CN102628248A - Cement concrete pavement preliminary paving equipment - Google Patents
Cement concrete pavement preliminary paving equipment Download PDFInfo
- Publication number
- CN102628248A CN102628248A CN2012101343851A CN201210134385A CN102628248A CN 102628248 A CN102628248 A CN 102628248A CN 2012101343851 A CN2012101343851 A CN 2012101343851A CN 201210134385 A CN201210134385 A CN 201210134385A CN 102628248 A CN102628248 A CN 102628248A
- Authority
- CN
- China
- Prior art keywords
- connecting rod
- steel plate
- cement concrete
- concrete pavement
- described steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Road Paving Structures (AREA)
- Road Paving Machines (AREA)
Abstract
Provided is cement concrete pavement preliminary paving equipment. When manual work cement concrete pavement is in construction or three-roll-shaft cement concrete pavement is in construction, preliminary leveling of cement concrete materials discharged on a base layer by a dumper needs to be performed. The cement concrete pavement preliminary paving equipment comprises a steel plate shovel (1). A vertical connecting rod (2) is connected with the upper portion of the back face of the steel plate shovel and is connected with bent connecting rods (3). The bent connecting rods are connected with a horizontal connecting rod (4) and are connected with a tractor connecting rod (5). The lower portion of the horizontal connecting rod is connected with a slant connecting rod (6) which is connected with the tractor connecting rod (5). The lower portion of the horizontal connecting rod is connected with the slant connecting rod (6) which is connected with the tractor connecting rod. The upper portion of the horizontal connecting rod is connected with a tractor lifting connecting rod (9). The lower portion of the back face of the steel plate shovel is connected with a claw (7). A connecting plate (8) is connected between the bent connecting rods. The cement concrete pavement preliminary paving equipment is used for construction of manual work cement concrete pavement and construction of three-roll-shaft cement concrete pavement.
Description
Technical field:
the present invention relates to the preliminary laying equipment of a kind of cement concrete pavement.
Background technology:
When
artificial construction of cement concrete road surface or three roll shaft construction of cement concrete road surface; Need the cement concrete material that tipping truck is discharged in the basic unit be carried out preliminary levelling, utilize manual work or three roll shafts to vibrate, carry slurry, floating then.When carrying out preliminary levelling, adopt artificial levelling more, such job practices, not only speed is slow, and personnel's physical demands is very big, greatly influences construction speed and construction of cement concrete road surface quality.If adopt the preliminary levelling of excavator, again because the excavator volume is big, underaction, and also cost is too high.
Summary of the invention:
the purpose of this invention is to provide a kind of preliminary laying equipment of effective cement concrete pavement of mating formation.
Above-mentioned purpose realizes through following technical scheme:
preliminary laying equipment of a kind of cement concrete pavement, its composition comprises: the steel plate shovel, described steel plate back-off face top connects vertical connecting rod; Described vertical connecting rod connects the bending connecting rod; Described bending connecting rod connection horizontal is to connecting rod, and described bending connecting rod connects the tractor connecting rod, and described horizontal connecting rod bottom connects oblique connecting rod; Described oblique connecting rod connects the tractor connecting rod; Described horizontal connecting rod top connects tractor up-down connecting rod, and described steel plate back-off basifacial connects hook, connects junction plate between the described bending connecting rod.
preliminary laying equipment of described cement concrete pavement, described vertical connecting rod has the 3-9 root, 2 of described oblique connecting rods, described bending connecting rod 3-9 root, described hook 2-10.
preliminary laying equipment of described cement concrete pavement, described steel plate shovel length is 1.5-2.2 rice, and described steel plate shovel width is a 0.3-0.4 rice, and described steel plate shovel thickness is 0.03-0.04 rice.
preliminary laying equipment of described cement concrete pavement, described steel plate shovel length is 1.8 meters, and described steel plate shovel width is 0.3 meter, and described steel plate shovel thickness is 0.03 meter.
preliminary laying equipment of described cement concrete pavement, described steel plate shovel length is 2.2 meters, and described steel plate shovel width is 0.4 meter, and described steel plate shovel thickness is 0.04 meter.
preliminary laying equipment of described cement concrete pavement, described steel plate shovel length is 2 meters, and described steel plate shovel width is 0.35 meter, and described steel plate shovel thickness is 0.035 meter.
preliminary laying equipment of described cement concrete pavement, described vertical connecting rod has 3,2 of described oblique connecting rods, 3 of described bending connecting rods, 4 on described hook.
