The preparation method of energy-conservation heat mirror film double glazing
Technical field
The present invention relates to glass processing technical field, particularly relate to a kind of preparation method of energy-conservation heat mirror film double glazing.
Background technology
Along with the high speed development of building curtain wall, the form of building curtain wall is more and more paid attention to energy-conservation effect, and therefore the performance of building curtain wall to glass and the parameter request of each side are more and more higher.For building glass, daylighting, view, decoration are the basic demands to glass, and energy-saving and environmental protection are the further requirements to glass, and are more and more subject to social attention.Existing market product has 1, three glass two chamber double glazings are that three sheet glass combine, and its conventional glass composition structure is: glass A+ interval box+glass B+ interval box+glass C, and its feature comprises:
(1) glass can select LOW-E glass, laminated glass, toughened glass etc. different classes of according to different demands;
(2) interval box can be selected the unlike material such as aluminum strip, warm edge strip, desiccant-filled in interval box, and the thickness of interval box is not typically chosen in 6mm-30mm not etc.
(3) between interval box and glass, adopt double sealing glue to seal (first seal gum, second seal gum), first seal gum is generally butyl rubber, and second seal gum can be poly-sulphur glue, silicone adhesive etc.
(4) superiority of double glazing is embodied in: because the thermal conductivity of air is very low, dry air that cannot convection current is sealed between glass, can effectively delay heat and scatter and disappear by the mode of conduction, thereby reach energy-conservation, antisweat texts.
But the double glazing in this common three glass two chambeies, the problem of bringing also can not be ignored:
(1) weight of glass increases, and causes the pressure of door-window section bar, five metals to strengthen;
(2) increase the trim of spacer bar, caused the ratio that double glazing lost efficacy to increase.
Glass in the middle of (3) two pressure that cavity is different cause bears large stress, easily causes glass rupture.
2, low-emission coated (LOW-E) glass can improve the energy-saving effect of double glazing, plates low-emission coated (LOW-E) at a space of a whole page of glass B.
3, heat mirror film double glazing, in order to have good energy-saving and environmental protection, efficient, light, high-intensity hollow new variety, it is configured to glass A1+ interval box 2+ heat mirror film 3+ interval box 4+ glass B5, and its structure is as shown in Figure 1.
Heat mirror film film is a kind of low emissivity glass from seeing in essence, and it is mainly that the polyester film that one deck has been plated to film is suspended between layer glass sheet, the heating while manufacture by hollow glass unit, contraction principle.Heat mirror film double glazing has two gas clouds, instead of a gas cloud, and these two gas clouds have improved the performance of double glazing.By adopting the isolation of heat mirror film polyester film, the weight of the double glazing of two gas clouds that obtain is identical with the double glazing weight of an original same thickness.The remarkable advantage of heat mirror film double glazing: 1, reduce the weight of glass, alleviate the pressure to door-window section bar, five metals; Use heat mirror film film, not only effectively saved material, greatly reduce the weight of hollow finished glass simultaneously, due to the specific function of heat mirror film, thereby improved the various performance parameters of double glazing.2, there is efficient transmittance; The transmission of visible light of general online LOW-E is 60%, and the two hollow LOW-E glass visible light transmittance rate of off-line are 65%, and the transmission of visible light of heat mirror film is more than 70%.The energy-conservation double glazing of heat mirror film has not only been saved a lot of resources in production process, after installing, played especially good energy-saving effect simultaneously, as: the two transparent glass 24mm cavity thickness of super large plate face, U value is 2.75, and the U value that is attached with the double glazing of heat mirror film in hollow layer has just been reduced to 1.03, also there is selectable shading coefficient, possess high saturating visible ray performance simultaneously.3, antisweat efficiently; Heat mirror film double glazing has excellent heat-insulating property makes the temperature difference remain on the both sides of hollow layer, thereby reduces heat loss or the accumulation of interior sheet glass.The internal temperature of heat mirror film double glazing and room temp approach, thereby can reach the effect of Antidewing.4, heat-insulation and heat-preservation; Because the two hollow structures of uniqueness of heat mirror film double glazing effectively prevent from, by heat conducting power loss, making it to become the optimal selection of heat insulation glass under high temperature difference condition, heat insulation and preservation effect is better than ordinary insulating glass greatly.Test factually general double glazing and the heat mirror film double glazing of same 24mm, under the infra-red light irradiation of 250W, after 10 seconds, ordinary insulating glass back of the body temperature reaches 51 DEG C, and heat mirror film double glazing back of the body temperature is 23 DEG C, after 60 seconds, the former 74 DEG C, 25 DEG C of the latter.5, high-efficiency shielding ultraviolet ray; Heat mirror film double glazing product can be selected the spectral selectivity reflective film of various visible light transmittance rate, and in film, integrated efficient uv-absorbing agent, can shield 99.5% harmful uv-radiation and enter indoor.6, the performance of sound insulation and the saving energy; Ordinary insulating glass can completely cut off the noise of 29 decibels of left and right, and heat mirror film double glazing can completely cut off the level of noise of 34.5 decibels of left and right.
Because heat mirror film is a kind of soft polyester film, its hardness is equivalent to common plate, in the process of closing sheet, be prone to film plastic film mulch and do not open up, and heat stretch tight after aluminum strip dislocation cause the phenomenons such as heat mirror film limit portion fold, make the outward appearance of energy-conservation heat mirror film double glazing and usefulness all undesirable.
Summary of the invention
For the deficiency in above-mentioned field, the invention provides a kind of preparation method of energy-conservation heat mirror film double glazing, this technological operation is simple, processing parameter is easily controlled, solve heat mirror film and in the time closing sheet, be prone to plastic film mulch injustice, the film fold causing and aluminum strip inconsistent phenomenon, its heat mirror film extensibility is very good, and its outward appearance and usefulness are all very good.
The preparation method of energy-conservation heat mirror film double glazing, comprises the steps:
(1) cleaned first piece A, is coated with and breaks first seal gum at lower spacer bar two sections simultaneously, lower spacer bar is fixed on to the periphery of glass A,
(2) heat mirror film is expanded on spacer bar, heat mirror film is exceeded to 2-4mm outside spacer bar, press with the second sheet glass B, make glue and heat mirror film bonding,
(3) take the second sheet glass B away, upper spacer bar both ends of the surface be coated with and break first seal gum, and upper spacer bar and heat mirror film are fixed together,
(4) on heat mirror film, open equalizing port,
(5) put second block of glass, with the fixing whole energy-conservation heat mirror film double glazing of fixer.
(6) be coated with and break second seal gum for the first time, the thick 3mm-5mm of glue, has played after glue maintenance about one week, and heat stretches tight, be coated with and break second seal gum for the second time again, maintenance one week, described maintenance is for keeping 23 DEG C of temperature, relative humidity 60% left and right, make glue spontaneous curing, the described heat technique that stretches tight is divided into three section rank: the first stage heats up 10 minutes, 30 DEG C of holding temperatures, constant temperature time 10 minutes; 10 minutes subordinate phase heating-up times, 60 DEG C of degree of holding temperature, constant temperature time 10 minutes, 30 minutes heating-up times phase III, 102 DEG C of holding temperatures, constant temperature time 80 minutes.
Described first seal gum is butyl rubber.
The diameter control of described equalizing port is at 3mm.
The section of described spacer bar has 2 symmetrical holes.
Described symmetrical holes size is 5mm.
Described maintenance processes and the heat energy-conservation heat mirror film double glazing in process that stretches tight, adopts horizontal positioned, and the spacing of putting between every block of glass is controlled at 150-200mm left and right.
The present invention develops professional lamination process, and the heat processing parameter that stretches tight has been carried out to further adjustment, has closed after hollow, second seal gum is coated with to beat on the end face outside of spacer bar be that above-mentioned said heat mirror film is reserved 2-4mm place and beaten the thick 3mm-5mm of glue.After seal gum maintenance solidifies, then carry out the heat processing (above-mentioned processing parameter) of stretching tight.Heat stretches tight and handles, and determines the heat mirror film flat mass defect that do not have that stretches tight completely, is then coated with and breaks second seal gum (remainder), again carries out maintenance curing (finished product).Deeply by establishing clocking requirement, do not have qualitative about the glue of second seal gum.Playing twice glue just according to heat mirror membrane process demand (contraction principle of film), second seal gum is implemented at twice, is one step completed according to general double glazing.This technological operation is simple, and processing parameter is easily controlled, and solve heat mirror film and in the time closing sheet, be prone to plastic film mulch injustice, the film fold causing and aluminum strip inconsistent phenomenon, its heat mirror film extensibility is very good, and its outward appearance and usefulness are all very good.
According to the size of glass size, determine the number of the equalizing port of opening, diameter control is in 3mm left and right.
The perforate of spacer bar end face is in the naturally vertical put procedure of glass, two perpendicular end surface perforates are to ensure the consistent convection current of air pressure, it is symmetry direction (above-mentioned technological temperature while stretching tight because of heat, will cause the air pressure density in cavity inconsistent with the temperature and air pressure variation that heat stretches tight in stove, prevention double glazing spreading).
Here consider the glass of oversize, but little glass can adopt the form standing up.
Technological operation of the present invention is simple, and processing parameter is easily controlled, and solve heat mirror film and in the time closing sheet, be prone to plastic film mulch injustice, the film fold causing and aluminum strip inconsistent phenomenon, its heat mirror film extensibility is very good, and its outward appearance and usefulness are all very good.
Brief description of the drawings
The structural representation of the energy-conservation heat mirror film of Fig. 1 double glazing,
In figure, each label lists as follows: 1-glass A, 2-interval box, 3-heat mirror film, 4-interval box, 5-glass B.
Fig. 2 process flow sheet of the present invention.
Embodiment
Energy-conservation heat mirror film double glazing as shown in Figure 1, its configuration:
The white steel homogeneous (glass) in 15 white steel homogeneous (glass)+12A knot (spacer bar)+heat mirror film+12A knot (spacer bar)+15
The white steel of 10 white steel+12A knot+heat mirror films+12A knot+8 white steel+1.52PVB+8
(2) specification: 1985*8815
Preparation process is as follows:
1, adopt 100,000 grades of purifications to close sheet chamber, require temperature to be controlled at 20 ± 3 DEG C, in relative humidity 25%; Heat mirror film rete is polluted in the impact of prevention space environment; And be convenient to the storage to heat mirror film.
2, before plastic film mulch, staff has dressed special gloves, mouth mask, protective clothing; Prevention sweat mark and saliva cause oxidation to rete.
3, first piece surface cleaning is good, and fixing aluminium frame, when membrane, to there is special messenger's controlling diaphragm volume, the personnel of glass both sides want simultaneously evenly firmly, the two ends of catching hold of film film is launched slowly prevents heat mirror film surface in operating process to occur fold, worm shape folding line, the defect such as lines and scuffing that can not remove simultaneously.
4, pull film make its exceed glass edge portion a little, the black of the former initial line of film portion mark and scratch and will throw away, then film is placed on uniformly to the outside of aluminium frame, cuts film with sharp blade.The remainder of film is 3mm, can not be oversize, can not be too short, and prevent that film from coming off.
5, reseal membrane and butyl rubber stick together uniformly.Another piece glass of placement after completing, with the manual pressing of stitching wheel one time, makes film and butyl rubber completely bonding, again glass is inhaled and opened, prepare by second aluminium frame, second aluminium frame interface will align with first aluminium frame interface, it is folded poor to occur, affects final visual appearance.
6, after second aluminium frame installs, 10mm place extends internally in aluminium frame bight with electric iron, at heat mirror film face, iron the equalizing port of diameter 3mm, according to the size of the glass space of a whole page, set the number (the middle part the bests on four bights and both sides) of equalizing port, in heat stretches tight process, play air pressure in whole double glazing chamber even.After checking well, put into second block of glass, fix with fixer, handling is to special frame, and horizontal positioned, requires the lateral error of shelf to be controlled in 2mm.
7, according to the characteristic of this heat mirror film, the seal gum of employing, due to performance requriements, is played glue and is carried out at twice, beats for the first time 3mm-5mm, has played after glue maintenance about one week, keeps 23 DEG C of temperature, and the heat processing of stretching tight is carried out in relative humidity 60% left and right after glue solidifies completely again; After heat stretches tight, be coated with and break second seal gum, by above-mentioned technique maintenance.
8, heat stretches tight
Produce heat mirror film supplier provide heat stretch tight parameter only require that heat stretches tight temperature must not be higher than 102 DEG C, the super large space of a whole page heat mirror film double glazing that Beijing North Glass Safety Glass Co., Ltd produces, at home, belong to first, technique, brand-new, in order to ensure that heat mirror film heat stretches tight in process, the overall homogeneity of institute's endothermic temperature, providing the heat parameter that stretches tight supplier is on the basis of reference, experiment is several times groped by Beijing North Glass Safety Glass Co., Ltd, has finally successfully developed the stretch tight parameter of technical maturity of heat mirror film heat:
1, the first stage heats up 10 minutes, 30 DEG C of holding temperatures, constant temperature time 10 minutes; 10 minutes subordinate phase heating-up times, 60 DEG C of degree of holding temperature, constant temperature time 10 minutes, 30 minutes heating-up times phase III, 102 DEG C of holding temperatures, constant temperature time 80 minutes; And the spacing of putting between every block of glass is controlled at 150-200mm left and right.
2, work in-process glass is before heat stretches tight, and in order to ensure in double glazing chamber consistent with temperature, air pressure in stove, avoids glass distending, and the affiliated section at glass aluminum strip is opened 2 symmetrical holes, and diameter 5mm guarantees the balance of temperature, air pressure.
Heat mirror film double glazing is as a kind of novel double glazing product, there is vast potential for future development in building glass field, its appear as shatter proof glass, energy-saving glass, ambetti, lighting roof Glass lamp building glass project provide new selection scheme, the successful exploitation of this Technology, processing parameter is easily controlled, solved heat mirror film and in the time closing sheet, be prone to plastic film mulch injustice, the film fold causing and aluminum strip inconsistent phenomenon, be conducive to applying of energy-conservation heat mirror film double glazing.