CN102635121A - 一种滑坡抢险治理高压充气截水法 - Google Patents
一种滑坡抢险治理高压充气截水法 Download PDFInfo
- Publication number
- CN102635121A CN102635121A CN2012101429157A CN201210142915A CN102635121A CN 102635121 A CN102635121 A CN 102635121A CN 2012101429157 A CN2012101429157 A CN 2012101429157A CN 201210142915 A CN201210142915 A CN 201210142915A CN 102635121 A CN102635121 A CN 102635121A
- Authority
- CN
- China
- Prior art keywords
- landslide
- section
- drill hole
- hole wall
- borehole wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/23—Dune restoration or creation; Cliff stabilisation
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
本发明公开了一种滑坡抢险治理高压充气截水法,在滑坡的后缘斜坡区,沿斜坡等高线布置若干钻孔,相邻钻孔之间间隔8~10m,每个钻孔内插入一根输气管;输气管的上部为钻孔孔壁封闭段,下部为钻孔孔壁透气段,钻孔孔壁封闭段与钻孔孔壁透气段的相接处在坡面以下3~5m,钻孔孔壁透气段的长度一般可取3~5m;所有输气管均通过输气管路与空气压缩机相连;本发明的滑坡抢险治理高压充气截水法截水速度快,施工技术简单,整个过程不涉及土石方开挖工程,工程造价低,在控制滑坡体地下水位上升作用的效果明显,能够为滑坡抢险赢得时间。
Description
技术领域
本发明涉及一种滑坡抢险治理方法,尤其涉及一种适用于坡体的变形破坏主要受斜坡后缘地下水补给影响的滑坡类型的应急抢险治理方法。
背景技术
地下水常常是影响滑坡稳定性的主要因素,大多数滑坡的启动源于地下水位上升导致的下滑力增大。对于大部分滑坡,其坡体地下水主要来源于后缘斜坡区域的降雨入渗。当滑坡出现变形破坏后,实施滑坡抢险治理过程需要一定的时间,期间最令人担忧的往往就是进一步降雨,因为目前还缺乏有效手段快速阻止降雨对滑坡体地下水的补给。因此,为了防止斜坡后缘来水向滑坡体内入渗引起地下水位上升,在滑坡体后缘的入渗路径上设置障碍阻止地下水流入滑坡体,就能为滑坡抢险赢得时间,防止地质灾害的发生。
发明内容
本发明的目的在于针对现有技术的不足,提供了一种滑坡抢险治理高压充气截水法。
本发明的目的是通过以下技术方案来实现的:一种滑坡抢险治理高压充气截水法,具体为:在滑坡的后缘斜坡区,沿斜坡等高线布置若干钻孔,相邻钻孔之间间隔8~10m,每个钻孔内插入一根输气管;输气管的上部为钻孔孔壁封闭段,下部为钻孔孔壁透气段,钻孔孔壁封闭段与钻孔孔壁透气段的相接处在坡面以下3~5m,钻孔孔壁透气段的长度一般可取3~5m;所有输气管均通过输气管路与空气压缩机相连。
本发明的有益效果是:本发明的滑坡抢险治理高压充气截水法截水速度快,施工技术简单,整个过程不涉及土石方开挖工程,工程造价低,在控制滑坡体地下水位上升作用的效果明显,能够为滑坡抢险赢得时间。
附图说明
图1是本发明滑坡抢险治理高压充气截水实施工作示意图;
图中:空气压缩机1,输气管路2,钻孔3,钻孔孔壁封闭段4,钻孔孔壁透气段5,斜坡坡面6,潜在滑动面7。
具体实施方式
本发明的原理是:针对斜坡后缘来水入渗引起滑坡体地下水位上升而影响滑坡稳定性的作用方式,利用岩土的渗透性随饱和度降低而快速下降的原理,在滑坡的上游斜坡区布置一系列钻孔,在钻孔内插入输气管,用空气压缩机向钻孔内压入高压气体,通过压入高压气体在滑坡的后缘斜坡中形成非饱和区,降低斜坡局部区段的地下水渗透系数,从而减少斜坡后缘地下水入渗到滑坡区,达到降低滑坡灾害风险,为滑坡治理工程措施的实施赢取时间。
下面根据附图详细描述本发明,本发明的目的和效果将变得更加明显。
如图1所示,本发明滑坡抢险治理高压充气截水法具体为:在滑坡的后缘斜坡区,沿斜坡等高线布置若干钻孔3,相邻钻孔3之间间隔8~10m,每个钻孔3内插入一根输气管2;输气管2的上部为钻孔孔壁封闭段4,下部为钻孔孔壁透气段5,钻孔孔壁封闭段4与钻孔孔壁透气段5的相接处在坡面6以下3~5m,钻孔孔壁透气段5的长度取斜坡渗透性良好的土层厚度,一般钻孔孔壁透气段5的长度可取3~5m。所有输气管2均通过输气管路2与空气压缩机1相连。
本发明用输气管2连接空气压缩机1和各钻孔3,开启空气压缩机1以一定的压力通过钻孔孔壁透气段5向钻孔3内压入空气,在滑坡后缘水入渗路径上形成非饱和区截水帷幕,实现减少滑坡后缘斜坡地下水的入渗,从而实现降低滑坡灾害风险,为滑坡治理工程措施的实施赢取时间的目的。
Claims (1)
1.一种滑坡抢险治理高压充气截水法,其特征在于,该方法具体为:在滑坡的后缘斜坡区,沿斜坡等高线布置若干钻孔(3),相邻钻孔(3)之间间隔约8~10m,每个钻孔(3)内插入一根输气管(2);输气管(2)的上部为钻孔孔壁封闭段(4),下部为钻孔孔壁透气段(5),钻孔孔壁封闭段(4)与钻孔孔壁透气段(5)的相接处在坡面(6)以下3~5m,钻孔孔壁透气段(5)的长度一般可取3~5m;所有输气管(2)均通过输气管路(2)与空气压缩机(1)相连。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101429157A CN102635121A (zh) | 2012-05-10 | 2012-05-10 | 一种滑坡抢险治理高压充气截水法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101429157A CN102635121A (zh) | 2012-05-10 | 2012-05-10 | 一种滑坡抢险治理高压充气截水法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102635121A true CN102635121A (zh) | 2012-08-15 |
Family
ID=46619688
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012101429157A Pending CN102635121A (zh) | 2012-05-10 | 2012-05-10 | 一种滑坡抢险治理高压充气截水法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102635121A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110219356A (zh) * | 2019-05-13 | 2019-09-10 | 河海大学 | 尾矿库中快速降低浸润线的充气截水减渗系统及方法 |
CN117385860A (zh) * | 2023-12-07 | 2024-01-12 | 石家庄铁道大学 | 一种深土层气水交换设备 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101575857A (zh) * | 2009-06-11 | 2009-11-11 | 浙江大学 | 一种滑坡充气排水治理方法 |
-
2012
- 2012-05-10 CN CN2012101429157A patent/CN102635121A/zh active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101575857A (zh) * | 2009-06-11 | 2009-11-11 | 浙江大学 | 一种滑坡充气排水治理方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110219356A (zh) * | 2019-05-13 | 2019-09-10 | 河海大学 | 尾矿库中快速降低浸润线的充气截水减渗系统及方法 |
CN117385860A (zh) * | 2023-12-07 | 2024-01-12 | 石家庄铁道大学 | 一种深土层气水交换设备 |
CN117385860B (zh) * | 2023-12-07 | 2024-02-23 | 石家庄铁道大学 | 一种深土层气水交换设备 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102094669B (zh) | 三位立体分源卸压瓦斯治理方法 | |
CN103291313B (zh) | 土压盾构开挖拱顶压力支护系统及其施工方法 | |
CN103291325A (zh) | 承压水体上采煤底板岩层突水的防控方法 | |
CN102140901A (zh) | 一种耐高压钻孔密封方法 | |
CN103422886A (zh) | 一种煤矿分布式地下水库的人工挡水坝及其筑坝方法 | |
CN103174453A (zh) | 一种煤矿井下多煤层分层水力压裂方法 | |
CN103362540A (zh) | 高瓦斯煤层卸压瓦斯抽采方法 | |
CN207073410U (zh) | 向煤层循环注入热水和液氮的增透系统 | |
AU2016370451A1 (en) | Method for determining length of filling section of fully mechanized coal mining-filling mixed mining working face | |
CN105484790A (zh) | 一种穿层钻孔间隔注水促进瓦斯抽采与工作面降尘的方法 | |
CN105114116A (zh) | 一种水热耦合压裂强化区域瓦斯抽采方法 | |
CN102865104A (zh) | 下向抽采钻孔排水装置 | |
CN102121364A (zh) | 卸压煤层气地面抽采井的井身结构及其布设方法 | |
CN108952776A (zh) | 一种等距水平定向顺层钻孔注浆改造顶底板双重灰岩的方法 | |
CN201818312U (zh) | 一种采用管道气压送土的盾构装置 | |
CN102182426A (zh) | 远距离卸压煤层煤层气的抽采方法 | |
CN105003294B (zh) | 一种基于水热耦合压裂煤体石门揭煤方法 | |
CN102635121A (zh) | 一种滑坡抢险治理高压充气截水法 | |
CN104018844A (zh) | 富水地层中的盾构机水压气压平衡控制系统及其控制方法 | |
CN104747231B (zh) | 一种覆岩隔离注浆充填层位探测方法 | |
CN105019935A (zh) | 一种井上井下联合卸压消突煤层快速掘巷法 | |
CN205638532U (zh) | 煤矿井下可重复利用的瓦斯抽采注水一体封孔装置 | |
CN104832130B (zh) | 露天矿端帮残煤气化回收方法 | |
CN204608810U (zh) | 用于高陡边坡开挖工程中的出渣竖井结构 | |
CN204676504U (zh) | 一种无自流引排条件的长尾水隧洞群的放空检修结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120815 |