Beneficial effect:
are simple, the easy row of present device transformation 1., and has numerous farm tractors capable of using; Equipment cost is low, lease expenses is low.
3. present device is simple to operate, requires low to the driver's operation level; Speed of application is fast, flexible; Efficient improves greatly.
It is smooth that the hook that
steel plate spader 4. of the present invention has can make this product when work, the road surface put in order, reduces workman's workload, improves the quality of paving the way.
5. the present invention are connected when being used with tractor, and it is adjustable lifting height, no matter is that low-lying land or high hillock can be used, and the scope of application is very wide.
Description of drawings:
accompanying drawing 1 is the structural representation of this product.
accompanying drawing 2 is vertical views of accompanying drawing 1.
The specific embodiment:
Embodiment 1:
preliminary laying equipment of a kind of cement concrete pavement, its composition comprises: steel plate shovel 1, described steel plate back-off face top connects vertical connecting rod 2; Described vertical connecting rod connects bending connecting rod 3; Described bending connecting rod connection horizontal is to connecting rod 4, and described bending connecting rod connects tractor connecting rod 5, and described horizontal connecting rod bottom connects oblique connecting rod 6; Described oblique connecting rod connects the tractor connecting rod; Described horizontal connecting rod top connects tractor up-down connecting rod 9, and described steel plate back-off basifacial connects hook 7, connects junction plate 8 between the described bending connecting rod.
Embodiment 2:
The preliminary laying equipment of
embodiment 1 described cement concrete pavement, described vertical connecting rod has the 3-9 root, 2 of described oblique connecting rods, described bending connecting rod 3-9 root, described hook 2-10.
Embodiment 3:
Embodiment 4:
The preliminary laying equipment of
embodiment 3 described cement concrete pavements, described steel plate shovel length is 1.8 meters, and described steel plate shovel width is 0.3 meter, and described steel plate shovel thickness is 0.03 meter.
Embodiment 5:
The preliminary laying equipment of
embodiment 3 described cement concrete pavements, described steel plate shovel length is 2.2 meters, and described steel plate shovel width is 0.4 meter, and described steel plate shovel thickness is 0.04 meter.
Embodiment 6:
The preliminary laying equipment of
embodiment 3 described cement concrete pavements, described steel plate shovel length is 2 meters, and described steel plate shovel width is 0.35 meter, and described steel plate shovel thickness is 0.035 meter.
Embodiment 7:
The preliminary laying equipment of
embodiment 2 described cement concrete pavements, described vertical connecting rod has 3,2 of described oblique connecting rods, 3 of described bending connecting rods, 4 on described hook.
Embodiment 8:
The preliminary laying equipment of
embodiment 1 described cement concrete pavement, described vertical connecting rod has 5,2 of described oblique connecting rods, 5 of described bending connecting rods, 5 on described hook.
Embodiment 9:
The preliminary laying equipment of
embodiment 1 described cement concrete pavement, described vertical connecting rod has 7,2 of described oblique connecting rods, 7 of described bending connecting rods, 7 on described hook.
Embodiment 10:
The preliminary laying equipment of
embodiment 1 described cement concrete pavement, described vertical connecting rod has 8,2 of described oblique connecting rods, 8 of described bending connecting rods, 8 on described hook.
Embodiment 11:
The preliminary laying equipment of
the described cement concrete pavement of the foregoing description utilizes the small farm tractor to transform.Through connecting rod, bending connecting rod, the hook of selecting varying number for use be adapted to demands of different material spreader or road structure.
basic idea of the present invention is on hydraulic pressure undercarriage behind the small farm tractor, to install a shovel that can easy on and off rises and falls additional; Make full use of the characteristics that the small farm tractor can be walked in the muddy terrain freely; Drive the small farm tractor by the driver and in cement concrete, walk, and according to the construction needs, carrying of control shovel fallen and reciprocating sliding; Be transported to assigned address to cement concrete, and carry out preliminary levelling.
Claims (7)
1. preliminary laying equipment of cement concrete pavement, its composition comprises: the steel plate shovel, it is characterized in that: described steel plate back-off face top connects vertical connecting rod; Described vertical connecting rod connects the bending connecting rod; Described bending connecting rod connection horizontal is to connecting rod, and described bending connecting rod connects the tractor connecting rod, and described horizontal connecting rod bottom connects oblique connecting rod; Described oblique connecting rod connects the tractor connecting rod; Described horizontal connecting rod top connects tractor up-down connecting rod, and described steel plate back-off basifacial connects hook, connects junction plate between the described bending connecting rod.
2. the preliminary laying equipment of cement concrete pavement according to claim 1 is characterized in that: described vertical connecting rod has the 3-9 root, 2 of described oblique connecting rods, described bending connecting rod 3-9 root, described hook 2-10.
3. the preliminary laying equipment of cement concrete pavement according to claim 1 and 2 is characterized in that: described steel plate shovel length is 1.5-2.2 rice, and described steel plate shovel width is a 0.3-0.4 rice, and described steel plate shovel thickness is 0.03-0.04 rice.
4. the preliminary laying equipment of cement concrete pavement according to claim 3 is characterized in that: described steel plate shovel length is 1.8 meters, and described steel plate shovel width is 0.3 meter, and described steel plate shovel thickness is 0.03 meter.
5. the preliminary laying equipment of cement concrete pavement according to claim 3 is characterized in that: described steel plate shovel length is 2.2 meters, and described steel plate shovel width is 0.4 meter, and described steel plate shovel thickness is 0.04 meter.
6. the preliminary laying equipment of cement concrete pavement according to claim 3 is characterized in that: described steel plate shovel length is 2 meters, and described steel plate shovel width is 0.35 meter, and described steel plate shovel thickness is 0.035 meter.
7. the preliminary laying equipment of cement concrete pavement according to claim 2 is characterized in that: described vertical connecting rod has 3,2 of described oblique connecting rods, 3 of described bending connecting rods, 4 on described hook.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210134385.1A CN102628248B (en) | 2012-05-03 | 2012-05-03 | The preliminary laying equipment of cement concrete pavement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210134385.1A CN102628248B (en) | 2012-05-03 | 2012-05-03 | The preliminary laying equipment of cement concrete pavement |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102628248A true CN102628248A (en) | 2012-08-08 |
CN102628248B CN102628248B (en) | 2015-10-28 |
Family
ID=46586628
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210134385.1A Active CN102628248B (en) | 2012-05-03 | 2012-05-03 | The preliminary laying equipment of cement concrete pavement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102628248B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114277647A (en) * | 2022-01-14 | 2022-04-05 | 龙建路桥股份有限公司 | Paving equipment for construction of cement stabilized base layer based on road construction |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87100448A (en) * | 1986-01-24 | 1987-09-09 | 托马斯·R·班恩 | Paver |
CN87210161U (en) * | 1987-07-12 | 1988-06-01 | 千阳县农机技术管理推广站 | Manuring and seeding machine for horizontal furrow |
CN87216931U (en) * | 1987-12-26 | 1988-11-30 | 王永昌 | Scraping and lifting device for agricultural four-wheel tractor |
US6283672B1 (en) * | 1999-07-16 | 2001-09-04 | Transtech Systems, Inc. | Pavement edger and joint maker |
CN2516592Y (en) * | 2001-03-02 | 2002-10-16 | 刘云成 | Snow removing scraper on vehicle |
CN2548986Y (en) * | 2002-04-30 | 2003-05-07 | 丁晓东 | Large capacity multi-claw sealed frequency converting hydraulic bucket grab |
