CN102646981A CN2012101150524A CN201210115052A CN102646981A CN 102646981 A CN102646981 A CN 102646981A CN 2012101150524 A CN2012101150524 A CN 2012101150524A CN 201210115052 A CN201210115052 A CN 201210115052A CN 102646981 A CN102646981 A CN 102646981A
Authority
CN
China
Prior art keywords
circuit current
short circuit
initial value
short
attenuation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101150524A
Other languages
Chinese (zh)
Inventor
曹炜
戈睛天
杨文清
祁晓卿
杜洋
李万信
苏虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai University of Electric Power
University of Shanghai for Science and Technology
Original Assignee
Shanghai University of Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai University of Electric Power filed Critical Shanghai University of Electric Power
Priority to CN2012101150524A priority Critical patent/CN102646981A/en
Publication of CN102646981A publication Critical patent/CN102646981A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to a power system short-circuit current attenuation practical calculation method. The initial value of short-circuit current based on tidal current is taken as the initial value for practical attenuation calculation; under the condition of classical assumption and based on the principle that the flux linkage (electric potential) does not mutate, and taking that the electric potential attenuates along with time into consideration, circuit equations (linear algebraic equations) are listed out and are worked out through a computer to get the attenuation of the short-circuit current. In such way, the initial value of the short-circuit current and the calculation result of attenuation are closer to the practical situation.

Description

Power System Shortcuts current attenuation practical calculation method
Technical field
The present invention relates to a kind of computational methods of short circuit current, particularly a kind of Power System Shortcuts current attenuation practical calculation method.
Background technology
Short circuit is the catastrophe failure of electric power system, and it is extremely important for selecting electric equipment, configuration relaying protection in the electric power system accurately to calculate short circuit current and attenuation thereof.
The conventional method of calculating the short circuit current decay is the calculation of short-circuit current curve method; The restrictions such as generator 's parameter when making curve, load factor, system loading distribution but this method is limited by cause the short circuit current decay error of calculation of practical power systems bigger, and it is too conservative to show as result of calculation; Because specified full-load run before the supposition generator short circuit when making calculated curve; And in practical power systems when operation, considered system safety stability, and most units are not in specified running status.And because network abbreviation problem, calculated curve method also inconvenience is used in actual large power system.
The decay of short circuit current is calculated also can write the electric power system differential equation through row, uses numerical computations to find the solution differential equation group then.Though this method is accurate, amount of calculation is big, is not suitable for carrying out the engineering calculation of short circuit current decay.
For above-mentioned reasons; Electric power enterprise carries out not considering when the Power System Shortcuts electric current calculates the decay of short circuit current at present; Only calculate the initial value of short circuit current; Then other short circuit current constantly after the short circuit is equal to the initial value of short circuit current, makes result of calculation too conservative when reality is used so equally.
Two kinds of short circuit current initial value carculation methods are arranged in the practicality, be divided into based on the short circuit current initial value of trend and calculate and calculate based on the short circuit current initial value of classical assumption.Running status, line parameter circuit value, transformer parameter etc. before the former the electrification system short circuit are accurately considered the load influence of electric power system, it is generally acknowledged the actual state that can fully reflect electrical network, near actual short electric current initial value.The latter ignores that all promptly disregard line charging electric capacity, bus parallel branch and load to the influence of ground leg in the system, and the non-standard no-load voltage ratio of all transformers gets 1.0, and all node voltages are got the average rated voltage (corresponding perunit value is 1) of place electric pressure.The trend distribution influence that this method changes when not normally moved by electric power system at any time, thereby have good practical applications property, but there are certain deviation in the short circuit current initial value and the actual conditions of calculating gained.
Summary of the invention
The present invention be directed to short circuit initial value in the present electric power system and decay and calculate the problem of the deficiency that exists; A kind of Power System Shortcuts current attenuation practical calculation method has been proposed; With the initial value of decaying and calculating as practicality based on the short circuit current initial value of trend; But under the classical assumption condition,, consider that electromotive force is along with the time decays, through row write circuit equation (linear algebraic equation group) based on magnetic linkage (electromotive force) principle of not suddenling change; Obtain the attenuation of short circuit current with computer solving, thereby make the initial value of short circuit current and the result of calculation that decays all more near actual conditions.
Technical scheme of the present invention is: a kind of Power System Shortcuts current attenuation practical calculation method comprises following concrete steps:
1) under the situation that known trend distributes, the short circuit current initial value being carried out in preset fault point calculates; Obtain short circuit current initial value result, be designated as based on trend;
2) adopt the classical assumption condition to form node admittance matrix, the particular content of classical assumption is following:
A: adopt average rated voltage as voltage reference, ignore the rated voltage of each element and the difference of the average rated voltage of relevant voltage grade;
B: ignore that all promptly disregard line charging electric capacity, static exciter branch road, bus parallel branch and load to the influence of ground leg in the system;
C: think that transformer voltage ratio equals the ratio of the average rated voltage of side, promptly the mark of all transformers one no-load voltage ratio equals 1.0;
3) to preset fault point, according to the decay calculating that electromotive force does not suddenly change and carries out the generator electromotive force, be example with generator d axle, computing formula is following:
Figure 252462DEST_PATH_IMAGE004
In the formula, is moment d axle time transient potential before the generator short circuit;
Figure 593762DEST_PATH_IMAGE008
is moment stator winding d shaft current before the generator short circuit;
Figure 262641DEST_PATH_IMAGE010
is respectively steady-state reactance, transient state reactance and the subtranient reactance of generator;
Figure 2012101150524100002DEST_PATH_IMAGE012
be after the short circuit of calculating based on the node admittance matrix of classical assumption moment generator terminal voltage and the merchant of machine end electric current;
Figure 692223DEST_PATH_IMAGE014
is respectively transient state component and time time constant of transient state component decay;
4) separate network equation; Obtain after the short circuit each attenuation of periodic component of short-circuit current constantly according to the decay of generator electromotive force, be designated as
Figure 384235DEST_PATH_IMAGE016
(
Figure 2012101150524100002DEST_PATH_IMAGE018
);
5) calculate gained each constantly value
Figure 582315DEST_PATH_IMAGE016
based on short circuit current initial value result
Figure 58930DEST_PATH_IMAGE002
the correction step 4) of trend based on the periodic component of short-circuit current decay of classical assumption with step 1), correction formula is following:
In
Figure 2012101150524100002DEST_PATH_IMAGE020
formula,
Figure 2012101150524100002DEST_PATH_IMAGE022
is based on trend and deviation based on the short circuit current initial value of classical assumption;
Figure 2012101150524100002DEST_PATH_IMAGE024
is the short circuit current initial value result based on classical assumption;
Figure 2012101150524100002DEST_PATH_IMAGE026
is each revised short circuit current attenuation results constantly; The short circuit current attenuation curve that correction formula is equivalent to step 4) is obtained carries out translation; Initial value is consistent with short circuit current initial value result based on trend before making, thereby obtains revised short circuit current attenuation curve.
Beneficial effect of the present invention is: Power System Shortcuts current attenuation practical calculation method of the present invention, Power System Shortcuts current attenuation practical calculation method makes the initial value of short circuit current and the result of calculation that decays all more near actual conditions.Use method result of calculation of the present invention to have higher accuracy, the goodness of fit of short circuit current attenuation curve and electromechanical transient is also better, and result calculated has certain margin of safety generally greater than the result of electromechanical transient.
Description of drawings
Fig. 1 is the network configuration and the preceding trend distribution map of short circuit of Power System Shortcuts current attenuation practical calculation method instance of the present invention one IEEE9 system;
Fig. 2 is periodic component of short-circuit current decay sketch map during for Power System Shortcuts current attenuation practical calculation method instance one bus BusA three-phase shortcircuit of the present invention;
Fig. 3 is periodic component of short-circuit current decay sketch map during for Power System Shortcuts current attenuation practical calculation method instance one bus Bus1 three-phase shortcircuit of the present invention;
Fig. 4 is the network structure of Power System Shortcuts current attenuation practical calculation method instance of the present invention two IEEE39 systems;
Fig. 5 is periodic component of short-circuit current decay sketch map during for Power System Shortcuts current attenuation practical calculation method instance two buses 8 three-phase shortcircuits of the present invention;
Fig. 6 is periodic component of short-circuit current decay sketch map during for Power System Shortcuts current attenuation practical calculation method instance two buses 13 three-phase shortcircuits of the present invention;
Fig. 7 is periodic component of short-circuit current decay sketch map during for Power System Shortcuts current attenuation practical calculation method instance two buses 16 three-phase shortcircuits of the present invention;
Fig. 8 is periodic component of short-circuit current decay sketch map during for Power System Shortcuts current attenuation practical calculation method instance two buses 20 three-phase shortcircuits of the present invention;
Fig. 9 is periodic component of short-circuit current decay sketch map during for Power System Shortcuts current attenuation practical calculation method instance two buses 39 three-phase shortcircuits of the present invention.
Embodiment
The practical implementation step of the practical calculating of short circuit current decay new method is following:
(1) under the situation that known trend distributes, the short circuit current initial value being carried out in preset fault point calculates; Obtain short circuit current initial value result, be designated as
Figure 323744DEST_PATH_IMAGE002
based on trend.
(2) adopt the classical assumption condition to form node admittance matrix, the particular content of classical assumption is following:
A: adopt average rated voltage as voltage reference, ignore the rated voltage of each element and the difference of the average rated voltage of relevant voltage grade;
B: ignore that all promptly disregard line charging electric capacity, static exciter branch road, bus parallel branch and load to the influence of ground leg in the system;
C: think that transformer voltage ratio equals the ratio of the average rated voltage of side, promptly the mark of all transformers one no-load voltage ratio equals 1.0.
(3) to preset fault point, according to the decay calculating that electromotive force does not suddenly change and carries out the generator electromotive force, be example with generator d axle, computing formula is following:
Figure 565370DEST_PATH_IMAGE004
(1)
In the formula, is moment d axle time transient potential before the generator short circuit;
Figure 421647DEST_PATH_IMAGE008
is moment stator winding d shaft current before the generator short circuit;
Figure 756814DEST_PATH_IMAGE010
is respectively steady-state reactance, transient state reactance and the subtranient reactance of generator;
Figure 423418DEST_PATH_IMAGE012
be after the short circuit of calculating based on the node admittance matrix of classical assumption moment generator terminal voltage and the merchant of machine end electric current;
Figure 502233DEST_PATH_IMAGE014
is respectively transient state component and time time constant of transient state component decay.
(4) separate network equation; Obtain after the short circuit each attenuation of periodic component of short-circuit current constantly according to the decay of generator electromotive force, be designated as
Figure 436428DEST_PATH_IMAGE016
(
Figure 208075DEST_PATH_IMAGE018
).
(5) calculate gained each constantly value
Figure 978902DEST_PATH_IMAGE016
based on short circuit current initial value result
Figure 96397DEST_PATH_IMAGE002
the correction step (4) of trend based on the periodic component of short-circuit current decay of classical assumption with step (1), correction formula is following:
?(2)
In the formula,
Figure 211618DEST_PATH_IMAGE022
is based on trend and deviation based on the short circuit current initial value of classical assumption;
Figure 649552DEST_PATH_IMAGE024
is the short circuit current initial value result based on classical assumption; is each revised short circuit current attenuation results constantly.Formula (2) is equivalent to the short circuit current attenuation curve that step (4) obtains is carried out translation, and initial value is consistent with short circuit current initial value result based on trend before making, thereby obtains revised short circuit current attenuation curve.
Practicality calculating new method and other computational methods that the present invention is proposed compare, the existing regulation as follows: traditional utilization calculated curve is calculated the method for short circuit current decay, be called the calculated curve method; To obtain short circuit current calculation of attenuation method through finding the solution the differential equation, be called electromechanical transient.
Here select IEEE9 system and IEEE39 system respectively as applicating example of the present invention.Consider that the calculating of electromechanical transient adopts the differential equation without algebraic simplification, accurately considered the quasi steady state model of generator, result of calculation is near actual conditions, the present invention with the result of calculation of electromechanical transient as standard of comparison.
Instance one: the practicality that proposes according to the present invention is calculated new method the bus BusA of IEEE9 system is carried out short circuit current decay calculating with bus Bus1, and the result of calculation that lists file names with the calculated curve method as a comparison.Trend distributes before the network configuration of IEEE9 as shown in Figure 1 system and the short circuit, during result of calculation bus BusA as shown in table 1 three-phase shortcircuit during bus Bus1 three-phase shortcircuit shown in periodic component of short-circuit current decay result of calculation, the table 2 when periodic component of short-circuit current decay result of calculation and Fig. 2 bus BusA three-phase shortcircuit when periodic component of short-circuit current decay sketch map, Fig. 3 bus Bus1 three-phase shortcircuit shown in the periodic component of short-circuit current decay sketch map.
Table 1
Figure DEST_PATH_IMAGE030
Table 2
Figure DEST_PATH_IMAGE032
Can find out that from table 1, table 2 and Fig. 1, Fig. 2 the result of calculation of practical calculating new method and electromechanical transient is very approaching, the phase rate is all in ± 1%.When bus BusA was short-circuited, the maximal phase rate was 0.63% (0.1s after short circuit); When bus Bus1 was short-circuited, the maximal phase rate was-0.90% (0.08s after short circuit).
By contrast, the result of calculated curve method is too conservative.If short circuit occurs in bus BusA, all in 10%, the maximal phase rate is 7.51% (0.09s after short circuit) to the phase rate; If short circuit occurs in bus Bus1, the phase rate is all greater than 10%, and the maximal phase rate is 14.87% (0.02s after short circuit).
And the result of calculation of the practicality that the present invention proposes calculating new method has higher accuracy, and the goodness of fit of short circuit current attenuation curve and electromechanical transient is also better.
Instance two: the network configuration of IEEE39 as shown in Figure 4 system; The short circuit current decay that proposes according to the present invention is practical calculates new method and bus 8, bus 13, bus 16, bus 20 and the bus 39 of IEEE39 system carried out the short circuit current decay calculates; Consider that the calculated curve method need be to the artificial conversion of network; Not only workload is big, and has seen in conservative from the effect of applicating example 1, so the IEEE39 system no longer adopts the calculated curve method to calculate.Periodic component of short-circuit current decay result of calculation during result of calculation bus 8 three-phase shortcircuits as shown in table 3; Periodic component of short-circuit current decay sketch map during Fig. 5 bus 8 three-phase shortcircuits; Periodic component of short-circuit current decay sketch map during Fig. 6 bus 13 three-phase shortcircuits; Periodic component of short-circuit current decay sketch map during Fig. 7 bus 16 three-phase shortcircuits; Periodic component of short-circuit current decay sketch map during Fig. 8 bus 20 three-phase shortcircuits; Periodic component of short-circuit current is decayed shown in the sketch map during Fig. 9 bus 39 three-phase shortcircuits.
Figure DEST_PATH_IMAGE034
Table 3
Figure DEST_PATH_IMAGE036
Can find out from table 3, Fig. 5 to Fig. 9; The practical new method of calculating of short circuit current decay is compared with the result of calculation of electromechanical transient; Still comparatively conservative; In 5 short dots of stochastic calculation, maximum positive rate is 10.32% (0.1s after bus 20 short circuits), and maximum negative phase rate is-1.14% (0.1s after bus 39 short circuits); And except that bus 39, the phase rate of all the other short dot result of calculations is all greater than zero, and the promptly practical result who calculates new method has certain margin of safety generally greater than the result of electromechanical transient.

