CN102647720A - System and method for sub-band frequency hopping external interference avoidance based on long term evolution (LTE) - Google Patents

System and method for sub-band frequency hopping external interference avoidance based on long term evolution (LTE) Download PDF

Info

Publication number
CN102647720A
CN102647720A CN2012101295627A CN201210129562A CN102647720A CN 102647720 A CN102647720 A CN 102647720A CN 2012101295627 A CN2012101295627 A CN 2012101295627A CN 201210129562 A CN201210129562 A CN 201210129562A CN 102647720 A CN102647720 A CN 102647720A
Authority
CN
China
Prior art keywords
base station
subband
sub
bunch
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101295627A
Other languages
Chinese (zh)
Other versions
CN102647720B (en
Inventor
刘洪�
俞凯
贠超
卜智勇
陈实
王海峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Institute of Microsystem and Information Technology of CAS
Original Assignee
Shanghai Institute of Microsystem and Information Technology of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Institute of Microsystem and Information Technology of CAS filed Critical Shanghai Institute of Microsystem and Information Technology of CAS
Priority to CN201210129562.7A priority Critical patent/CN102647720B/en
Publication of CN102647720A publication Critical patent/CN102647720A/en
Application granted granted Critical
Publication of CN102647720B publication Critical patent/CN102647720B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a system and a method for sub-band frequency hopping external interference avoidance based on long term evolution (LTE). The system comprises an initialization module, an assignment module, a sub-band determination module and a broadcasting module, wherein the initialization module is used for dividing the whole frequency spectrum of a cell into M sub-bands, all users in the cell are divided into N clusters according to geographic locations of users, M is larger than or equals to N, one of the users is set as a cluster head in each of the clusters, and a base station assigns a cluster number to each of the users; the assignment module instructs the base station to select N sub-bands from M sub-bands according to channel interference of cluster heads and assigns one of the sub-bands to all clusters, and the base station assigns one channel resource at a corresponding position in one sub-band to users of each of the clusters; the sub-band determination module instructs the base station to determine sub-band frequency hopping patterns according to the channel interference of cluster heads; and the broadcasting module is used by the base station for sending broadcasting sub-band frequency hopping results to all users. By the aid of the system and the method, the problems that external system interference exists in current smart grids and huge dispatching signaling overhead caused by a large user volume are solved.

Description

A kind of subband hopping external disturbance based on LTE is avoided system and method
Technical field
The present invention relates to a kind of subband hopping external disturbance based on LTE and avoid system and method, a kind of subband hopping external disturbance based on LTE that particularly relates in the intelligent grid is avoided system and method.
Background technology
Intelligent grid has smoothly been integrated regenerative resource and alternative energy source as a kind of modern electric power network infrastructure through automation control and modern communication technology, has improved efficient simultaneously, reliability and fail safe.The existing electrical network that lacks communication capability of contrast, intelligent grid infrastructure has powerful remote sensing, advanced person's communication and computing capability.Different system components links together through communication path and sensor node, has improved interoperability each other, for example: transmission of electricity, distribution and other transformer stations.
As everybody knows, communication system is the important component part of intelligent grid infrastructure.Wired and wireless these two main communication mediums are supported the different communication technologys, can be used for the transfer of data between intelligent electric meter and the Utilities Electric Co..Advanced broadband wireless system can provide better quality products at good values, disposes fast, installs cheaply, insert widely and mobile communication, and these all are the benefits that cable communicating technology even old arrowband wireless technology often can't provide.Yet in the past because low data rate, relevant interference, safe, limited problems such as product availability, wireless technology can only be accepted in power industry more slowly; Several activities have started and have solved the problems referred to above, and require to confirm that suitable wireless technology especially is applied to the technology of intelligent grid.From nearest development and the activity carried out, can see the effort of carrying out for various intelligent use are provided; Various standardized wireless communication techniques have been adopted, for example: the MobileFi etc. that based on the WiMAX of IEEE 802.11 WLANs, IEEE 802.16 standards, 3G/4G honeycomb, based on ZigBee, 802.20 standards of IEEE802.15 is the basis.Fig. 1 is the system architecture diagram that adopts the LTE cellular system of wireless technology in the current intelligent grid, and it comprises base station, user and external equipment, has formed special wireless broadband network.
As everyone knows, interference is the one of the main reasons that wireless network performance is degenerated.Successful channel allocation algorithm design is through on interfering link, using non-overlapped channel to reduce the interference in the network range.Yet, except in the sub-district with the interference of minizone, different with the scene of common honeycomb LTE (Long Term Evolution, Long Term Evolution) system, in intelligent grid, also exist uncontrollable external disturbance.For example, in the frequency range of 230MHz, might be that department of astronomy unifies the radio positioning system of intelligent grid frequency spectrum simultaneously in operation.Wireless transmission that these are outside and equipment, owing under the control of heterogeneous networks operator, do not consider usually in the channel allocation, so their activity is to be difficult to catch.
In addition, the wireless channel decline at intelligent grid is quite slowly.Because most user and the fixed position of base station deployment in intelligent grid, the radio channel variation between user and its relevant base station is compared and moved the LTE environment is quite slowly.Therefore, it there is no need per 10 milliseconds of renewal channel condition informations as common honeycomb LTE system call.In addition, the number of users in the sub-district of intelligent grid is far away more than general cellular cell, usually according to cell size and geographic area, and the channel resource of thousands of equipment requirements 10,000 [1].Therefore the LTE system is huge at the cost of intelligent grid scheduling.
In sum, can know that the intelligent grid of prior art exists external system interference and large user's amount to bring the problem of huge dispatch expense, therefore be necessary to propose improved technological means in fact, solve this problem.
Summary of the invention
For overcoming the deficiency that above-mentioned prior art exists; The present invention's purpose is to provide a kind of subband hopping external disturbance based on LTE to avoid system and method, measures the problem of bringing huge dispatch expense with external system interference and the large user who solves in the intelligent grid.
For reaching above-mentioned and other purpose, the present invention provides a kind of subband hopping external disturbance based on LTE to avoid system, is applied to comprise the intelligent grid of base station, user and external equipment, and this system comprises:
The initialization module is used for the entire spectrum of sub-district is divided into M subband, and all users in this sub-district are divided into N bunch according to its geographical position; Wherein satisfy M >=N; In one bunch, to set one of them user and be bunch head, the base station distributes a bunch of numbering for each user;
Distribute module, be used for selecting N subband according to the channel disturbance indication base station of bunch head from this M subband, distribute a subband for then each bunch, the base station is distributed in a channel resource of relative position in the subband for the user in each bunch;
Subband is confirmed module, is used for confirming the subband hopping pattern according to the channel disturbance indication base station of bunch head; And
The broadcasting module, base station broadcast subband hopping result gives all users.
Further, this base station is with CEIL (log 2(M! / (M-N)! )) flag bit of position bit representes the frequency-hopping mode of all subbands, wherein CEIL (X) expression is not less than the smallest positive integral of X.
Further, first bit representation base station of this channel disturbance indication and bunch head receive the situation of external disturbance in first sub-band channel, and the second bit representation base station and bunch head receive the situation of external disturbance in second sub-band channel.
Further; Represent that base station and bunch head are disturbed by external equipment in first sub-band channel for first ' 1 ' of this channel disturbance indication, represent that a base station and a bunch base station and bunch head are the clean channel that not disturbed by external equipment in second sub-band channel for second ' 0 ' of this channel disturbance indication.
For reaching above-mentioned and other purposes, the present invention also provides a kind of subband hopping external disturbance avoiding method based on LTE, is applied to comprise the intelligent grid of base station, user and external equipment, and this method comprises the steps:
Step 1, k the existing external equipment of bunch hair disturbs, and to the current channel disturbance indication of base station report;
After step 2, base station receive the channel disturbance indication of this k bunch head, attempt bunch being selected k subband from (M-N+k) individual subband for what k quilt disturbed;
Step 3, base station broadcast Interference Detection require to all bunch heads;
Step 4, receive the requirement of Interference Detection from the base station after, find bunch all M subbands of head scanning that disturb, and report that current channel disturbance indicates to the base station;
Step 5, the base station is selected N subband according to the channel disturbance indication that receives from M subband, and avoids all bunches to receive the interference of external equipment; And
Step 6, base station broadcast subband hopping result, each user switches to the corresponding channel of new subband according to newly assigned subband with channel.
Further, in step 2, if there are enough allocation of subbands to give k bunch to avoid the external equipment interference again, the base station directly obtains the allocation of subbands result, gets into step 6; Otherwise entering step 3.
Further, in step 6, this base station is with CEIL (log 2(M! / (M-N)! )) bit broadcasting subband hopping result.
Compared with prior art; A kind of subband hopping external disturbance based on LTE of the present invention avoids system and method to pass through all user's sub-clusterings; And will bunch in all users be assigned to when the fixing channel of relative position switches with the subband when bunch distribution in the subband; Subband after the corresponding corresponding bunch switching of channel of switching separately of user; Not only avoid the interference of external system, and significantly reduced signaling consumption, solved the external system interference of prior art existence and the problem that large user's amount is brought huge dispatch expense.
Description of drawings
Fig. 1 is the system architecture diagram that adopts the LTE cellular system of wireless technology in the current intelligent grid;
Fig. 2 is a kind of system architecture diagram of avoiding system based on the subband hopping external disturbance of LTE of the present invention;
Subscriber channel resource pre-scheduling sketch map in Fig. 3 bunch;
Fig. 4 is the corresponding CII channel reporting structure of bunch head;
Fig. 5 is the flow chart of steps of a kind of subband hopping external disturbance avoiding method based on LTE of the present invention.
Embodiment
Below through specific instantiation and accompanying drawings execution mode of the present invention, those skilled in the art can understand other advantage of the present invention and effect easily by the content that this specification disclosed.The present invention also can implement or use through other different instantiation, and each item details in this specification also can be based on different viewpoints and application, carries out various modifications and change under the spirit of the present invention not deviating from.
Fig. 2 is a kind of system architecture diagram of avoiding system based on the subband hopping external disturbance of LTE of the present invention.As shown in Figure 2, a kind of subband hopping external disturbance based on LTE of the present invention is avoided system, is applied to comprise in the intelligent grid: initialization module 201, distribution module 202, subband are confirmed module 203 and broadcasting module 204.
Wherein, initialization module 201 is used for the entire spectrum of sub-district is divided into M subband, and all users in the sub-district are divided into N bunch according to its geographical position; Wherein satisfy M >=N; In one bunch, to set one of them user and be bunch head, the base station distributes a bunch of numbering for each user.
Distribute module 202, N subband selected according to the channel disturbance indication (CII, Channel Interface Indicator) of bunch head in the base station from M subband, distributes a subband for then each bunch, so CEIL (log need be used in the base station 2(M! / (M-N)! )) flag bit of position bit representes the frequency-hopping mode of all subbands.Here function C EIL (X) expression is not less than the smallest positive integral of X.In this hypothesis, base station and user know the mapping relations between subband hopping pattern and the flag bit.The base station is distributed in a channel resource of relative position in the subband for the user in each bunch, and as shown in Figure 3, the position of the channel resource that the user is assigned in subband is geostationary, even experience subband hopping process.
Here, channel condition information is indicated by CII, and its structural design is as shown in Figure 4.For simplicity, the signal interference ratio that defines among the present invention (SINR, Signal to Interference plus Noise Ratio) threshold value is SINR Th, for example work as SINR less than SINR ThShi Xindao is disturbed, and works as SINR more than or equal to SINR ThShi Xindao is not disturbed.Represent that base station and bunch head are disturbed by external system in first sub-band channel for first ' 1 ' of CII, represent that base station and bunch head are the clean channel that does not receive external disturbance in second sub-band channel for second ' 0 ' of CII.In a word, position ' 1 ' representative ' interference ', position ' 0 ' representative ' noiseless '; Each bit position in the CII structure is represented the sequence number of subband.Therefore, all bunches head only need spend altogether N * M position bit and report their channel condition information, thereby adopts the instruction design of CII to reduce signaling consumption greatly than original channel quality indication (CQI, Channel Quality Indicator).For example, suppose CQI cost K 1Channel quality between position bit quantization user and the base station; A subband comprises K 2Channel; One bunch comprises K 3The user; Report that all users and the CQI between the base station need spend N * M * K 1* K 2* K 3Bit.Use bunch head and CII structure, greatly saved the channel status information reports expense, the chances are N * M * (K 1* K 2* K 3-1) bit.
Subband is confirmed module 203, and the base station is according to the CII decision subband frequency hopping pattern of bunch head, that is, which subband which bunch is assigned to.
Broadcasting module 204, base station broadcast subband hopping result gives all users, thus the channel resource that the user can distribute under its bunch numbering, bunch sub-reel number and the pre-scheduling result obtains the final channel resource that himself is assigned to.
Fig. 5 is the flow chart of steps of a kind of subband hopping external disturbance avoiding method based on LTE of the present invention; As shown in Figure 5; A kind of subband hopping external disturbance avoiding method based on LTE of the present invention is applied to comprise in the intelligent grid of base station, user and external equipment, comprises the steps:
Step 501, k the existing external disturbance of bunch hair, and to the current CII of base station report.When external disturbance got into the sub-district, some bunches head can find that they and base station can not successfully send or receive data on the channel of distributing, thereby they have found external disturbance.If a bunch of head has perceived interference, it can scan all M subband, and uses bit report current CII in M position to give the base station.If have k by bunch head that disturbed, the reporting uplink signaling needs the cost (bit of k * M).
Step 502, after the base station received k CII from a k bunch head, it can attempt bunch being selected k subband from (M-N+k) individual subband for what k quilt disturbed.If there are enough allocation of subbands to give k bunch to avoid external disturbance again, the base station can directly obtain the allocation of subbands result so, directly connects to get into step 506; Otherwise get into step 503.
Step 503, base station broadcast Interference Detection require to all bunch heads, and this will spend the downlink signaling expense of 1 bit.
Step 504 after the requirement of base station reception Interference Detection, find that bunch head that disturbs scans all M subbands, and report current C II is to the base station.Because a k bunch head reported CII in the time of the 1st step, therefore also has the up signaling consumption of (N-k) * M bit.
Step 505, the base station is selected N subband according to the CII that receives from M subband, and avoids all bunches to receive the interference of external system.
Step 506, the base station is with CEIL (log 2(M! / (M-N)! )) bit broadcasting subband hopping result, each user switches to the corresponding channel of new subband according to newly assigned subband with channel.
The scheduling scheme of the CQI structure that below will use the present invention and original LTE through an instantiation does one relatively.As previously mentioned, K 1, K 2, K 3Represent respectively in the bit number, subband of channel CQI the number of channel, bunch in number of users.In the scheduling scheme of the CQI structure that original LTE uses, each user effort (K 1* K 2* M) bit comes the up signaling of reporting channel state information, spends (K altogether 1* K 2* K 3The bit of * N * M).Then, (K 2* M) channel can be distributed to (K 3* N) user.For downlink signaling, base station cost CEIL (log 2(K 2* M)) bit indicates the channel of distributing to each user, needs (K altogether 3* N) * CEIL (log 2(K 2* M)) bit.
Figure BDA0000158385430000071
Table 1 the present invention and original LTE strategy scheduling overhead are relatively
Enumerated the comparative result of CQI structure under signaling consumption of the present invention and the original LTE at table 1.Adopt M=15, N=10, K1=4, K2=10, K3=25.The present invention is at up signaling and maximum expense 35 bits of downlink signaling and 150 bits, and up signaling consumption 150000 bits of the LTE of original CQI structure are with believing signaling consumption 2000 bits at present.Therefore, the present invention has significantly reduced signaling consumption.
In sum; A kind of subband hopping external disturbance based on LTE of the present invention avoids system and method to pass through all user's sub-clusterings; And will bunch in all users be assigned to when the fixing channel of relative position switches with the subband when bunch distribution in the subband; Subband after the corresponding corresponding bunch switching of channel of switching separately of user; Not only avoid the interference of external system, and significantly reduced signaling consumption, solved the external system interference of prior art existence and the problem that large user's amount is brought huge dispatch expense.
The foregoing description is illustrative principle of the present invention and effect thereof only, but not is used to limit the present invention.Any those skilled in the art all can be under spirit of the present invention and category, and the foregoing description is modified and changed.Therefore, rights protection scope of the present invention should be listed like claims.

Claims (7)

1. the subband hopping external disturbance based on LTE is avoided system, is applied to comprise the intelligent grid of base station, user and external equipment, comprising:
The initialization module is used for the entire spectrum of sub-district is divided into M subband, and all users in this sub-district are divided into N bunch according to its geographical position; Wherein satisfy M >=N; In one bunch, to set one of them user and be bunch head, the base station distributes a bunch of numbering for each user;
Distribute module, be used for selecting N subband according to the channel disturbance indication base station of bunch head from this M subband, distribute a subband for then each bunch, the base station is distributed in a channel resource of relative position in the subband for the user in each bunch;
Subband is confirmed module, is used for confirming the subband hopping pattern according to the channel disturbance indication base station of bunch head; And
The broadcasting module, base station broadcast subband hopping result gives all users.
2. the subband hopping external disturbance based on LTE as claimed in claim 1 is avoided system, and it is characterized in that: this base station is with CEIL (log 2(M! / (M-N)! )) flag bit of position bit representes the frequency-hopping mode of all subbands, wherein CEIL (X) expression is not less than the smallest positive integral of X.
3. the subband hopping external disturbance based on LTE as claimed in claim 1 is avoided system; It is characterized in that: first bit representation base station of this channel disturbance indication and bunch head receive the situation of external disturbance in first sub-band channel, and the second bit representation base station and bunch head receive the situation of external disturbance in second sub-band channel.
4. the subband hopping external disturbance based on LTE as claimed in claim 3 is avoided system; It is characterized in that: represent that base station and bunch head are disturbed by external equipment in first sub-band channel for first ' 1 ' of this channel disturbance indication, represent that base station and bunch head are the clean channel that not disturbed by external equipment in second sub-band channel for second ' 0 ' of this channel disturbance indication.
5. subband hopping external disturbance avoiding method based on LTE is applied to comprise comprise the steps: the intelligent grid of base station, user and external equipment
Step 1, k the existing external equipment of bunch hair disturbs, and to the current channel disturbance indication of base station report;
After step 2, base station receive the channel disturbance indication of this k bunch head, attempt bunch being selected k subband from (M-N+k) individual subband for what k quilt disturbed;
Step 3, base station broadcast Interference Detection require to all bunch heads;
Step 4, receive the requirement of Interference Detection from the base station after, find bunch all M subbands of head scanning that disturb, and report that current channel disturbance indicates to the base station;
Step 5, the base station is selected N subband according to the channel disturbance indication that receives from M subband, and avoids all bunches to receive the interference of external equipment; And
Step 6, base station broadcast subband hopping result, each user switches to the corresponding channel of new subband according to newly assigned subband with channel.
6. the subband hopping external disturbance avoiding method based on LTE as claimed in claim 5 is characterized in that: in step 2, if there are enough allocation of subbands to give k bunch to avoid the external equipment interference again, the base station directly obtains the allocation of subbands result, gets into step 6; Otherwise entering step 3.
7. the subband hopping external disturbance avoiding method based on LTE as claimed in claim 5, it is characterized in that: in step 6, this base station is with CEIL (log 2(M! / (M-N)! )) bit broadcasting subband hopping result.
CN201210129562.7A 2012-04-27 2012-04-27 System and method for sub-band frequency hopping external interference avoidance based on long term evolution (LTE) Active CN102647720B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210129562.7A CN102647720B (en) 2012-04-27 2012-04-27 System and method for sub-band frequency hopping external interference avoidance based on long term evolution (LTE)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210129562.7A CN102647720B (en) 2012-04-27 2012-04-27 System and method for sub-band frequency hopping external interference avoidance based on long term evolution (LTE)

Publications (2)

Publication Number Publication Date
CN102647720A true CN102647720A (en) 2012-08-22
CN102647720B CN102647720B (en) 2014-10-22

Family

ID=46660256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210129562.7A Active CN102647720B (en) 2012-04-27 2012-04-27 System and method for sub-band frequency hopping external interference avoidance based on long term evolution (LTE)

Country Status (1)

Country Link
CN (1) CN102647720B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103338434A (en) * 2013-07-09 2013-10-02 中国科学院上海微系统与信息技术研究所 Interference avoidance method and system based on positions in smart power grid
CN106572506A (en) * 2015-10-13 2017-04-19 华为技术有限公司 Subband switching method, equipment and system thereof
CN111201718A (en) * 2017-10-10 2020-05-26 英国电讯有限公司 Identifying interfering links in a local area network
US11070249B2 (en) 2017-09-28 2021-07-20 British Telecommunications Public Limited Company Controlling communications in respect of local area networks

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1902972A (en) * 2003-10-30 2007-01-24 高通股份有限公司 Layered reuse for a wireless communication system
CN1909539A (en) * 2005-08-02 2007-02-07 大唐移动通信设备有限公司 Sub-carrier distribution method for crossing frequency division multiplexing system
CN1994017A (en) * 2004-06-08 2007-07-04 高通股份有限公司 Intra-cell common reuse for a wireless communication system
WO2007105914A1 (en) * 2006-03-14 2007-09-20 Samsung Electronics Co., Ltd. Apparatus and method for performing resource allocation and communication in a wireless communication system, and system using the same
CN101753226A (en) * 2008-12-16 2010-06-23 华为技术有限公司 Clustering method, equipment and system for cognitive radio system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1902972A (en) * 2003-10-30 2007-01-24 高通股份有限公司 Layered reuse for a wireless communication system
CN1994017A (en) * 2004-06-08 2007-07-04 高通股份有限公司 Intra-cell common reuse for a wireless communication system
CN1909539A (en) * 2005-08-02 2007-02-07 大唐移动通信设备有限公司 Sub-carrier distribution method for crossing frequency division multiplexing system
WO2007105914A1 (en) * 2006-03-14 2007-09-20 Samsung Electronics Co., Ltd. Apparatus and method for performing resource allocation and communication in a wireless communication system, and system using the same
CN101753226A (en) * 2008-12-16 2010-06-23 华为技术有限公司 Clustering method, equipment and system for cognitive radio system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103338434A (en) * 2013-07-09 2013-10-02 中国科学院上海微系统与信息技术研究所 Interference avoidance method and system based on positions in smart power grid
CN103338434B (en) * 2013-07-09 2016-03-02 中国科学院上海微系统与信息技术研究所 Location-based interference avoidance method and system in intelligent grid
CN106572506A (en) * 2015-10-13 2017-04-19 华为技术有限公司 Subband switching method, equipment and system thereof
WO2017063479A1 (en) * 2015-10-13 2017-04-20 华为技术有限公司 Method, device and system for switching between subbands
US11082895B2 (en) 2015-10-13 2021-08-03 Huawei Technologies Co., Ltd. Subband switching method, device, and system
US11070249B2 (en) 2017-09-28 2021-07-20 British Telecommunications Public Limited Company Controlling communications in respect of local area networks
CN111201718A (en) * 2017-10-10 2020-05-26 英国电讯有限公司 Identifying interfering links in a local area network
CN111201718B (en) * 2017-10-10 2021-10-01 英国电讯有限公司 Identifying interfering links in a local area network
US11290149B2 (en) 2017-10-10 2022-03-29 British Telecommunications Public Limited Company Identifying interfering links in local area networks

Also Published As

Publication number Publication date
CN102647720B (en) 2014-10-22

Similar Documents

Publication Publication Date Title
Jungnickel et al. The role of small cells, coordinated multipoint, and massive MIMO in 5G
CN102090096B (en) Access mechanisms for base stations in heterogeneous access point networks
CN101877887B (en) Downlink transmission control method and device of cooperative multicast system
CN101420746B (en) Method for interference coordination between cells and interference coordination information transmission method therefor
CN102833793B (en) Disturbance coordination method and base station
US8369863B2 (en) Method for interference suppression
CN105723771A (en) Method for scheduling and/or muting of radio resources in wireless communication system
CN101686550A (en) Inter-cell interference suppression method, system and base station and user terminal
CN102763478A (en) Methods for reducing interference in a wireless communication system
CN103369611A (en) A random access processing method, switch processing method, and apparatus
CN102820954A (en) Method for reducing inter-cell interference of heterogeneous network
CN102202311A (en) Coordination method of interference, equipment and system thereof
CN102647720B (en) System and method for sub-band frequency hopping external interference avoidance based on long term evolution (LTE)
EP3179772A1 (en) Small cell base station-based communication method and communication system
CN104053241A (en) System and method for interference coordination among communication nodes
CN101621322A (en) Low-feedback multi-user scheduling method in cooperative multicast MIMO transmission
CN103002587B (en) Power determining method and device
CN101742519B (en) Frequency resource allocation method and device
Marzuki et al. Mobile small cells: Broadband access solution for public transport users
CN102547736B (en) Method and system for controlling downlink interference between neighboring cells
CN104168574A (en) Uplink transmission method based on adaptable interference selection in mixed cellular system
Kawade et al. Broadband wireless delivery using an inside-out tv white space network architecture
Sayyari et al. Cell-free massive MIMO system with an adaptive switching algorithm between cooperative NOMA, non-cooperative NOMA, and OMA modes
CN103209472A (en) Method and system for cooperative scheduling of inter-cell uplink interference coordination
CN104581974B (en) Dynamic base-station collaboration method based on orthogonal resource in super-intensive network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant