CN102695211A - Method and system for radio resource control - Google Patents

Method and system for radio resource control Download PDF

Info

Publication number
CN102695211A
CN102695211A CN201110072665XA CN201110072665A CN102695211A CN 102695211 A CN102695211 A CN 102695211A CN 201110072665X A CN201110072665X A CN 201110072665XA CN 201110072665 A CN201110072665 A CN 201110072665A CN 102695211 A CN102695211 A CN 102695211A
Authority
CN
China
Prior art keywords
terminal
base station
radio resource
attribute
operating position
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110072665XA
Other languages
Chinese (zh)
Inventor
邓云
戴谦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201110072665XA priority Critical patent/CN102695211A/en
Priority to PCT/CN2011/081864 priority patent/WO2012126247A1/en
Publication of CN102695211A publication Critical patent/CN102695211A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/52Allocation or scheduling criteria for wireless resources based on load

Abstract

The invention discloses a method and system for radio resource control. A base station respectively measures radio resource using conditions for terminals with different attributes; and the base station controls terminals with corresponding attributes according to the measured radio resource using conditions. According to the invention, the base station monitors radio resource using conditions of terminals with different attributes in real time so as to dynamically control access, and/or load balancing control, and/or scheduling of the terminals with the different attributes, wherein the using conditions include general physical resource blocks that are used. Meanwhile, a problem that access of other terminals to a network can not be carried out successfully due to occupation of lots of radio resources during access of a portion of terminals to the network can be solved, thereby successfully carrying out services and especially preventing machine type equipment from occupying lots of radio resources effectively; therefore, it can be voided that available physical resource blocks by common user equipment are strained, thereby ensuring transmission efficiency of access of common users to a network and further enhancing the network load control capability.