Claims (1)

1. a Power System Shortcuts current attenuation practical calculation method is characterized in that, comprises following concrete steps:
1) under the situation that known trend distributes, the short circuit current initial value being carried out in preset fault point calculates; Obtain short circuit current initial value result, be designated as based on trend;
2) adopt the classical assumption condition to form node admittance matrix, the particular content of classical assumption is following:
A: adopt average rated voltage as voltage reference, ignore the rated voltage of each element and the difference of the average rated voltage of relevant voltage grade;
B: ignore that all promptly disregard line charging electric capacity, static exciter branch road, bus parallel branch and load to the influence of ground leg in the system;
C: think that transformer voltage ratio equals the ratio of the average rated voltage of side, promptly the mark of all transformers one no-load voltage ratio equals 1.0;
3) to preset fault point, according to the decay calculating that electromotive force does not suddenly change and carries out the generator electromotive force, be example with generator d axle, computing formula is following:
Figure 287605DEST_PATH_IMAGE004
In the formula,
Figure 2012101150524100001DEST_PATH_IMAGE006
is moment d axle time transient potential before the generator short circuit;
Figure DEST_PATH_IMAGE008
is moment stator winding d shaft current before the generator short circuit;
Figure 2012101150524100001DEST_PATH_IMAGE010
is respectively steady-state reactance, transient state reactance and the subtranient reactance of generator;
Figure 2012101150524100001DEST_PATH_IMAGE012
be after the short circuit of calculating based on the node admittance matrix of classical assumption moment generator terminal voltage and the merchant of machine end electric current; is respectively transient state component and time time constant of transient state component decay;
4) separate network equation; Obtain after the short circuit each attenuation of periodic component of short-circuit current constantly according to the decay of generator electromotive force, be designated as
Figure DEST_PATH_IMAGE016
(
Figure DEST_PATH_IMAGE018
);
5) calculate gained each constantly value
Figure 649502DEST_PATH_IMAGE016
based on short circuit current initial value result
Figure 254293DEST_PATH_IMAGE002
the correction step 4) of trend based on the periodic component of short-circuit current decay of classical assumption with step 1), correction formula is following:
In
Figure DEST_PATH_IMAGE020
formula,
Figure DEST_PATH_IMAGE022
is based on trend and deviation based on the short circuit current initial value of classical assumption; is the short circuit current initial value result based on classical assumption; is each revised short circuit current attenuation results constantly; The short circuit current attenuation curve that correction formula is equivalent to step 4) is obtained carries out translation; Initial value is consistent with short circuit current initial value result based on trend before making, thereby obtains revised short circuit current attenuation curve.
CN2012101150524A 2012-04-19 2012-04-19 Power system short-circuit current attenuation practical calculation method Pending CN102646981A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101150524A CN102646981A (en) 2012-04-19 2012-04-19 Power system short-circuit current attenuation practical calculation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101150524A CN102646981A (en) 2012-04-19 2012-04-19 Power system short-circuit current attenuation practical calculation method

Publications (1)

Publication Number Publication Date
CN102646981A true CN102646981A (en) 2012-08-22

Family

ID=46659632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101150524A Pending CN102646981A (en) 2012-04-19 2012-04-19 Power system short-circuit current attenuation practical calculation method

Country Status (1)

Country Link
CN (1) CN102646981A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102944720A (en) * 2012-11-21 2013-02-27 上海电力学院 Short-circuit current attenuation calculating method with consideration of dynamic load for power system
CN106410783A (en) * 2016-04-14 2017-02-15 上海电力学院 Power system short circuit current attenuation calculating method based on coordinate transformation
CN113447803A (en) * 2021-06-08 2021-09-28 国网上海市电力公司 Short-circuit current calculation voltage coefficient value taking method for checking on-off capacity of circuit breaker

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
丁北平: "基于PSS/EBKDY模块的短路电流周期分量计算方法分析", 《上海电力学院学报》 *
吕文杰: "三相短路电流计算方法的探讨", 《四川电力技术》 *
曹炜等: "PSS/E BKDY 短路计算模块评述", 《华东电力》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102944720A (en) * 2012-11-21 2013-02-27 上海电力学院 Short-circuit current attenuation calculating method with consideration of dynamic load for power system
CN102944720B (en) * 2012-11-21 2015-02-25 上海电力学院 Short-circuit current attenuation calculating method with consideration of dynamic load for power system
CN106410783A (en) * 2016-04-14 2017-02-15 上海电力学院 Power system short circuit current attenuation calculating method based on coordinate transformation
CN106410783B (en) * 2016-04-14 2019-02-22 上海电力学院 A kind of Power System Shortcuts current attenuation calculation method based on coordinate transform
CN113447803A (en) * 2021-06-08 2021-09-28 国网上海市电力公司 Short-circuit current calculation voltage coefficient value taking method for checking on-off capacity of circuit breaker

Similar Documents

Publication Publication Date Title
Kawabe et al. Analytical method for short-term voltage stability using the stability boundary in the PV plane
Kamel et al. A novel hybrid ant colony-particle swarm optimization techniques based tuning STATCOM for grid code compliance
CN103199526B (en) Short circuit power frequency electrical quantity calculating method for power system comprising doubly-fed induction generator
CN102938563B (en) A kind of electric railway electric energy quality comprehensive treatment device
CN102403716A (en) Dynamic equalizing method for multi-infeed alternating/direct-current power grid
CN102882208B (en) A kind of electric railway electric energy quality comprehensive treatment device control method
WO2019007354A1 (en) Short-circuit current calculation method for doubly-fed wind power generation system considering different slips
CN106066918A (en) Based on homotopy containing distributed power source and the short-circuit current calculation method of nonlinear-load
Bidram et al. Capacitor design considering first swing stability of distributed generations
CN102361329A (en) Modeling method for performing dynamic characteristic research on hybrid alternating current/direct current (AC/DC) transmission system
Ahmad et al. A placement method of fuzzy based unified power flow controller to enhance voltage stability margin
CN104079010A (en) Transient stability emergency control strategy calculating method with generator tripping and direct-current emergency power modulation coordinated
CN103217623B (en) The line double-end fault distance-finding method had nothing to do with transition resistance and load current
CN102646981A (en) Power system short-circuit current attenuation practical calculation method
CN116247726A (en) Method and system for calculating accessible capacity and evaluating bearing capacity of distribution network system
Juanuwattanakul et al. Voltage stability enhancement for unbalanced multiphase distribution networks
CN103543315A (en) Impedance network analysis method of short-circuit current of 500 kV autotransformer
CN106981880B (en) Quantitative calculation method for unbalanced responsibility at public coupling point in power distribution system
Peters et al. Static VAR compensation of a fixed speed stall control wind turbine during start-up
CN106410783A (en) Power system short circuit current attenuation calculating method based on coordinate transformation
CN105262046B (en) Relay protection fixed value setting method based on electromechanical transient method
CN104899677B (en) The radial supply network load maximum reactive requirements of 500kV estimate method soon during disturbance restores
CN102495262B (en) Improved calculation method for classical assumption of short-circuit current
Mobarak et al. Voltage Instability of Initiation Fault Duration as Influenced by Nodes Short Circuit Levels NSCL.
CN205753432U (en) Three-phase load unbalance self-checking device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination