CN102691314B - Internal deviation correcting fine adjusting system and adjusting technology for immersed tubes - Google Patents

Internal deviation correcting fine adjusting system and adjusting technology for immersed tubes Download PDF

Info

Publication number
CN102691314B
CN102691314B CN201210188487.1A CN201210188487A CN102691314B CN 102691314 B CN102691314 B CN 102691314B CN 201210188487 A CN201210188487 A CN 201210188487A CN 102691314 B CN102691314 B CN 102691314B
Authority
CN
China
Prior art keywords
immersed tube
jack
group
mandril
immersed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210188487.1A
Other languages
Chinese (zh)
Other versions
CN102691314A (en
Inventor
林鸣
李一勇
翟世鸿
李增军
冯海暴
刘德进
曲俐俐
宿发强
苏长玺
杨瑞亮
李德钊
王强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201210188487.1A priority Critical patent/CN102691314B/en
Publication of CN102691314A publication Critical patent/CN102691314A/en
Application granted granted Critical
Publication of CN102691314B publication Critical patent/CN102691314B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention relates to an internal deviation correcting fine adjusting system and an internal deviation correcting fine adjusting technology for immersed tubes. The system comprises a control system and a mechanical system, wherein the mechanical system comprises a hydraulic pump station, a jack group and a jack ejector rod group; the jack group is arranged at the front end of the immersed tube to be installed, and the jack ejector rod group is arranged at the tail ends of the immersed tube to be installed and the installed immersed tube through flanges; the jack group is formed by connecting a plurality of jacks with limiting and jacking functions together through fixing racks; and the jack ejector rod group is formed by connecting a plurality of jack ejector rods together through the fixing racks. By adopting internal deviation correction, the deviation correcting fine adjusting system is simple and reasonable in structure and convenient to operate; when an immersed tube is installed, the immersed tube is placed in a combination cavity of the installed immersed tube and the immersed tube to be installed, so that a broken stone base bed is not required; influence of natural conditions such as wave, water flow and wind is reduced through a wave compensator in the adjusting process; and installation is controlled through the control system, so that the immersed tubes are positioned accurately, and time and labor are saved.

