Summary of the invention
Resource allocation methods and device when main purpose of the present invention is to provide a kind of ascending control information multiplexing because ascending control information multiplexing causes the Traffic Channel error rate to increase, influence the throughput problem of system to solve.
According to an aspect of the present invention; Resource allocation methods when providing a kind of ascending control information multiplexing; Comprise: according to MLP (MAC (Media Access Control, medium access control) Logical Channel Priority, MAC priority of logical channels) to UE (User Equipment; Subscriber equipment) original allocation RB (Resource Block, Resource Block); The code check of the business when the calculating ascending control information is multiplexing; RB to original allocation expands according to the code check of business.
The step of professional code check comprised when wherein, the calculating ascending control information was multiplexing: judge whether current MLP is first MLP of UE; If current MLP is first MLP of UE; The code check of business when initial MCS (Modulation Coding Scheme, the Modulation and Coding Scheme) value of then distributing according to the RB of original allocation and for UE is calculated no up control information professional limit bit rate and ascending control information are multiplexing when multiplexing; If current MLP be first MLP of UE, then calculate the code check of limit bit rate and the ascending control information of no up control information business when multiplexing business when multiplexing according to the sum that has distributed RB and initial MCS value.
Wherein, according to the code check of business the step that the RB of original allocation expands is comprised: whether code check professional when judging that the ascending control information that calculates is multiplexing is greater than limit bit rate; If code check professional when the ascending control information that calculates is multiplexing is greater than limit bit rate, then the RB to original allocation expands.
Wherein, the step that the RB of original allocation is expanded comprises: calculate the quantity N of the RB of needs expansion, and whether the sum of judging unappropriated RB is more than or equal to N; If the sum of unappropriated RB more than or equal to N, then is the RB of N for the UE quantity allotted, wherein, distributed to number and the N sum of the RB that adds up to original allocation of the RB of UE; If the sum of unappropriated RB then reduces the MCS value less than N.
Wherein, The step of the quantity N of the RB that calculating need be expanded comprises: repeat following steps; When ascending control information is multiplexing professional code check smaller or equal to no up control information professional limit bit rate when multiplexing: make N=N+1, and calculate the code check of limit bit rate and the ascending control information of no up control information business when multiplexing business when multiplexing, wherein according to the sum of the RB that has distributed and initial MCS value; The number of the RB of the sum of the RB that has distributed=N+ original allocation, the initial value of N are 0.
Wherein, under predetermined condition, the resource allocation methods when ascending control information is multiplexing also comprises: the RB number to expanding after the multiplexing control information of UE carries out rollback; Wherein, Predetermined condition comprises: for first MLP of UE, for UE expands RB, the current MLP of UE is not first MLP; And for current MLP, code check professional when the ascending control information under the current MLP is multiplexing is smaller or equal to limit bit rate; Wherein, The rollback step comprises: repeat following steps; When ascending control information is multiplexing professional code check greater than no up control information professional limit bit rate when multiplexing: the sum-1 of the RB that calculating has distributed o'clock; Do not have up control information when multiplexing professional limit bit rate with ascending control information professional code check when multiplexing, if the code check of business is smaller or equal to limit bit rate when this moment, ascending control information was multiplexing, the sum-1 of the RB of the sum of the RB that has then distributed=distributed.
Wherein, The step that reduces the MCS value comprises: repeat following steps; When ascending control information is multiplexing professional code check smaller or equal to no up control information professional limit bit rate when multiplexing, wherein, as if MCS value=0; Then stop UE and send data: make MCS value=MCS value-1, and according to the no up control information of sum calculating of MCS value and the RB that distributed the code check of business when the limit bit rate of business and ascending control information are multiplexing when multiplexing.
Wherein, according to MLP the step of UE original allocation RB is comprised: according to MLP order from low to high to UE original allocation RB.
According to a further aspect in the invention, the resource allocation device when providing a kind of ascending control information multiplexing comprises: the original allocation unit is used for according to MLP UE original allocation RB; Computing unit is used to calculate the code check of the business of ascending control information when multiplexing; Expansion unit is used for expanding according to the code check of the business RB to original allocation.
