CN102672154B - Continuous-casting tundish comprehensive permanent liner and preparation method thereof - Google Patents

Continuous-casting tundish comprehensive permanent liner and preparation method thereof Download PDF

Info

Publication number
CN102672154B
CN102672154B CN201210112699.1A CN201210112699A CN102672154B CN 102672154 B CN102672154 B CN 102672154B CN 201210112699 A CN201210112699 A CN 201210112699A CN 102672154 B CN102672154 B CN 102672154B
Authority
CN
China
Prior art keywords
permanent liner
castable
tundish
granularity
bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210112699.1A
Other languages
Chinese (zh)
Other versions
CN102672154A (en
Inventor
武光君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Laiwu Iron and Steel Group Co Ltd
Original Assignee
Laiwu Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Laiwu Iron and Steel Group Co Ltd filed Critical Laiwu Iron and Steel Group Co Ltd
Priority to CN201210112699.1A priority Critical patent/CN102672154B/en
Publication of CN102672154A publication Critical patent/CN102672154A/en
Application granted granted Critical
Publication of CN102672154B publication Critical patent/CN102672154B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ceramic Products (AREA)

Abstract

The invention relates to a continuous-casting tundish comprehensive permanent liner and a preparation method thereof. The continuous-casting tundish comprehensive permanent liner is mainly characterized in that the bottom of a tundish permanent liner and the wall under a slag line are made of high alumina pouring materials, and the slag line part is made of corundum pouring materials. According to the continuous-casting tundish comprehensive permanent liner provided by the invention, the long service life and low cost are achieved, the average service life is increased more than doubled on a year-on-year basis;, and the refractory material cost of the continuous-casting tundish permanent liner is reduced by more than 25% on the year-on-year basis.

Description

Comprehensive permanent liner of a kind of continuous casting tundish and preparation method thereof
Technical field
The present invention relates to comprehensive permanent liner of a kind of continuous casting tundish and preparation method thereof, belong to Ferrous Metallurgy continuous casting tundish technical field of refractory materials.
Background technology
Continuous casting tundish permanent liner mainly adopts the integrated poured technology of high alumina castable at present, the common technology problem existing is, at the bottom of the bag of permanent liner, slag line and and the bag wall below line adopt the high alumina castable of identical material, the damage mechanism at each position is different, the damage speed difference opposite sex is large, the working lining of its slag lining by slag Eroded after, also usually corrode the material for permanent liner in pouring at Dao Gai position, and cause the local shedding of castable, cause whole service life low, be generally 20~30 and water time, accumulative total 500~900 stoves.Normal turnover use and production cost to continuous casting tundish affect greatly.At present iron and steel is produced and is entered low margin age, and the research and development long-life, permanent liner technology ,Dui enterprise cost efficiency is significant cheaply.
CN201455216U discloses a kind of composite dreg retaining wall with holes for tundish, barricade body and mosaics, consists of, and mosaics is arranged on barricade body, on mosaics with the steel outlet hole of certain angle; Slag blocking wall body adopts magnalium matter or alumina-silica or High-Alumina or magnesia or magnalium matter material, and mosaics adopts corundum material.The deficiency of this invention is: barricade body, mosaics carry out respectively one-time cast-forming, and then assemble, toast, complex process, and production cost is high.
CN101579726 discloses a kind of composite dreg retaining wall with holes for tundish and preparation technology, comprises the slag blocking wall body and the mosaics that are arranged on tundish appropriate location; Mosaics is arranged on slag blocking wall body, and the center of mosaics is with steel outlet hole.Preparation technology is: first adopt magnalium matter or alumina-silica or High-Alumina or magnesia or magnalium matter material to carry out the cast of slag blocking wall body, then adopt corundum material to carry out the cast of mosaics; The demoulding after curing in the mold 24h after two kinds of castable initial sets, after the demoulding, natural curing 12-24h assembles, and toasts.The deficiency of this invention: barricade body, mosaics carry out respectively one-time cast-forming, and then assemble, toast, complex process, production cost is high.
Summary of the invention
The object of the invention is, the common technology problem existing for existing continuous casting tundish permanent liner, comprehensive permanent liner of a kind of tundish and preparation method thereof is provided, this tundish permanent liner is according to the serviceability requirement of molten bath, slag lining, the gravity flow pouring material of the different qualities of development and Application, long-life, the low cost of continuous casting tundish permanent liner have been realized, permanent liner improves more than 1 times average life on year-on-year basis, reaching 50 waters inferior, more than accumulative total 1500 stoves, reduce on year-on-year basis the continuous casting tundish permanent liner cost of resistance to material more than 25%.
The comprehensive permanent liner of a kind of continuous casting tundish, the comprehensive permanent liner of tundish vertical section is " U " shape, cross section is "T"-shaped or rectangle, the comprehensive permanent liner of tundish comprises from top to bottom: slag line (2), bag wall (3) and the bag end (4), it is characterized in that, at the bottom of the bag of liner in dundish, (4) and bag wall (3) all adopt high alumina castable, and slag line (2) position adopts corundum castable.
Preferably, bag base thickness degree (a) is 120~180mm, and bag wall is identical with slag line thickness, all that (b) is 100~160mm, slag line height (H) is 300~400mm, and the bag end and Bao Bijun adopt high alumina castable, and slag lining adopts corundum castable.
Preferably, the described comprehensive permanent liner of continuous casting tundish, bag base thickness degree (a) is 150~180mm, bag wall is identical with slag line thickness, is all that (b) is 120~150mm.
Described at the bottom of the comprehensive permanent liner bag of continuous casting tundish and slag line wrap below the high alumina castable of wall, by following material, formed by weight percentage: the one-level alumine 25~35% of 5mm≤granularity < 10mm, the one-level alumine 20~25% of one-level alumine 10~15%1mm≤granularity < 3mm of 3mm≤granularity < 5mm, the one-level alumine 10~15% of 0.083mm < granularity < 1mm, the special grade bauxite fine powder 8.0~12% of granularity≤0.074mm, the middle-grade magnesite clinker fine powder 4~8% of granularity≤0.074mm, granularity≤0.047mm a-AI 2o 3micro mist 1.0~3.0%, silicon powder 0.5~1.5%, sodium phosphate trimer 0.2~0.5%, pure calcium aluminate cement 2.0~4.0%, heat-resistant steel fiber 0.5~1.5%, is all weight percentage.
Alumine claims again bauxite; Used for refractory material bauxite (raw material) is general main is to look its Al 2o 3the height of content comes classification, Al 2o 3> 75% is superfine, and 70-75%'s is one-level, and 60-70%'s is secondary, and 50-60%'s is three grades, and 45-55%'s is level Four.Its impurity F e2O3 General Requirements is less than 2.5% (except superfine requires to be less than 2.0%), and CaO is generally less than 0.6% (superfine requirement is less than 0.5%, and level Four is only required lower than 0.7%).Refractoriness requires higher than 1770 ℃.In addition, also can to the commercial grade of same bauxite, carry out Primary Evaluation by light microscope, be mainly the relative amount of measuring diaspore.The main alumine being comprised of diaspore is superfine and one-level, and the diaspore of take is main, but what contain some clay minerals (as kaolinite) is secondary; Take kaolinite as main, and what contain a great deal of diaspore is three grades simultaneously.The specification requirement of high aluminas at different levels is known to those skilled in the art.
Middle-grade magnesite clinker claims again medium-grade magnesite, is that to take the light calcined magnesia that MgO content is 97% be raw material, through explained hereafter such as pressure ball, high temperature vertical kiln calcinings, forms.Product sintering degree is good, compact crystallization.The purposes of medium-grade magnesite is: it is the quality raw materials of producing middle-grade magnesia fireproof goods.
Preferably, the described pure calcium aluminate cement trade mark is CA-70.
Pure calcium aluminate cement is that to take alumina powder and selected lime stone be raw material, melts to practice produces grog through electric arc furnaces, through fine grinding, is making finished product.The trade mark is that the specific targets of pure calcium aluminate cement of CA-70 are as follows: AL 2o 368.5-71.5; CaO26.5-30.5; ≤ 0.5; Fe 2o 3≤ 0.5; Specific area (cm 2/ g)>=5000; Initial set setting time (min)>=150; Final set (h)≤6; Anti-folding>=5 of 24h curing strength (MPa), resistance to compression>=40, refractoriness (℃) 1680.Examination criteria is GB201-2000.
Described silicon powder, is commonly called as silicon ash, is the byproduct of producing metallic silicon or Antaciron, SiO in silicon ash 2content>=92%, granularity is less than 5 μ m, and granularity be less than 2 μ m account for 80~85%.
Described heat-resistant steel fiber, is to produce with the heat resisting steel containing the alloying element such as chromium nickel, and its specification is cross section 0.2mm * 1.0mm, and length has 20mm, 25mm, 30mm and 35mm, the optional trade mark be 330,310,304,446,430 wherein a kind of.
Preferably, for at the bottom of the comprehensive permanent liner bag of continuous casting tundish and slag line wrap below the high alumina castable of wall, by following material, formed by weight percentage: the one-level alumine 30% of 5mm≤granularity < 10mm, the one-level alumine 12% of 3mm≤granularity < 5mm, the one-level alumine 22% of 1mm≤granularity < 3mm, the one-level alumine 12% of 0.083mm < granularity < 1mm, the special grade bauxite fine powder 10% of granularity≤0.074mm, the middle-grade magnesite clinker fine powder 6% of granularity≤0.074mm, α-Al of granularity≤0.047mm 2o 3micro mist 2.0%, silicon powder 1.2%, sodium phosphate trimer 0.5%, pure calcium aluminate cement 3.5%, heat-resistant steel fiber 0.8%, is all weight percentage.
The described corundum castable for the comprehensive permanent liner slag lining of continuous casting tundish, by following material, formed by weight percentage: the brown corundum 28~32% of 5mm≤granularity < 10mm, the brown corundum 10~14% of 3mm≤granularity < 5mm, the brown corundum 14~18% of 1mm≤granularity < 3mm, the brown corundum 12~16% of 0.083mm < granularity < 1mm, the alumina-based alundum fine powder 10~12% of granularity≤0.074mm, the fused magnesite fine powder 4.5~5.5% of granularity≤0.074mm, the Spinel micropowder 2.5~3.5% of granularity≤0.047mm, granularity≤0.047mm α-Al 2o 3micro mist 3.5~5.0%, silicon powder 0.5~1.5%, sodium phosphate trimer 0.1~0.3%, pure calcium aluminate cement 3.5~4.5%, heat-resistant steel fiber 0.3~0.8%, is all weight percentage.
The physical and chemical index of described brown corundum, alumina-based alundum sees the following form:
Figure BDA0000153985450000031
The preferred trade mark of described pure calcium aluminate cement is CA-70.
Described fused magnesite is that in electric arc furnaces, melting makes with the selected natural magnesite of special A level or high-purity magnesia unslacked particle.It is high that this product has purity, and crystal grain is large, compact structure, and the strong material of resistance to slag, good thermal shock stability, is a kind of good high temperature electrical insulation material, is also to make high-grade magnesia brick, the important source material of magnesia carbon brick and unshape refractory.
Preferably, the described corundum castable for the comprehensive permanent liner slag lining of continuous casting tundish, by following material, formed by weight percentage: the brown corundum 30% of 5mm≤granularity < 10mm, the brown corundum 12% of 3mm≤granularity < 5mm, the brown corundum 16% of 1mm≤granularity < 3mm, the brown corundum 15% of 0.083mm < granularity < 1mm, the alumina-based alundum fine powder 10% of granularity≤0.074mm, the fused magnesite fine powder 4.5% of granularity≤0.074mm, the Spinel micropowder 3.0% of granularity≤0.047mm, granularity≤0.047mm a-AI 2o 3micro mist 4.0%, silicon powder 1.0%, sodium phosphate trimer 0.15%, pure calcium aluminate cement 4.0%, heat-resistant steel fiber 0.35%, is all weight percentage.
The present invention also provides the preparation method of the comprehensive permanent liner of described continuous casting tundish, comprises the following steps:
1) castable is prepared: the required high alumina castable of the comprehensive permanent liner of continuous casting tundish, the material preparation of corundum castable: after above-mentioned material is weighed by described proportioning, add in batch mixer and stir evenly, be dry mixed 5~10 minutes, after stirring, pack standby.
2) tundish box hat is prepared: on tundish Baogang shell, adopt Methods of OFC-A to set up steam vent, and steam vent diameter ¢ 10~16, pitch of holes M is 200~400mm; On tundish box hat inwall, welding " V " shape anchor nails, adopts heat-resisting reinforcing bar ¢ 10~¢ 16, and the vertical height m of " V " shape anchor nails is about 2/3 of bag wall thickness a below material for permanent liner in pouring slag line, and anchor nails spacing N is 100~200mm.
3) high alumina castable batch mixing is prepared: remove foreign material in mixer, in the high alumina castable mixer of falling people, be dry mixed after 1~2 minute, add 6~8% water to mix.
4) at the bottom of cast permanent liner bag: with spade, the high alumina castable after mixing is put into position, tundish bag bottom, adopt the vibration moulding of plug-in type vibrating rod, discharge the interior bubble of castable until castable is fully closely knit, surfacing, and guarantee that bag bottom pour mold material feeding thickness a is 120~180mm, natural Health preservation 12~24 hours.
5) the integrated poured construction loose tool of permanent liner is prepared: after clean to the removing surface of the integrated poured construction loose tool of permanent liner before construction, evenly brush oil is standby.
6) place, fixed packet wall casting and constructing fetal membrane: above the integrated poured construction loose tool of permanent liner is put at the bottom of tundish bag at the bottom of permanent liner bag, guarantee that the casting and constructing loose tool sidewall in same level equates with the level interval of tundish involucrum sidewall, spacing b is 100~160mm.
7) the bag wall below cast permanent liner slag line: the high alumina castable after mixing is put in the gap between casting and constructing loose tool sidewall and tundish involucrum sidewall with spade, adopt the vibration moulding of plug-in type vibrating rod, insertion depth 250~350mm, discharge bubble in castable and, until castable is fully closely knit, keep surfacing.
8) corundum castable batch mixing is prepared: the high alumina castable of mixer is cleaned out, in the corundum castable mixer of falling people, be dry mixed after 1~2 minute, add 6~8% water to mix.
9) cast permanent liner slag lining: after the bag wall below permanent liner slag line is poured, the corundum castable of continuous pouring permanent liner slag lining, the same 7), slag line height H is 300-400mm.
10) natural Health preservation is 16~48 hours, 16~24 hours spring and summers, 24~48 hours autumn and winters.
11) ℃ baking and cooling 68~113h in normal temperature~450, be divided into the next stage: (1) normal temperature~150 ℃, with 4~6 ℃/h programming rate, heat up, and heating-up time 20~32h; (2) 150 ℃ of insulations, 8~16 hours time; (3) 150~450 ℃, with 12~15 ℃/h programming rate, heat up, heating-up time 20~25h; (4) 450 ℃ of insulations, 8~16 hours time; (5) truce is naturally cooling, time 12~24h.
12) the integrated poured construction loose tool of permanent liner is hung out, the comprehensive permanent liner of continuous casting tundish completes.
The invention has the beneficial effects as follows:
1) continuous casting tundish adopts comprehensive permanent liner technology, having realized permanent liner slag line synchronizeed with the service life at other positions, reaching 50 average life waters inferior, more than accumulative total 1500 stoves, improve on year-on-year basis permanent liner average life more than 1 times, reduce on year-on-year basis the continuous casting tundish permanent liner cost of resistance to material more than 25%.
2) slag lining of the comprehensive permanent liner of continuous casting tundish adopts corundum castable, solves the pit problem that this position invar scouring causes, and has improved the security reliability of permanent liner, has alleviated the repairing labour intensity of permanent liner.
The present invention applies on Laiwu steel enterprise Yin Shan shaped steel Co., Ltd each conticaster tundish of steel mill, for large H shaped steel Near-net-shape Profiled Blank Caster tundish, permanent liner average life by 25 water time bring up on year-on-year basis 50 water time more than, reach on 2000 stoves; For three platen billet continuous casting machine tundish, permanent liner average life by 30 water time bring up on year-on-year basis 60 water time more than, more than reaching 1500 stoves.Application the present invention, improves permanent liner average life more than 1 times on year-on-year basis, reduces on year-on-year basis the continuous casting tundish permanent liner cost of resistance to material more than 25%.
Accompanying drawing explanation
Fig. 1 is the comprehensive permanent liner structural representation of continuous casting tundish of the present invention.
In figure: 1-tundish involucrum; 2-permanent liner slag line; Bag wall below 3-permanent liner slag line; At the bottom of 4-permanent liner bag; 5-steam vent; 6-anchor nails; 7-casting and constructing loose tool.
The specific embodiment
Following examples are that the preparation technology of invention is further illustrated, but the present invention is not limited thereto.
Embodiment 1:
As shown in Figure 1, the comprehensive permanent liner of a kind of continuous casting tundish, the comprehensive permanent liner of tundish vertical section is " U " shape, cross section is rectangle, the comprehensive permanent liner of tundish comprises from top to bottom: slag line (2), bag wall (3) and the bag end (4), its position, molten bath, wrap the end 4 and the bag wall 3 below slag line, adopt high alumina castable, the bag ends 4 castable thickness a is 150mm, and its slag line 2 positions adopt corundum castable, and the thickness of slag line 2 and the bag wall 3 below slag line is identical, be all that b is 120mm, slag line height H is 400mm.
Described at the bottom of the comprehensive permanent liner bag of continuous casting tundish 4 and the high alumina castable of bag wall 3 below slag line, by following material, formed by weight percentage: the one-level alumine 30% of 5mm≤granularity < 10mm, the one-level alumine 12% of 3mm≤granularity < 5mm, the one-level alumine 22% of 1mm≤granularity < 3mm, the one-level alumine 12% of 0.083mm < granularity < 1mm, the special grade bauxite fine powder 10% of granularity≤0.074mm, the middle-grade magnesite clinker fine powder 6% of granularity≤0.074mm, granularity≤0.047mm α-Al 2o 3micro mist 2.0%, silicon powder 1.2%, sodium phosphate trimer 0.5%, pure calcium aluminate cement 3.5%, heat-resistant steel fiber 0.8%, is all weight percentage.
The described corundum castable for the comprehensive permanent liner slag line of continuous casting tundish 2 positions, by following material, formed by weight percentage: the brown corundum 30% of 5mm≤granularity < 10mm, the brown corundum 12% of 3mm≤granularity < 5mm, the brown corundum 16% of 1mm≤granularity < 3mm, the brown corundum 15% of 0.083mm < granularity < 1mm, the alumina-based alundum fine powder 10% of granularity≤0.074mm, the fused magnesite fine powder 4.5% of granularity≤0.074mm, the Spinel micropowder 3.0% of granularity≤0.047mm, granularity≤0.047mm α-Al 2o 3micro mist 4.0%, silicon powder 1.0%, sodium phosphate trimer 0.15%, pure calcium aluminate cement 4.0%, heat-resistant steel fiber 0.35%, is all weight percentage.
Described heat-resistant steel fiber, the trade mark is 330.
The present invention also provides the preparation method of the comprehensive permanent liner of described continuous casting tundish, comprises the following steps:
1) castable is prepared: the required high alumina castable of the comprehensive permanent liner of continuous casting tundish, the material preparation of corundum castable: after above-mentioned material is weighed by described proportioning, add in batch mixer and stir evenly, be dry mixed 5 minutes, after stirring, pack standby.
2) tundish box hat 1 is prepared: on tundish Baogang shell 1, adopt Methods of OFC-A to set up steam vent 5, and the diameter ¢ 16 of steam vent 5, pitch of holes M is 250mm; On the inwall of tundish box hat 1, welding " V " shape anchor nails 6, adopts heat-resisting reinforcing bar ¢ 10, and the vertical height h of " V " shape anchor nails 6 is about 2/3 of bag wall 3 thickness a below material for permanent liner in pouring slag line, and the spacing N of anchor nails 6 is 150mm.
3) high alumina castable batch mixing is prepared: remove foreign material in mixer, in the high alumina castable mixer of falling people, be dry mixed after 1 minute, add 6.6% water to mix.
4) at the bottom of cast permanent liner bag 4: with spade, the high alumina castable after mixing is put into the bag bottom of tundish involucrum 1, adopt the vibration moulding of plug-in type vibrating rod, discharge the interior bubble of castable until castable is fully closely knit, surfacing, and guaranteeing that bag bottom pour mold material feeding thickness a is 150mm, summer, natural Health preservation was 12 hours.
5) the integrated poured construction loose tool 7 of permanent liner is prepared: after clean to the removing surface of the integrated poured construction loose tool 7 of permanent liner before using, evenly brush oil is standby.
6) place, fixed packet wall casting and constructing fetal membrane 7: the integrated poured construction loose tool 7 of permanent liner is put at the bottom of tundish bag at the bottom of permanent liner bag above 4, the sidewall that guarantees the construction loose tool 7 in same level equates with the level interval of the sidewall of tundish involucrum 1, and spacing b is 120mm.
7) the bag wall 3 below cast permanent liner slag line: the high alumina castable after mixing is put in the gap between the construction sidewall of loose tool 7 and the sidewall of tundish involucrum 1 with spade, adopt the vibration moulding of plug-in type vibrating rod, insertion depth 250mm, discharge bubble in castable and, until castable is fully closely knit, keep surfacing.
8) corundum castable batch mixing is prepared: the low-grade high alumina castable of mixer is cleaned out, in the corundum castable mixer of falling people, be dry mixed after 1 minute, add 6.5% water to mix.
9) cast permanent liner slag line 2: after the bag wall 3 below permanent liner slag line is poured, the corundum castable of continuous pouring permanent liner slag line 2, the same 7), slag line height H is 400mm.
10) natural Health preservation, 16 hours summers.
11), in 15~450 ℃ of bakings and cooling 95h, be divided into the next stage: (1) 15~150 ℃, with 5 ℃/h programming rate, heat up, heating-up time 27h; (2) 150 ℃ of insulations, 16 hours time; (3) 150~450 ℃, with 15 ℃/h programming rate, heat up, heating-up time 20h; (4) 450 ℃ of insulations, 8 hours time; (5) truce is naturally cooling, time 24h.
12) the integrated poured construction loose tool 7 of permanent liner is hung out, the comprehensive permanent liner of continuous casting tundish completes.
Embodiment 2
Other are with embodiment 1, and difference is:
The comprehensive permanent liner of tundish vertical section is for " U ”Xing, cross section is "T"-shaped, and at the bottom of permanent liner bag, 4 castable thickness a are 180mm, and slag line 2 and bag wall 3 thickness below slag line are identical, is all that b is 150mm, and slag line height H is 300mm.
Described at the bottom of the comprehensive permanent liner bag of continuous casting tundish 4 and the high alumina castable of bag wall 3 below slag line, by following material, formed by weight percentage: the one-level alumine 25% of 5mm≤granularity < 10mm, the one-level alumine 15% of 3mm≤granularity < 5mm, the one-level alumine 20% of 1mm≤granularity < 3mm, the one-level alumine 13% of 0.083mm < granularity < 1mm, the special grade bauxite fine powder 12% of granularity≤0.074mm, the middle-grade magnesite clinker fine powder 8.0% of granularity≤0.074mm, granularity≤0.047mm a-AI 2o 3micro mist 1.3%, silicon powder 1.0%, sodium phosphate trimer 0.2%, pure calcium aluminate cement 4.0%, heat-resistant steel fiber 0.5%, is all weight percentage.
The described corundum castable for the comprehensive permanent liner slag line of continuous casting tundish 2 positions, by following material, formed by weight percentage: the brown corundum 28% of 5mm≤granularity < 10mm, the brown corundum 14% of 3mm≤granularity < 5mm, the brown corundum 12% of 1mm≤granularity < 3mm, the brown corundum 16% of 0.083mm < granularity < 1mm, the alumina-based alundum fine powder 12% of granularity≤0.074mm, the fused magnesite fine powder 5.5% of granularity≤0.074mm, the Spinel micropowder 3.5% of granularity≤0.047mm, granularity≤0.047mm a-AI 2o 3micro mist 3.5%, silicon powder 1.2%, sodium phosphate trimer 0.3%, pure calcium aluminate cement 3.5%, heat-resistant steel fiber 0.5%, is all weight percentage.
The preparation method of the comprehensive permanent liner of described continuous casting tundish, comprises the following steps:
1) castable is prepared: the required high alumina castable of the comprehensive permanent liner of continuous casting tundish, the material preparation of corundum castable: after above-mentioned material is weighed by described proportioning, add in batch mixer and stir evenly, be dry mixed 10 minutes, after stirring, pack standby.
2) tundish box hat 1 is prepared: on tundish Baogang shell 1, adopt Methods of OFC-A to set up steam vent 5, and the diameter ¢ 10 of steam vent 5, pitch of holes M is 300mm; On the inwall of tundish box hat 1, welding " V " shape anchor nails 6, adopts heat-resisting reinforcing bar ¢ 16, the vertical height m of " V " shape anchor nails 6 be about material for permanent liner in pouring slag line wrap below wall 3 thickness a 2/3, the spacing N of anchor nails 6 is 100mm.
3) high alumina castable batch mixing is prepared: remove foreign material in mixer, in the high alumina castable mixer of falling people, be dry mixed after 2 minutes, add 8% water to mix.
4) at the bottom of cast permanent liner bag 4: with spade, the high alumina castable after mixing is put into tundish bag bottom, adopt the vibration moulding of plug-in type vibrating rod, discharge the interior bubble of castable until castable is fully closely knit, surfacing, and guarantee that bag bottom pour mold material feeding thickness a is 180mm, natural Health preservation 24 hours.
5) the integrated poured construction loose tool 7 of permanent liner is prepared: after clean to the removing surface of the integrated poured construction loose tool 7 of permanent liner before construction, evenly brush oil is standby.
6) place, fixed packet wall casting and constructing fetal membrane 7: the integrated poured construction loose tool of permanent liner put at the bottom of tundish bag at the bottom of permanent liner bag 4 above, the sidewall that guarantees the casting and constructing loose tool 7 in same level equates with the level interval of tundish involucrum 1 sidewall, and spacing b is 160mm.
7) the bag wall 3 below cast permanent liner slag line: the high alumina castable after mixing is put in the gap between the sidewall of casting and constructing loose tool 7 and the sidewall of tundish involucrum 1 with spade, adopt the vibration moulding of plug-in type vibrating rod, insertion depth 350mm, discharge bubble in castable and, until castable is fully closely knit, keep surfacing.
8) corundum castable batch mixing is prepared: the high alumina castable of mixer is cleaned out, in the corundum castable mixer of falling people, be dry mixed after 2 minutes, add 8% water to mix.
9) cast permanent liner slag line 2: after the bag wall 3 below permanent liner slag line is poured, the corundum castable at continuous pouring permanent liner slag line 2 positions, the same 7), slag line height H is 350mm.
10) natural Health preservation, 48 hours winters.
11), in 26~450 ℃ of bakings and cooling 92h, be divided into the next stage: (1) 26~150 ℃, with 4 ℃/h programming rate, heat up, heating-up time 31h; (2) 150 ℃ of insulations, 8 hours time; (3) 150~450 ℃, with 12 ℃/h programming rate, heat up, heating-up time 25h; (4) 450 ℃ of insulations, 16 hours time; (5) truce is naturally cooling, time 12h.
12) the integrated poured construction loose tool 7 of permanent liner is hung out, the comprehensive permanent liner of continuous casting tundish completes.
Embodiment 3
Other are with embodiment 1, and difference is:
As shown in Figure 1, the comprehensive permanent liner of a kind of continuous casting tundish, the bag ends 4 castable thickness a is 120mm, and its slag line 2 positions adopt corundum castable, and the thickness of slag line 2 and the bag wall 3 below slag line is identical, is all that b is 100mm, and slag line height H is 350mm.
The preparation method of the comprehensive permanent liner of described continuous casting tundish, comprises the following steps:
1) castable is prepared: the required high alumina castable of the comprehensive permanent liner of continuous casting tundish, the material preparation of corundum castable: after above-mentioned material is weighed by described proportioning, add in batch mixer and stir evenly, be dry mixed 7 minutes, after stirring, pack standby.
2) tundish box hat 1 is prepared: on tundish Baogang shell 1, adopt Methods of OFC-A to set up steam vent 5, and the diameter ¢ 14 of steam vent 5, pitch of holes M is 400mm; On the inwall of tundish box hat 1, welding " V " shape anchor nails 6, adopts heat-resisting reinforcing bar ¢ 14, the vertical height m of " V " shape anchor nails 6 be about material for permanent liner in pouring slag line wrap below wall 3 thickness a 2/3, anchor nails 6 spacing N are 200mm.
3) high alumina castable batch mixing is prepared: remove foreign material in mixer, in the high alumina castable mixer of falling people, be dry mixed after 1.5 minutes, add 7.2% water to mix.
4) at the bottom of cast permanent liner bag 4: with spade, the high alumina castable after mixing is put into tundish bag bottom, adopt the vibration moulding of plug-in type vibrating rod, discharge the interior bubble of castable until castable is fully closely knit, surfacing, and guarantee that bag bottom pour mold material feeding thickness a is 120mm, natural Health preservation 16 hours.
5) the integrated poured construction loose tool 7 of permanent liner is prepared: after clean to the removing surface of the integrated poured construction loose tool 7 of permanent liner before construction, evenly brush oil is standby.
6) place, fixed packet wall casting and constructing fetal membrane 7: the integrated poured construction loose tool 7 of permanent liner put at the bottom of tundish bag at the bottom of permanent liner bag 4 above, the sidewall that guarantees the casting and constructing loose tool 7 in same level equates with the level interval of the sidewall of tundish involucrum 1, and spacing b is 140mm.
7) the bag wall 3 below cast permanent liner slag line: the high alumina castable after mixing is put in the gap between the sidewall of casting and constructing loose tool 7 and the sidewall of tundish involucrum 1 with spade, adopt the vibration moulding of plug-in type vibrating rod, insertion depth 300mm, discharge bubble in castable and, until castable is fully closely knit, keep surfacing.
8) corundum castable batch mixing is prepared: the high alumina castable of mixer is cleaned out, in the corundum castable mixer of falling people, be dry mixed after 1.5 minutes, add 7% water to mix.
9) cast permanent liner slag line 2: after the bag wall 3 below permanent liner slag line is poured, the corundum castable of continuous pouring permanent liner slag line 2, the same 7), slag line height H is 300mm.
10) natural Health preservation, 16~24 hours spring and summers, 24~48 hours autumn and winters.Those skilled in the art regulate according to degree of drying.
11), in 18~450 ℃ of bakings and cooling 88.2h, be divided into the next stage: (1) 18~150 ℃, with 6 ℃/h programming rate, heat up, heating-up time 22h; (2) 150 ℃ of insulations, 12 hours time; (3) 150~450 ℃, with 13.5 ℃/h programming rate, heat up, heating-up time 22.2h; (4) 450 ℃ of insulations, 12 hours time; (5) truce is naturally cooling, time 20h.
12) the integrated poured construction loose tool 7 of permanent liner is hung out, the comprehensive permanent liner of continuous casting tundish completes.

Claims (9)

1. the comprehensive permanent liner of continuous casting tundish, the comprehensive permanent liner of tundish vertical section is " U " shape, cross section is "T"-shaped or rectangle, the comprehensive permanent liner of tundish comprises from top to bottom: slag line (2), bag wall (3) and the bag end (4), it is characterized in that, at the bottom of the bag of the comprehensive permanent liner of tundish, (4) and bag wall (3) all adopt high alumina castable, and slag line (2) position adopts corundum castable;
Described at the bottom of the comprehensive permanent liner bag of continuous casting tundish and slag line wrap below the high alumina castable of wall, by following material, formed by weight percentage: the one-level alumine 25~35% of 5mm≤granularity<10mm, the one-level alumine 20~25% of one-level alumine 10~15% 1mm≤granularity<3mm of 3mm≤granularity<5mm, the middle-grade magnesite clinker fine powder 4~8% of special grade bauxite fine powder 8.0~12% Li Du≤0.074mm of one-level alumine 10~15% Li Du≤0.074mm of 0.083mm<granularity<1mm, Li Du≤0.047mm α-Al<sub TranNum="196">2</sub>o<sub TranNum="197">3</sub>micro-part 1.0~3.0%, silicon powder 0.5~1.5%, sodium phosphate trimer 0.2~0.5%, pure calcium aluminate cement 2.0~4.0%, heat-resistant steel fiber 0.5~1.5%, is all weight percentage.
2. the comprehensive permanent liner of a kind of continuous casting tundish as claimed in claim 1, it is characterized in that, bag base thickness degree (a) is 120~180mm, bag wall is identical with slag line thickness, all to be 100~160mm, slag line height (H) is 300~400mm, and the bag end and Bao Bijun adopt high alumina castable, and slag lining adopts corundum castable.
3. the comprehensive permanent liner of a kind of continuous casting tundish as claimed in claim 1, is characterized in that, the described comprehensive permanent liner of continuous casting tundish, and bag base thickness degree (a) is 150~180mm, bag wall is identical with slag line thickness, is to be all 120~150mm.
4. the comprehensive permanent liner of a kind of continuous casting tundish as claimed in claim 1, is characterized in that, the described pure calcium aluminate cement trade mark is CA-70; Described silicon powder, is commonly called as silicon ash, is the byproduct of producing metallic silicon or Antaciron, SiO in silicon ash 2content>=92%, granularity is less than 5 μ m, and granularity be less than 2 μ m account for 80~85%; Described heat-resistant steel fiber, is to produce with the heat resisting steel containing the alloying element of chromium nickel, and its specification is cross section 0.2mm * 1.0mm, and length has 20mm, 25mm, 30mm and 35mm, the trade mark be 330,310,304,446,430 wherein a kind of.
5. the comprehensive permanent liner of a kind of continuous casting tundish as claimed in claim 1, it is characterized in that, for at the bottom of the comprehensive permanent liner bag of continuous casting tundish and slag line wrap below the high alumina castable of wall, by following material, formed by weight percentage: the one-level alumine 30% of 5mm≤granularity<10mm, the one-level alumine 12% of 3mm≤granularity<5mm, the one-level alumine 22% of 1mm≤granularity<3mm, the one-level alumine 12% of 0.083mm<granularity<1mm, the special grade bauxite fine powder 10% of Li Du≤0.074mm, the middle-grade magnesite clinker fine powder 6% of Li Du≤0.074mm, α-Al of Li Du≤0.047mm<sub TranNum="207">2</sub>o<sub TranNum="208">3</sub>micro mist 2.0%, silicon powder 1.2%, sodium phosphate trimer 0.5%, pure calcium aluminate cement 3.5%, heat-resistant steel fiber 0.8%, is all weight percentage.
6. the comprehensive permanent liner of a kind of continuous casting tundish as described in claim 1~3 any one, it is characterized in that, the described corundum castable for the comprehensive permanent liner slag lining of continuous casting tundish, by following material, formed by weight percentage: the brown corundum 28~32% of 5mm≤granularity<10mm, the brown corundum 10~14% of 3mm≤granularity<5mm, the brown corundum 14~18% of 1mm≤granularity<3mm, the brown corundum 12~16% of 0.083mm<granularity<1mm, the alumina-based alundum fine powder 10~12% of Li Du≤0.074mm, the fused magnesite fine powder 4.5~5.5% of Li Du≤0.074mm, the Spinel micropowder 2.5~3.5% of Li Du≤0.047mm, Li Du≤0.047mm α-Al<sub TranNum="211">2</sub>o<sub TranNum="212">3</sub>micro mist 3.5~5.0%, silicon powder 0.5~1.5%, sodium phosphate trimer 0.1~0.3%, pure calcium aluminate cement 3.5~4.5%, heat-resistant steel fiber 0.3~0.8%, is all weight percentage.
7. the comprehensive permanent liner of a kind of continuous casting tundish as claimed in claim 6, is characterized in that, the described pure calcium aluminate cement trade mark is CA-70.
8. the comprehensive permanent liner of a kind of continuous casting tundish as claimed in claim 6, it is characterized in that, the described corundum castable for the comprehensive permanent liner slag lining of continuous casting tundish, by following material, formed by weight percentage: the brown corundum 30% of 5mm≤granularity<10mm, the brown corundum 12% of 3mm≤granularity<5mm, the brown corundum 16% of 1mm≤granularity<3mm, the brown corundum 15% of 0.083mm<granularity<1mm, the alumina-based alundum fine powder 10% of Li Du≤0.074mm, the fused magnesite fine powder 4.5% of Li Du≤0.074mm, the Spinel micropowder 3.0% of Li Du≤0.047mm, Li Du≤0.047mm α-Al<sub TranNum="217">2</sub>o<sub TranNum="218">3</sub>micro mist 4.0%, silicon powder 1.0%, sodium phosphate trimer 0.15%, pure calcium aluminate cement 4.0%, heat-resistant steel fiber 0.35%, is all weight percentage.
9. the preparation method of the comprehensive permanent liner of continuous casting tundish as claimed in claim 6, comprises the following steps:
1) castable is prepared: the required high alumina castable of the comprehensive permanent liner of continuous casting tundish, the material preparation of corundum castable: after above-mentioned material is weighed by described proportioning, add in batch mixer and stir evenly, be dry mixed 5~10 minutes, after stirring, pack standby;
2) tundish box hat is prepared: on tundish Baogang shell, adopt Methods of OFC-A to set up steam vent, and steam vent diameter ¢ 10~16, pitch of holes M is 200~400mm; On tundish box hat inwall, welding " V " shape anchor nails, adopts heat-resisting reinforcing bar ¢ 10~¢ 16, and the vertical height m of " V " shape anchor nails is about 2/3 of bag wall thickness a below material for permanent liner in pouring slag line, and anchor nails spacing N is 100~200mm;
3) high alumina castable batch mixing is prepared: remove foreign material in mixer, in the high alumina castable mixer of falling people, be dry mixed after 1~2 minute, add 6~8% water to mix;
4) at the bottom of cast permanent liner bag: with spade, the high alumina castable after mixing is put into position, tundish bag bottom, adopt the vibration moulding of plug-in type vibrating rod, discharge the interior bubble of castable until castable is fully closely knit, surfacing, and guarantee that bag bottom pour mold material feeding thickness a is 120~180mm, natural Health preservation 12~24 hours;
5) the integrated poured construction loose tool of permanent liner is prepared: after clean to the removing surface of the integrated poured construction loose tool of permanent liner before construction, evenly brush oil is standby;
6) place, fixed packet wall casting and constructing fetal membrane: above the integrated poured construction loose tool of permanent liner is put at the bottom of tundish bag at the bottom of permanent liner bag, guarantee that the casting and constructing loose tool sidewall in same level equates with the level interval of tundish involucrum sidewall, spacing b is 100~160mm;
7) the bag wall below cast permanent liner slag line: the high alumina castable after mixing is put in the gap between casting and constructing loose tool sidewall and tundish involucrum sidewall with spade, adopt the vibration moulding of plug-in type vibrating rod, insertion depth 250~350mm, discharge bubble in castable and, until castable is fully closely knit, keep surfacing;
8) corundum castable batch mixing is prepared: the high alumina castable of mixer is cleaned out, in the corundum castable mixer of falling people, be dry mixed after 1~2 minute, add 6~8% water to mix;
9) cast permanent liner slag lining: after the bag wall below permanent liner slag line is poured, the corundum castable of continuous pouring permanent liner slag lining, the same 7), slag line height H is 300-400mm;
10) natural Health preservation is 16~48 hours, 16~24 hours spring and summers, 24~48 hours autumn and winters;
11) ℃ baking and cooling 68~113 h in normal temperature~450, be divided into the next stage: (1) normal temperature~150 ℃, with 4~6 ℃/h programming rate, heat up, and heating-up time 20~32h; (2) 150 ℃ of insulations, 8~16 hours time; (3) 150~450 ℃, with 12~15 ℃/h programming rate, heat up, heating-up time 20~25h; (4) 450 ℃ of insulations, 8~16 hours time; (5) truce is naturally cooling, time 12~24h;
12) the integrated poured construction loose tool of permanent liner is hung out, the comprehensive permanent liner of continuous casting tundish completes.
CN201210112699.1A 2012-04-17 2012-04-17 Continuous-casting tundish comprehensive permanent liner and preparation method thereof Expired - Fee Related CN102672154B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210112699.1A CN102672154B (en) 2012-04-17 2012-04-17 Continuous-casting tundish comprehensive permanent liner and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210112699.1A CN102672154B (en) 2012-04-17 2012-04-17 Continuous-casting tundish comprehensive permanent liner and preparation method thereof

Publications (2)

Publication Number Publication Date
CN102672154A CN102672154A (en) 2012-09-19
CN102672154B true CN102672154B (en) 2014-01-15

Family

ID=46805077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210112699.1A Expired - Fee Related CN102672154B (en) 2012-04-17 2012-04-17 Continuous-casting tundish comprehensive permanent liner and preparation method thereof

Country Status (1)

Country Link
CN (1) CN102672154B (en)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103831426A (en) * 2012-11-28 2014-06-04 西林钢铁集团有限公司 Novel method for pouring steel ladle permanent layer
CN103878356A (en) * 2013-05-04 2014-06-25 上海利尔耐火材料有限公司 Tundish lining construction method
CN103252486A (en) * 2013-05-13 2013-08-21 莱芜钢铁集团有限公司 Knockout method of pouring ladle permanent layer
CN104226970B (en) * 2014-09-16 2016-03-30 武汉钢铁集团耐火材料有限责任公司 Optimization-type high life low-material-consumption smelts ladle
CN104625039B (en) * 2013-11-12 2017-01-18 中冶宝钢技术服务有限公司 Placing method of integrally cast steel ladle core die
CN103551555B (en) * 2013-11-12 2015-09-23 武汉钢铁(集团)公司 Baking method after the overhaul of steel-making tundish permanent layer
CN103658577B (en) * 2013-11-29 2015-09-16 莱芜钢铁集团有限公司 A kind of preparation method of continuous casting production combined type turbulence inhibitor
CN106378442A (en) * 2016-08-30 2017-02-08 洛阳利尔耐火材料有限公司 Preparation method for slag wall of tundish
CN106735149A (en) * 2016-12-06 2017-05-31 武汉威林科技股份有限公司 A kind of construction method of the integrated poured tundish permanent layer of the high alumina castable of use silicon carbide-containing
CN107442768A (en) * 2017-08-10 2017-12-08 张家港浦项不锈钢有限公司 The pouring technology of steel-making continuous casting tundish permanent layer
CN108405843B (en) * 2018-05-22 2023-05-26 山东钢铁股份有限公司 Special-shaped blank continuous casting tundish lining and preparation method thereof
CN109807315A (en) * 2019-03-11 2019-05-28 中冶宝钢技术服务有限公司 The integrated poured technique of the tundish liner of resistance to material
CN111348904B (en) * 2020-02-26 2022-05-13 郑州大学 Tundish gas curtain retaining wall argon-blowing slag line protective sleeve and preparation method thereof
CN111673075A (en) * 2020-07-29 2020-09-18 北京利尔高温材料股份有限公司 Tundish composite slag line permanent lining and preparation method thereof
CN112974785B (en) * 2021-02-08 2023-02-10 北京首钢股份有限公司 Steel ladle and steel ladle building method
CN115213390B (en) * 2022-07-15 2023-06-23 武汉钢铁集团耐火材料有限责任公司 Reinforced steel ladle lining construction method
CN115946226A (en) * 2022-12-16 2023-04-11 郑州润立得新材料科技有限公司 Pouring method and pouring material of protection plate for ladle turner