Description

Immersed tube inner correction accurate adjustment system and adjusting process thereof
Technical field
The present invention relates to immersed tube tunnel construction technology, specifically, relates to immersed tube inner correction regulating system and adjusting process thereof in a kind of immersed tube tunnel work progress.
Background technology
Immersed tunnelling method is a kind of construction method in building tunnel, the bottom.Immersed tube tunnel be exactly by several prefabricated section respectively transportation by driving to sea (river surface) scene, and sinking is arranged in the foundation trench of having dredged one by one, the submerged tunnel of building with the method.At present, in immersed tube tunnel work progress, in order to improve the planarization of trench bottom surfaces, the subaqueous tunnel that the overwhelming majority builds up all adopts the method for leveling up.Wherein, the early stage method of leveling up mostly adopting is a kind of first paving method that first sanding masonry is bed course before Pipe Sinking, it is by hoist engine and the special paving machine of scraping or the steel plough of cable control on operation ship, the guide rail that arrange, that there is regulation absolute altitude and the gradient along trench bottom surfaces both sides, the bedding and padding that put down are back and forth struck off, and this method shortcoming is more; The method that another kind is leveled up is filled out method after being, first by Pipe Sinking on the temporary support in trench bottom, and make to manage the end and form certain space (default hydraulic jack in pipeline section base plate can be pushed up to bearing in the time of location, regulate pipeline section elevation), use subsequently course filling closely knit.In above-mentioned two kinds of methods, the object of processing sinking pipeline section basis is to make trench bottom surfaces smooth, rather than in order to improve the bearing capacity of ground, the groove of excavation under water, its bottom surface is uneven, if do not flattened, after Pipe Sinking, can cause local failure because of ground discontinuity, or ftracture because of differential settlement.
The essential condition that is suitable for immersed tunnelling method construction is: water channel stabilization of river bed and current are not too urgent.When, immersed tube aspect ratio large in the depth of water is large, need obviously to increase jack configuration, conventionally adopt sinking to refute assisted Extraction and feed to the power of hanging oneself to reduce immersed tube to bedding frictional force, refute and assist installation stricter to wave height requirement by sinking, general job wave height requirement≤0.4m.At present, adopt sinking to refute auxiliary case of installing and only have Pusan-huge Ji immersed tube tunnel and Oresund immersed tube tunnel, wherein, Pusan-huge Ji immersed tube tunnel is to operation wave height requirement≤0.4m; In the immersed tube tunnel construction of Oresund, can find out from map, job site surrounding has formed shielding, and sea situation is better.And require while being greater than 0.4m for wave height, owing to being subject to the impact of the natural conditions such as wave, current, wind, while adopting sinking to refute auxiliary installation, the power amplitude of variation of hanging is very large, and larger to control effect is installed, jack thrust is large, control difficulty, and installation accuracy is inaccurate, need the time to adjust, waste time and energy.
Summary of the invention
The present invention is directed to the thrust that existed by the effect of natural conditions such as wave, current, wind when immersed tube in existing immersed tube tunnel work progress is installed large, control difficulty, the problems referred to above such as waste time and energy, a kind of immersed tube inner correction accurate adjustment system and adjusting process thereof are provided, this system is positioned at the binding cavity that immersed tube and immersed tube to be installed are installed while use, to the no requirement (NR) of rubble bedding, the immersed tube correction while being applicable to immersed tube tunnel construction.
Technical scheme of the present invention is: the inner correction of a kind of immersed tube accurate adjustment system, this system comprises control system and mechanical system, mechanical system comprises hydraulic power unit, jack group and mandril of lifting jack group, jack group is arranged on the front end of immersed tube to be installed by support, mandril of lifting jack group is arranged on immersed tube to be installed by flange and the tail end of immersed tube has been installed; Jack group is to have by multiple one group of jack that jack spacing, pushing tow function links together by fixed mount, and mandril of lifting jack group is the one group of mandril of lifting jack multiple mandril of lifting jacks being linked together by fixed mount.
Preferably, in jack group, the quantity of jack is identical with the quantity of mandril of lifting jack in mandril of lifting jack group.
Preferably, jack and mandril of lifting jack are provided with 6.
Preferably, jack and mandril of lifting jack are provided with 4 or 8 or 10.
Preferably, control system and hydraulic power unit are all placed on and have installed in immersed tube.
Another object of the present invention is to provide the inner correction of a kind of immersed tube adjusting process, adopt the inner correction of immersed tube accurate adjustment system to regulate, its adjusting process step is:
(1) installation of the inner correction of immersed tube accurate adjustment system: being arranged in depressed place of the inner correction of immersed tube accurate adjustment system jack carried out, six jack are connected to one group by fixed support, when secondary fitting-out, jack group is fixedly mounted on to the front end of immersed tube to be installed by support, and leave oil pipe, displacement data wire terminal, do waterproofing work; The installation industry of the inner correction of immersed tube accurate adjustment system mandril of lifting jack is carried out in depressed place, by flange, mandril of lifting jack is connected with immersed tube section, is arranged on the tail end of immersed tube to be installed.
(2) immersed tube sinking, waterpower crimping: immersed tube sinking, drawing, waterpower crimping.
(3) holing through survey: after the crimping of immersed tube waterpower completes, open the steel measured hole of sealing up a door and carry out holing through survey, when tube coupling level and tunnel axis deviation≤35mm, do not adjust, when tube coupling level and tunnel axis deviation > 35mm, carry out immersed tube tail end lateral adjustments to be installed by the inner correction of immersed tube regulating system, until immersed tube misalignment of axe to be installed meets the demands.
(4) circuit and push rod connect: need to regulate time, open steel and seal up a door the connection of jack group pipeline, and by mandril of lifting jack group docking jack group, manual debugging puts in place.
(5) the inner correction of immersed tube accurate adjustment system correction: hydraulic power unit and control system are placed on installs in immersed tube, after circuit has been connected with mandril of lifting jack group; First each spacing jack is applied to pre-jacking force locking spacing; Pushing tow jack applies pre-jacking force, then sets and regulates jack stroke; Operating period closes steel and seals up a door, and keeps measured hole open mode; Two sinkings are refuted lifting simultaneously and are reduced immersed tube to be installed to bedding pressure, guarantee that immersed tube to be installed is not less than 400t to bedding pressure, and refute by sinking the passive heave compensator arranging on hanger rope and reduce the impact of wave on the power of hanging; Pushing tow jack starts to load rectifies a deviation, and reaches after default stroke, and the inner correction of immersed tube regulating system stops pushing tow, and off-load sinking is refuted the power of hanging.
(6) Real-Time Monitoring: correction operating period utilizes total powerstation to observe immersed tube tail end correction situation by measured hole.
(7) jack group unloading: before the unloading of jack group, adopt and add after Ballast Water maximal density 5% negative buoyancy force, immersed tube to be installed meets in 1.3m/s flow velocity drag force and the requirement of effect of water pressure stability inferior as calculated; For guaranteeing safety, after locking backfill, more synchronous, the spacing jack of load shedding and pushing tow jack top power, observe immersed tube tail end stable case simultaneously.
(8) rectified a deviation: after immersed tube to be installed has been rectified a deviation, remove the inner correction of immersed tube regulating system.
The invention has the beneficial effects as follows: the present invention's accurate adjustment system architecture advantages of simple, easy to operate of rectifying a deviation, in the time that immersed tube is installed, be positioned in the binding cavity that immersed tube and immersed tube to be installed are installed, for the inside correction of immersed tube, to the no requirement (NR) of rubble bedding, and in adjustment process, reduce the impact of the natural conditions such as wave, current, wind by heave compensator, and install by control system control, accurate positioning, installation accuracy is high, time saving and energy saving.
Accompanying drawing explanation
The plane structure schematic diagram of accompanying drawing 1 specific embodiment of the invention immersed tube jack to be installed group and mandril of lifting jack group.
Accompanying drawing 2 is the partial enlarged drawing of A part in specific embodiment of the invention accompanying drawing 1.
Accompanying drawing 3 is immersed tube to connect the flat surface structural representation after the crimping of specific embodiment of the invention waterpower.
The A-A cross-sectional view that accompanying drawing 4 is accompanying drawing 3 of the present invention.
Accompanying drawing 5 for the specific embodiment of the invention adjust after jack state diagram.
Accompanying drawing 6 is immersed tube mounting plane structural representation after the crimping of specific embodiment of the invention sinking waterpower completes.
Accompanying drawing 7 rubs in moving horizontally the immersed tube mounting plane structural representation of critical condition for specific embodiment of the invention jack thrust overcomes.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention will be further described.
