CN102635059B - 一种桥梁勘察方法 - Google Patents
一种桥梁勘察方法 Download PDFInfo
- Publication number
- CN102635059B CN102635059B CN201210042283.7A CN201210042283A CN102635059B CN 102635059 B CN102635059 B CN 102635059B CN 201210042283 A CN201210042283 A CN 201210042283A CN 102635059 B CN102635059 B CN 102635059B
- Authority
- CN
- China
- Prior art keywords
- bridge
- model
- dimensional
- entity
- solid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 40
- 238000011835 investigation Methods 0.000 title claims abstract description 9
- 239000007787 solid Substances 0.000 claims abstract description 70
- 238000013461 design Methods 0.000 claims abstract description 11
- 238000001514 detection method Methods 0.000 claims abstract description 8
- 238000004458 analytical method Methods 0.000 claims abstract description 6
- 238000006073 displacement reaction Methods 0.000 claims abstract description 6
- 238000010276 construction Methods 0.000 claims description 31
- 230000002787 reinforcement Effects 0.000 claims description 13
- 230000003014 reinforcing effect Effects 0.000 claims description 13
- 238000012986 modification Methods 0.000 claims description 7
- 230000004048 modification Effects 0.000 claims description 7
- 238000012423 maintenance Methods 0.000 claims description 5
- 239000011230 binding agent Substances 0.000 claims description 4
- 238000004364 calculation method Methods 0.000 claims description 4
- 238000012545 processing Methods 0.000 claims description 4
- 238000005457 optimization Methods 0.000 claims description 3
- 230000001788 irregular Effects 0.000 claims 1
- 239000000126 substance Substances 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 5
- 229910000831 Steel Inorganic materials 0.000 abstract description 3
- 239000010959 steel Substances 0.000 abstract description 3
- 238000005520 cutting process Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000004062 sedimentation Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 230000008676 import Effects 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 230000003449 preventive effect Effects 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 238000012952 Resampling Methods 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000013507 mapping Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000012892 rational function Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000012502 risk assessment Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000012876 topography Methods 0.000 description 1
Images
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210042283.7A CN102635059B (zh) | 2012-02-23 | 2012-02-23 | 一种桥梁勘察方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210042283.7A CN102635059B (zh) | 2012-02-23 | 2012-02-23 | 一种桥梁勘察方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102635059A CN102635059A (zh) | 2012-08-15 |
CN102635059B true CN102635059B (zh) | 2014-02-26 |
Family
ID=46619626
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210042283.7A Expired - Fee Related CN102635059B (zh) | 2012-02-23 | 2012-02-23 | 一种桥梁勘察方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102635059B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2521157A (en) * | 2013-12-10 | 2015-06-17 | Network Mapping Uk Ltd | Infrastructure positioning |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102865085B (zh) * | 2012-10-10 | 2014-11-12 | 江西省交通设计研究院有限责任公司 | 一种地下工程岔洞接头三维设计方法 |
CN104655037A (zh) * | 2015-02-08 | 2015-05-27 | 中国地质环境监测院 | 陡崖山体溃屈失稳体应变速率监测方法 |
CN106558097B (zh) * | 2016-10-15 | 2019-06-14 | 合肥市勘察院有限责任公司 | 一种地下环境透视三维模型建立方法 |
CN108520366B (zh) * | 2018-04-24 | 2020-11-13 | 中铁十一局集团有限公司 | 一种确定大桥建设方案合理性的方法及计算机装置 |
CN110555905B (zh) * | 2018-06-04 | 2023-05-23 | 百度在线网络技术(北京)有限公司 | 生成三维天桥模型的方法、装置、计算机设备及存储介质 |
CN108645360A (zh) * | 2018-06-22 | 2018-10-12 | 核工业西南勘察设计研究院有限公司 | 一种桥梁监测方法 |
CN110804953A (zh) * | 2019-11-17 | 2020-02-18 | 徐州迪沃通讯工程有限公司 | 一种适用于深山的桥梁建设选址方法 |
KR20220049407A (ko) | 2020-10-14 | 2022-04-21 | 삼성전자주식회사 | 디스플레이 장치 및 그 제어 방법 |
CN113587835A (zh) * | 2021-07-22 | 2021-11-02 | 河北工业大学 | 一种利用三维激光扫描技术进行桥梁工程质量验收的方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1529126A (zh) * | 2003-10-14 | 2004-09-15 | 武汉大学 | 基于数字立体正射影像镶嵌的可量测无缝空间立体模型的生成方法 |
CN101159066A (zh) * | 2007-11-20 | 2008-04-09 | 中交第二公路勘察设计研究院有限公司 | 基于三维机载lidar的公路测设方法 |
CN101509328A (zh) * | 2009-03-30 | 2009-08-19 | 许国森 | 一种圆顶密封储煤仓 |
CN101540020A (zh) * | 2009-04-01 | 2009-09-23 | 江西省交通设计院 | 一种公路三维选线方法 |
JP2010043961A (ja) * | 2008-08-13 | 2010-02-25 | Acutelogic Corp | 三次元画像計測システム |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2002308651A1 (en) * | 2001-05-04 | 2002-11-18 | Leberl, Franz, W. | Digital camera for and method of obtaining overlapping images |
-
2012
- 2012-02-23 CN CN201210042283.7A patent/CN102635059B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1529126A (zh) * | 2003-10-14 | 2004-09-15 | 武汉大学 | 基于数字立体正射影像镶嵌的可量测无缝空间立体模型的生成方法 |
CN101159066A (zh) * | 2007-11-20 | 2008-04-09 | 中交第二公路勘察设计研究院有限公司 | 基于三维机载lidar的公路测设方法 |
JP2010043961A (ja) * | 2008-08-13 | 2010-02-25 | Acutelogic Corp | 三次元画像計測システム |
CN101509328A (zh) * | 2009-03-30 | 2009-08-19 | 许国森 | 一种圆顶密封储煤仓 |
CN101540020A (zh) * | 2009-04-01 | 2009-09-23 | 江西省交通设计院 | 一种公路三维选线方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2521157A (en) * | 2013-12-10 | 2015-06-17 | Network Mapping Uk Ltd | Infrastructure positioning |
Also Published As
Publication number | Publication date |
---|---|
CN102635059A (zh) | 2012-08-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102635059B (zh) | 一种桥梁勘察方法 | |
CN101509382B (zh) | 一种隧道勘察方法 | |
Gómez-Ortiz et al. | Assessing the risk of subsidence of a sinkhole collapse using ground penetrating radar and electrical resistivity tomography | |
CN102938095B (zh) | 一种基于多源数据的矿山沉陷监测预警方法 | |
Gischig et al. | Composite rock slope kinematics at the current Randa instability, Switzerland, based on remote sensing and numerical modeling | |
Salvini et al. | Photogrammetry and laser scanning for analyzing slope stability and rock fall runout along the Domodossola–Iselle railway, the Italian Alps | |
CN101221246B (zh) | 雪崩的遥感量化勘察方法 | |
CN105242279A (zh) | 一种基于激光雷达技术的滑坡体变化检测方法 | |
Viero et al. | Laser scanning-based recognition of rotational movements on a deep seated gravitational instability: The Cinque Torri case (North-Eastern Italian Alps) | |
CN105526908A (zh) | 一种三维激光扫描和gps相结合的边坡监测方法 | |
CN110207681A (zh) | 基于无人机的地面变形监测方法 | |
Spreafico et al. | Terrestrial Remote Sensing techniques to complement conventional geomechanical surveys for the assessment of landslide hazard: The San Leo case study (Italy) | |
Jiang et al. | A monitoring method integrating terrestrial laser scanning and unmanned aerial vehicles for different landslide deformation patterns | |
CN110672073B (zh) | 一种基于三维遥感技术辅助隧址区施工的方法及装置 | |
CN113532509A (zh) | 一种基于空天地立体技术的大规模高陡边坡监测方法 | |
CN114674277B (zh) | 全场测线联合的深部开采地表沉陷监测方法 | |
Pan et al. | Analysis on the influence of cross tunnel construction on the deformation of the existing high-speed railway tunnel | |
CN113536414A (zh) | 基于三维建模的岩质边坡稳定性分析方法、系统及介质 | |
Refice et al. | Investigating uplift in Lesina Marina (Southern Italy) with the aid of persistent scatterer SAR interferometry and in situ measurements | |
Tan et al. | Deformation monitoring and spatiotemporal evolution of mining area with unmanned aerial vehicle and D-InSAR technology | |
CN103745408B (zh) | 资源压覆量的获取方法及装置 | |
Al-Adamat et al. | DSM derived stereo pair photogrammetry: Multitemporal morphometric analysis of a quarry in karst terrain | |
Huang | Multidisciplinary investigation of surface deformation above salt domes in Houston, Texas | |
Arbanas et al. | The Croatian-Japanese SATREPS joint research project on landslides (IPL-161) | |
Vilceanu et al. | Geodetic studies with significant contribution to landslide monitoring in south-western Romania–area with high risk potential |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: JIANGXI COMMUNICATIONS DESIGN INSTITUE CO., LTD. Free format text: FORMER OWNER: ZHU HAITAO Effective date: 20130107 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhu Haitao Inventor after: Wu Wenqing Inventor after: Zhang Hongyu Inventor after: Nie Fusheng Inventor after: Zhang Xiaoming Inventor after: Luo Xianhu Inventor after: Xu Shitian Inventor after: Chen Qiang Inventor before: Zhu Haitao |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: ZHU HAITAO TO: ZHU HAITAO WU WENQING ZHANG HONGYU NIE FUSHENG ZHANG XIAOMING LUO XIANHU XU SHITIAN CHEN QIANG |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20130107 Address after: 330002 No. 657, Jinggangshan Avenue, Nanchang, Jiangxi Applicant after: Communications Design Research Institute Co., Ltd. of Jiangxi Prov. Address before: 330002, Jinggangshan Avenue, Nanchang, Jiangxi Province, No. 657 Applicant before: Zhu Haitao |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140226 Termination date: 20190223 |
|
CF01 | Termination of patent right due to non-payment of annual fee |