CN102637242A - Control method for improving line loss calculating accuracy of power distribution room - Google Patents

Control method for improving line loss calculating accuracy of power distribution room Download PDF

Info

Publication number
CN102637242A
CN102637242A CN2012100950429A CN201210095042A CN102637242A CN 102637242 A CN102637242 A CN 102637242A CN 2012100950429 A CN2012100950429 A CN 2012100950429A CN 201210095042 A CN201210095042 A CN 201210095042A CN 102637242 A CN102637242 A CN 102637242A
Authority
CN
China
Prior art keywords
district
user
sales amount
electricity sales
little
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100950429A
Other languages
Chinese (zh)
Inventor
张骋
董伟毅
任文龙
李翔
徐莉
郭征
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Electric Power Co filed Critical Shanghai Municipal Electric Power Co
Priority to CN2012100950429A priority Critical patent/CN102637242A/en
Publication of CN102637242A publication Critical patent/CN102637242A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a control method for improving the line loss calculating accuracy of a power distribution room, comprising the following steps: firstly, dividing each power distribution room into a small user power distribution room, a large user power distribution room, a small user mixing power distribution room and a large user mixing power distribution room; secondly, determining the average time of power selling amount aiming at different types of power distribution room based on the current situation that the meter reading times are different for different users, and designing different formulas to calculate the power supply amount and the power selling amount of the power distribution room; and finally, calculating the line loss according to the collected power supply amount and power selling amount. Therefore, the control method ensures that the time difference of power amount calculation is eliminated and a reasonable calculating result is acquired.

Description

Be used to improve the control method of electric power platform district line loss counting accuracy
Technical field
The present invention relates to power domain, particularly a kind of control method that is used to improve electric power platform district line loss counting accuracy.
Background technology
Line loss is promptly from supplying power to the electric quantity loss between the sale of electricity, the method for calculating line loss at present be of that month delivery deduct of that month electricity sales amount difference divided by of that month delivery.Because the time difference that electric weight calculates, and the electricity consumption customer type differs, and dissimilar user's electric weight time of entering an item of expenditure in the accounts is different, calculates line loss like this and can produce very big error, and usually line loss per unit reaches a few percent thousand, and data error is bigger.
Summary of the invention
The purpose of this invention is to provide a kind of control method that is used to improve electric power platform district line loss counting accuracy; Through deep research and experiment; Draw the electricity sales amount averaging time in dissimilar districts, and collect delivery and electricity sales amount averaging time, eliminate the time difference that electric weight calculates according to electricity sales amount; Reach the result of reasonable computation, thereby overcome existing the bigger deficiency of district's line loss error of calculation.
In order to achieve the above object, technical scheme of the present invention provides a kind of control method that is used to improve electric power platform district line loss counting accuracy; Said control method comprises following steps:
Step 1, classified in the platform district; That is, according to all electricity consumption clients' in the platform district capacity, will be arbitrarily platform zoning be divided into little subscriber board district, large user Tai Qu, little user and mix the platform district, or the large user mixes the platform district;
Step 2, collect delivery, the electricity sales amount data in platform district and check meter the time; Wherein, with the mean value of time of checking meter of all sale of electricity users in any platform district in any January, be called this district electricity sales amount averaging time of this month;
Step 3, according to platform district delivery and the electricity sales amount collected, according to formula, calculate the line loss per unit in this district; Line loss per unit=(delivery-electricity sales amount)/delivery * 100%.
In the step 1, the foundation of platform region class is:
All electricity consumption client electricity capacities in the Dang Tai district are all less than 100 o'clock, and setting this district is little subscriber board district:
All electricity consumption client electricity capacities in the Dang Tai district are all greater than 100 o'clock, and setting this district is large user's platform district:
Capacity is promptly arranged greater than 100 client in the Dang Tai district, capacity is also arranged less than 100 client, and every month large user's power consumption is less than 40% o'clock, setting this district is that little user mixes the platform district:
Capacity is promptly arranged greater than 100 client in the Dang Tai district, capacity is also arranged less than 100 client, and every month large user's power consumption was set this district and mixed the platform district for the large user greater than 40% o'clock.
In the step 2, the electricity sales amount A1 that sets little subscriber board district is of that month electricity sales amount;
The delivery A2 that sets little subscriber board district is: the time of checking meter is electricity sales amount averaging time moon greater than preceding January, and smaller or equal to all users' of of that month electricity sales amount averaging time electric weight sum;
Then in the step 3, the line loss per unit in little subscriber board district is (A2-A1)/A2 * 100%.
In the step 2, the electricity sales amount B1 that sets large user's platform district is the electricity sales amount in preceding January;
The delivery B2 that sets large user's platform district is: the electricity sales amount averaging time of the time of checking meter greater than preceding the bimester, and smaller or equal to all users' of electricity sales amount averaging time in preceding January electric weight sum;
Then in the step 3, the line loss per unit in large user's platform district is (B2-B1)/B2 * 100%.
In the step 2, set the electricity sales amount C1 that little user mixes the platform district and be:
SX0+SD1/(TD1-TD2)×(TD1-TX1)+SD0/(TD0-TD1)×(TX0-?TD1);
Wherein, SX0 is of that month little user's a electricity sales amount; SD0 is of that month large user's a electricity sales amount; SD1 is large user's electricity sales amount in preceding January;
TX0 is of that month little user averaging time; TX1 is the little user averaging time in preceding January; TD0 is of that month large user's averaging time; TD1 is large user's averaging time in preceding January; Large user's averaging time bimester that TD2 being preceding;
And, set the delivery C2 that little user mixes the platform district and be: preceding January little user the time of checking meter greater than little user's electricity sales amount averaging time in preceding January, and smaller or equal to all users' of little user's electricity sales amount averaging time in this month electric weight sum;
Then in the step 3, the line loss per unit that little user mixes the platform district is (C2-C1)/C2 * 100%.
In the step 2, the electricity sales amount D1 that the setting large user mixes the platform district is:
SD1+?SX1/(TX1-TX2)×(TX1-?TD2)+?SX0/(?TX0-?TX1)×(TD1-?TX1);
Wherein, SD1 is large user's electricity sales amount in preceding January; SX0 is of that month little user's electricity sales amount; SX1 is little user's electricity sales amount in preceding January;
TX0 is of that month little user averaging time; TX1 is the little user averaging time in preceding January; Little user averaging time bimester that TX2 being preceding; TD1 is large user's averaging time in preceding January; Large user's averaging time bimester that TD2 being preceding.
Setting the delivery D2 that the large user mixes the platform district is: the large user electricity sales amount averaging time of user's the time of checking meter greater than preceding the bimester, and smaller or equal to all users' of of that month large user's electricity sales amount averaging time delivery sum;
Then in the step 3, the line loss per unit that the large user mixes the platform district is (D2-D1)/D2 * 100%.
Compared with prior art; The control method that is used to improve electric power platform district line loss counting accuracy according to the invention; Its advantage is: at first, among the present invention each zoning is divided into following several types: little subscriber board district, large user Tai Qu, little user mix the platform district and the large user mixes the platform district; Secondly, to different platform district types,, confirm electricity sales amount averaging time, and designed delivery and the electricity sales amount that different formula comes the computer board district respectively according to the check meter present situation of asynchronism(-nization) of different user types; At last, carry out line loss calculating according to delivery of collecting and electricity sales amount.Therefore, the present invention can eliminate the time difference that electric weight calculates, and obtains the result of reasonable computation.
Description of drawings
Fig. 1 is the process flow diagram that is used to improve the control method of electric power platform district line loss counting accuracy according to the invention;
Fig. 2 shows the type and the corresponding line loss computing formula in each district in the control method according to the invention.
Embodiment
Cooperation is referring to illustrated in figures 1 and 2; The control method that is used to improve electric power platform district line loss counting accuracy according to the invention; The technical scheme that adopts is: at first; Different according to platform district type is divided into little subscriber board district, large user's platform district and mixes the platform district, wherein mixes the platform district and can be divided into again that little user mixes the platform district, the large user mixes the platform district.Secondly, confirm electricity sales amount averaging time according to the check meter difference of time of different user types in the enterprise, and collect delivery, electricity sales amount that what is called is meant " electricity sales amount averaging time " mean value of this month all sale of electricity users' of this district the time of checking meter.At last, carrying out line loss according to the confession electricity sales amount of collecting calculates.
The present invention is directed to different platform district types,, designed respectively with different formula and calculated line loss per unit according to the check meter present situation of asynchronism(-nization) of different user types.Concrete, control method according to the invention comprises following steps:
Step 1, classified in the platform district;
Step 1.1, all electricity consumption client electricity capacities of Dang Tai district are set at little subscriber board district all less than 100 o'clock:
Step 1.2, all electricity consumption client electricity capacities of Dang Tai district are set at large user's platform district all greater than 100 o'clock:
Promptly there was capacity in step 1.3, Dang Tai district greater than 100 client, capacity is also arranged less than 100 client, and every month large user's power consumption were set at little user and mix the platform district less than 40% o'clock:
Promptly there was capacity in step 1.4, Dang Tai district greater than 100 client, capacity is also arranged less than 100 client, and every month large user's power consumption were set at the large user and mix the platform district greater than 40% o'clock.
Step 2, collect delivery, electricity sales amount data and check meter the time by the platform district;
Platform district line loss computing method are described for ease, and existing is example with the line loss of calculating certain year Dec, wherein " electricity sales amount averaging time " be meant the mean value of this month all sale of electricity users' of this district the time of checking meter;
Step 2.1, for little subscriber board district, setting its electricity sales amount A1 is the electricity sales amount in Dec;
Setting its delivery A2 is: the time of checking meter is for greater than electricity sales amount averaging time in November, and smaller or equal to all users' of electricity sales amount averaging time in Dec electric weight sum.
Step 2.2, for large user's platform district, setting its electricity sales amount B1 is the electricity sales amount in November;
Setting its delivery B2 is: the time of checking meter is greater than electricity sales amount averaging time in October, and smaller or equal to all users' of electricity sales amount averaging time in November electric weight sum.
Step 2.3, mix the platform district, set its electricity sales amount C1 and be for little user:
SX0+SD1/(TD1-TD2)×(TD1-TX1)+SD0/(TD0-TD1)×(TX0-?TD1);
Wherein, SX0 is little user's electricity sales amount in Dec; SD0 is large user's electricity sales amount in Dec; SD1 is large user's electricity sales amount in November;
TX0 is little user averaging time in Dec; TX1 is little user averaging time in November; TD0 is large user averaging time in Dec; TD1 is large user averaging time in November; TD2 is large user averaging time in October.
Setting the delivery C2 that little user mixes the platform district is: November little user the time of checking meter greater than little user's electricity sales amount averaging time in November, and smaller or equal to all users' of little user's electricity sales amount averaging time in Dec electric weight sum.
Step 2.4, mix the platform district, set its electricity sales amount D1 and be for the large user:
SD1+?SX1/(TX1-TX2)×(TX1-?TD2)+?SX0/(?TX0-?TX1)×(TD1-?TX1);
Wherein, SD1 is large user's electricity sales amount in November; SX0 is little user's electricity sales amount in Dec; SX1 is little user's electricity sales amount in November;
TX0 is little user averaging time in Dec; TX1 is little user averaging time in November; TX2 is little user averaging time in October; TD1 is large user averaging time in November; TD2 is large user averaging time in October.
Setting the delivery D2 that the large user mixes the platform district is: user's the time of checking meter is greater than large user's electricity sales amount averaging time in October, and smaller or equal to all users' of large user's electricity sales amount averaging time in Dec delivery sum.
Step 3 computer board district line loss per unit; Carry out line loss calculating according to delivery of collecting and electricity sales amount, computing formula is following:
Line loss per unit=(delivery-electricity sales amount)/delivery * 100%.
That is to say that the line loss per unit in little subscriber board district is (A2-A1)/A2 * 100%, wherein the numerical value of delivery A2 and electricity sales amount A1 is specifically seen the description in the step 2.1.Line loss per unit computing method to other districts are similar, repeat no more.
Although content of the present invention has been done detailed introduction through above-mentioned preferred embodiment, will be appreciated that above-mentioned description should not be considered to limitation of the present invention.After those skilled in the art have read foregoing, for multiple modification of the present invention with to substitute all will be conspicuous.Therefore, protection scope of the present invention should be limited appended claim.

Claims (6)

1. a control method that is used to improve electric power platform district line loss counting accuracy is characterized in that,
Said control method comprises following steps:
Step 1, classified in the platform district; That is, according to all electricity consumption clients' in the platform district capacity, will be arbitrarily platform zoning be divided into little subscriber board district, large user Tai Qu, little user and mix the platform district, or the large user mixes the platform district;
Step 2, collect delivery, the electricity sales amount data in platform district and check meter the time; Wherein, with the mean value of time of checking meter of all sale of electricity users in any platform district in any January, be called this district electricity sales amount averaging time of this month;
Step 3, according to platform district delivery and the electricity sales amount collected, according to formula, calculate the line loss per unit in this district; Line loss per unit=(delivery-electricity sales amount)/delivery * 100%.
2. be used to improve the control method of electric power platform district line loss counting accuracy according to claim 1, it is characterized in that,
In the step 1, the foundation of platform region class is:
All electricity consumption client electricity capacities in the Dang Tai district are all less than 100 o'clock, and setting this district is little subscriber board district:
All electricity consumption client electricity capacities in the Dang Tai district are all greater than 100 o'clock, and setting this district is large user's platform district:
Capacity is promptly arranged greater than 100 client in the Dang Tai district, capacity is also arranged less than 100 client, and every month large user's power consumption is less than 40% o'clock, setting this district is that little user mixes the platform district:
Capacity is promptly arranged greater than 100 client in the Dang Tai district, capacity is also arranged less than 100 client, and every month large user's power consumption was set this district and mixed the platform district for the large user greater than 40% o'clock.
3. like the said control method that is used to improve electric power platform district line loss counting accuracy of claim 2, it is characterized in that,
In the step 2, the electricity sales amount A1 that sets little subscriber board district is of that month electricity sales amount;
The delivery A2 that sets little subscriber board district is: the time of checking meter is electricity sales amount averaging time moon greater than preceding January, and smaller or equal to all users' of of that month electricity sales amount averaging time electric weight sum;
Then in the step 3, the line loss per unit in little subscriber board district is (A2-A1)/A2 * 100%.
4. like the said control method that is used to improve electric power platform district line loss counting accuracy of claim 2, it is characterized in that,
In the step 2, the electricity sales amount B1 that sets large user's platform district is the electricity sales amount in preceding January;
The delivery B2 that sets large user's platform district is: the electricity sales amount averaging time of the time of checking meter greater than preceding the bimester, and smaller or equal to all users' of electricity sales amount averaging time in preceding January electric weight sum;
Then in the step 3, the line loss per unit in large user's platform district is (B2-B1)/B2 * 100%.
5. like the said control method that is used to improve electric power platform district line loss counting accuracy of claim 2, it is characterized in that,
In the step 2, set the electricity sales amount C1 that little user mixes the platform district and be:
SX0+SD1/(TD1-TD2)×(TD1-TX1)+SD0/(TD0-TD1)×(TX0-?TD1);
Wherein, SX0 is of that month little user's a electricity sales amount; SD0 is of that month large user's a electricity sales amount; SD1 is large user's electricity sales amount in preceding January;
TX0 is of that month little user averaging time; TX1 is the little user averaging time in preceding January; TD0 is of that month large user's averaging time; TD1 is large user's averaging time in preceding January; Large user's averaging time bimester that TD2 being preceding;
And, set the delivery C2 that little user mixes the platform district and be: preceding January little user the time of checking meter greater than little user's electricity sales amount averaging time in preceding January, and smaller or equal to all users' of little user's electricity sales amount averaging time in this month electric weight sum;
Then in the step 3, the line loss per unit that little user mixes the platform district is (C2-C1)/C2 * 100%.
6. like the said control method that is used to improve electric power platform district line loss counting accuracy of claim 2, it is characterized in that,
In the step 2, the electricity sales amount D1 that the setting large user mixes the platform district is:
SD1+?SX1/(TX1-TX2)×(TX1-?TD2)+?SX0/(?TX0-?TX1)×(TD1-?TX1);
Wherein, SD1 is large user's electricity sales amount in preceding January; SX0 is of that month little user's electricity sales amount; SX1 is little user's electricity sales amount in preceding January;
TX0 is of that month little user averaging time; TX1 is the little user averaging time in preceding January; Little user averaging time bimester that TX2 being preceding; TD1 is large user's averaging time in preceding January; Large user's averaging time bimester that TD2 being preceding;
Setting the delivery D2 that the large user mixes the platform district is: the large user electricity sales amount averaging time of user's the time of checking meter greater than preceding the bimester, and smaller or equal to all users' of of that month large user's electricity sales amount averaging time delivery sum;
Then in the step 3, the line loss per unit that the large user mixes the platform district is (D2-D1)/D2 * 100%.
CN2012100950429A 2012-03-31 2012-03-31 Control method for improving line loss calculating accuracy of power distribution room Pending CN102637242A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100950429A CN102637242A (en) 2012-03-31 2012-03-31 Control method for improving line loss calculating accuracy of power distribution room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100950429A CN102637242A (en) 2012-03-31 2012-03-31 Control method for improving line loss calculating accuracy of power distribution room

Publications (1)

Publication Number Publication Date
CN102637242A true CN102637242A (en) 2012-08-15

Family

ID=46621636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100950429A Pending CN102637242A (en) 2012-03-31 2012-03-31 Control method for improving line loss calculating accuracy of power distribution room

Country Status (1)

Country Link
CN (1) CN102637242A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104730393A (en) * 2015-04-02 2015-06-24 国家电网公司 District line loss rate detecting method and system
CN105117973A (en) * 2015-07-31 2015-12-02 国家电网公司 Method for determining resident capacity per household classification threshold values based on marketing data and statistics
CN105117373A (en) * 2015-07-31 2015-12-02 国家电网公司 Marketing data based determination method for classification threshold of resident capacity duty
CN105260944A (en) * 2015-10-10 2016-01-20 燕山大学 Method for calculating statistical line loss based on LSSVM (Least Square Support Vector Machine) algorithm and association rule mining
CN105488994A (en) * 2015-12-03 2016-04-13 国网上海市电力公司 Electrical transformer district electricity meter dynamic three-phase single phase line loss acquisition method
CN107666149A (en) * 2017-10-23 2018-02-06 珠海许继芝电网自动化有限公司 A kind of medium voltage distribution network line loss calculation method
CN108038347A (en) * 2017-12-01 2018-05-15 国网北京市电力公司 Line loss per unit acquisition methods and device
CN108573454A (en) * 2017-03-09 2018-09-25 国网甘肃省电力公司电力科学研究院 A kind of computational methods of regional distribution network middle pipe lineation damage electricity

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101206239A (en) * 2007-08-01 2008-06-25 许之端 Method for real-time measurement of matching net wire loss

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101206239A (en) * 2007-08-01 2008-06-25 许之端 Method for real-time measurement of matching net wire loss

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
丁心海等: "改进配电网线损计算方法的几点建议", 《电力系统自动化》 *
余卫国等: "电力网技术线损分析及降损对策", 《电网技术》 *
刘立霞: "可视化配电网线损计算与管理系统", 《CNKI优秀硕士学位论文全文库》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104730393A (en) * 2015-04-02 2015-06-24 国家电网公司 District line loss rate detecting method and system
CN105117973A (en) * 2015-07-31 2015-12-02 国家电网公司 Method for determining resident capacity per household classification threshold values based on marketing data and statistics
CN105117373A (en) * 2015-07-31 2015-12-02 国家电网公司 Marketing data based determination method for classification threshold of resident capacity duty
CN105117373B (en) * 2015-07-31 2018-02-13 国家电网公司 Resident's capacity accounting classification thresholds based on marketing data determine method
CN105260944A (en) * 2015-10-10 2016-01-20 燕山大学 Method for calculating statistical line loss based on LSSVM (Least Square Support Vector Machine) algorithm and association rule mining
CN105488994A (en) * 2015-12-03 2016-04-13 国网上海市电力公司 Electrical transformer district electricity meter dynamic three-phase single phase line loss acquisition method
CN108573454A (en) * 2017-03-09 2018-09-25 国网甘肃省电力公司电力科学研究院 A kind of computational methods of regional distribution network middle pipe lineation damage electricity
CN107666149A (en) * 2017-10-23 2018-02-06 珠海许继芝电网自动化有限公司 A kind of medium voltage distribution network line loss calculation method
CN108038347A (en) * 2017-12-01 2018-05-15 国网北京市电力公司 Line loss per unit acquisition methods and device

Similar Documents

Publication Publication Date Title
CN102637242A (en) Control method for improving line loss calculating accuracy of power distribution room
Johnson et al. Peak shifting and cross-class subsidization: The impacts of solar PV on changes in electricity costs
Das et al. Bangladesh power supply scenarios on renewables and electricity import
Hu et al. Stochastic–multiobjective market equilibrium analysis of a demand response program in energy market under uncertainty
Buck et al. Measuring welfare losses from urban water supply disruptions
Agarwal et al. Noncooperative games for autonomous consumer load balancing over smart grid
Godal et al. Permit trading: Merely an efficiency‐neutral redistribution away from climate‐change victims?
Fatima et al. Comparison of economical and technical photovoltaic hosting capacity limits in distribution networks
Raina et al. Equity impacts of informal private water markets: case of Kathmandu Valley
Maggiore et al. Impact of the enforcement of a time-of-use tariff to residential customers in Italy
CN103971261A (en) Pricing method and device, order processing method and electronic commerce system
CN112418702B (en) Method for calculating phase and load component of user meter made of composite components and related device
Iwasa et al. Dynamic two‐country Heckscher–Ohlin model with externality
CN108830663B (en) Electric power customer value evaluation method and system and terminal equipment
Dragnoiu et al. The more you know: energy labelling enables more sustainable cryptocurrency investments
Heinz et al. Balancing wind energy and participating in electricity markets with a fuel cell population
CN103377309A (en) Method and device for displaying released information
Hrga et al. Decentralized platform for investments and operation of energy communities
Dutra et al. Price regulation and the incentives to pursue energy efficiency by minimizing network losses
Radzi et al. Investigation on cost reflective network pricing and modified cost reflective network pricing methods for transmission service charges
Nguyen et al. Multi-stage stackelberg game approach for colocation datacenter demand response
Bertoldi et al. Efficiency valuation-concepts and practice
Xiao et al. Demand resource modeling in PJM capacity market
CN207249733U (en) A kind of subregion Spot Price computing system
Abdullah et al. Assessment of contribution-based congestion cost allocation using AC and DC for bilateral market

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20121031

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121031

Address after: 200002 Nanjing East Road, Shanghai, No. 181, No.

Applicant after: Shanghai Electric Power Corporation

Applicant after: State Grid Corporation of China

Address before: 200002 Nanjing East Road, Shanghai, No. 181, No.

Applicant before: Shanghai Electric Power Corporation

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120815