CN1651663A (en) * | 2004-02-03 | 2005-08-10 | 株式会社中山铁工所 | Open-close type crushing bucket and its crushing treatment method |
CN1989301A (en) * | 2004-05-21 | 2007-06-27 | 洋马株式会社 | Loading apparatus |
CN201121302Y (en) * | 2007-09-24 | 2008-09-24 | 东营市市容环境卫生处 | Multifunctional environmental sanitation cleaning combined tool |
CN201321595Y (en) * | 2008-12-17 | 2009-10-07 | 重庆建工市政交通工程有限责任公司 | Road base course spreader |
-
2012
- 2012-05-03 CN CN201210134385.1A patent/CN102628248B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87100448A (en) * | 1986-01-24 | 1987-09-09 | 托马斯·R·班恩 | Paver |
CN87210161U (en) * | 1987-07-12 | 1988-06-01 | 千阳县农机技术管理推广站 | Manuring and seeding machine for horizontal furrow |
CN87216931U (en) * | 1987-12-26 | 1988-11-30 | 王永昌 | Scraping and lifting device for agricultural four-wheel tractor |
US6283672B1 (en) * | 1999-07-16 | 2001-09-04 | Transtech Systems, Inc. | Pavement edger and joint maker |
CN2516592Y (en) * | 2001-03-02 | 2002-10-16 | 刘云成 | Snow removing scraper on vehicle |
CN2548986Y (en) * | 2002-04-30 | 2003-05-07 | 丁晓东 | Large capacity multi-claw sealed frequency converting hydraulic bucket grab |
CN1651663A (en) * | 2004-02-03 | 2005-08-10 | 株式会社中山铁工所 | Open-close type crushing bucket and its crushing treatment method |
CN1989301A (en) * | 2004-05-21 | 2007-06-27 | 洋马株式会社 | Loading apparatus |
CN201121302Y (en) * | 2007-09-24 | 2008-09-24 | 东营市市容环境卫生处 | Multifunctional environmental sanitation cleaning combined tool |
CN201321595Y (en) * | 2008-12-17 | 2009-10-07 | 重庆建工市政交通工程有限责任公司 | Road base course spreader |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114277647A (en) * | 2022-01-14 | 2022-04-05 | 龙建路桥股份有限公司 | Paving equipment for construction of cement stabilized base layer based on road construction |
Also Published As
Publication number | Publication date |
---|---|
CN102628248B (en) | 2015-10-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631253A (en) | Improvement and filling method of red clay subgrades at zone 94 and zone 96 of highway | |
CN205804904U (en) | A kind of leveling unit | |
CN108677638A (en) | Express highway roadbed dam filling construction based on building waste | |
CN103161109A (en) | Method for subgrade filling of peat soil subgrade by sea sand | |
CN105386381A (en) | Pickaxe crushing and grouting recycling method for old cement concrete pavement | |
CN102628248A (en) | Cement concrete pavement preliminary paving equipment | |
CN107389477B (en) | A kind of Layer Modulus of Asphalt Pavement reverse calculation algorithms | |
CN206706526U (en) | A kind of adjustment structure of road roller cleaning shoe | |
CN109958016A (en) | A kind of extremely frigid zones marshland roadbed anti-sedimentation structure | |
CN204139041U (en) | A kind of asphalt pavement rut repair machine | |
Solovyev et al. | Improving of performance characteristics during mechanical stabilization of quarry haul roads with stiff polymeric Tensar TriAx hexagonal geogrid | |
CN204266137U (en) | A kind of novel municipal porous pavement road drainage structure | |
CN101363209A (en) | Technology for preventing bumping at bridge-head | |
CN207003192U (en) | One kind is exempted to consign single-drum road roller | |
CN206376186U (en) | A kind of Sliding Structures for the opposite pushing tow frame bridge of driving across underneath highway | |
CN102337715A (en) | Granite concrete pavior brick and its manufacturing method | |
CN203834313U (en) | Impound strap for highway pavement | |
CN206512541U (en) | A kind of highway subgrade | |
CN202194061U (en) | Combined bridge | |
CN206396570U (en) | A kind of garden road pile foundation type spit of fland walks structure | |
CN101429765A (en) | High-pressure earth mortar pile squeezing method and system | |
CN205917746U (en) | Earth scraper of leveler constructs | |
CN204023361U (en) | The top of the levelling leveling beam in road surface | |
CN204389680U (en) | The image resolution ratio that optics-microwave shares evaluates bar shaped target | |
CN204849582U (en) | Overpass prevention and cure ponding system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |