CN102635244A CN2012101194645A CN201210119464A CN102635244A CN 102635244 A CN102635244 A CN 102635244A CN 2012101194645 A CN2012101194645 A CN 2012101194645A CN 201210119464 A CN201210119464 A CN 201210119464A CN 102635244 A CN102635244 A CN 102635244A
Authority
CN
China
Prior art keywords
concrete
temperature
day
under
reduce
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101194645A
Other languages
Chinese (zh)
Inventor
陈明宝
刘祖国
何文斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN2012101194645A priority Critical patent/CN102635244A/en
Publication of CN102635244A publication Critical patent/CN102635244A/en
Pending legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention provides a construction method of a slide mould under a high-temperature environment and belongs to the technical field of civil engineering construction. The method mainly comprises the following steps of: firstly, selecting a proper additive; dividing temperatures of each day into sections from time according to the characteristic that a day and night temperature difference is great; then, setting a concrete mixing proportion by sections; adding ice blocks when concrete is agitated; agitating by a concrete tank car and the like so as to reduce a temperature of casting concrete; when a mould slides, adopting an interval lifting process; and covering a cotton felt on the surface of the cast concrete and utilizing an annular spraying and maintenance measure. By using the method, the technical difficulty that the slide mould cannot be realized by a regular construction method under the environment with a high temperature and the great day and night temperature difference is solved; and the method disclosed by the invention has the characteristics of fast construction period and low cost.

Description

The job practices of sliding formwork under hot environment
Technical field
The invention belongs to the civil engineering technical field, be specifically related to the job practices of a kind of sliding formwork under hot environment.
Background technology
In the also Monba gill cement mill project that certain unit undertakes the construction of, need build 1 of raw material homogenizing storehouse, 3 of clinker warehouses, 4 of cement bunkers, storehouse top mark Gao Jun is about 45m; Interior diameter is all about 20m; Wall thickness is 350mm, and strength grade of concrete C30 requires to adopt slding form operation.This engineering is positioned at desert area, and 39 ℃ of the annual mean highest temperatures are during construction; 48 ℃ of day maximum temperatures; Maximum 20 ℃ of day and night temperature, and the locality is Portland cement, the early strength height; Following at present problem is produced in conventional slding form operation meeting: concrete slump loss is fast, and is almost nil 1.5 hours inner concrete slumps; Concrete initial set, final setting time weak point, wherein the initial setting time is 1.5h, final setting time 2.5h; Normally night, the ready-mixed concrete mold clearing temperature reached 36-37 ℃.Thereby can't satisfy concrete from agitator to the pouring place haulage time 0.5h and from pump truck or ground pump to the sliding formwork storehouse wall build the requirement of the thick needs 1h of 500mm.
48 ℃ of maximum temperatures, it is high and can't carry out the problem of reinforced concrete structure sliding formwork that under the environment that day and night temperature is maximum 20 ℃, because of concrete slump loss is big, initial set, final setting time are short, concrete stirs mold clearing temperature.Under the big environment of high temperature, day and night temperature, the reinforced concrete structure sliding formwork can't be realized by conventional slding form operation method.
Summary of the invention
The present invention is directed to the technical problem that existing slding form operation method exists under the hot environment, the job practices of a kind of sliding formwork under hot environment is provided.
The job practices particular content of sliding formwork provided by the present invention under hot environment is following:
(1) selects suitable Concrete admixtures; This Concrete admixtures requires to satisfy the requirement of concrete design strength and the slding form operation requirement under the hot environment; Be that concrete strength meets design requirement; Concrete slump >=the 160mm of pouring location, initial setting time >=2.5h, final setting time >=4h;
(2) characteristics big according to day and night temperature, segmentation is provided with concrete mix;
(3) stir through on the rocks, the concrete tank of ready-mixed concrete, reduce the mold clearing temperature and the molding temperature of ready-mixed concrete, promptly the concrete molding temperature be controlled at≤33 ℃, reduce the obstruction and the slump-loss of concrete pump;
(4) take intermittently that sliding formwork promotes technology, concrete correlated performance is complementary under this at intermittence sliding formwork lifting technology and the hot environment;
(5) on the surface of concreting, cover cotton felt and adopt annular spray maintenance measure, reduce concrete and produce the crack because of dehydration.
The inventive method is specified as follows at present:
1, selects the suitable external agent for use
In order to solve concrete initial set, the short technical problem of final setting time, when design of concrete, at first select the suitable external agent for use.
According to the performance of different Admixtures, the Admixture of selecting for use should possess following characteristics:
(1) is liquid, is convenient to metering.
(2) under the prerequisite of guaranteed strength, has deferred action, i.e. concrete initial set time >=2.5h, final setting time >=4h.
(3) have the buck effect, the slump >=160mm reduces pump pressure simultaneously.
(4) reduce cement consumption, reduce the heat of hydration that cement produces.
Concrete is joined by degree of the falling .1o examination of routine, and Admixture is pressed cement consumption admixture step by step, until satisfying above requirement.
2, segmentation is provided with concrete mix
According to the big characteristics of day and night temperature every day, in time with the temperature section of every day, according to temperature section with also segmentation setting of concrete mix, to adapt to the temperature requirement of different time sections.
Press the concrete mix that temperature section is provided with, only need adjustment Admixture consumption, concrete is consistent at the correlated performance of different time sections basically.
3, reduce the going out of ready-mixed concrete, molding temperature
It is on the rocks when (1) concrete stirs
According to curing temperature relation in the U.S. " the high temperature concrete ACI 305R-1999 " standard, the mold clearing temperature that adopts ready-mixed concrete on the rocks is calculated in temperature, the slump and water requirement, makes it satisfy the mold clearing temperature requirement after concrete stirs.
(2) to template sunshade, watering cooling, reduce concrete molding temperature.
(3) adopt the concrete tank stirring technique
Enforcement through above measure; Reduced the concrete molding temperature, both the concrete molding temperature be controlled at≤33 ℃, reduce concrete stir, slump-loss in the transportation; Concrete slump>=the 160mm of pouring location satisfies the pumping condition and has reduced the plugging phenomenon.
4, sliding formwork adopts and intermittently promotes technology
The time of each climbing shuttering was controlled at about one hour under the normal temperature; When the concreting lap time is long under the high temperature,, whenever promoted 2-3 stroke at a distance from 30 minutes for reducing concrete lift height; Each stroke 50~100mm promotes about 250mm at every turn.
5, on the surface of concreting, cover cotton felt and adopt annular spray maintenance measure
Conventional concrete curing be direct water pipe at interval certain hour the concrete surface behind the final set 4h is watered, the dehydration under hot environment of this method is fast, can not satisfy concrete maintenance demand.
Maintenance process after the improvement adopts high-pressure hydraulic pump and circular spray tube on the cotton felt that covers on the wall of inside and outside storehouse, to spray water on the basis that cotton felt covers on the concrete surface of having built, and daytime is every at a distance from 1-2 hour water spray once, keeps the storehouse wall moist; Confirm according to temperature night.
The beneficial effect of the inventive method is following:
Use of the present invention has solved also Monba gill cement plant 48 ℃ of maximum temperatures, under the environment that day and night temperature is maximum 20 ℃; Because of concrete slump loss big; Initial set, final setting time are short, and molding temperature is high and can't carry out the problem of reinforced concrete structure sliding formwork, make characteristics fast, that cost is low of conventional slding form operation duration be able to continue use down at high temperature, environment that day and night temperature is big; Shorten the duration, reduced cost.
The specific embodiment
The inventive method practical implementation step is following:
1, selects the suitable external agent for use
Select Rheobuild 850 Admixtures that are suitable for the high temperature characteristics for use, these Admixture original producton location United Arab Emirates, fluid concrete under hot climate; Performance with raising and curing concrete reduces pump pressure, prolongs concrete apart from advantages such as transportations; Its initial setting time: 3h; Final setting time: 4.5h, the slump: 180~220mm, intensity satisfies the C30 requirement.
Concrete is joined by degree of the falling .1o examination of routine, and Admixture is pressed cement consumption admixture step by step, until satisfying above requirement.
2, segmentation is provided with concrete mix
The characteristics big according to local day and night temperature in time with temperature section, are the high temperature period between at 10 in the morning at 3 in afternoon, after at 3 in afternoon to 10 of the next mornings be the general period, design two kinds of match ratios, press the period and adjust the Admixture consumption.
Press the concrete mix that temperature section is provided with, only need adjustment Admixture consumption, concrete is consistent at the correlated performance of different time sections basically.
3, reduce the going out of ready-mixed concrete, molding temperature
It is on the rocks when (1) concrete stirs
According to curing temperature relation in the U.S. " the high temperature concrete ACI 305R-1999 " standard, the mold clearing temperature that adopts ready-mixed concrete on the rocks is calculated in temperature, the slump and water requirement, makes it satisfy the mold clearing temperature requirement after concrete stirs.
(2) to template sunshade, watering cooling, reduce concrete molding temperature.
(3) adopt the concrete tank stirring technique
Concrete tank is made up of two motors, and one is used for vehicle ', and one is used for the concrete stirring, simultaneously, is provided with the control water meter in the concrete tank.
Concrete mixing plant only carries out concrete batching, adds 70% frozen water during batching, in tank car, stirs and adds 30% water, reduces concrete transportation, mixing time, reduces slump-loss.
Enforcement through above measure; Reduced the concrete molding temperature, both the concrete molding temperature be controlled at≤33 ℃, reduce concrete stir, slump-loss in the transportation; Concrete slump>=the 160mm of pouring location satisfies the pumping condition and has reduced the plugging phenomenon.
4, sliding formwork adopts and intermittently promotes technology
Whenever promoted 2-3 stroke at a distance from 30 minutes, each stroke 50~100mm promotes about 250mm at every turn.Hoistway is separated by the decision of depanning concrete surface intensity, and the lifting operating personnel must in time observe concrete surface, and links up with the related personnel, accomplishes that the lifting of water velocity and platform is complementary.
5, on the surface of concreting, cover cotton felt and adopt annular spray maintenance measure
On the basis that cotton felt covers on the concrete surface of having built, adopt high-pressure hydraulic pump and circular spray tube on the cotton felt that covers on the wall of inside and outside storehouse, to spray water, daytime is every at a distance from 1-2 hour water spray once, keeps the storehouse wall moist; Confirm according to temperature night.

Claims (1)

1. the job practices of a sliding formwork under hot environment is characterized in that this method particular content is following:
(1) selects suitable Concrete admixtures; This Concrete admixtures requires to satisfy the requirement of concrete design strength and the slding form operation requirement under the hot environment; Be that concrete strength meets design requirement; Concrete slump >=the 160mm of pouring location, initial setting time >=2.5h, final setting time >=4h;
(2) characteristics big according to day and night temperature, segmentation is provided with concrete mix;
(3) stir through on the rocks, the concrete tank of ready-mixed concrete, reduce the mold clearing temperature and the molding temperature of ready-mixed concrete, promptly the concrete molding temperature be controlled at≤33 ℃, reduce the obstruction and the slump-loss of concrete pump;
(4) take intermittently that sliding formwork promotes technology, concrete correlated performance is complementary under this at intermittence sliding formwork lifting technology and the hot environment;
(5) on the surface of concreting, cover cotton felt and adopt annular spray maintenance measure, reduce concrete and produce the crack because of dehydration.
CN2012101194645A 2012-01-12 2012-04-23 Construction method of slide mould under high-temperature environment Pending CN102635244A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101194645A CN102635244A (en) 2012-01-12 2012-04-23 Construction method of slide mould under high-temperature environment

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201210008593.7 2012-01-12
CN201210008593 2012-01-12
CN2012101194645A CN102635244A (en) 2012-01-12 2012-04-23 Construction method of slide mould under high-temperature environment

Publications (1)

Publication Number Publication Date
CN102635244A true CN102635244A (en) 2012-08-15

Family

ID=46619808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101194645A Pending CN102635244A (en) 2012-01-12 2012-04-23 Construction method of slide mould under high-temperature environment

Country Status (1)

Country Link
CN (1) CN102635244A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979305A (en) * 2012-12-14 2013-03-20 中国十七冶集团有限公司 Slip-form construction method in high-temperature environment with big temperature difference
CN103878880A (en) * 2014-02-21 2014-06-25 中国十七冶集团有限公司 Stirring method of concrete tank truck
CN105822068A (en) * 2015-01-05 2016-08-03 五冶集团上海有限公司 Ultra-long thin wall concrete wall pouring and maintenance method under high temperature environment
CN111411785A (en) * 2020-03-31 2020-07-14 五冶集团上海有限公司 Concrete construction mold-entering temperature control system and temperature control method under high-temperature condition
CN113431318A (en) * 2021-07-29 2021-09-24 中建三局第二建设工程有限责任公司 Sliding form construction control method for special-shaped structure in high-temperature environment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1067231A (en) * 1992-06-08 1992-12-23 黑龙江省低温建筑科学研究所 Setting retardant type-high-early strength water-reducing agent preparation method and product
CN201661082U (en) * 2010-02-03 2010-12-01 中铁二十五局集团第三工程有限公司 Concrete heater for winter construction
JP2011000799A (en) * 2009-06-18 2011-01-06 Ohbayashi Corp Slipform construction method and finishing method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1067231A (en) * 1992-06-08 1992-12-23 黑龙江省低温建筑科学研究所 Setting retardant type-high-early strength water-reducing agent preparation method and product
JP2011000799A (en) * 2009-06-18 2011-01-06 Ohbayashi Corp Slipform construction method and finishing method
CN201661082U (en) * 2010-02-03 2010-12-01 中铁二十五局集团第三工程有限公司 Concrete heater for winter construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王俊芳: "高温环境下混凝土筒仓滑模温度控制技术研究与应用", 《工业建筑》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979305A (en) * 2012-12-14 2013-03-20 中国十七冶集团有限公司 Slip-form construction method in high-temperature environment with big temperature difference
CN102979305B (en) * 2012-12-14 2015-09-23 中国十七冶集团有限公司 High temperature and slding form operation method in the large environment of the temperature difference
CN103878880A (en) * 2014-02-21 2014-06-25 中国十七冶集团有限公司 Stirring method of concrete tank truck
CN105822068A (en) * 2015-01-05 2016-08-03 五冶集团上海有限公司 Ultra-long thin wall concrete wall pouring and maintenance method under high temperature environment
CN111411785A (en) * 2020-03-31 2020-07-14 五冶集团上海有限公司 Concrete construction mold-entering temperature control system and temperature control method under high-temperature condition
CN113431318A (en) * 2021-07-29 2021-09-24 中建三局第二建设工程有限责任公司 Sliding form construction control method for special-shaped structure in high-temperature environment

Similar Documents

Publication Publication Date Title
CN102635244A (en) Construction method of slide mould under high-temperature environment
CN106904923B (en) A kind of large volume eco-concrete and its construction method suitable for torrid areas
CN104058678A (en) Highly-antifreezing highly-slump retaining self-compacting C40 concrete
CN102924019A (en) High-strength micro-expansive grouting material and its preparation method
CN112960958B (en) Sealing slurry for winter assembly type construction and preparation method thereof
CN102887716A (en) Self-compaction refractory concrete
CN106082818A (en) Concrete and making, construction method
CN104230251B (en) The constructional method of teletostage mass concrete
EP2637830A1 (en) Controlled curing of concrete
CN102172979A (en) Method for improving concrete strength of cement product
CN101747002A (en) High-strength concrete
CN105254242A (en) C30 temperature shrinkage cracking-resistant steam-curing concrete, and preparation method thereof
CN104261766A (en) High-toughness mould pressing tile and preparation method thereof
CN103979997B (en) A kind of water-quenched manganese slag that utilizes prepares the method for high strength gas concrete as aggregate
CN105370041A (en) Concrete engineering construction method under extreme temperature difference in desert area
CN108071173A (en) A kind of construction method of mass concrete
CN112031423A (en) Construction quality control method for ultra-large-volume concrete
CN107459327A (en) Suitable for low temperature or the fast repairing concrete material of construction in minus-temperature environment
CN110469113A (en) A kind of self-compact concrete in construction method under hot conditions
CN103758006A (en) Novel road and construction method thereof
CN110593017A (en) Technology for controlling cracking and pulverization of concrete of high-speed rail turnout zone bed in severe cold area
CN104291756A (en) High-strength thermal insulation mould pressing tile and manufacturing method thereof
CN108751926A (en) The cast-in-place phosphorus magnesium concrete of prefabricated node of column and beam based on phosphorus magnesium material and construction method
CN115124302A (en) Low-temperature-rise anti-cracking corrosion-resistant large-volume concrete preparation technology and cooling-pipe-free construction method
CN103539381B (en) Admixture for pea gravel concrete

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120815