The inner correction of a kind of immersed tube accurate adjustment system, this system comprises control system and mechanical system, mechanical system comprises hydraulic power unit, jack group 1 and mandril of lifting jack group 2, jack group 1 is arranged on the front end of immersed tube to be installed by support, mandril of lifting jack group 2 is arranged on immersed tube to be installed by flange 3 and the tail end of immersed tube has been installed; Control system and hydraulic power unit are all placed on have been installed in immersed tube.Jack group 1 is for having one group of jack that jack 5 spacing, pushing tow function links together, the one group mandril of lifting jack of mandril of lifting jack group 2 for multiple mandril of lifting jacks 6 being linked together by fixed mount 4 by fixed mount 4 by multiple.In jack group 1, the quantity of jack 5 is identical with the quantity of mandril of lifting jack 6 in mandril of lifting jack group 2.Jack 5 and mandril of lifting jack 6 are provided with 6.
Its adjusting process step is:
(1) installation of the inner correction of immersed tube accurate adjustment system: being arranged in depressed place of the inner correction of immersed tube accurate adjustment system jack carried out, six jack are connected to one group by fixed support, when secondary fitting-out, jack group is fixedly mounted on to the front end of immersed tube to be installed by support, and leave oil pipe, displacement data wire terminal, do waterproofing work; The installation industry of the inner correction of immersed tube accurate adjustment system mandril of lifting jack is carried out in depressed place, by flange, mandril of lifting jack is connected with immersed tube section, is arranged on the tail end of immersed tube to be installed.
(2) immersed tube sinking, waterpower crimping: immersed tube sinking, drawing, waterpower crimping, after the crimping of immersed tube waterpower completes, under least favorable state, waterstop evenly compresses, and as shown in Figure 6, wherein, f is frictional force.
(3) holing through survey: after the crimping of immersed tube waterpower completes, open the steel measured hole of sealing up a door and carry out holing through survey, when tube coupling level and tunnel axis deviation≤35mm, do not adjust, when tube coupling level and tunnel axis deviation > 35mm, carry out immersed tube tail end lateral adjustments to be installed by the inner correction of immersed tube regulating system, until immersed tube misalignment of axe to be installed meets the demands.
(4) circuit and push rod connect: need to regulate time, open steel and seal up a door the connection of jack group pipeline, and by mandril of lifting jack group docking jack group, manual debugging puts in place, as shown in Figure 7, and after installation jack puts in place, jack thrust overcome friction is in moving horizontally critical condition, wherein, A end jack is spacing, B end jack pushing tow, f is frictional force, now, B end pushing tow jack thrust increases, and direction is contrary with original direction.
(5) the inner correction of immersed tube accurate adjustment system correction: hydraulic power unit and control system are placed on installs in immersed tube, after circuit has been connected with mandril of lifting jack group, first A is held spacing jack to apply pre-jacking force locking spacing, B end pushing tow jack applies pre-jacking force, frictional force f direction starts to change, and then sets and regulates jack stroke; Operating period closes steel and seals up a door, and keeps measured hole open mode; Two sinkings are refuted lifting simultaneously and are reduced immersed tube to be installed to bedding pressure, guarantee that immersed tube to be installed is not less than 400t to bedding pressure, and refute by sinking the passive heave compensator arranging on hanger rope and reduce the impact of wave on the power of hanging; B end pushing tow jack starts to load rectifies a deviation, and when correction, immersed tube to be installed starts to hold spacing jack rotation around A, reaches after default stroke, and the inner correction of immersed tube regulating system stops pushing tow, and off-load sinking is refuted the power of hanging.
(6) Real-Time Monitoring: correction operating period utilizes total powerstation to observe immersed tube tail end correction situation by measured hole.
(7) jack group unloading: before the unloading of jack group, adopt and add after Ballast Water maximal density 5% negative buoyancy force, immersed tube to be installed meets in 1.3m/s flow velocity drag force and the requirement of effect of water pressure stability inferior as calculated; For guaranteeing safety, after locking backfill, more synchronous, the spacing jack of load shedding and pushing tow jack top power, observe immersed tube tail end stable case simultaneously.
(8) rectified a deviation: after immersed tube to be installed has been rectified a deviation, remove the inner correction of immersed tube regulating system.
According to differences such as the lengths of immersed tube to be installed and immersed tube tunnel, jack and mandril of lifting jack all can also be set to 4 or 8 or 10.
The above specific embodiment is only unrestricted in order to technical scheme of the present invention to be described, although the present invention is had been described in detail with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can modify or be equal to replacement technical scheme of the present invention, and not departing from the spirit and scope of technical solution of the present invention, it all should be encompassed in the middle of claim scope of the present invention.

Claims (3)

1. the inner correction of an immersed tube adjusting process, is characterized in that: adopt the inner correction of immersed tube accurate adjustment system to regulate, its adjusting process step is:
(1) installation of the inner correction of immersed tube accurate adjustment system: being arranged in depressed place of the inner correction of immersed tube accurate adjustment system jack carried out, six jack are connected to one group by fixed support, when secondary fitting-out, jack group is fixedly mounted on to the front end of immersed tube to be installed by support, and leave oil pipe, displacement data wire terminal, do waterproofing work; The installation industry of the inner correction of immersed tube accurate adjustment system mandril of lifting jack is carried out in depressed place, by flange, mandril of lifting jack is connected with immersed tube section, is arranged on the tail end of immersed tube to be installed;
(2) immersed tube sinking, waterpower crimping: immersed tube sinking, drawing, waterpower crimping;
(3) holing through survey: after the crimping of immersed tube waterpower completes, open the steel measured hole of sealing up a door and carry out holing through survey, when tube coupling level and tunnel axis deviation≤35mm, do not adjust, when tube coupling level and tunnel axis deviation > 35mm, carry out immersed tube tail end lateral adjustments to be installed by the inner correction of immersed tube regulating system, until immersed tube misalignment of axe to be installed meets the demands;
(4) circuit and push rod connect: need to regulate time, open steel and seal up a door the connection of jack group pipeline, and by mandril of lifting jack group docking jack group, manual debugging puts in place;
(5) the inner correction of immersed tube accurate adjustment system correction: hydraulic power unit and control system are placed on installs in immersed tube, after circuit has been connected with mandril of lifting jack group; First each spacing jack is applied to pre-jacking force locking spacing; Pushing tow jack applies pre-jacking force, then sets and regulates jack stroke; Operating period closes steel and seals up a door, and keeps measured hole open mode; Two sinkings are refuted lifting simultaneously and are reduced immersed tube to be installed to bedding pressure, guarantee that immersed tube to be installed is not less than 400t to bedding pressure, and refute by sinking the passive heave compensator arranging on hanger rope and reduce the impact of wave on the power of hanging; Pushing tow jack starts to load rectifies a deviation, and reaches after default stroke, and the inner correction of immersed tube regulating system stops pushing tow, and off-load sinking is refuted the power of hanging;
(6) Real-Time Monitoring: correction operating period utilizes total powerstation to observe immersed tube tail end correction situation by measured hole;
(7) jack group unloading: before the unloading of jack group, adopt and add after Ballast Water maximal density 5% negative buoyancy force, immersed tube to be installed meets in 1.3m/s flow velocity drag force and the requirement of effect of water pressure stability inferior as calculated; For guaranteeing safety, after locking backfill, more synchronous, the spacing jack of load shedding and pushing tow jack top power, observe immersed tube tail end stable case simultaneously;
(8) rectified a deviation: after immersed tube to be installed has been rectified a deviation, remove the inner correction of immersed tube regulating system.
2. the inner correction of immersed tube as claimed in claim 1 adjusting process, it is characterized in that: the described inner correction of immersed tube accurate adjustment system comprises control system and mechanical system, mechanical system comprises hydraulic power unit, jack group and mandril of lifting jack group, jack group is arranged on the front end of immersed tube to be installed by support, mandril of lifting jack group is arranged on immersed tube to be installed by flange and the tail end of immersed tube has been installed; Jack group is to have by multiple one group of jack that jack spacing, pushing tow function links together by fixed mount, and mandril of lifting jack group is the one group of mandril of lifting jack multiple mandril of lifting jacks being linked together by fixed mount.
3. the inner correction of immersed tube as claimed in claim 2 adjusting process, is characterized in that: in jack group, the quantity of jack is identical with the quantity of mandril of lifting jack in mandril of lifting jack group.
CN201210188487.1A 2012-06-11 2012-06-11 Internal deviation correcting fine adjusting system and adjusting technology for immersed tubes Active CN102691314B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210188487.1A CN102691314B (en) 2012-06-11 2012-06-11 Internal deviation correcting fine adjusting system and adjusting technology for immersed tubes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210188487.1A CN102691314B (en) 2012-06-11 2012-06-11 Internal deviation correcting fine adjusting system and adjusting technology for immersed tubes

Publications (2)

Publication Number Publication Date
CN102691314A CN102691314A (en) 2012-09-26
CN102691314B true CN102691314B (en) 2014-07-02

Family

ID=46857040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210188487.1A Active CN102691314B (en) 2012-06-11 2012-06-11 Internal deviation correcting fine adjusting system and adjusting technology for immersed tubes

Country Status (1)

Country Link
CN (1) CN102691314B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912015B (en) * 2012-12-31 2016-02-03 中交第一航务工程局有限公司 Tube coupling drawing system
CN103912014B (en) * 2012-12-31 2015-10-28 中交第一航务工程局有限公司 Installing rack in a kind of chamber of interior deviation correcting device
CN103912017B (en) * 2013-01-05 2015-10-28 中交第一航务工程局有限公司 A kind of method for correcting error for immersed tube tunnel
CN103195091B (en) * 2013-04-09 2015-04-22 中交一航局第二工程有限公司 Immersed tube top 3D (three dimensional) accurate adjustment system and method
CN104197142B (en) * 2014-09-25 2016-11-23 中国化学工程第三建设有限公司 A kind of method of heating pipeline compensator prestretched
CN104652480B (en) * 2015-02-16 2017-03-01 中交一航局第二工程有限公司 A kind of method of adjustment of immersed tube axis
CN107476342B (en) * 2017-08-31 2019-09-13 上海振华重工(集团)股份有限公司 A kind of immersed tube tunnel final connector pipe bending cylinder support installation method
CN107700543A (en) * 2017-09-01 2018-02-16 中交第航务工程局有限公司 Longitudinally adjusted system and method after immersed tube tunnel final joint implantation
CN107687181A (en) * 2017-09-01 2018-02-13 中交第航务工程局有限公司 FS final spice entirety fine adjustment method
CN107642100B (en) * 2017-09-01 2019-06-07 中交第一航务工程局有限公司 Device and method for the draining of FS final spice engagement cavity

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101446201A (en) * 2008-12-19 2009-06-03 上海隧道工程股份有限公司 Method for rectifying and selecting tunnel segment
CN202787339U (en) * 2012-06-11 2013-03-13 中交第一航务工程局有限公司 Immersed tube inner portion rectifying and adjusting system

Also Published As

Publication number Publication date
CN102691314A (en) 2012-09-26

Similar Documents

Publication Publication Date Title
CN102691314B (en) Internal deviation correcting fine adjusting system and adjusting technology for immersed tubes
CN102720222B (en) Tail-end deviation rectifying process for immersed pipe
CN102720140B (en) Large-span prestress concrete continuous beam deepwater pier construction process
CN107460888B (en) Mounting structure and method for concrete prefabricated pipe gallery
CN1215276C (en) Earth pressure balancing technology for laying rectangular top pipe
CN103114599B (en) Deep basal pit sealing dewatering device and construction method thereof
CN111910678A (en) Novel foundation structure of offshore wind power and construction method thereof
CN108194703A (en) A kind of the amendment construction system and its modification method of push pipe of constructing
CN102704512B (en) Immersed tube bottom jack type deviation rectifying fine adjusting system and adjusting technology
CN102720211B (en) Wedge type bottom-end deviation fine-rectifying system for immersed pipe and rectifying process of wedge type bottom-end deviation fine-rectifying system
CN105546213B (en) A kind of flexible composite pipe rapid construction device and construction method
CN208058113U (en) A kind of amendment construction system of construction push pipe
CN103669383B (en) A kind of method of installation and leveling caisson on ground, seabed
CN202787339U (en) Immersed tube inner portion rectifying and adjusting system
CN102704508B (en) Immersed tube bottom end fork truck type deviation correcting fine adjusting system and regulating process of system
CN202913431U (en) Immersed tube bottom end jack type deviation-rectifying accurate adjustment system
CN204370466U (en) A kind of jacket offshore wind turbine foundation with bracket
CN114232689B (en) Leveling method for immersed tube tunnel full-floating foundation bed
CN202787314U (en) Immersed tube bottom end forklift-type rectifying and fine adjusting system
CN102691313B (en) Immersed tube bottom capsule water filling fine adjusting system and adjusting technology
CN201778339U (en) Submarine tunnel pipe joint positioning system
CN210216519U (en) Submarine pipeline landing section interval type soil body liquefaction resistance improving device
CN202913427U (en) Immersed tube bottom end capsule water-filling type accurate adjustment system
CN110499791B (en) Method for detecting pulling-resistant bearing capacity of suction bucket
CN202787316U (en) Rectifying precise adjusting system for immersed tube tail end