Wherein, computing unit comprises: first judge module is used to judge whether current MLP is first MLP of UE; First computing module is used for when current MLP is first MLP of UE, and the initial MCS value of distributing according to the RB of original allocation and for UE is calculated the code check of limit bit rate and the ascending control information of no up control information business when multiplexing business when multiplexing; Second computing module is used at current MLP during not for first MLP of UE, calculates the code check of limit bit rate and the ascending control information of no up control information business when multiplexing business when multiplexing according to the sum of the RB that has distributed and initial MCS value.
Wherein, expansion unit comprises: second judge module is used to judge that whether code check professional when the ascending control information that calculates is multiplexing is greater than limit bit rate; Enlargement module when being used for when the ascending control information that calculates is multiplexing professional code check greater than limit bit rate, expands the RB of original allocation.
Wherein, enlargement module also comprises: the 3rd calculating sub module is used to calculate the quantity N of the RB that needs expand; The 3rd judges submodule, and whether the sum that is used to judge unappropriated RB is more than or equal to N; Distribution sub module when being used for sum at unappropriated RB more than or equal to N, for the UE quantity allotted is the RB of N, wherein, has been distributed to number and the N sum of the RB that adds up to original allocation of the RB of UE; Reduce submodule, when being used for sum at unappropriated RB, reduce the MCS value less than N.
Through the present invention; Employing is to the technical scheme that the RB of UE original allocation expands, and solved because ascending control information multiplexing causes the Traffic Channel error rate to increase; Influence the problem of the throughput of system; And then reached optimal and use RB, improve the system availability of RB, improve the effect of throughput.
Embodiment
Hereinafter will and combine embodiment to specify the present invention with reference to accompanying drawing.Need to prove that under the situation of not conflicting, embodiment and the characteristic among the embodiment among the application can make up each other.
Embodiment 1
Fig. 1 is a kind of preferred flow charts of the resource allocation methods when multiplexing according to the ascending control information of the embodiment of the invention, comprising:
S102,, preferred according to MLP to UE original allocation RB, according to MLP order from low to high to a plurality of UE original allocation RB;
S104, the code check of the business when the calculating ascending control information is multiplexing;
S106, the RB to original allocation expands according to the code check of business.
In this preferred embodiment; Employing is to the technical scheme that the RB of UE original allocation expands, and solved because ascending control information multiplexing causes the Traffic Channel error rate to increase; Influence the problem of the throughput of system; And then reached optimal and use RB, improve the system availability of RB, improve the effect of throughput.
Preferably, the step of professional code check included but are not limited to following steps when the calculating ascending control information was multiplexing: S1, judge whether current MLP is first MLP of UE; S2, if current MLP is first MLP of UE, the initial MCS value of then distributing according to the RB of original allocation and for UE is calculated the code check of limit bit rate and the ascending control information of no up control information business when multiplexing business when multiplexing; S3 if current MLP be first MLP of UE, then calculates the code check of limit bit rate and the ascending control information of no up control information business when multiplexing business when multiplexing according to the sum that has distributed RB and initial MCS value.Preferably, the span of MCS value is 0-28.
Certainly, the present invention is not limited only to above-mentioned judgement and computational process, for example; If when current MLP was first MLP, multiplexing UCI (Uplink Control information, ascending control information) code check afterwards was not high; During then for second MLP, increase owing to distribute to the RB number of this UE, code check certainly can be not high behind the multiplexing UCI; Therefore, execution in step S3 promptly need not get into above-mentioned Rate Control flow process and judge code check again one time; And stop expansion to the RB of original allocation, directly carry out the transmission of UE data.At this moment, can be through increasing the code check sign that whether meets the demands, thus can simplify calculation process.
Before the RB to original allocation expands, can judge at first that whether code check professional when the ascending control information that calculates is multiplexing is greater than limit bit rate; If code check professional when the ascending control information that calculates is multiplexing is greater than limit bit rate, then the RB to original allocation expands.Certainly, the present invention is not limited only to above-mentioned Rule of judgment, also can judge whether to carry out the operation that the RB to original allocation expands through other Rule of judgment.
In the process that the RB to original allocation expands, can at first calculate the quantity N of the RB that need to expand, and whether the sum of judging unappropriated RB is more than or equal to N; If the sum of unappropriated RB more than or equal to N, then is the RB of N for the UE quantity allotted, wherein, distributed to number and the N sum of the RB that adds up to original allocation of the RB of UE.For example, it is 10 that original allocation is given the number of the RB of this UE, and in the expansion process, has distributed 5 RB for this UE again, after then expanding, adds up to 15 for the RB of this UE distribution.
In the process that the RB to original allocation expands; Can repeat following steps; When ascending control information is multiplexing professional code check smaller or equal to no up control information the limit bit rate of business when multiplexing; So that calculate the quantity N of the RB that need to expand: make N=N+1, and calculate the code check of limit bit rate and the ascending control information of no up control information business when multiplexing business when multiplexing, wherein according to the sum of the RB that has distributed and initial MCS value; The number of the RB of the sum of the RB that has distributed=N+ original allocation, the initial value of N are 0.Certainly; The present invention is not limited only to the computational process of above-mentioned recursion, can also calculate the quantity N of the RB of required expansion through similar recursive process, for example; Carry out above-mentioned identical recursive process through N=N+2, so that reach the purpose that calculates N more apace.
After the quantity N that calculates the RB that need to expand,, and do not carry out the operation that the RB to original allocation expands if the sum of judging unappropriated RB less than N, is then carried out the operation that reduces the MCS value.Particularly; In carrying out the process that reduces MSC; Can repeat following steps; When ascending control information is multiplexing professional code check smaller or equal to no up control information professional limit bit rate when multiplexing: make MCS value=MCS value-1, and according to the no up control information of sum calculating of MCS value and the RB that distributed the code check of business when the limit bit rate of business and ascending control information are multiplexing when multiplexing.In the process that reduces the MCS value, if MCS value=0 then stops UE and sends data.Certainly, the present invention is not limited only to the computational process of above-mentioned recursion, can also reduce the MCS value through similar recursive process, for example, carries out above-mentioned identical recursive process through MCS value=MCS value-2, so that reach the purpose of quick reduction MCS value.
Preferably, under predetermined condition, the resource allocation methods when ascending control information is multiplexing also comprises: the RB number to expanding after the multiplexing control information of UE carries out rollback; Wherein, predetermined condition comprises: for first MLP of UE, expand RB for UE; The current MLP of UE is not first MLP; And for current MLP, code check professional when the ascending control information under the current MLP is multiplexing just need not carry out RB to UE and expand smaller or equal to limit bit rate.Concrete; In the process of carrying out rollback; Can repeat following steps, when ascending control information is multiplexing professional code check greater than no up control information professional limit bit rate when multiplexing: calculate the sum-1 o'clock of the RB that has distributed, the code check of business when not having a up control information professional limit bit rate and ascending control information are multiplexing when multiplexing; If this moment ascending control information when multiplexing professional code check smaller or equal to limit bit rate, the sum-1 of the RB of the sum of the RB that has then distributed=distributed.In this preferred embodiment, whole RB or the wherein a part of RB that expands discharged, can make the RB of release supply other UE to use, guaranteed that simultaneously the RB resource reaches optimization, and then improved the throughput of sub-district.Certainly; The present invention is not limited only to the computational process of above-mentioned recursion, can also come rollback RB through similar recursive process, for example; The sum-2 of the RB of the sum through the RB that distributed=distributed is carried out above-mentioned identical back off procedure, so that reach the purpose of quick rollback RB.
In this preferred embodiment, can expand according to the code check of business RB original allocation, UE is carried out RB reasonably expand; Practiced thrift resource, and guaranteed in the time can't carrying out the expansion of RB, reduced the MCS value UE; To guarantee that UE normally carries out transfer of data; When the MCS value drops to zero code check when also high, then this UE is not dispatched, use to other UE resource.
Embodiment 2
Fig. 2 is a kind of preferred structure block diagram of the resource allocation device when multiplexing according to the ascending control information of the embodiment of the invention, and comprising: original allocation unit 202 is used for according to MLP UE original allocation RB; Computing unit 204 is used to calculate the code check of the business of ascending control information when multiplexing; Expansion unit 206 is used for expanding according to the code check of the business RB to original allocation.
In this preferred embodiment; Employing is to the technical scheme that the RB of UE original allocation expands, and solved because ascending control information multiplexing causes the Traffic Channel error rate to increase; Influence the problem of the throughput of system; And then reached optimal and use RB, improve the system availability of RB, improve the effect of throughput.
On the basis of Fig. 2, Fig. 3 has shown the another kind of structured flowchart of the ascending control information of the embodiment of the invention resource allocation device when multiplexing, wherein:
Computing unit 204 comprises: connect first judge module 2041 of original allocation unit 202, connect first computing module 2042 and second computing module 2043 of first judge module 2041 respectively; Expansion unit 206 comprises: second judge module 2061 that connects first computing module 2042 and second computing module 2043; The enlargement module 2062 that connects second judge module 2061; Wherein enlargement module 2062 further comprises: the 3rd calculating sub module 20621, the three that connects is successively judged submodule 20622, and distribution sub module 20623; Simultaneously, enlargement module 2062 also comprises the reduction submodule 20624 that connects the 3rd judgement submodule 20622.
Preferably, computing unit 204 through but be not limited only to following operation and calculate ascending control information professional code check when multiplexing: first judge module 2041 judges whether current MLP is first MLP of UE; If current MLP is first MLP of UE, the initial MCS value that 2042 of first computing modules distribute according to the RB of original allocation and for UE is calculated the code check of limit bit rate and the ascending control information of no up control information business when multiplexing business when multiplexing; If current MLP be first MLP of UE, 2043 bases of second computing module have distributed sum and the initial MCS value of RB to calculate the code check of limit bit rate and the ascending control information of no up control information business when multiplexing business when multiplexing.
Certainly, the present invention is not limited only to the decision operation of above-mentioned first judge module 2041, and the calculating operation of first computing module 2042 and second computing module 2043; For example, when being first MLP as if current MLP, multiplexing UCI (Uplink Controlinformation; Ascending control information) afterwards code check is not high, during then for second MLP, increases owing to distribute to the RB number of this UE; Code check certainly can be not high behind the multiplexing UCI, therefore, can not carry out the calculating operation of second computing module 2043; Promptly need not get into above-mentioned Rate Control flow process and judge code check again one time, and stop expansion, directly carry out the transmission of UE data the RB of original allocation.At this moment, can be through increasing the code check sign that whether meets the demands, thus can simplify calculation process.
Before the RB to original allocation expanded, whether code check professional in the time of can at first judging that by second judge module 2061 ascending control information that calculates is multiplexing was greater than limit bit rate; If code check professional when the ascending control information that calculates is multiplexing is greater than limit bit rate, then second judge module 2061 informs that the RB of 2062 pairs of original allocation of enlargement module expands.Certainly, the present invention is not limited only to above-mentioned Rule of judgment, also can judge whether to carry out the operation that the RB to original allocation expands through other Rule of judgment.Certainly, enlargement module 2062 can also initiatively obtain the judged result of second judge module 2061, thereby expands according to the RB of judged result to original allocation.
In the process that the RB to original allocation expands, the quantity N of the RB that can be at first needs to expand by 20621 calculating of the 3rd calculating sub module, the 3rd judges that whether sum that submodule 20622 judges unappropriated RB is more than or equal to N simultaneously; If the sum of unappropriated RB is more than or equal to N, then the 3rd judges that submodule 20622 informs that distribution sub module 20623 is the RB of N for the UE quantity allotted, wherein, has distributed to number and the N sum of the RB that adds up to original allocation of the RB of UE.For example, it is 10 that original allocation is given the number of the RB of this UE, and in the expansion process, has distributed 5 RB for this UE again, after then expanding, adds up to 15 for the RB of this UE distribution.Certainly, distribution sub module 20623 can also initiatively obtain the 3rd judge submodule 20622 judged result, thereby be the RB of N for the UE quantity allotted according to judged result.
In the process that the RB to original allocation expands; The 3rd calculating sub module 20621 can repeat following operation; Until second judge module 2061 judge ascending control information when multiplexing professional code check smaller or equal to no up control information the limit bit rate of business when multiplexing; So that calculate the quantity N of the RB that need to expand: make N=N+1, and calculate the code check of limit bit rate and the ascending control information of no up control information business when multiplexing business when multiplexing, wherein according to the sum of the RB that has distributed and initial MCS value; The number of the RB of the sum of the RB that has distributed=N+ original allocation, the initial value of N are 0.Certainly; The present invention is not limited only to the computational process of above-mentioned recursion, can also calculate the quantity N of the RB of required expansion through similar recursive process, for example; Carry out above-mentioned identical recursive process through N=N+2, so that reach the purpose that calculates N more apace.
After the 3rd calculating sub module 20621 calculates the quantity N of the RB that needs expansion; If the sum that the 3rd judgement submodule 20622 is judged unappropriated RB is less than N; Then the 3rd judges that submodule 20622 informs that reducing submodule 20624 carries out the operation that reduces the MCS values, and does not carry out the operation that the RB to original allocation expands.Particularly; In carrying out the process that reduces MSC; Reduce submodule 20624 and can repeat following operation; Up to second judge module 2061 judge ascending control information when multiplexing professional code check smaller or equal to no up control information professional limit bit rate when multiplexing: make MCS value=MCS value-1, and according to the no up control information of sum calculating of MCS value and the RB that distributed the code check of business when the limit bit rate of business and ascending control information are multiplexing when multiplexing.In the process that reduces the MCS value, if MCS value=0 then stops UE and sends data.Certainly, the present invention is not limited only to the computational process of above-mentioned recursion, can also reduce the MCS value through similar recursive process, for example, carries out above-mentioned identical recursive process through MCS value=MCS value-2, so that reach the purpose of quick reduction MCS value.
Preferably, under predetermined condition, distribution sub module 20623 is also carried out rollback to the RB number that expands after the multiplexing control information of UE; Wherein, predetermined condition comprises: for first MLP of UE, expand RB for UE; The current MLP of UE is not first MLP; And for current MLP, second judge module 2061 judge ascending control information under the current MLP when multiplexing professional code check just need not carry out RB and expand smaller or equal to limit bit rate UE.Concrete; In the process of carrying out rollback; Distribution sub module 20623 can repeat following steps; When second judge module 2061 judges that ascending control informations are multiplexing professional code check greater than no up control information professional limit bit rate when multiplexing: the sum-1 of the RB that calculating has distributed o'clock; Do not have up control information when multiplexing professional limit bit rate with ascending control information professional code check when multiplexing, if the code check of business is smaller or equal to limit bit rate when this moment, ascending control information was multiplexing, the sum-1 of the RB of the sum of the RB that has then distributed=distributed.In this preferred embodiment, whole RB or the wherein a part of RB that expands discharged, can make the RB of release supply other UE to use, guaranteed that simultaneously the RB resource reaches optimization, and then improved the throughput of sub-district.Certainly; The present invention is not limited only to the computational process of above-mentioned recursion, can also come rollback RB through similar recursive process, for example; The sum-2 of the RB of the sum through the RB that distributed=distributed is carried out above-mentioned identical back off procedure, so that reach the purpose of quick rollback RB.
In this preferred embodiment, can expand according to the code check of business RB original allocation, UE is carried out RB reasonably expand; Practiced thrift resource, and guaranteed in the time can't carrying out the expansion of RB, reduced the MCS value UE; To guarantee that UE normally carries out transfer of data; When the MCS value drops to zero code check when also high, then this UE is not dispatched, use to other UE resource.
Embodiment 3
Resource allocation methods when present embodiment provides a kind of ascending control information multiplexing; In up resource allocation; According to MLP (MAC Logical Channel Priority, MAC logical control channel priority) UE is carried out Resources allocation, scheduling and distribution RB carry out according to MLP is ascending; When supposing this module of input, obtained the RB and the initial MCS value of sub-distribution just.
The embodiment of the invention can be applied in the LTE system; For example; LTE system shown in Figure 3; Fig. 4 is the another kind of flow chart of the resource allocation methods when multiplexing according to the ascending control information of the embodiment of the invention, and the flow process of this embodiment specifically realizes through base station side, and the RB number of supposing to distribute on each MLP UE is RB
Last, mainly may further comprise the steps:
S401: judge whether UCI flag (this value initialization is 0) equals zero, if equal zero, then carry out the allocation process of ascending control information when multiplexing,, then withdraw from this flow process if be not 0.The consideration of this step here mainly is for the less situation of multiplexing ascending control information, if when first MLP, code check is just not high, then can judge when second MLP, and code check is not high yet, therefore need not advance the flow process of RB and MCS value adjustment.
S402: judge whether current MLP is first MLP of this UE, if, execution in step S403, if not, execution in step S409.
In the present embodiment, first MLP and second MLP of UE treated with a certain discrimination, carried out the expansion of RB as first MLP; When second MLP,, then only need carry out normal RB allocation flow if need not carry out the expansion of RB; Just can reach the code check requirement of multiplexing ascending control information, simultaneously, when second MLP; Also need carry out rollback operation to the RB that expands, the purpose of doing like this is to let the RB of rollback that other UE can be used, wherein; Rollback operation can be included in to be judged under the situation that the code check reach multiplexing ascending control information requires, and discharges all RB that expanded, and perhaps only discharges a part of RB that expands.
S403: according to the RB of original allocation
Last, and initial MCS value, calculate code check R professional when no up control information is multiplexing under this configuration
MCS, and calculate the upper limit R of no up control information code check when multiplexing, wherein R=R
MCS+ (R
MCS+1-R
MCS)/A, the limit bit rate (wherein the value of A can be the arbitrary number greater than 1) for satisfying service feature calculates under the current MCS value simultaneously, professional code check R ' during multiplexing CQI/PMI/RI.
S404: judge this moment during multiplexing CQI/PMI/RI professional code check R ' whether greater than limit bit rate R; At this moment; Judge whether that whether high Rule of judgment greater than limit bit rate be code check Rule of judgment behind the present multiplexing ascending control information, has only the high expansion that just needs consideration RB resource of code check this moment.
If code check R ' professional during multiplexing CQI/PMI/RI is greater than limit bit rate R, execution in step S405 then, if less than, then UCI_flag is set to 1, execution in step S408.
S405: after calculating multiplexing ascending control information, the RB that code check R ' need expand during greater than limit bit rate R counts RB
UCI_RB, judge whether available RB simultaneously, if having, execution in step S406 is not if there is execution in step S407.
The RB that here need expand counts RB
UCI_RBCalculation Method is: make RB
UCI_RB=RB
UCI_RB+ 1, wherein, RB
UCI_RBInitial value be 0, whether the code check R ' of business judged R ' greater than R when the RB number that expands as required and the RB of original allocation counted limit bit rate R that sum and initial MCS value recomputate service feature and multiplexing ascending control information, as if greater than, then proceed RB
UCI_RB=RB
UCI_RB+ 1 operation is till code check R ' is smaller or equal to R.
Judging available RB, mainly is to judge (RB
Most>=RB
UCI_RB) & (RB
Last+ RB
UCI_RB≤RB
Rest) whether set up RB wherein
MostBe the RB number that maximum power can be supported, RB
RestRB number for remaining maximum continuous.
S406: expand the RB number that distributes.
Expand the RB number that this MLP distributes to this UE, RB
Last=RB
Last+ RB
UCI_RB, the RB number that the renewal maximum power can be supported and the continuous RB number of remaining maximum, RB
Most=RB
Most-RB
UCI_RB, RB
Rest=RB
Rest-RB
UCI_RB, and write down the RB that gives this UE and count RB
UE=RB
Last(RB
UEInitialization value is 0) execution in step S408.
S407: reduce the MCS value of distributing.
At this moment, owing to can't expand RB, then can only reduce professional code check behind the multiplexing ascending control information through falling the MCS value, the method for adjustment MCS value is:
Make MCS value=MCS value-1, professional code check R ' when recomputating limit bit rate R and the multiplexing ascending control information of service feature judges that whether R ' is greater than R; If R ', then proceeds MCS value=MCS value-1 operation greater than R, till code check R ' is smaller or equal to R; It should be noted that here if MCS value=0 o'clock, code check is still high; Then abandon the transfer of data of this UE, use to other UE the resource of this UE.
S408: output UCI_flag, RB
UCI_RB, the RB that this MLP distributes counts RB
LastAnd total RB that this UE distributes counts RB
UE
S409: if current MLP is not first MLP of this UE, the RB that current this UE of then first calculating has distributed counts RB
UE=RB
UE+ RB
Last, according to RB
UEAnd initial MCS value, calculate code check R professional when no UCI is multiplexing under this configuration
MCS, and calculate UCI professional limit bit rate R, wherein R=R when multiplexing
MCS+ (R
MCS+1-R
MCS)/A, (value of A is seen step S403) calculates under the current MCS value simultaneously, professional code check R ' during multiplexing CQI/PMI/RI.
S410: judge whether to satisfy R<R ', if do not satisfy, make UCI_flag=1, execution in step S411 is if satisfy execution in step S405.
S411: the rollback operation that carries out RB.The requirement that RB number that distribute this moment and initial MCS value have satisfied multiplexing ascending control information owing to ascending control information multiplexing introduced extra RB, need be carried out the rollback of RB, so that the use of follow-up UE.At this moment, if in second MLP, because this UE has distributed the RB resource again; Twice MLP goes up the RB resource of distributing and adds up, and behind the multiplexing uplink information, code check R ' is less than limit bit rate R; Whether the RB resource of distributing when considering ascending control information when code check was high when needed to consider first MLP this moment can carry out rollback, if code check R ' then carries out the rollback of RB still less than limit bit rate R behind the rollback; If code check R ' is more than or equal to limit bit rate R behind the rollback, rollback not then.The fallback mechanism of introducing RB mainly is in order to let the RB resource reach optimization, and then improves the throughput of sub-district.
Above-mentioned back off procedure specifically comprises: make RB
UE_Temp=RB
UE-Δ RB, Δ RB=1 ..., RB
UCI_RB, according to RB
UE_TempReach the MCS value, calculate and to dispose down, the code check R of business when no UCI is multiplexing
MCS, and calculate the limit bit rate R that satisfies the service feature requirement, wherein R=R
MCS+ (R
MCS+1-R
MCS)/A.Calculate under current RB number and the MCS value professional code check R ' during multiplexing CQI/PMI/RI simultaneously.Judge whether to satisfy R '<R,, then make Δ RB=Δ RB+1, continue to calculate R and R ', the Δ RB value of correspondence when finding first a R '<R not satisfy if satisfy.
More be newly assigned to the RB number of this UE, and RB
UE=RB
UE-Δ RB+1 considers the RB adjusted value RB when ascending control information is multiplexing
UCI_RB=RB
UCI_RBThe RB number that-Δ RB+1, this MLP give this UE is: RB
Last=RB
Last-Δ RB+1
Resource allocation methods when the ascending control information that present embodiment provides is multiplexing is applicable to that all carry out the multiplexing user of control information in the sub-district, is carrying out by MLP from low to high after the Resources allocation; Carry out the processing of ascending control information when multiplexing again, consider that uplink information controls the code check of traffic channel data when multiplexing, if code check is greater than limit bit rate; Then pay the utmost attention to the processing of expanding RB,, then consider to fall the MCS value if there is not available RB this moment; Till code check is smaller or equal to limit bit rate, simultaneously if UE Resources allocation all in two MLP, when second MLP; If code check is less than limit bit rate, then will consider the rollback operation of RB, when even two MLP resource sum of distributing lets the code check of Traffic Channel less than limit bit rate; The RB number that then increases during first MLP of rollback; Can optimal use RB like this, and then improve the system availability of RB, finally improve throughput.
In step 406 and 407, considered the mode of two kinds of multiplexing ascending control informations, if when available RB is arranged, then pay the utmost attention to the processing that increases RB, if during no available RB, then the processing of MCS value falls in consideration.
From above description, can find out that the present invention has realized following technique effect: through when presorting RB; Add above-mentioned resource allocation device; Adopt above-mentioned resource allocation methods, the PUSCH channel in the time of can letting multiplexing ascending control information has suitable R B and suitable MCS value more, lets the launching success rate of multiplexing ascending control information on the PUSCH channel increase like this; Increase the transmission success rate of Traffic Channel simultaneously, improved the throughput of system effectively.
Obviously, it is apparent to those skilled in the art that above-mentioned each module of the present invention or each step can realize with the general calculation device; They can concentrate on the single calculation element; Perhaps be distributed on the network that a plurality of calculation element forms, alternatively, they can be realized with the executable program code of calculation element; Thereby; Can they be stored in the storage device and carry out, and in some cases, can carry out step shown or that describe with the order that is different from here by calculation element; Perhaps they are made into each integrated circuit modules respectively, perhaps a plurality of modules in them or step are made into the single integrated circuit module and realize.Like this, the present invention is not restricted to any specific hardware and software combination.
The above is merely the preferred embodiments of the present invention, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.All within spirit of the present invention and principle, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.