Description

A kind of Radio Resource control method and system
Technical field
The present invention relates to wireless communication technology, refer to a kind of Radio Resource control method and system especially.
Background technology
Communication between the person to person (H2H, Human to Human) is that the people passes through operation of equipment is realized, the existing wireless communications technology is based on that the Communication Development of H2H gets up.And the sense stricto definition of machine (M2M, Machine to Machine) is the communication of machine to machine, and sensu lato definition is the application and the service of core, networking with the machine terminal intelligent interaction.M2M is based on the intelligence machine terminal, is the access means with multiple communication mode, is the informatization resolve scheme that the client provides, and is used to satisfy the information system requirement of client to aspects such as monitoring, command scheduling, data acquisition and measurements.
The development of wireless technology is the key factor of M2M market development; It has broken through the space-time restriction and the region obstacle of traditional communication mode; Make the enterprise and the public break away from the cable constraint, let the client more effectively control cost, reduce mounting cost and easy to use.In addition, growing demand is promoting M2M and is constantly advancing.Yet constantly increase with information processing capability and the network bandwidth and conflictingly to be; The means that information is obtained lag far behind, and M2M has well satisfied this demand of people, through M2M; People can monitor external environment condition in real time, realize on a large scale, the information gathering of automation.Therefore; The application of M2M comprises sector application, domestic. applications, individual's application etc.; Wherein, Sector application comprises traffic monitoring, warning system, rescue at sea, automatic vending machine, driving paying etc., and domestic. applications comprises automatic data logging, temperature control etc., and the individual uses and comprises life detection, far-end diagnosis etc.
The object of M2M is machine, Human-to-Machine, and the data communication between one or more machines is defined as machine class communication (MTC, Machine Type Communication), lessly in this case needs human-computer interaction.The machine of participating in MTC is called MTC equipment or MTC terminal (MTC Device).MTC equipment can pass through public land mobile communication network network (PLMN, Public Land Mobile-communication Network) and communicate with other MTC equipment or MTC server.
After introducing MTC and using, can carry out some optimizations to existing communication system, satisfying the MTC application demand, and the domestic consumer terminal in the existing network (UE, User Equipment) do not exerted an influence according to its characteristics.Some distinguishing features that M2M uses have: the MTC number of devices is a lot, and each data quantity transmitted is little, and transmission intercal is big, part MTC device location relative fixed.According to statistics, the MTC equipment of in the cell range in certain urban district, installing will reach 3000, if the initiation that so many MTC equipment is relatively concentrated inserts at random, such as under situation such as fire, earthquake, reporting to the police simultaneously, will bring very big impact to network.Usually, a plurality of base stations can be connected to same core network element, like Mobility Management Entity (MME; Mobility Management Entity); When the numerous MTC equipment in all base stations all needed access network, for example after the outage, MTC equipment all when restoring electricity need be registered in the network; To cause MME to bear huge signaling and impact, even possibly cause overload.
During numerous MTC equipment access network, with taking a large amount of Radio Resources.If the MTC number of devices of access network is too many, will cause the Radio Resource overload, this will produce adverse influence to common H2H equipment access network.Because for any one sub-district; Radio Resource is limited (confirming in other words conj.or perhaps); At Long Term Evolution (LTE; Long-Term Evolution) in the system; Radio Resource can be used Physical Resource Block (PRB; Physical Resource Block) expression; Agreement stipulates that continuous
Figure BDA0000051966260000022
number of sub-carrier is defined as a PRB (up) in
Figure BDA0000051966260000021
individual single-carrier frequency division multiple access (SC-FDMA) symbol continuous in the time domain and the frequency domain; Wherein,
Figure BDA0000051966260000023
is the SC-FDMA symbolic number that comprises in the ascending time slot, and
Figure BDA0000051966260000024
is the resource block size on the frequency domain.The ascending resource of whole sub-district can be expressed as by
Figure BDA0000051966260000025
number of sub-carrier to be formed; Wherein, The value of
Figure BDA0000051966260000026
is by the uplink bandwidth decision of disposing in the sub-district; Satisfy
Figure BDA0000051966260000027
wherein simultaneously; Minimum uplink bandwidth
Figure BDA0000051966260000028
and maximum uplink bandwidth agreement define the downlink physical Resource Block;
Figure BDA00000519662600000210
individual continuous OFDM (OFDM) symbol is defined as a Physical Resource Block (descending) with individual continuous subcarrier in frequency domain on the time domain; Wherein,
Figure BDA00000519662600000212
is the OFDM symbolic number that comprises in the descending time slot, and is the resource block size on the frequency domain.The downlink resource of whole sub-district can be expressed as by number of sub-carrier to be formed; Wherein, The value of
Figure BDA00000519662600000215
is by the downstream transmission bandwidth decision of disposing in the sub-district, and
Figure BDA0000051966260000031
of agreement support now also is between 6 to 110.Too many when the MTC number of devices that inserts the sub-district, will inevitably take a large amount of Physical Resource Block, the Physical Resource Block limited amount that causes domestic consumer to use has influenced the efficiency of transmission of domestic consumer's access network.
In existing protocol; Some measurements need be carried out in the base station; So that according to enforcement access control of the change dynamics of load etc.; The measurement of existing base station comprises the throughput that use, the quantity of activated terminals, the terminal of PRB is total etc.; Wherein, the use of PRB comprises that total Physical Resource Block (Total PRB usage) of use, the Physical Resource Block (PRB usage per traffic class) that each grade of service is used, the Physical Resource Block (PRB usage for SRB) that Signaling Radio Bearer uses, the Physical Resource Block that CCCH uses comprise uplink and downlink (DL PRB usage for Common Control Channels, UL PRB usage for Common Control Channels).
The measurement to PRB has been realized in existing base station, such as:
For the total Physical Resource Block that uses; Protocol definition is that (this section period is also referred to as Measuring Time) average total Physical Resource Block ratio
Figure BDA0000051966260000032
that uses is wherein in the duration T; M1 (T) is meant the Physical Resource Block summation of transmission that uplink and downlink are useful on, and P (T) is meant Physical Resource Block total in the duration T;
The Physical Resource Block that each grade of service is used is defined as
Figure BDA0000051966260000033
wherein; M1 (qci; T) be meant total Physical Resource Block that each grade of service is used in the duration T, P (T) is meant Physical Resource Block total in the duration T.Each grade of service is according to QoS Class Identifier (QCI here; QoS Class Identifier) divide, QCI is used to specify the control of definition in the access node to carry a level packet forward mode (like dispatch weight, admit thresholding, queue management thresholding, link layer protocol configuration etc.);
Physical Resource Block and above-mentioned two kinds of definition that Physical Resource Block that Signaling Radio Bearer uses and CCCH use are similar, repeat no more here.
Yet what the surveyingpin of existing base station was right is all terminals, and the base station can not know that H2H equipment uses the situation of Radio Resource, thereby can not prevent effectively that the machine kind equipment from taking the appearance of the situation of a large amount of Radio Resources.Like this,, possibly hinder the access of domestic consumer, have a strong impact on the access impression of domestic consumer if the machine kind equipment quantity of access network is huge.
Summary of the invention
In view of this; Main purpose of the present invention is to provide a kind of Radio Resource control method and system; Can prevent effectively that the machine kind equipment from taking the situation of a large amount of Radio Resources; Thereby the physical resource number of blocks of avoiding domestic consumer to use is nervous, guarantees the efficiency of transmission of domestic consumer's access network.
For achieving the above object, technical scheme of the present invention is achieved in that
A kind of Radio Resource control method, the base station is measured the Radio Resource operating position respectively to the different attribute terminal, also comprises:
Said base station is controlled the respective attributes terminal according to the Radio Resource operating position that measures.
Said base station is controlled to be according to the Radio Resource operating position that measures: access control, and/or load balancing control, and/or scheduling.
Also comprise before this method: said base station is provided with the threshold value of the Physical Resource Block that uses at the different attribute terminal in advance respectively;
Said base station is carried out access control according to the Radio Resource operating position that measures and is comprised:
Meet or exceed said threshold value if be under the jurisdiction of the total Physical Resource Block that uses at the terminal of certain attribute, said base station refusal is under the jurisdiction of the accessing terminal to network of this attribute; Perhaps, said base station discharges the part or all of terminal of this attribute.
Also comprise before this method: said base station is provided with the threshold value of the Physical Resource Block that uses at the different attribute terminal in advance respectively;
Said base station is carried out load balancing control according to the Radio Resource operating position that measures and is comprised:
Total physical resource block message of the different attribute terminal use that self measures is sent in said base station to other base stations; Other base stations are when being select target sub-district, terminal; According to the Radio Resource operating position and the said threshold value at attribute terminal under this terminal that receives, select to satisfy the Target cell of this terminal traffic demand to this attribute terminal.
Also comprise before this method: said base station is provided with the threshold value of the Physical Resource Block that uses at the different attribute terminal in advance respectively;
Said base station is dispatched according to the Radio Resource operating position that measures and is comprised:
Said base station confirms that total Physical Resource Block that use at the terminal of certain attribute surpasses said threshold value, then reduces the scheduling to this attribute terminal.
The attribute at said terminal is known in said base station through reporting of terminal.
Said different attribute terminal is dissimilar terminal; Perhaps,
Initiate to allow the terminal of time-delay business, and/or initiate not allow the professional terminal of delaying time;
Perhaps, initiate the terminal of service with different priority levels;
Perhaps, the terminal of different priorities;
Perhaps, the terminal of roaming, and/or non-roaming terminal;
Perhaps, be under the jurisdiction of not on the same group terminal.
A kind of Radio Resource control system comprises the base station at least, and the terminal, wherein,
The terminal comprises the terminal of one or more different attribute, is used for realizing communication through the base station access network;
The base station is used for measuring the Radio Resource operating position respectively to the different attribute terminal; According to the Radio Resource operating position that measures, the respective attributes terminal is controlled.
Said base station specifically is used for: to measuring the Radio Resource operating position respectively in the different attribute terminal; Radio Resource operating position according to measuring is controlled to be: access control, and/or load balancing control, and/or scheduling.
Said base station is one or more; Said terminal is one or more;
Said terminal comprises machine class communication MTC equipment, and/or person to person H2H equipment.
Can find out from the technical scheme that the invention described above provides, comprise that the base station is directed against the different attribute terminal and measures the Radio Resource operating position respectively, the base station is controlled the respective attributes terminal according to the Radio Resource operating position that measures.Among the present invention; The base station is through the total Physical Resource Block of operating position as using of the Radio Resource at real-time monitoring different attribute terminal; Controlled the access and/or the load balancing control at different attribute terminal dynamically, and/or scheduling, simultaneously; Problem, the business that makes of access network are able to carry out smoothly the other-end that takies a large amount of Radio Resources when having avoided the part accessing terminal to network and cause smoothly; Especially, prevented that effectively the machine kind equipment from taking the situation of a large amount of Radio Resources, thereby the physical resource number of blocks of having avoided domestic consumer to use is nervous; Guarantee the efficiency of transmission of domestic consumer's access network, and then improved the offered load control ability.
Description of drawings
Fig. 1 is the flow chart of Radio Resource control method of the present invention;
Fig. 2 is the composition structural representation of Radio Resource control system of the present invention;
Fig. 3 is the schematic flow sheet of first embodiment of Radio Resource control method of the present invention;
Fig. 4 is the schematic flow sheet of the 3rd embodiment of Radio Resource control method of the present invention.
Embodiment
Fig. 1 is for the flow chart of Radio Resource control method of the present invention, and is as shown in Figure 1, may further comprise the steps:
Step 100: the base station is measured the Radio Resource operating position respectively to the different attribute terminal.
The different attribute terminal is meant dissimilar terminals, comprises MTC equipment, and/or H2H equipment;
Perhaps, the different attribute terminal is meant the terminal of initiating to allow the time-delay business, and/or initiates not allow the professional terminal of delaying time;
Perhaps, the different attribute terminal is meant the terminal of initiating service with different priority levels;
Perhaps, the different attribute terminal is meant the terminal of different priorities;
Perhaps, the different attribute terminal is meant the terminal of roaming, and/or non-roaming terminal;
Perhaps, the different attribute terminal is meant the terminal that is under the jurisdiction of not on the same group.
In this step, the attribute at said terminal is known through reporting of terminal in the base station, through inserting request, or connects to set up when accomplishing through connecting and accomplishes signaling and report base station etc. when inserting at the terminal.
Step 101: the base station is controlled the respective attributes terminal according to the Radio Resource operating position that measures.Specifically can comprise access control, and/or load balancing control, and/or scheduling etc.Wherein,
In this step; The base station is carried out access control according to the Radio Resource operating position that measures and comprised: the base station is provided with the threshold value of the Physical Resource Block that uses at the different attribute terminal in advance respectively; If be under the jurisdiction of the threshold value that the total Physical Resource Block that uses at the terminal of certain attribute meets or exceeds setting, so, the base station refusal is under the jurisdiction of the accessing terminal to network of this attribute; Perhaps the base station discharges the part or all of terminal of this attribute (concrete realization can be carried out according to predefined strategy; When receiving the access request that is under the jurisdiction of this attribute terminal, send the connection rejection signaling such as the base station, refuse the access at this terminal to it; Perhaps base station selected part is in the terminal that is under the jurisdiction of this attribute of connected state, sends to it to connect release signaling etc.).
In this step; The base station is carried out load balancing control according to the Radio Resource operating position that measures and comprised: the base station is provided with the threshold value of the Physical Resource Block that uses at the different attribute terminal in advance respectively; Total physical resource block message of the different attribute terminal use that self measures is sent in the base station to other base stations; Other base stations are when being select target sub-district, terminal; According to the Radio Resource operating position and the said threshold value at attribute terminal under this terminal that receives, select to satisfy the Target cell of this terminal traffic demand to this attribute terminal.
In this step; The base station is dispatched according to the Radio Resource operating position that measures and comprised: the base station is provided with the threshold value of the Physical Resource Block that uses at the different attribute terminal in advance respectively; Total Physical Resource Block that the terminal use of certain attribute is determined in the base station surpasses threshold value; Then reduce scheduling to this attribute terminal by the strategy that also early is provided with in advance (, comprising uplink and downlink etc.) such as reducing the Physical Resource Block that use at this attribute terminal.
Visible from the inventive method shown in Figure 1; The base station is through the total Physical Resource Block of operating position as using of the Radio Resource at real-time monitoring different attribute terminal; Controlled the access and/or the load balancing control at different attribute terminal dynamically, and/or scheduling, simultaneously; Problem, the business that makes of access network are able to carry out smoothly the other-end that takies a large amount of Radio Resources when having avoided the part accessing terminal to network and cause smoothly; Especially, prevented that effectively the machine kind equipment from taking the situation of a large amount of Radio Resources, thereby the physical resource number of blocks of having avoided domestic consumer to use is nervous; Guarantee the efficiency of transmission of domestic consumer's access network, and then improved the offered load control ability.
Fig. 2 is for the composition structural representation of Radio Resource control system of the present invention, and is as shown in Figure 2, comprises the base station at least, and the terminal, wherein,
The base station is used for measuring the Radio Resource operating position respectively to the different attribute terminal; According to the Radio Resource operating position that measures, the respective attributes terminal is controlled.
The terminal comprises the terminal of one or more different attribute, is used for realizing communication through the base station access network.
Said base station is one or more,
Said base station specifically is used for carrying out access control according to the Radio Resource operating position that measures;
And/or; Said base station; Specifically be used for sending total physical resource block message of the different attribute terminal use that self measures, and other base stations are used for for select target sub-district, terminal the time to other base stations; According to the Radio Resource operating position at attribute terminal under this terminal that receives, select to satisfy the Target cell of this terminal traffic demand to this attribute terminal.
And/or said base station specifically is used for dispatching according to the Radio Resource operating position that measures.
, be described in detail the inventive method below in conjunction with embodiment.
Fig. 3, supposes in long evolving system among first embodiment for the schematic flow sheet of first embodiment of Radio Resource control method of the present invention, and different attribute terminal such as MTC equipment and H2H equipment are through base station 1 jurisdiction district, 1 access network and be in connection status.In order to realize load balancing; Base station 1 needs to measure in real time the operating position of Radio Resource; The operating position of present embodiment middle finger PRB comprises that total Physical Resource Block (Total PRB usage) of use, the Physical Resource Block (PRB usage per traffic class) that each grade of service is used, the Physical Resource Block (PRB usage for SRB) that Signaling Radio Bearer uses, the Physical Resource Block that CCCH uses comprise uplink and downlink (DL PRB usage for Common Control Channels, UL PRB usage for Common Control Channels).As shown in Figure 3, specifically may further comprise the steps:
Step 300: base station 1 is provided with total PRB threshold value that MTC uses.
Especially; Among first embodiment; Too many Radio Resource is used in order to prevent MTC equipment in base station 1, causes H2H equipment access network to encounter difficulties, and can not carry out big band width service; Base station 1 is provided with total PRB threshold value that MTC equipment uses in advance; Thresholding as 20% (according to the definition of the total PRB that uses, is a percent value, so this threshold value is a percent value).
Need to prove that the base station also can be provided with corresponding threshold value to H2H equipment; Perhaps, for MTC equipment and H2H equipment threshold value separately is set all.
Step 301: the access request of base station 1 receiving terminal, know the attribute at terminal.
For the scheduling of resource that realizes base station 1, access control etc.; Terminal (the present embodiment middle finger inserts through sub-district 1) when access network needs its attribute of report; Such as; The terminal can connect setting up in reason (Establishment Cause) field of (RRC) connection request at Radio Resource and show attribute, also can connect the information of carrying attribute in the signaling of accomplishing of setting up at RRC.In the present embodiment, suppose that MTC equipment is provided with its attribute setting up of RRC connection request in the reason be MTC equipment.
Step 302: base station 1 judges that can the MTC equipment that allow current requirement to insert; If total PRB that the current MTC equipment that has inserted uses is lower than the threshold value of setting; Then accept the access request of the MTC equipment of current request access, get into step 303 then; Otherwise execution in step 304.
Step 303; The access request of current MTC equipment is accepted in base station 1, measures total PRB that this MTC equipment uses, if there has been MTC equipment to insert sub-district 1 before; This part MTC equipment has used part PRB; Base station 1 needs to measure total PRB that these MTC equipment use, and adds the PRB that this MTC equipment that allows to insert uses then, obtains to be in all sub-districts 1 total PRB that the MTC equipment of connected state uses.Process ends.
Step 304: the MTC equipment that base station 1 refusal current request inserts.
Especially, if surpass predetermined threshold if total PRB that this moment, MTC equipment used is found in base station 1, can also release portion or all be in the MTC equipment of connected state, so that vacate enough resources, with the use of assurance H2H equipment.
In first embodiment; Get into Idle state if be in the MTC equipment of connected state; Promptly discharged the RRC connection; This method also comprises: base station 1 deducts the PRB that this part MTC equipment uses, total PRB that the MTC equipment after obtaining to upgrade uses, then with this as the foundation of judging that can new MTC equipment access network.
In first embodiment; Base station 1 also can be according to each grade of service of MTC equipment foundation; Measure the PRB that each grade of service is used respectively; Total PRB threshold value of the different business grade use of setting is in advance passed through in base station 1, and judges whether to allow new MTC equipment access network according to this threshold value.
According to the method that first embodiment describes, base station 1 provides enough Radio Resources for H2H equipment, has avoided H2H equipment the problem that access delay is big, efficiency of transmission is low to occur.
Second embodiment supposes in long evolving system, and MTC equipment and H2H equipment are through base station 2 jurisdiction districts, 2 access networks and be in connection status.In order to realize load balancing; Base station 2 needs to measure in real time the operating position of Radio Resource; The operating position of present embodiment middle finger PRB comprises total Physical Resource Block (Total PRB usage) of use, the Physical Resource Block (PRB usage per traffic class) that each grade of service is used etc.
In a second embodiment; Suppose that MTC equipment and H2H equipment all can initiate the business of the business of permissible delay (Delay tolerant) business of time delay tolerance (or be called) or low priority; Corresponding with it is, the initiation that MTC equipment and H2H equipment also can initiate to set in business such as the existing protocol of business or normal priority of permissible delay not is former because the signaling that initiate at the terminal is called out the business of the data call (mo-Data) of (mo-Signaling) or terminal initiation.And, under some scene, when detecting emergency, can also initiate the business (high Priority Access) of high priority like MTC equipment in the monitoring state.H2H equipment can be initiated the business and the urgency traffic (emergency) of high priority.Urgency traffic is a kind of business of limit priority, is meant that terminal and local urgency communication accept center such as police, fire alarm, medical aid etc. and communicate.
Suppose that base station 2 is provided with the professional operable PRB threshold value of permissible delay in advance, the Radio Resource control method comprises in this enforcement:
Base station 2 measurements are initiated the total PRB that uses at the professional terminal of permissible delay and are initiated not total PRB of the terminal use of permissible delay business;
Whether the PRB that the professional actual use in terminal of permissible delay is relatively initiated in base station 2 reaches the threshold value that is provided with in advance; If reach; The permissible delay of the terminal initiation that then base station 2 refusals are new is professional; Perhaps base station 2 selects part to initiate permissible delay professional MTC equipment or H2H equipment, and the RRC that discharges this part terminal connects, so that effectively the employed stock number of permissible delay service terminal is initiated in control.
In addition, if the PRB that base station 2 is found to initiate to use at the professional terminal of permissible delay above threshold value, can also further reduce the scheduling to these terminals,, reduction in time uses Physical Resource Block so that initiating the professional terminal of permissible delay.
Other implementations of second embodiment can also be:
Base station 2 is measured the employed PRB of service with different priority levels respectively; Base station 2 is set the PRB threshold value that service with different priority levels can be used simultaneously; When the PRB of certain priority service use reaches the threshold value of setting; The foundation request of this priority service of base station 2 refusals, perhaps release portion has been initiated the terminal of this priority service; Perhaps,
Base station 2 is measured total PRB of the terminal use of different priorities respectively; Base station 2 is set the PRB threshold value that the terminal of different priorities can be used simultaneously; When the PRB that uses when the terminal of certain priority reaches threshold value; The accessing terminal to network of base station 2 these priority of refusal, the perhaps terminal of having inserted of this priority of release portion.Need to prove; Self affiliated precedence information (terminal that comprises low priority is preserved at the terminal; The terminal of normal priority and the terminal of high priority); When initiating service request, need send to base station 2, the Physical Resource Block that use according to all these priority endpoint of this information measurement base station 2 through the priority of RRC signaling under with self; Perhaps,
Base station 2 is measured total PRB of the terminal use of (Group) not on the same group respectively; Base station 2 is set the PRB threshold value that can not use on the same group simultaneously; When the PRB of certain group use reaches threshold value; Base station 2 refusals are under the jurisdiction of the accessing terminal to network of this group, perhaps release portion or whole terminal that has been under the jurisdiction of this group.Need to prove; Different terminal can be under the jurisdiction of different groups; Also can be under the jurisdiction of same group, each group all has group name sign separately, and the group name that it is subordinate to is known through terminal transmission RRC signaling in base station 2; Perhaps know that through core net its group name that is subordinate to is (concrete when passing through core net and knowing that its group name that is subordinate to is meant that core net is carried out authentication to the terminal of inserting; Know the group name that it is subordinate to, the group name that is subordinate to by this terminal of core net informing base station then), and then can measure the PRB that does not use on the same group respectively; Perhaps,
Base station 2 is measured total PRB of the terminal use of roaming and total PRB that use at non-roaming terminal respectively; Base station 2 is set the PRB threshold value that roaming terminal can use simultaneously; When the PRB of roaming terminal use reaches the threshold value of setting; The access request of base station 2 refusal roaming terminals, perhaps release portion or all roaming terminal.Wherein, Subscriber Identity Module (USIM at the terminal; Universal Subscriber Identity Module) preserves home public land mobile network (HPLMN, Home Public Land Mobile Network) network identity in, or also preserve equivalent home public land mobile network (EHPLMN; Equivalent Home PLMN) sign; The PLMN sign of this sub-district belonging network can be known in the terminal in the system message of present access subzone, and then can judge whether it is the terminal of roaming: if the current access network in terminal is not HPLMN, represent that then this terminal is the terminal of roaming; If perhaps current network is neither HPLMN, neither EHPLMN, represent that then this terminal is the terminal of roaming.The terminal can report self whether to belong to the terminal of roaming to base station 2 through the RRC signaling, and roaming terminal total PRB that uses and the total PRB that measures the use of non-roaming terminal can be measured according to the information that obtains in base station 2.
Fig. 4 in the 3rd embodiment, supposes in long evolving system that for the schematic flow sheet of the 3rd embodiment of Radio Resource control method of the present invention base station 3 is an adjacent base station with base station 4, has X2 interface between them.3 jurisdiction districts 3, base station and 4 jurisdiction districts 4, base station are neighbor cell each other.Different H2H equipment inserts sub-district 3 and sub-district 4 respectively with different MTC equipment.Base station 3 and base station 4 are measured total PRB of the different types of terminals use in the jurisdiction district separately respectively; Because the terminal can be moved; Can switch to adjacent sub-district smoothly in order to ensure the terminal; According to the inventive method, can shift to an earlier date mutual Radio Resource between the base station and use information, so that source base station can be selected the switching target small area of abundant resource.As shown in Figure 4, specifically comprise:
Step 400: resource status request (Resource Status Request) is sent to base station 4 in base station 3.
In this step, in the resource status request, carry the characteristic (Report Characteristics) of request report, like the user mode of request report PRB, the perhaps user mode of the PRB of request report different types of terminals; Can also further comprise the cycle of report, the cell ID of request report etc.
Step 401: after the resource status request is received in base station 4, return resource status response (Resource Status Response) to base station 3, informing base station 3, the corresponding measurement will be implemented in base station 4, and can be to the user mode of base station 3 report PRB.
Step 402: base station 4 is sent resource status to base station 3 and is upgraded (Resource Status Update) signaling; Upgrade the total PRB that includes different types of terminals use in the sub-district 4 in the signaling at this resource status, promptly comprise total Physical Resource Block of MTC equipment use and total PRB that H2H equipment uses.
Step 403: base station 3 is upgraded according to the resource status that receives, and carries out the selection of Target cell.
Such as: certain the MTC equipment in 3 jurisdiction districts 3, base station needs to switch; The measurement report that base station 3 reports according to MTC equipment is selected candidate's Target cell; Suppose; Candidate's Target cell comprises sub-district 4 (belonging to base station 4) and sub-district 5 (base station that belongs to other) in the present embodiment, but base station 3 knows that through step 402 total PRB that MTC equipment uses in the sub-district 4 transships (such as reaching 100%), and then base station 3 can not select sub-district 4 as Target cell.Otherwise, if base station 3 knows that through step 402 total PRB that MTC equipment uses in the sub-district 4 does not transship, can satisfy the business demand of to be switched MTC equipment, then base station 3 can select sub-district 4 as the Target cell that switches.
Need to prove; The 3rd embodiment also has other implementation; Can ask base station 4 to send the state information of the PRB of roaming terminal and the use of non-roaming terminal such as base station 3; After base station 3 obtains this information, in the time of need switching at the terminal, can select suitable Target cell according to the roaming characteristics at terminal; Perhaps,
Base station 3 can ask base station 4 to send the PRB attitude information of the professional terminal use of initiation permissible delay, after base station 3 obtains these information, in the time of need switching at the terminal of initiating the permissible delay business, can be that suitable Target cell is selected at the terminal; Perhaps,
The PRB state information that use at the terminal that base station 3 can ask base station 4 to send the initiation service with different priority levels after base station 3 obtains these information, can be selected suitable Target cell for the terminal of initiating service with different priority levels.
Through the method for the 3rd embodiment, realized between the base stations neighboring PRB information that mutual different types of terminals uses, or realized the physical resource block message that whether roaming terminal uses alternately, or realized the mutual initiation physical resource block message whether the permissible delay service terminal uses, or realized the physical resource block message that use at mutual initiation service with different priority levels terminal; And the Target cell of business demand can be selected to satisfy in the base station when relevant terminal need be switched, and the RRC that has avoided the switching flow failure to cause connects release.Especially; When PRB information that the mutual MTC equipment of base stations neighboring uses, show that base station needs rationally control the machine Terminal Type, thereby avoided the machine Terminal Type to take a large amount of Radio Resources; Cause domestic consumer's access network smoothly, can not obtain the problem of satisfied wireless service.
The above is merely preferred embodiment of the present invention, is not to be used to limit protection scope of the present invention, all any modifications of within spirit of the present invention and principle, being done, is equal to replacement and improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. a Radio Resource control method is characterized in that, the base station is measured the Radio Resource operating position respectively to the different attribute terminal, also comprises:
Said base station is controlled the respective attributes terminal according to the Radio Resource operating position that measures.
2. Radio Resource control method according to claim 1 is characterized in that, said base station is controlled to be according to the Radio Resource operating position that measures: access control, and/or load balancing control, and/or scheduling.
3. Radio Resource control method according to claim 2 is characterized in that, also comprises before this method: said base station is provided with the threshold value of the Physical Resource Block that uses at the different attribute terminal in advance respectively;
Said base station is carried out access control according to the Radio Resource operating position that measures and is comprised:
Meet or exceed said threshold value if be under the jurisdiction of the total Physical Resource Block that uses at the terminal of certain attribute, said base station refusal is under the jurisdiction of the accessing terminal to network of this attribute; Perhaps, said base station discharges the part or all of terminal of this attribute.
4. Radio Resource control method according to claim 2 is characterized in that, also comprises before this method: said base station is provided with the threshold value of the Physical Resource Block that uses at the different attribute terminal in advance respectively;
Said base station is carried out load balancing control according to the Radio Resource operating position that measures and is comprised:
Total physical resource block message of the different attribute terminal use that self measures is sent in said base station to other base stations; Other base stations are when being select target sub-district, terminal; According to the Radio Resource operating position and the said threshold value at attribute terminal under this terminal that receives, select to satisfy the Target cell of this terminal traffic demand to this attribute terminal.
5. Radio Resource control method according to claim 2 is characterized in that, also comprises before this method: said base station is provided with the threshold value of the Physical Resource Block that uses at the different attribute terminal in advance respectively;
Said base station is dispatched according to the Radio Resource operating position that measures and is comprised:
Said base station confirms that total Physical Resource Block that use at the terminal of certain attribute surpasses said threshold value, then reduces the scheduling to this attribute terminal.
6. according to each described Radio Resource control method of claim 1~5, it is characterized in that the attribute at said terminal is known in said base station through reporting of terminal.
7. according to each described Radio Resource control method of claim 1~5, it is characterized in that said different attribute terminal is dissimilar terminal; Perhaps,
Initiate to allow the terminal of time-delay business, and/or initiate not allow the professional terminal of delaying time;
Perhaps, initiate the terminal of service with different priority levels;
Perhaps, the terminal of different priorities;
Perhaps, the terminal of roaming, and/or non-roaming terminal;
Perhaps, be under the jurisdiction of not on the same group terminal.
8. a Radio Resource control system is characterized in that, comprises the base station at least, and the terminal, wherein,
The terminal comprises the terminal of one or more different attribute, is used for realizing communication through the base station access network;
The base station is used for measuring the Radio Resource operating position respectively to the different attribute terminal; According to the Radio Resource operating position that measures, the respective attributes terminal is controlled.
9. Radio Resource control system according to claim 8 is characterized in that, said base station specifically is used for: to measuring the Radio Resource operating position respectively in the different attribute terminal; Radio Resource operating position according to measuring is controlled to be: access control, and/or load balancing control, and/or scheduling.
10. Radio Resource control system according to claim 9 is characterized in that, said base station is one or more; Said terminal is one or more;
Said terminal comprises machine class communication MTC equipment, and/or person to person H2H equipment.
CN201110072665XA 2011-03-24 2011-03-24 Method and system for radio resource control Pending CN102695211A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201110072665XA CN102695211A (en) 2011-03-24 2011-03-24 Method and system for radio resource control
PCT/CN2011/081864 WO2012126247A1 (en) 2011-03-24 2011-11-07 Method and system for controlling wireless resource

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110072665XA CN102695211A (en) 2011-03-24 2011-03-24 Method and system for radio resource control

Publications (1)

Publication Number Publication Date
CN102695211A true CN102695211A (en) 2012-09-26

Family

ID=46860461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110072665XA Pending CN102695211A (en) 2011-03-24 2011-03-24 Method and system for radio resource control

Country Status (2)

Country Link
CN (1) CN102695211A (en)
WO (1) WO2012126247A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104105135A (en) * 2013-04-02 2014-10-15 电信科学技术研究院 Mobile load balancing, air interface resource utilization rate counting method and device
CN104640160A (en) * 2015-01-04 2015-05-20 中国联合网络通信集团有限公司 Method and system for implementing allocation of mobile resources
WO2015113310A1 (en) * 2014-01-30 2015-08-06 Nokia Technologies Oy Load control system for device to device discovery signal transmissions
CN108271125A (en) * 2017-01-04 2018-07-10 中兴通讯股份有限公司 Data transmission, data receiver method and device
CN108574968A (en) * 2017-03-13 2018-09-25 中兴通讯股份有限公司 Base station, mixed networking resource information are obtained, are reported and cell switching method
CN113225777A (en) * 2021-04-29 2021-08-06 广东邮电职业技术学院 Resource pre-allocation method for reducing air interface time delay
WO2023220992A1 (en) * 2022-05-18 2023-11-23 Oppo广东移动通信有限公司 Network accessing method, terminal device and network device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104581826B (en) * 2013-10-24 2018-10-16 中国移动通信集团北京有限公司 A kind of dynamic load balancing method and system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006071179A1 (en) * 2004-12-30 2006-07-06 Teliasonera Ab Method and system for service access control in shared networks
CN101094494A (en) * 2006-06-19 2007-12-26 上海贝尔阿尔卡特股份有限公司 Method and device in use for carrying out wireless access control for grouped users in wireless network
CN101262699A (en) * 2007-03-09 2008-09-10 华为技术有限公司 A method and system for wireless resource management of access network
CN101616436A (en) * 2009-07-08 2009-12-30 西安电子科技大学 Based on the user selection switching method under the moving load equilibrating mechanism
CN101827368A (en) * 2010-03-09 2010-09-08 西安电子科技大学 Load balance optimization method of cellular cells based on X2 interface information interaction
JP2010252256A (en) * 2009-04-20 2010-11-04 Nec Corp Network device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2058957A4 (en) * 2006-08-29 2012-07-18 Fujitsu Ltd Communication apparatus, terminal, and radio channel quality control method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006071179A1 (en) * 2004-12-30 2006-07-06 Teliasonera Ab Method and system for service access control in shared networks
CN101094494A (en) * 2006-06-19 2007-12-26 上海贝尔阿尔卡特股份有限公司 Method and device in use for carrying out wireless access control for grouped users in wireless network
CN101262699A (en) * 2007-03-09 2008-09-10 华为技术有限公司 A method and system for wireless resource management of access network
JP2010252256A (en) * 2009-04-20 2010-11-04 Nec Corp Network device
CN101616436A (en) * 2009-07-08 2009-12-30 西安电子科技大学 Based on the user selection switching method under the moving load equilibrating mechanism
CN101827368A (en) * 2010-03-09 2010-09-08 西安电子科技大学 Load balance optimization method of cellular cells based on X2 interface information interaction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
SAMSUNG: "MTC Signal Congestion Control", 《3GPP TSG SA WG2 MEETING #79 TD S2-102395》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104105135A (en) * 2013-04-02 2014-10-15 电信科学技术研究院 Mobile load balancing, air interface resource utilization rate counting method and device
CN104105135B (en) * 2013-04-02 2019-02-01 电信科学技术研究院 A kind of mobility load balance, utilization rate of air interface resource statistical method and equipment
WO2015113310A1 (en) * 2014-01-30 2015-08-06 Nokia Technologies Oy Load control system for device to device discovery signal transmissions
CN106068662A (en) * 2014-01-30 2016-11-02 诺基亚技术有限公司 The load control system of signal transmission is found for device-to-device
US10674516B2 (en) 2014-01-30 2020-06-02 Nokia Technologies Oy Load control system for device to device discovery signal transmissions
CN104640160A (en) * 2015-01-04 2015-05-20 中国联合网络通信集团有限公司 Method and system for implementing allocation of mobile resources
CN104640160B (en) * 2015-01-04 2018-06-05 中国联合网络通信集团有限公司 A kind of method and system for realizing mobile resources allotment
CN108271125B (en) * 2017-01-04 2022-01-28 中兴通讯股份有限公司 Data transmitting method, data receiving method and device
CN108271125A (en) * 2017-01-04 2018-07-10 中兴通讯股份有限公司 Data transmission, data receiver method and device
CN108574968A (en) * 2017-03-13 2018-09-25 中兴通讯股份有限公司 Base station, mixed networking resource information are obtained, are reported and cell switching method
CN113225777A (en) * 2021-04-29 2021-08-06 广东邮电职业技术学院 Resource pre-allocation method for reducing air interface time delay
CN113225777B (en) * 2021-04-29 2022-08-05 广东邮电职业技术学院 Resource pre-allocation method for reducing air interface time delay
WO2023220992A1 (en) * 2022-05-18 2023-11-23 Oppo广东移动通信有限公司 Network accessing method, terminal device and network device

Also Published As

Publication number Publication date
WO2012126247A1 (en) 2012-09-27

Similar Documents

Publication Publication Date Title
US9155105B2 (en) Enhanced access control in LTE advanced systems
CN102695199A (en) Method and system for realizing radio resource control
CN105745945B (en) Control the data transmission of the machine type communication in mobile communication system
EP2250833B1 (en) Access class restriction implemented in radio access node for core network processing load reduction
CN102695211A (en) Method and system for radio resource control
CN102333354B (en) Signalling of resource status information between base stations for load balancing
EP2654346B1 (en) Terminal access method and device
CN102469543B (en) Acceptance controlling method, Apparatus and system
CN102484765A (en) Enhanced rach design for machine-type communications
CN105659691A (en) Execution method and user equipment for service request procedure
CN104270725A (en) Indication information determination and processing method and device and request message processing method and device
CN102740493A (en) Method and system for adjusting terminal access control
WO2014176863A1 (en) Access control method and device
CN103298126B (en) A kind of dynamic channel assignment method of TD-LTE trunked communication system
EP2798903A1 (en) Operating broadband public safety mobile communication
CN103731872A (en) Method and device for controlling data transmission of user equipment through signaling
JP2020504551A (en) Method and apparatus for configuring a signaling category for a connection control mechanism in a wireless communication system
CN105940718A (en) A method and apparatus for adaptive barring control for MO-SMS in wireless access system
CN106604207A (en) Method for packet-based cell access and selection in M2M communication
CN104159254B (en) A kind of network congestion processing method and system
CN102469554B (en) Method for terminal to switch in network and terminal
CN104301931A (en) Congestion/overload control method, system, device and base station
CN102469552B (en) A kind of method and system of terminal access
CN101841850A (en) Method, device and system for acquiring neighboring cell load information from LTE system
CN102958168A (en) Cognitive radio system resource redistributing method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20120926

RJ01 Rejection of invention patent application after publication