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1415446A (en) * 2001-10-29 2003-05-07 宝山钢铁股份有限公司 Pouring material for permanent liner in pouring basket
CN1686948A (en) * 2005-04-08 2005-10-26 上海彭浦特种耐火材料厂 Improved type casting material based on bauxite for middle-small type ladle and preparation method
CN101092653A (en) * 2006-06-19 2007-12-26 章荣会 Liner making technique for casting lander of blast furnace with single iron notch, and free from baking casting material for iron notch
CN101397212A (en) * 2008-09-16 2009-04-01 高树森 Refractory castable of nanocomposite oxide ceramic combining alumina-spinelle and preparation method thereof
CN101434490A (en) * 2008-09-28 2009-05-20 瑞泰科技股份有限公司 Composite fire resistant pouring material
CN101891485A (en) * 2009-05-21 2010-11-24 宝山钢铁股份有限公司 Pouring material for steel ladle
CN102133632A (en) * 2011-03-03 2011-07-27 莱芜钢铁股份有限公司 Continuous-casting comprehensive tundish working liner and production process
CN102260087A (en) * 2011-06-15 2011-11-30 阳谷信民耐火材料有限公司 Casting refractory material for foundry ladle furnace lining

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004050256A (en) * 2002-07-22 2004-02-19 Daido Steel Co Ltd Ladle having improved heat insulating property

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1415446A (en) * 2001-10-29 2003-05-07 宝山钢铁股份有限公司 Pouring material for permanent liner in pouring basket
CN1686948A (en) * 2005-04-08 2005-10-26 上海彭浦特种耐火材料厂 Improved type casting material based on bauxite for middle-small type ladle and preparation method
CN101092653A (en) * 2006-06-19 2007-12-26 章荣会 Liner making technique for casting lander of blast furnace with single iron notch, and free from baking casting material for iron notch
CN101397212A (en) * 2008-09-16 2009-04-01 高树森 Refractory castable of nanocomposite oxide ceramic combining alumina-spinelle and preparation method thereof
CN101434490A (en) * 2008-09-28 2009-05-20 瑞泰科技股份有限公司 Composite fire resistant pouring material
CN101891485A (en) * 2009-05-21 2010-11-24 宝山钢铁股份有限公司 Pouring material for steel ladle
CN102133632A (en) * 2011-03-03 2011-07-27 莱芜钢铁股份有限公司 Continuous-casting comprehensive tundish working liner and production process
CN102260087A (en) * 2011-06-15 2011-11-30 阳谷信民耐火材料有限公司 Casting refractory material for foundry ladle furnace lining

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
"宝钢不锈钢生产用耐火材料使用实践";姜茂华等;《宝钢技术》;20071231(第2期);第48页右栏第6-10行 *
"连铸中间包永久衬的整体浇注";李学良等;《宽厚板》;20011231;第7卷(第4期);第16页右栏第5-10行 *
JP特开2004-050256A 2004.02.19
姜茂华等."宝钢不锈钢生产用耐火材料使用实践".《宝钢技术》.2007,(第2期),
李学良等."连铸中间包永久衬的整体浇注".《宽厚板》.2001,第7卷(第4期),

Also Published As

Publication number Publication date
CN102672154A (en) 2012-09-19

Similar Documents

Publication Publication Date Title
CN102672154B (en) Continuous-casting tundish comprehensive permanent liner and preparation method thereof
JP5656629B2 (en) AZS fire resistant composition
CN102744394B (en) Flow control device for tundish of slab continuous caster and deslagging method thereof
CN101805198B (en) Mullite steel fiber castable
CN102744393B (en) Tundish flow control device for slab casting machine, preparation method thereof and slagging method using tundish flow control device
EP2006260A1 (en) Refractory composition for glass melting furnaces
CN101921128B (en) Pouring material for lime rotary kiln
CN102491769A (en) Composite bonding low-temperature constructional castable refractory
CN102491770A (en) Wear-resisting castable refractory
CN104226970B (en) Optimization-type high life low-material-consumption smelts ladle
EP1428807B2 (en) Refractory system for glass melting furnaces
CN107580590B (en) Method for repairing an unshaped product of a glass melting furnace
CN100391902C (en) Silicon carbide corundum pouring material
CN104402469A (en) Electric furnace top central area furnace cover and preparation method thereof
CN106396712B (en) Castable for ladle roaster burner and preparation method thereof
CN103983101A (en) Energy-saving rotary kiln and furnace lining fireproof brick building slurry
CN110128119A (en) Blast furnace main iron channel castable and processing method and the method for preparing main trough of blast furnace
CN105481375A (en) Energy-saving and fire-resistant material
CN103011851A (en) Mullite-silicon-corundum abrasive brick and manufacturing method thereof
CN104827020B (en) A kind of combined type high life low cost ladle pocket block and its preparation technology
CN104311078A (en) Castable for working layer of refining ladle slag line as well as preparation method and application of castable
CN102992787A (en) Special zirconium oxide fireproof brick for liner layer of smelting kiln
CN106396699B (en) A kind of aluminum-resistant liquid penetration pouring material and preparation method thereof adding ZrN-SiAlON
CN204621070U (en) A kind of combined type high life low cost ladle pocket block
Dubreuil et al. Use of andalusite refractories in ferrous metallurgy

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140115