustic sludge instead of quick lime
KR100627846B1 (en) A composite of consolidation and hardening pile for soft ground
CN105293962A (en) Geotechnical engineering waste slurry efficient solidifying agent
KR101279752B1 (en) Environment-friendly concrete composition made by field soils and preparation method thereof
CN107572928A (en) A kind of dirty mud environment protection type water-permeable brick and preparation method thereof
CN103161110A (en) New construction method for waterproof, anti-crack, long-life and environment-friendly road

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121003