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: CCCC FIRST HARBOR ENGINEERING COMPANY LTD.

Free format text: FORMER OWNER: THE SECOND ENGINEERING CO. OF CCCC FIRST HARBOR ENGINEERING CO., LTD.

Effective date: 20121022

Owner name: THE SECOND ENGINEERING CO. OF CCCC FIRST HARBOR EN

Effective date: 20121022

C10 Entry into substantive examination
C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Lin Ming

Inventor after: Yang Ruiliang

Inventor after: Li Dezhao

Inventor after: Wang Qiang

Inventor after: Li Yiyong

Inventor after: Zhai Shihong

Inventor after: Li Zengjun

Inventor after: Feng Haibao

Inventor after: Liu Dejin

Inventor after: Qu Lili

Inventor after: Su Faqiang

Inventor after: Su Changxi

Inventor before: Feng Haibao

Inventor before: Liu Dejin

Inventor before: Qu Lili

Inventor before: Su Changxi

Inventor before: Yang Ruiliang

Inventor before: Li Dezhao

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 266071 QINGDAO, SHANDONG PROVINCE TO: 300461 TANGGU, TIANJIN

Free format text: CORRECT: INVENTOR; FROM: FENG HAIBAO LIU DEJIN QU LILI SU CHANGXI YANG RUILIANG LI DEZHAO TO: LIN MING LI YIYONG ZHAI SHIHONG LI ZENGJUN FENG HAIBAO LIU DEJIN QU LILI SU FAQIANG SU CHANGXI YANG RUILIANG LI DEZHAO WANG QIANG

SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20121022

Address after: 300461 Tianjin Free Trade Zone Yuejin Road shipping service center, building 8

Applicant after: CCCC FIRST HARBOR ENGINEERING CO.,LTD.

Applicant after: NO.2 ENGINEERING COMPANY LTD. OF CCCC FIRST HARBOR ENGINEERING Co.,Ltd.

Address before: 266071 Shandong city of Qingdao province Fuzhou City Road No. 16 building in Hong Kong

Applicant before: NO.2 ENGINEERING COMPANY LTD. OF CCCC FIRST HARBOR ENGINEERING Co.,Ltd.

CI01 Publication of corrected invention patent application

Correction item: Applicant

Correct: CCCC First Harbor Engineering Co.,Ltd.|300461 Tianjin Free Trade Zone Yuejin Road Shipping Service Center Building No. 8|NO.2 ENGINEERING COMPANY LTD. OF CCCC FIRST HARBOR ENGINEERING Co.,Ltd.

False: CCCC FIRST HARBOR ENGINEERING CO.,LTD.|300461 No. 8 building, Yuejin shipping service center, Tianjin Free Trade Zone|NO.2 ENGINEERING COMPANY LTD. OF CCCC FIRST HARBOR ENGINEERING Co.,Ltd.

Number: 47

Volume: 28

ERR Gazette correction

Free format text: CORRECT: APPLICANT; FROM: CCCC FIRST HARBOR ENGINEERING COMPANY LTD.:300461 TANGGU, TIANJIN; THE SECOND ENGINEERING CO. OF CCCC FIRST HARBOR ENGINEERING CO., LTD. TO: CCCC FIRST HARBOR ENGINEERING CO., LTD.:300461 TANGGU, TIANJIN; THE SECOND ENGINEERING CO. OF CCCC FIRST HARBOR ENGINEERING CO., LTD.

C14 Grant of patent or utility model