CN102641912B - Technology for continuously extruding coils by aluminum and aluminum alloy parallel flow pipes - Google Patents

Technology for continuously extruding coils by aluminum and aluminum alloy parallel flow pipes Download PDF

Info

Publication number
CN102641912B
CN102641912B CN201210146066.2A CN201210146066A CN102641912B CN 102641912 B CN102641912 B CN 102641912B CN 201210146066 A CN201210146066 A CN 201210146066A CN 102641912 B CN102641912 B CN 102641912B
Authority
CN
China
Prior art keywords
concurrent flow
zinc
cooling
preheating
flow pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210146066.2A
Other languages
Chinese (zh)
Other versions
CN102641912A (en
Inventor
彭俊芳
曹显华
李俊
杨立权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Asia Pacific Aviation Technology Co., Ltd.
Original Assignee
JIANGSU YATAL ALUMINUM CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU YATAL ALUMINUM CO Ltd filed Critical JIANGSU YATAL ALUMINUM CO Ltd
Priority to CN201210146066.2A priority Critical patent/CN102641912B/en
Publication of CN102641912A publication Critical patent/CN102641912A/en
Application granted granted Critical
Publication of CN102641912B publication Critical patent/CN102641912B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Extrusion Of Metal (AREA)

Abstract

The invention discloses a technology for continuously extruding coils by aluminum and aluminum alloy parallel flow pipes, which comprises the following steps of: (1) cleaning, (2) preheating, (3) extruding, (4) zinc spraying, (5) cooling, (6) drying, (7) flaw detection ink jetting, and (8) rolling. The technology integrates continuous extrusion, zinc spraying, cooling, drying, flaw detection, flaw marking, rolling and other processes, has high automation degree, stable process and quality, and high production efficiency, and the continuous batch production is successfully realized; the disqualified part of the product is more thoroughly marked; the drying of the product adopts a double-level drying process of a cold knife and hot blast tunnel drying equipment; and the production process is environmental-friendly and safe.

Description

The parallel stream of aluminium and aluminium alloy is managed continuously extruded coil pipe technique
Technical field
The present invention relates to relate to the parallel stream of a kind of aluminium and aluminium alloy and manage continuously extruded coil pipe technique, belong to aluminium and aluminium alloy extruded manufacture field technical field.
Background technology
Lightweight, the plurality of advantages such as heat-conductive characteristic good, good corrosion resistance, good processability, recycling capable of circulation that the parallel stream pipe of aluminium and aluminium alloy has, has been widely used on automobile and domestic air conditioning, has wide market prospects.Along with application widely, also more and more stricter to the quality requirement of concurrent flow pipe, particularly to being mingled with, pin hole, cracking, scuffing etc. may cause the control of the defect of leaking to require more and more higher.
Originally conventional processing step is: preheating → extruding → spray zinc → cooling → dry up → rolling.The shortcoming of this processing step has: 1. the greasy dirt on aluminium bar surface and dust are easily squeezed into product, the defect such as cause that product is mingled with; 2. cooling employing spraying cooling water, inefficiency; 3. dry up and cannot guarantee product surface aridity, easily cause product surface corrosion; 4. surface defects of products is by Manual Visual Inspection, and the risk that defect flows in certified products is very big; 5. joint None-identified in later process out, flows in certified products and causes quality risk to increase.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of for heat exchange concurrent flow pipe, and automaticity is high, stable production process, high, the stay-in-grade production technology of production efficiency.
Technical scheme of the present invention is:
The parallel stream of aluminium and aluminium alloy is managed a continuously extruded coil pipe technique, comprises the steps:
(1) clean, aluminium bar is cleaned in bar cleaning machine, remove aluminium bar surface and oil contaminant and dust, remove bar end face burr simultaneously;
(2) preheating, cleans aluminium bar later and will in hanging type Medium frequency induction pot arch, be preheating to 420-480 ℃;
(3) extruding, the aluminium bar after preheating is admitted in the extrusion die in forward extrusion machine and pushes, and forms the concurrent flow pipe of required size, and extrusion die need carry out preheating before use in mould pot arch;
(4) spray zinc, by closed spray zinc chamber, automatic spray Zn system that automatically the spray zinc platform of electric arc zn spraying machine, location use forms, utilize compressed air that the zinc silk of arc-melting is carried out to atomization and blow out being sprayed on product surface, the upper and lower surface of concurrent flow pipe is sprayed to zinc simultaneously and process, form the spray zinc layer of one deck even compact;
(5) cooling, by adopting the cooling water tank of recirculated water to make concurrent flow pipe cooling, and make not fully the zinc zinc layer firm attachment of cooled and solidified at concurrent flow tube-surface;
(6) dry, with cold wind cutter, dispel a small amount of cooling water moisture concurrent flow tube-surface being adhered to hot blast tunnel drying plant and carry out twin-stage processing, compressed air in cold wind cutter dries up most cooling waters of concurrent flow tube-surface, and the compressed air in hot blast tunnel drying plant after heating is thoroughly dried moisture;
(7) flaw detection ink-jet, adopt automatic eddy current flaw detec to detect a flaw to concurrent flow pipe, lean out pin hole, be mingled with, ftracture, scratch and signal is exported to after defect to defect sign ink jet printer, defect sign ink jet printer is received the signal of automatic eddy current flaw detec, and forward extrusion machine and automatically after the signal of electric arc zn spraying machine and the concurrent flow pipe speed of service of measuring in conjunction with tachymeter, implement ink-jet;
(8) rolling, is wound into coil pipe by four automatic winding-machines by product.
Beneficial effect, the present invention has the following advantages:
1. collect the operations such as continuously extruded, spray zinc, cooling, oven dry, flaw detection, defect sign, coiling in integrated, automaticity is high, process and steady quality, and production efficiency is high, has successfully realized the continuous batch production of this product;
2. the sign at the defective position of product quality more comprehensively, has not only identified the product defects that the eddy current inspection of prior art sign goes out, and has also identified the binding site of extruded bar stock and spray zinc position when abnormal simultaneously;
3. the oven dry of product, has adopted the secondary drying course of cold wind cutter, hot blast tunnel drying plant, and solve common heating mode drying rate and cannot catch up with product extrusion speed, and the problem of extrusion speed product surface excess Temperature fusing when slack-off;
4. production process environmental protection, safety, spraying on the one hand zinc carries out enclosed spray zinc is indoor, and adopting the vertical filter cylinder secondary ash collector of whirlwind to carry out zinc powder collection, the zinc powder in cooling water is also tackled in water tank and is focused on by filter pump on the other hand, has effectively prevented zinc powder contaminated environment.
Accompanying drawing explanation
Fig. 1 implements system schematic of the present invention;
Fig. 2 is process chart of the present invention.
1-aluminium bar in figure, 2-cleaning machine, 3-hanging type Medium frequency induction pot arch, 4-forward extrusion machine, 5-extrusion die, 6-pot arch, 7-automatic electric arc zn spraying machine, 8-spray zinc platform, 9-closed spray zinc chamber, 10-cooling water tank, 11-filter pump, 12-cold wind cutter, 13-hot blast tunnel drying plant, 14-automatic eddy current flaw detec, 15-defect sign ink jet printer, 16-tachymeter, 17-winder, 18-concurrent flow pipe, 19-dedusting pipeline, the vertical filter cylinder secondary ash collector of 20-whirlwind.
The specific embodiment
Below in conjunction with accompanying drawing, the invention will be further described.
The parallel stream of aluminium and aluminium alloy is managed a continuously extruded coil pipe technique, comprises the steps:
(1) clean, aluminium bar is cleaned in bar cleaning machine, remove aluminium bar surface and oil contaminant and dust, remove bar end face burr simultaneously.
First aluminium bar 1 is cleaned in bar cleaning machine 2, cleaning machine 2, when removing aluminium bar 1 surface and oil contaminant and dust, also possesses the function of removing bar end face burr, prevents that foreign matter from damaging extrusion die 5 and causing product to be mingled with bad in extrusion process.
(2) preheating, cleans aluminium bar later and will in hanging type Medium frequency induction pot arch, be preheating to 420-480 ℃.
Clean aluminium bar 1 later and will in hanging type Medium frequency induction pot arch 3, be preheating to 420-480 ℃, the advantage of hanging type Medium frequency induction pot arch 3 is: firing rate is fast, aluminium bar does not contact with body of heater, can not cause the defects such as surface tear, avoid causing product to produce the defects such as layering, cracking, bubble.
(3) extruding, the aluminium bar after preheating is admitted in the extrusion die in forward extrusion machine and pushes, and forms the concurrent flow pipe of required size, and extrusion die need carry out preheating before use in mould pot arch.
Aluminium bar after preheating is admitted to forward extrusion machine 4 and pushes, and after aluminium bar is out of shape after extrusion die 5, forms the concurrent flow pipe 18 of required size, and extrusion die 5 need carry out preheating before use in mould pot arch 6.
(4) spray zinc, by closed spray zinc chamber, automatic spray Zn system that automatically the spray zinc platform of electric arc zn spraying machine, location use forms, utilize compressed air that the zinc silk of arc-melting is carried out to atomization and blow out being sprayed on product surface, the upper and lower surface of concurrent flow pipe is sprayed to zinc simultaneously and process, form the spray zinc layer of one deck even compact.
Automatic spray Zn system is set at extruder outlet place, automatically spray Zn system is by closed spray zinc chamber 9, eight automatic electric arc zn spraying machines 7 have been located spray zinc platform 8 compositions of use, the upper and lower surface of concurrent flow pipe 18 is sprayed to zinc processes simultaneously, form the spray zinc layer of one deck even compact, spray zinc is to utilize compressed air that the zinc silk of arc-melting is carried out to atomization and blow out being sprayed on product surface, residual suspension zinc particle in closed spray zinc chamber 9 is collected by dedusting pipeline 19 by two vertical filter cylinder secondary ash collectors 20 of whirlwind, prevents from polluting workshop condition.
(5) cooling, by adopting the cooling water tank of recirculated water to make concurrent flow pipe cooling, and make not fully the zinc zinc layer firm attachment of cooled and solidified at concurrent flow tube-surface.
Spray zinc concurrent flow pipe 18 later can not contact any solid objects, and not yet fully the zinc layer of cooled and solidified is easily wiped.Need to make its cooling and firm attachment on concurrent flow pipe 18 surfaces by cooling water tank 10, cooling water tank 10 adopts recirculated water to guarantee water temperature, in product cooling procedure, have a small amount of zinc powder and fall in water, filter pump 11 is installed to prevent zinc powder polluted source water quality in recirculation water pipeline.
(6) dry, with cold wind cutter, dispel a small amount of cooling water moisture concurrent flow tube-surface being adhered to hot blast tunnel drying plant and carry out twin-stage processing, compressed air in cold wind cutter dries up most cooling waters of concurrent flow tube-surface, and the compressed air in hot blast tunnel drying plant after heating is thoroughly dried moisture;
Concurrent flow pipe 18 from cooling water tank 10 out after, a small amount of cooling water can be adhered in surface, if do not carry out drying and processing, the false alarm that can occur causes detecting a flaw, reduces the bad phenomenon such as ink-jet ink marks adhesion in subsequent handling.Adopt cold wind cutter 12 to dispel with hot blast tunnel drying plant 13 effects on surface moisture and carry out twin-stage processing, compressed air in cold wind cutter dries up most cooling waters on concurrent flow pipe 18 surfaces, and the compressed air in hot blast tunnel drying plant after heating is thoroughly dried moisture.
(7) flaw detection ink-jet, adopt automatic eddy current flaw detec to detect a flaw to concurrent flow pipe, lean out pin hole, be mingled with, ftracture, scratch and signal is exported to after defect to defect sign ink jet printer, defect sign ink jet printer is received the signal of automatic eddy current flaw detec, and forward extrusion machine and automatically after the signal of electric arc zn spraying machine and the concurrent flow pipe speed of service of measuring in conjunction with tachymeter, implement ink-jet;
After oven dry, adopt 14 pairs of concurrent flow pipes 18 of automatic eddy current flaw detec to detect a flaw, lean out pin hole, be mingled with, signal exported to defect sign ink jet printer 15 after the defect such as cracking, scuffing, defect sign ink jet printer 15 is received the signal of automatic eddy current flaw detec 14, and forward extrusion machine 4 and automatically after the signal of electric arc zn spraying machine 7 and concurrent flow pipe 18 speeds of service of measuring in conjunction with tachymeter 16, accurately implement ink jet process.Like this, the rejected region that the position when binding site between aluminium bar, the abnormal current interruption of spray Zn system and carrying out flaw detection go out can be identified out by automatic ink-jet, to choose and scrap in client's use procedure.
(8) rolling, is wound into coil pipe by four automatic winding-machines by product.
The parallel stream of aluminium of the present invention and aluminium alloy is managed continuously extruded coil pipe technique, collect the operations such as continuously extruded, spray zinc, cooling, oven dry, flaw detection, defect sign, coiling in integrated, automaticity is high, process and steady quality, production efficiency is high, has successfully realized the continuous batch of this product and has produced.
The sign at the defective position of product quality more comprehensively, has not only identified the product defects that the eddy current inspection of prior art sign goes out, and has also identified the binding site of extruded bar stock and spray zinc position when abnormal simultaneously.
The oven dry of product, has designed the secondary drying course of cold wind cutter, hot blast tunnel drying plant, and solve common heating mode drying rate and cannot catch up with product extrusion speed, and the problem of extrusion speed product surface excess Temperature fusing when slack-off.
Production process environmental protection, safety, spraying on the one hand zinc carries out enclosed spray zinc is indoor, and adopting the vertical filter cylinder secondary ash collector of whirlwind to carry out zinc powder collection, the zinc powder in cooling water is also tackled in water tank and is focused on by filter pump on the other hand, has effectively prevented zinc powder contaminated environment.

Claims (1)

1. the parallel stream of aluminium and aluminium alloy is managed a continuously extruded coil pipe technique, comprises the steps:
(1) clean, aluminium bar is cleaned in bar cleaning machine, remove aluminium bar surface and oil contaminant and dust, remove bar end face burr simultaneously;
(2) preheating, cleans aluminium bar later and will in hanging type Medium frequency induction pot arch, be preheating to 420-480 ℃;
(3) extruding, the aluminium bar after preheating is admitted in the extrusion die in forward extrusion machine and pushes, and forms the concurrent flow pipe of required size, and extrusion die need carry out preheating before use in mould pot arch;
(4) spray zinc, by closed spray zinc chamber, automatic spray Zn system that automatically the spray zinc platform of electric arc zn spraying machine, location use forms, utilize compressed air that the zinc silk of arc-melting is carried out to atomization and blow out being sprayed on product surface, the upper and lower surface of concurrent flow pipe is sprayed to zinc simultaneously and process, form the spray zinc layer of one deck even compact;
(5) cooling, by adopting the cooling water tank of recirculated water to make concurrent flow pipe cooling, and make not fully the spray zinc layer firm attachment of cooled and solidified at concurrent flow tube-surface;
(6) dry, with cold wind cutter, dispel a small amount of cooling water moisture concurrent flow tube-surface being adhered to hot blast tunnel drying plant and carry out twin-stage processing, compressed air in cold wind cutter dries up most cooling waters of concurrent flow tube-surface, and the compressed air in hot blast tunnel drying plant after heating is thoroughly dried moisture;
(7) flaw detection ink-jet, adopt automatic eddy current flaw detec to detect a flaw to concurrent flow pipe, lean out pin hole, be mingled with, ftracture, scratch and signal is exported to after defect to defect sign ink jet printer, defect sign ink jet printer is received the signal of automatic eddy current flaw detec, and forward extrusion machine and automatically after the signal of electric arc zn spraying machine and the concurrent flow pipe speed of service of measuring in conjunction with tachymeter, implement ink-jet;
(8) rolling, is wound into coil pipe by four automatic winding-machines by product.
CN201210146066.2A 2012-05-11 2012-05-11 Technology for continuously extruding coils by aluminum and aluminum alloy parallel flow pipes Active CN102641912B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210146066.2A CN102641912B (en) 2012-05-11 2012-05-11 Technology for continuously extruding coils by aluminum and aluminum alloy parallel flow pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210146066.2A CN102641912B (en) 2012-05-11 2012-05-11 Technology for continuously extruding coils by aluminum and aluminum alloy parallel flow pipes

Publications (2)

Publication Number Publication Date
CN102641912A CN102641912A (en) 2012-08-22
CN102641912B true CN102641912B (en) 2014-03-26

Family

ID=46655134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210146066.2A Active CN102641912B (en) 2012-05-11 2012-05-11 Technology for continuously extruding coils by aluminum and aluminum alloy parallel flow pipes

Country Status (1)

Country Link
CN (1) CN102641912B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103736765B (en) * 2013-12-09 2016-01-20 河南启德隆实业有限公司 A kind of manufacture craft of micro-channel parallel flow aluminum pipe
CN103938146B (en) * 2014-04-03 2016-02-24 上海良时喷涂设备有限公司 Branched microchannel aluminium flat conduit is online spray zinc and cleaning apparatus simultaneously
CN105032971A (en) * 2015-09-17 2015-11-11 天津市升发工贸有限公司 Aluminum profile cooling device
CN106591762B (en) * 2016-12-20 2019-05-10 黄早早 Aluminium flat conduit production line analog machine
CN107321806A (en) * 2017-07-24 2017-11-07 刘易铭 A kind of stacked continuously extruded metal tube mosquito-repellent incense coil production line and production method
CN108220862B (en) * 2018-03-30 2019-09-20 扬州瑞斯乐复合金属材料有限公司 A kind of control method of extrusion aluminum-type material surface spray zinc
CN108722821A (en) * 2018-05-30 2018-11-02 浙江康盛股份有限公司 A kind of organic coat aluminum pipe and its processing method
CN111014331B (en) * 2019-12-17 2021-09-24 扬州瑞斯乐复合金属材料有限公司 Cooling method of micro-channel aluminum flat tube
CN112893511A (en) * 2020-12-25 2021-06-04 亚太轻合金(南通)科技有限公司 Production method and production line for continuously-formed corrosion-resistant seamless aluminum alloy pipe

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4553416A (en) * 1983-06-20 1985-11-19 Sumitomo Metal Industries, Ltd. Dry type continuous wire drawing process
CN201697881U (en) * 2010-05-25 2011-01-05 上海龙阳精密复合铜管有限公司 Online copper pipe flaw ink mark detection device
CN101956102A (en) * 2010-10-27 2011-01-26 江苏格林威尔金属材料科技有限公司 Parallel flow tubes used for heat exchanger and manufacturing method thereof
CN202045188U (en) * 2011-04-29 2011-11-23 金川集团有限公司 Horizontal rewinding device for copper-nickel alloy disc stretched tube

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60152317A (en) * 1984-01-18 1985-08-10 Sumitomo Metal Ind Ltd Continuous drawing method of wire rod
JP3075385B2 (en) * 1993-11-25 2000-08-14 住友電気工業株式会社 Surface scratch removal method for hot rolled material

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4553416A (en) * 1983-06-20 1985-11-19 Sumitomo Metal Industries, Ltd. Dry type continuous wire drawing process
CN201697881U (en) * 2010-05-25 2011-01-05 上海龙阳精密复合铜管有限公司 Online copper pipe flaw ink mark detection device
CN101956102A (en) * 2010-10-27 2011-01-26 江苏格林威尔金属材料科技有限公司 Parallel flow tubes used for heat exchanger and manufacturing method thereof
CN202045188U (en) * 2011-04-29 2011-11-23 金川集团有限公司 Horizontal rewinding device for copper-nickel alloy disc stretched tube

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP昭60-152317A 1985.08.10
JP特开平7-148656A 1995.06.13

Also Published As

Publication number Publication date
CN102641912A (en) 2012-08-22

Similar Documents

Publication Publication Date Title
CN102641912B (en) Technology for continuously extruding coils by aluminum and aluminum alloy parallel flow pipes
CN102248444B (en) Filtering and cooling device for computerized numerical control gantry machine tool
KR20110010571U (en) Automatic anti-corrosion coating process and production line for large size steel pipe
CN104084750A (en) Submerged-arc welding repair method after alkali production squeezing roller is worn
CN104674263A (en) Metal surface cleaning method
CN103526498A (en) Energy-saving environmental-friendly system for setting machine
CN102560057A (en) Heat treatment process method and system for hot rolled seamless steel tubes
CN202934193U (en) Device for removing burrs in aluminum alloy high-frequency welding straight-welded pipe
CN108787264A (en) Welding epoxy coating antisepsis production line and anticorrosion process in a kind of welded still pipe
CN106040645A (en) Method for cleaning and drying carbon fiber composite work-pieces in batches
CN108063041B (en) A kind of on-line processing method and equipment manufacturing high-tension transformer lumen of radiator
CN108620808A (en) A kind of transmission shaft injury repair technique
CN105479339A (en) Device for automatically controlling grinding temperature of stainless steel
CN104233292A (en) Laser repair method adopting metal powder
CN104438381B (en) Metal plate and belt surface cleaning wiping arrangement on-line cleaning system
CN207628684U (en) The vacuum of radiator for transformer inner cavity draws paint and vacuum quick drying paint equipment
CN202003774U (en) Accumulated residue clearer
CN202592583U (en) Polyolefin filling masterbatch production dust collector
CN203600593U (en) Closed-loop filter screen circulating filter
CN203474898U (en) Wire strip product cleaning device
CN103629673B (en) Based on the industrial waste salt processing unit (plant) of fluidized bed furnace and high-temperature heat pipe heat exchange
CN104213068B (en) Bimetal continuous thermal spraying device for outer wall of oil pipe
CN101986397A (en) Slag deposit remover
CN206122211U (en) Cleaning device
CN204338588U (en) Metal plate and belt surface cleaning wiping arrangement on-line cleaning system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190618

Address after: 214145 Lihe Road and Hongxiang Road Intersection of Hongshan Street, Xinwu District, Wuxi City, Jiangsu Province

Patentee after: Jiangsu Asia Pacific Aviation Technology Co., Ltd.

Address before: 214111 No. 8 Fangxing Road, New District, Wuxi City, Jiangsu Province

Patentee before: Jiangsu Yatal Aluminum Co., Ltd.