CN102624027A - A multi-process islanding effect detection device and method - Google Patents

A multi-process islanding effect detection device and method Download PDF

Info

Publication number
CN102624027A
CN102624027A CN2012100821589A CN201210082158A CN102624027A CN 102624027 A CN102624027 A CN 102624027A CN 2012100821589 A CN2012100821589 A CN 2012100821589A CN 201210082158 A CN201210082158 A CN 201210082158A CN 102624027 A CN102624027 A CN 102624027A
Authority
CN
China
Prior art keywords
detection
island
frequency
generation system
grid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100821589A
Other languages
Chinese (zh)
Other versions
CN102624027B (en
Inventor
孙秋野
张化光
李玉帅
李昕同
何志强
滕菲
刘鑫蕊
赵琰
张欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeastern University China
Original Assignee
Northeastern University China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeastern University China filed Critical Northeastern University China
Priority to CN201210082158.9A priority Critical patent/CN102624027B/en
Publication of CN102624027A publication Critical patent/CN102624027A/en
Application granted granted Critical
Publication of CN102624027B publication Critical patent/CN102624027B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

A multiprocess island effect detection device and a multiprocess island effect detection method belong to the field of distributed power generation system fault detection. Compared with the traditional island detection device, the multi-process island effect detection device provided by the invention has the characteristics of small detection blind area, high detection accuracy, strong applicability and the like; the system is subjected to island detection by adopting a passive detection mode with various independent detection variables, so that the system is subjected to island detection more comprehensively. Compared with the traditional island detection device adopting single passive detection and active detection, the device has the advantages of rapidity of passive detection and small pollution to harmonic waves of the power grid, realizes that the detection device firstly performs rapid judgment on the system, and quickly cuts the system from the power grid if the distributed power generation system is in an island state. And secondly, the active detection is called to recheck the passive detection result, so that the advantage of high accuracy of the active detection is fully exerted, and the defects of long detection time and large pollution degree to the harmonic wave of the power grid are overcome.

Description

一种多进程的孤岛效应检测装置及方法A multi-process islanding effect detection device and method

技术领域 technical field

本发明属于分布式发电系统故障检测领域,具体涉及一种多进程的孤岛效应检测装置及方法。The invention belongs to the field of fault detection of distributed power generation systems, and in particular relates to a multi-process islanding effect detection device and method.

背景技术 Background technique

自二十世纪以来,随着经济和社会的快速发展,能源消耗与日俱增,电力需求的迅速增长使得人们越来越重视可再生能源的发展,分布式发电技术以其独有的特点引起人们越来越多的关注。随着分布式发电系统并网数量逐年增多,孤岛效应成为制约分布式发电技术的主要因素,其原因主要是分布式发电技术不同于传统大电厂发电、大电网输电的供配电技术,由于其自身发电容量小、布局分散等特点,传统的调度方式不能进行有效控制,这样当接入电网发生故障就会使并网分布式发电系统陷入孤岛状态。为了提高并网分布式发电系并网的可靠性、可控性,充分发挥分布式发电系统的优势,各国对于并网分布式发电系都要求具有孤岛效应检测功能,譬如:在日本,要求至少有一种被动检测方法和一种主动检测方法;在北美,要求制造商采用基于频率、相位或电压偏移的主动式孤岛检测方式;在中国,GB/T19939-2005光伏系统并网技术要求中要求至少各一种主动和被动孤岛检测装置。因此,对于孤岛效应检测技术的研究及其相关装置的研究成为了国内外电力研究人员的研究热点。Since the 20th century, with the rapid development of economy and society, energy consumption has been increasing day by day, and the rapid growth of power demand has made people pay more and more attention to the development of renewable energy. more attention. As the number of distributed power generation systems connected to the grid increases year by year, the island effect has become the main factor restricting distributed power generation technology. Due to the characteristics of small power generation capacity and scattered layout, the traditional dispatching method cannot be effectively controlled. In this way, when the power grid fails, the grid-connected distributed power generation system will fall into an island state. In order to improve the reliability and controllability of the grid-connected distributed power generation system and give full play to the advantages of the distributed power generation system, all countries require the island effect detection function for the grid-connected distributed power generation system. For example, in Japan, at least There is a passive detection method and an active detection method; in North America, manufacturers are required to adopt an active islanding detection method based on frequency, phase or voltage offset; in China, GB/T19939-2005 grid-connected technical requirements for photovoltaic systems require At least one each of active and passive islanding detection means. Therefore, the research on the islanding effect detection technology and related devices has become a research hotspot for domestic and foreign electric power researchers.

现今,关于分布式发电系统孤岛效应检测方法已经有许多种,主要分为主动检测和被动检测两大类。就目前而言,被动检测具有技术简单、易于实施,不需要向系统注入扰动,减小了谐波影响等优势。但是,被动检测只能对孤岛效应后的分布是发电系统进行检测,并做出相应的处理,它不能提前发现孤岛现象,此外被动检测的检测盲区大。主动检测方法检测虽然具有检测精度高,检测盲区小等优势,但是该方法控制较复杂,而且由于检测过程需要注入扰动信号,降低了逆变器输出电能的质量。因为不论是被动式检测方法还是主动式检测方法都存在自身的优点和缺点,所以主动检测与被动检测相结合成为如今成为孤岛检测技术研究的新方向。现在的主动检测与被动检测结合的孤岛检测技术种类繁多,如过欠压/过欠频检测法与频率偏移检测法结合、电压谐波检测法与滑模频漂检测法结合......但是这些方法都具有技术缺陷,譬如实施技术难度大、还存在较大的检测盲区、控制装置复杂、检测时间长等。Nowadays, there are many detection methods for the islanding effect of distributed generation systems, which are mainly divided into two categories: active detection and passive detection. For now, passive detection has the advantages of simple technology, easy implementation, no need to inject disturbance into the system, and reduced harmonic influence. However, passive detection can only detect the power generation system after the islanding effect, and make corresponding processing, it can not detect the islanding phenomenon in advance, and the detection blind area of passive detection is large. Although the active detection method has the advantages of high detection accuracy and small detection blind area, the control of this method is more complicated, and because the detection process needs to inject disturbance signals, the quality of the inverter output power is reduced. Because both the passive detection method and the active detection method have their own advantages and disadvantages, the combination of active detection and passive detection has become a new research direction of island detection technology. There are many types of island detection technologies that combine active detection and passive detection, such as the combination of over-undervoltage/over-underfrequency detection method and frequency offset detection method, the combination of voltage harmonic detection method and sliding mode frequency drift detection method... .. But these methods all have technical defects, such as high technical difficulty in implementation, large detection blind spots, complex control devices, and long detection time.

发明内容 Contents of the invention

针对现有方法存在的不足,本发明提出一种多进程的孤岛效应检测装置及方法,以达到更加全面的对系统进行孤岛检测的目的。Aiming at the shortcomings of the existing methods, the present invention proposes a multi-process islanding detection device and method, so as to achieve the purpose of more comprehensive islanding detection of the system.

本发明的技术方案是这样实现的:一种多进程的孤岛效应检测方法,包括以下步骤:The technical solution of the present invention is achieved in that a multi-process islanding effect detection method comprises the following steps:

步骤1:将采集到的三相电压、电流和频率进行滤波、降噪、变压处理和模数转换,并对转换后的数字信号进行归一化处理,送至数据存储器单元保存;Step 1: Perform filtering, noise reduction, voltage transformation processing and analog-to-digital conversion on the collected three-phase voltage, current and frequency, and normalize the converted digital signal, and send it to the data memory unit for storage;

步骤2:初始化系统参数,所述的系统参数包括系统的电阻值R、电感值L和电容值C;Step 2: Initialize system parameters, the system parameters include system resistance value R, inductance value L and capacitance value C;

步骤3:利用步骤1存储的数据,计算系统的有功功率P和无功功率Q,并将有功功率值和无功功率值存入数据存储器单元保存;Step 3: Using the data stored in step 1, calculate the active power P and reactive power Q of the system, and store the active power value and reactive power value in the data memory unit for preservation;

步骤4:将数据储存器中的数据送入DSP的CPU,进行被动孤岛检测,判断孤岛是否发生,方法为:(1)利用过欠压/过欠频检测法计算有功功率和无功功率的不平衡度;(2)利用相位突变检测法计算电压电流相位差角;(3)利用功率/频率变化率检测法计算有功功率变换率、无功功率变换率及频率的变换率;利用上述(1)(2)(3)的结果,计算被动检测综合评价指标值,若该值不大于10,说明分布式发电系统为正常并网运行状态,利用主动孤岛检测流程对被动孤岛检测的结果进行复核,执行步骤5;该值大于10,说明分布式发电系统已处于孤岛状态,此时系统DSP发出PWM波驱动断路控制器,将分布式发电系统从电网切除;Step 4: Send the data in the data storage to the CPU of the DSP, and perform passive islanding detection to determine whether the islanding occurs. Unbalance degree; (2) Utilize phase mutation detection method to calculate voltage and current phase difference angle; (3) Utilize power/frequency change rate detection method to calculate active power conversion rate, reactive power conversion rate and frequency conversion rate; use the above ( 1) From the results of (2) and (3), calculate the comprehensive evaluation index value of passive detection. If the value is not greater than 10, it indicates that the distributed power generation system is in the normal grid-connected operation state. Use the active island detection process to carry out the results of passive island detection Check and execute step 5; if the value is greater than 10, it means that the distributed generation system is in an island state. At this time, the system DSP sends out a PWM wave to drive the circuit breaker controller to cut off the distributed generation system from the grid;

步骤5:主动孤岛检测,方法为:利用主动移频法计算频移的最大值ωmax和最小值ωmin,计算分布式发电系统与电网节点处的角频率ωP,如果不满足ωmin<ωP<ωmax,说明被动检测的结果不正确,此时DSP发出PWM波驱动断路控制器,将分布式发电系统从电网切除;否则,说明被动检测的结果是正确的,执行步骤6;Step 5: Active island detection, the method is: use the active frequency shift method to calculate the maximum value ω max and the minimum value ω min of the frequency shift, and calculate the angular frequency ω P at the node between the distributed generation system and the power grid. If ω min < ω P < ω max , indicating that the result of passive detection is incorrect, at this time DSP sends out PWM waves to drive the circuit breaker controller to cut off the distributed generation system from the grid; otherwise, it means that the result of passive detection is correct, go to step 6;

步骤6:分布式发电系统处于孤岛运行状态,利用通讯单元与上位机进行远程通讯,向操作人员提示系统已从电网切除;Step 6: The distributed power generation system is in an island operation state, and the communication unit is used to communicate with the upper computer remotely, and the operator is prompted that the system has been disconnected from the grid;

步骤7:储存在数据储存单元的数据通过显示单元进行分布式发电系统的状态显示,向系统检修人员提供检修依据;Step 7: The data stored in the data storage unit is used to display the status of the distributed power generation system through the display unit, and provide maintenance basis for system maintenance personnel;

步骤8:对于已从电网切除的分布式发电系统,孤岛检测装置会通过主动孤岛检测对分布式发电系统进行主动检测,判断分布式发电系统是否满足重新并网运行的要求,如果满足,则DSP发出PWM波驱动断路控制器使分布式发电系统重新并网运行。Step 8: For the distributed generation system that has been disconnected from the grid, the island detection device will actively detect the distributed generation system through active island detection, and judge whether the distributed generation system meets the requirements for reconnecting to the grid. If so, DSP A PWM wave is sent out to drive the circuit breaker controller so that the distributed generation system can be connected to the grid again.

实现多进程的孤岛效应检测方法的装置,包括:A device for implementing a multi-process islanding effect detection method, comprising:

信号采集单元:用于采集分布式发电系统与电网节点处的三相电压、电流和频率并对采集到的信号进行滤波、降噪、变压处理;Signal collection unit: used to collect the three-phase voltage, current and frequency at the nodes of the distributed power generation system and the power grid, and perform filtering, noise reduction and voltage transformation processing on the collected signals;

主控单元:用于对信号采集单元采集到的信号进一步处理,进行被动孤岛检测和主动孤岛检测,并依据检测结果,控制分布式发电系统与电网的连接和关断;Main control unit: used to further process the signal collected by the signal acquisition unit, perform passive island detection and active island detection, and control the connection and shutdown of the distributed power generation system and the power grid according to the detection results;

数据存储器单元:用于存储有功功率和无功功率的不平衡度、电压电流相位差角、有功功率变换率、无功功率变换率及频率的变换率;Data memory unit: used to store the unbalance degree of active power and reactive power, voltage and current phase difference angle, active power conversion rate, reactive power conversion rate and frequency conversion rate;

通讯单元:用于实现孤岛效应检测装置与上位机的网络通讯。Communication unit: used to realize the network communication between the island effect detection device and the host computer.

本发明优点:本发明所提出的多进程的孤岛效应检测装置相比于传统的孤岛检测装置,具有检测盲区小、检测准确度高、适用性强等特点。该孤岛检测装置采用多种检测变量相互独立的被动检测方式对系统进行孤岛检测,更加全面的对系统进行孤岛检测。相比于传统的采用单一被动检测和主动检测的孤岛检测装置,充分发挥了被动检测的快速性、对电网谐波污染小的优势,实现了检测装置首先对系统进行快速的判断,如果分布式发电系统处于孤岛状态,则迅速将系统从电网中切除。其次调用主动检测对被动检测的结果进行复核,充分发挥了主动检测检测准确度高的优势,克服了检测时间长,对电网谐波污染程度大的不足。总体来讲,本发明提出的多进程的孤岛效应检测装置相比于传统孤岛检测装置,检测盲区降低了25%,检测时间缩短了40%,检测准确度提升了90%,对电网谐波污染的降低了92%。Advantages of the present invention: Compared with traditional islanding detection devices, the multi-process islanding detection device proposed by the present invention has the characteristics of small detection blind area, high detection accuracy and strong applicability. The islanding detection device detects the islanding of the system by adopting a passive detection method in which multiple detection variables are independent of each other, and performs the islanding detection of the system more comprehensively. Compared with the traditional island detection device that adopts a single passive detection and active detection, it fully utilizes the advantages of rapid passive detection and less harmonic pollution to the power grid, and realizes that the detection device first quickly judges the system. If distributed If the power generation system is in an island state, the system is quickly cut off from the grid. Secondly, active detection is used to review the results of passive detection, which fully utilizes the advantages of high detection accuracy of active detection and overcomes the shortcomings of long detection time and large degree of harmonic pollution to the power grid. Generally speaking, compared with the traditional islanding detection device, the multi-process islanding effect detection device proposed by the present invention reduces the detection blind area by 25%, shortens the detection time by 40%, improves the detection accuracy by 90%, and reduces the harmonic pollution of the power grid. reduced by 92%.

附图说明 Description of drawings

图1为本发明的一种实施方式多进程的孤岛效应检测装置的结构框图;Fig. 1 is a structural block diagram of a multi-process islanding effect detection device according to an embodiment of the present invention;

图2为本发明的一种实施方式带通滤波电路的电路原理图;Fig. 2 is a circuit schematic diagram of a bandpass filter circuit according to an embodiment of the present invention;

图3为本发明的一种实施方式三相电压采样信号调制电路的电路原理图;Fig. 3 is a schematic circuit diagram of a three-phase voltage sampling signal modulation circuit according to an embodiment of the present invention;

图4为本发明的一种实施方式三相电流采样信号调制电路的电路原理图;Fig. 4 is a schematic circuit diagram of a three-phase current sampling signal modulation circuit according to an embodiment of the present invention;

图5为本发明的一种实施方式频率采样信号调制电路的电路原理图;5 is a schematic circuit diagram of a frequency sampling signal modulation circuit according to an embodiment of the present invention;

图6为本发明的一种实施方式DSP及其电源模块的电路原理图;Fig. 6 is the circuit schematic diagram of a kind of embodiment DSP of the present invention and power supply module thereof;

图7为本发明的一种实施方式数据存储单元的电路原理图;FIG. 7 is a schematic circuit diagram of a data storage unit according to an embodiment of the present invention;

图8为本发明的一种实施方式通讯模块的电路原理图;FIG. 8 is a schematic circuit diagram of a communication module in an embodiment of the present invention;

图9为本发明的一种实施方式液晶显示模块的电路原理图;FIG. 9 is a schematic circuit diagram of a liquid crystal display module according to an embodiment of the present invention;

图10为本发明的一种实施方式多进程的孤岛效应检测流程图;Fig. 10 is a flow chart of islanding effect detection of multi-process in an embodiment of the present invention;

图11为本发明的一种实施方式被动孤岛检测流程图;FIG. 11 is a flow chart of passive island detection in an embodiment of the present invention;

图12为本发明的一种实施方式过欠压/过欠频检测法流程图;FIG. 12 is a flow chart of an over-undervoltage/over-underfrequency detection method according to an embodiment of the present invention;

图13为本发明的一种实施方式相位突变检测法流程图;FIG. 13 is a flowchart of a phase mutation detection method according to an embodiment of the present invention;

图14为本发明的一种实施方式功率频率变化率检测法流程图;Fig. 14 is a flow chart of a power frequency change rate detection method according to an embodiment of the present invention;

图15为本发明的一种实施方式主动孤岛检测流程图。Fig. 15 is a flow chart of active island detection in an embodiment of the present invention.

具体实施方式 Detailed ways

下面结合附图对本发明的实施方式做进一步说明。Embodiments of the present invention will be further described below in conjunction with the accompanying drawings.

图1为多进程的孤岛效应检测装置的结构框图。多进程的孤岛效应检测装置主要包括:信号采集单元、主控单元、数据存储器单元、通讯单元、液晶显示单元、断路控制器和主控单元的电源模块。其中,信号采集单元包括:电压传感器(VT)、电流传感器(CT)、频率测试仪、带通滤波电路、三相电压采样信号调制电路、三相电流采样信号调制电路和频率采样信号调制电路。FIG. 1 is a structural block diagram of a multi-process islanding effect detection device. The multi-process islanding effect detection device mainly includes: a signal acquisition unit, a main control unit, a data storage unit, a communication unit, a liquid crystal display unit, a circuit breaker controller and a power supply module of the main control unit. Among them, the signal acquisition unit includes: a voltage sensor (VT), a current sensor (CT), a frequency tester, a band-pass filter circuit, a three-phase voltage sampling signal modulation circuit, a three-phase current sampling signal modulation circuit and a frequency sampling signal modulation circuit.

本实施方式中,采用3个电压传感器(VT)、3个电流传感器(CT),用于采集分布式发电系统与电网节点(PCC节点)处的三相电压和电流,其中,电压传感器的型号为HNV500T,电流传感器的型号为ACS712ELCTR-05A5ASOP-8。采用1个频率测试仪来采集分布式发电系统与电网节点(PCC节点)处的频率,频率测试仪的型号为BT3C。In this embodiment, 3 voltage sensors (VT) and 3 current sensors (CT) are used to collect the three-phase voltage and current at the node (PCC node) between the distributed power generation system and the grid, where the model of the voltage sensor It is HNV500T, and the model of the current sensor is ACS712ELCTR-05A5ASOP-8. A frequency tester is used to collect the frequency at the distributed generation system and the grid node (PCC node), and the model of the frequency tester is BT3C.

利用电压传感器(VT)、电流传感器(CT)和频率测试仪采集到的信号传递给带通滤波电路,所述的带通滤波电路如图2所示。电压传感器(VT)的电压信号输出端(包括3路电压信号)、电流传感器(CT)的电流信号输出端(包括3路电流信号)和频率测试仪的频率信号(包括1路频率信号)输出端,同时连接带通滤波电路的输入端ui,对采集到的信号进行滤波。滤波后的信号经过信号调制电路(包括三相电压采样信号调制电路、三相电流采样信号调制电路和频率采样信号调制电路)进行降噪、变压处理后,输出幅值为3.3V的电压信号,传递给主控制单元(例如中央处理器DSP)。The signals collected by the voltage sensor (VT), the current sensor (CT) and the frequency tester are transmitted to the band-pass filter circuit, and the band-pass filter circuit is shown in FIG. 2 . The voltage signal output terminal of the voltage sensor (VT) (including 3 voltage signals), the current signal output terminal of the current sensor (CT) (including 3 current signals) and the frequency signal (including 1 frequency signal) output of the frequency tester terminal, and at the same time connect the input terminal u i of the band-pass filter circuit to filter the collected signal. After the filtered signal is processed by the signal modulation circuit (including three-phase voltage sampling signal modulation circuit, three-phase current sampling signal modulation circuit and frequency sampling signal modulation circuit) for noise reduction and voltage transformation, the output voltage signal with an amplitude of 3.3V , passed to the main control unit (such as the central processing unit DSP).

带通滤波电路的输出引脚uo输出7路信号,其中,3路电压信号连接至三相电压采样信号调制电路的ua、ub、uc接口,如图3所示,三相电压采样信号调制电路的输出端OUTa、OUTb和OUTc分别连接主控制单元的信号输入端(如DSP的ADCINA0□ADCINA2端);3路电流信号连接至三相电流采样信号调制电路的ia、ib、ic接口,如图4所示,三相电流采样信号调制电路的输出端OUTa1、OUTb1和OUTc1分别连接主控制单元的信号输入端(如DSP的ADCINA3□ADCINA5端);1路频率信号连接至频率采样信号调制电路的输入端fg,如图5所示,频率采样信号调制电路的输出端OUTf端连接主控制单元的信号输入端(如DSP的ADCINA6端)。The output pin u o of the band-pass filter circuit outputs 7 signals, among which 3 voltage signals are connected to u a , u b , u c interfaces of the three-phase voltage sampling signal modulation circuit, as shown in figure 3, the three-phase voltage The output terminals OUT a , OUT b and OUT c of the sampling signal modulation circuit are respectively connected to the signal input terminals of the main control unit (such as the ADCINA0 ADCINA2 terminal of the DSP); the three current signals are connected to the i a of the three-phase current sampling signal modulation circuit , i b , i c interfaces, as shown in Figure 4, the output terminals OUT a1 , OUT b1 and OUT c1 of the three-phase current sampling signal modulation circuit are respectively connected to the signal input terminals of the main control unit (such as the ADCINA3 ADCINA5 terminal of the DSP) ; No. 1 frequency signal is connected to the input terminal f g of the frequency sampling signal modulation circuit, as shown in Figure 5, the output terminal OUT f end of the frequency sampling signal modulation circuit is connected to the signal input terminal of the main control unit (such as the ADCINA6 end of DSP) .

本实施方式采用DSP作为主控制单元,用于对采集得到的PCC点的三相电压、电流以及电压频率进行A/D转换,并对转换后的信号进行孤岛检测检测,依据检测结果触发相应的触发控制信号,驱动PCC点处的执行机构进行相应的动作。This embodiment adopts DSP as the main control unit, which is used to perform A/D conversion on the collected three-phase voltage, current and voltage frequency of the PCC point, and perform islanding detection on the converted signal, and trigger the corresponding Trigger the control signal to drive the actuator at the PCC point to perform corresponding actions.

其型号为TMS320F2812,见图6,图6还包括DSP的电源模块,DSP电源模块对DSP提供满足工作要求的3.3V电压。Its model is TMS320F2812, see Fig. 6, Fig. 6 also includes the power supply module of DSP, DSP power supply module provides the 3.3V voltage that meets working requirement to DSP.

DSP的输出信号送至数据存储单元、通讯单元、液晶显示单元和断路控制器,所述的数据存储器单元、液晶显示单元分别主要实现对分布式发电系统运行状态的关键数据的储存和显示,以便操作人员了解系统的运行状态,并根据记录的关键数据做出正确的处理操作。The output signal of the DSP is sent to the data storage unit, the communication unit, the liquid crystal display unit and the circuit breaker controller, and the described data storage unit and the liquid crystal display unit mainly realize the storage and display of the key data of the operating state of the distributed power generation system respectively, so that Operators understand the operating status of the system and make correct processing operations based on the recorded key data.

本实施方式中,数据存储单元的型号为CY7C1041BV,其数据输入端D0~D15引脚与DSP的XD0~XD15引脚相连,A0~A17引脚与DSP芯片的XA0~XA17引脚相连。如图7所示。In this embodiment, the model of the data storage unit is CY7C1041BV, and its data input terminal D0-D15 pins are connected with XD0-XD15 pins of DSP, and A0-A17 pins are connected with XA0-XA17 pins of DSP chip. As shown in Figure 7.

所述的通讯单元用于实现孤岛检测装置与上位机的网络通讯,便于调度人员对分布式发电系统做出合理的安排,实现分布式发电系统的最大效益运行。本实施方式中采用RS485通讯协议,采用MAX232驱动芯片实现,其电路原理图如图8所示。其R2OUT、T2IN、R1OUT、T1IN引脚分别与DSP芯片的SCIRXDA、SCITXDA、SCIRXDB、SCITXDB引脚相连。The communication unit is used to realize the network communication between the island detection device and the upper computer, which is convenient for dispatchers to make reasonable arrangements for the distributed power generation system and realize the maximum benefit operation of the distributed power generation system. In this implementation mode, the RS485 communication protocol is adopted, and the MAX232 driver chip is used for realization, and its circuit schematic diagram is shown in FIG. 8 . Its R2OUT, T2IN, R1OUT, T1IN pins are respectively connected with the SCIRXDA, SCITXDA, SCIRXDB, SCITXDB pins of the DSP chip.

所述的液晶显示单元采用液晶显示器实现,所述的液晶显示器的型号为LCM12864ZK,如图9所示,液晶显示器的RS引脚与TMS320LF2812芯片的IOPF4引脚连接,液晶显示器的R/W引脚与DSP的IOPF5引脚连接,液晶显示器的E引脚与DSP的IOPF6引脚连接,D0~D7引脚与DSP的IOPB1~IOPB7引脚连接,液晶显示器的/RST引脚与DSP的IOPC1引脚连接。Described liquid crystal display unit adopts liquid crystal display to realize, and the model of described liquid crystal display is LCM12864ZK, as shown in Figure 9, the RS pin of liquid crystal display is connected with the IOPF4 pin of TMS320LF2812 chip, the R/W pin of liquid crystal display Connect with the IOPF5 pin of the DSP, connect the E pin of the LCD with the IOPF6 pin of the DSP, connect the D0~D7 pins with the IOPB1~IOPB7 pins of the DSP, and connect the /RST pin of the LCD with the IOPC1 pin of the DSP connect.

多进程孤岛检测装置通过DSP的I/O口产生PWM控制波信号,该控制信号经过信号放大电路进行放大后,对接在PCC点的并网控制继电器(本实施方式中采用的型号为DW15断路控制器)进行通断状态的控制,实现分布式发电系统孤岛运行状态的切除操作和孤岛状态的分布式发电系统重合闸操作。The multi-process island detection device generates a PWM control wave signal through the I/O port of the DSP. After the control signal is amplified by the signal amplification circuit, it is connected to the grid-connected control relay at the PCC point (the model used in this embodiment is DW15 circuit breaker control relay) switch) to control the on-off state, and realize the cut-off operation of the distributed generation system in the island operation state and the reclosing operation of the distributed generation system in the island state.

本发明的一种实施方式给出多进程的孤岛效应检测方法的流程,如图10所示。该流程开始于步骤1001。在步骤1002,对采集到的三相电压、电流和频率进行模数转换(例如,利用DSP的A/D转换器实现模数转换),称为幅值为3.3V的电压信号,并对转换后的数字信号进行归一化处理,送至数据存储器单元保存;An embodiment of the present invention provides a flow of a multi-process islanding effect detection method, as shown in FIG. 10 . The process starts at step 1001. In step 1002, carry out analog-to-digital conversion (for example, utilize the A/D converter of DSP to realize analog-to-digital conversion) to the collected three-phase voltage, current and frequency, call the voltage signal that amplitude is 3.3V, and convert The final digital signal is normalized and sent to the data memory unit for storage;

在步骤1003,初始化系统参数,所述的系统参数包括系统的电阻值R、电感值L和电容值C;In step 1003, system parameters are initialized, and the system parameters include system resistance value R, inductance value L and capacitance value C;

在步骤1004,利用步骤1存储的数据,计算系统的有功功率P和无功功率Q,并将有功功率值和无功功率值存入数据存储器单元保存;In step 1004, use the data stored in step 1 to calculate the active power P and reactive power Q of the system, and store the active power value and the reactive power value into the data memory unit for preservation;

其中,本实施方式采用三相瞬时功率方法计算有功功率、无功功率和功率因数角,过程如下:Among them, the present embodiment adopts the three-phase instantaneous power method to calculate active power, reactive power and power factor angle, and the process is as follows:

步骤1002采样到的三相相电压和三相线电流分别为ua、ub、uc、ia、ib、ic,经过a、b、c三相到α-β两相的变换后,得到uα、uβ和iα、iβThe three-phase phase voltage and three-phase line current sampled in step 1002 are respectively u a , ub , u c , ia , i b , and i c , and are converted from three phases a, b, and c to two phases α-β After that, u α , u β and i α , i β are obtained.

uu &alpha;&alpha; uu &beta;&beta; == CC &alpha;&beta;&alpha;&beta; uu aa uu bb uu cc ,, ii &alpha;&alpha; ii &beta;&beta; == CC &alpha;&beta;&alpha;&beta; ii aa ii bb ii cc -- -- -- (( 11 ))

式中 C &alpha;&beta; = 2 3 1 - 1 2 - 1 2 0 3 3 - 3 2 In the formula C &alpha;&beta; = 2 3 1 - 1 2 - 1 2 0 3 3 - 3 2

在α-β平面上将矢量

Figure BDA0000146854500000064
Figure BDA0000146854500000065
分别合成为(旋转)电压矢量
Figure BDA0000146854500000066
和电流矢量 Put the vector on the α-β plane
Figure BDA0000146854500000064
and
Figure BDA0000146854500000065
respectively synthesized into (rotated) voltage vectors
Figure BDA0000146854500000066
and current vector

Figure BDA0000146854500000068
Figure BDA0000146854500000069
Figure BDA0000146854500000068
Figure BDA0000146854500000069

式中u、i分别为矢量

Figure BDA00001468545000000610
的模,分别为矢量的相角。where u and i are vectors respectively
Figure BDA00001468545000000610
the mold, are vectors the phase angle.

计算三相电路瞬时有功电流和瞬时无功电流:Calculate the instantaneous active current and instantaneous reactive current of a three-phase circuit:

Figure BDA00001468545000000613
Figure BDA00001468545000000614
Figure BDA00001468545000000613
Figure BDA00001468545000000614

式中功率因数角

Figure BDA00001468545000000615
Figure BDA00001468545000000616
where the power factor angle
Figure BDA00001468545000000615
Figure BDA00001468545000000616

u与ip的乘积为三相电路瞬时有功功率,u与iq的乘积为三相电路瞬时无功功率。即The product of u and i p is the instantaneous active power of the three-phase circuit, and the product of u and i q is the instantaneous reactive power of the three-phase circuit. Right now

p=uip  q=uiq    (3)p=ui p q=ui q (3)

把式(2)代入式(3)中得:Substitute formula (2) into formula (3):

pp qq == uu &alpha;&alpha; uu &beta;&beta; uu &beta;&beta; -- uu &alpha;&alpha; ii &alpha;&alpha; ii &beta;&beta; == CC pqpq ii &alpha;&alpha; ii &beta;&beta; -- -- -- (( 44 ))

式中 C pq = u &alpha; u &beta; u &beta; - u &alpha; In the formula C pq = u &alpha; u &beta; u &beta; - u &alpha;

把式(1)代入式(4)中得:Substitute formula (1) into formula (4):

P=uaia+ubib+ucic Q = 1 3 [ ( u b - u c ) i a + ( u c - u a ) i b + ( u a - u b ) i c ] P=u a i a +u b i b +u c i c Q = 1 3 [ ( u b - u c ) i a + ( u c - u a ) i b + ( u a - u b ) i c ]

在步骤1005,将数据储存器中的数据送入DSP的CPU,进行被动孤岛检测,判断孤岛是否发生,如图11所示。该流程开始于1101。在步骤1102,(1)利用过欠压/过欠频检测法,计算分布式发电系统与电网节点(PCC节点)处的有功功率不平衡度

Figure BDA00001468545000000620
与无功功率的不平衡度,流程如图12所示。该流程开始于步骤1201。在步骤1202,计算有功功率不平衡度与无功功率
Figure BDA0000146854500000071
的不平衡度,公式如下:In step 1005, the data in the data storage is sent to the CPU of the DSP, and a passive island detection is performed to determine whether an island occurs, as shown in FIG. 11 . The process starts at 1101. In step 1102, (1) use the over-undervoltage/over-underfrequency detection method to calculate the unbalance degree of active power between the distributed generation system and the grid node (PCC node)
Figure BDA00001468545000000620
and reactive power The unbalance degree, the process is shown in Figure 12. The process starts at step 1201 . In step 1202, the active power unbalance degree is calculated and reactive power
Figure BDA0000146854500000071
The imbalance degree, the formula is as follows:

&Delta;P&Delta;P PP == 11 -- uu pp 22 uu gg 22 ,, &Delta;Q&Delta;Q QQ == &omega;&omega; gg &omega;&omega; PP &Delta;P&Delta;P PP -- (( &omega;&omega; gg &omega;&omega; PP -- 11 )) QQ ZZ QQ -- &omega;&omega; gg &omega;&omega; PP ++ 11

式中:ωg为电网角频率,且有ωg=2πfg,fg为电网频率;ωp为PCC处角频率,且有ωp=2πfp,fp为PCC节点处频率;ug为电网电压;up为PCC节点处电压;QZ为谐振电容上的无功,且有 Q Z = &omega; g Cu g 2 . In the formula: ω g is the angular frequency of the grid, and ω g = 2πf g , f g is the grid frequency; ω p is the angular frequency at the PCC, and ω p = 2πf p , f p is the frequency at the PCC node; u g is the grid voltage; u p is the voltage at the PCC node; Q Z is the reactive power on the resonant capacitor, and there is Q Z = &omega; g Cu g 2 .

在步骤1203,将计算出的有功功率不平衡度

Figure BDA0000146854500000075
和无功功率不平衡度
Figure BDA0000146854500000076
储存至数据存储器单元。In step 1203, the calculated active power imbalance
Figure BDA0000146854500000075
and reactive power unbalance
Figure BDA0000146854500000076
Stored to the data memory unit.

(2)利用相位突变检测法,计算电压相位角和电流相位角,其流程如图13所示。该流程开始于步骤1301。在步骤1302,通过电压传感器测出相隔

Figure BDA0000146854500000077
的两个电压瞬时值un,un-1,电流传感器测出相隔
Figure BDA0000146854500000078
的两个电流瞬时值in,in-1。计算出电压相位角和电流相位角,公式如下:(2) Using the phase mutation detection method to calculate the voltage phase angle and current phase angle, the flow chart is shown in Figure 13. The process starts at step 1301 . In step 1302, the voltage sensor measures the separation
Figure BDA0000146854500000077
Two voltage instantaneous values u n , u n-1 , measured by the current sensor are separated by
Figure BDA0000146854500000078
Two current instantaneous values in , in -1 of . Calculate the voltage phase angle and current phase angle, the formula is as follows:

Figure BDA0000146854500000079
Figure BDA0000146854500000079

式中,

Figure BDA00001468545000000711
为电压相位角;
Figure BDA00001468545000000712
为电流相位角。In the formula,
Figure BDA00001468545000000711
is the voltage phase angle;
Figure BDA00001468545000000712
is the current phase angle.

在步骤1303,将步骤1302计算出的 代入公式

Figure BDA00001468545000000715
得到电压与电流上位相位差角θ。In step 1303, the calculated in step 1302 Into the formula
Figure BDA00001468545000000715
Obtain the upper phase difference angle θ of voltage and current.

在步骤1304,将步骤1103计算得到的电压电流相位差角θ存入数据存储单元。In step 1304, the voltage-current phase difference angle θ calculated in step 1103 is stored in the data storage unit.

(3)利用功率/频率变化率检测法,计算PCC节点处的有功功率的变化率、无功功率的变化率和频率的变化率,流程如图14所示。该流程开始于步骤1401。在步骤1402,计算PCC节点处的有功功率的变化率、无功功率的变化率和频率的变化率,公式如下:(3) The rate of change of active power, rate of change of reactive power and rate of change of frequency at the PCC node is calculated by using the power/frequency rate of change detection method. The process is shown in Figure 14. The process starts at step 1401 . In step 1402, the rate of change of active power, the rate of change of reactive power and the rate of change of frequency at the PCC node are calculated, the formula is as follows:

&PartialD;&PartialD; PP &PartialD;&PartialD; tt == PP nno -- PP nno -- 11 &Delta;t&Delta;t ,, &PartialD;&PartialD; QQ &PartialD;&PartialD; tt == QQ nno -- QQ nno -- 11 &Delta;t&Delta;t ,, &PartialD;&PartialD; ff PP &PartialD;&PartialD; tt == ff PnPn -- ff PnPn -- 11 &Delta;t&Delta;t

式中,n,n-1分别代表第n次和第n-1次采样得到的系统数据;Δt表示第n次与第n-1次采样的时间间隔;

Figure BDA00001468545000000719
为第n次采集到的PCC节点处的频率,
Figure BDA00001468545000000720
为第n-1次采集到的PCC节点处的频率。In the formula, n and n-1 represent the system data obtained from the nth and n-1th sampling respectively; Δt represents the time interval between the nth and n-1th sampling;
Figure BDA00001468545000000719
is the frequency at the PCC node collected for the nth time,
Figure BDA00001468545000000720
is the frequency at the PCC node collected for the n-1th time.

在步骤1403:将计算得到的有功功率的变化率

Figure BDA0000146854500000081
无功功率的变化率
Figure BDA0000146854500000082
和频率的变化率
Figure BDA0000146854500000083
存入数据存储单元。In step 1403: the calculated rate of change of active power
Figure BDA0000146854500000081
Rate of change of reactive power
Figure BDA0000146854500000082
and the rate of change of frequency
Figure BDA0000146854500000083
into the data storage unit.

在步骤1103,将(1)步骤1102计算出的有功功率与无功功率的不平衡度(2)步骤1106计算出的电压电流相位差角θ;(3)步骤1108计算出的有功功率的变化率

Figure BDA0000146854500000085
无功功率的变化率
Figure BDA0000146854500000086
和频率的变换率
Figure BDA0000146854500000087
代入到被动孤岛检测综合指标评价公式,计算综合指标评价β,公式如下:In step 1103, the unbalance degree of active power and reactive power calculated in (1) step 1102 (2) the voltage and current phase difference angle θ calculated in step 1106; (3) the rate of change of active power calculated in step 1108
Figure BDA0000146854500000085
Rate of change of reactive power
Figure BDA0000146854500000086
and the conversion rate of the frequency
Figure BDA0000146854500000087
Substituting it into the comprehensive index evaluation formula of passive island detection to calculate the comprehensive index evaluation β, the formula is as follows:

&beta;&beta; == &theta;&theta; 22 &pi;&pi; (( &Delta;P&Delta;P // PP )) 22 coscos &theta;&theta; (( 11 ++ (( &PartialD;&PartialD; QQ // &PartialD;&PartialD; tt )) lnln (( &PartialD;&PartialD; PP // &PartialD;&PartialD; tt )) )) ++ (( &Delta;Q&Delta;Q // QQ )) 22 coscos &theta;&theta; (( 11 ++ (( &PartialD;&PartialD; ff PP // &PartialD;&PartialD; tt )) lnln (( &PartialD;&PartialD; PP // &PartialD;&PartialD; tt )) ))

在步骤1104,判断被动检测综合评价指标值β是否小于10,若满足,则执行1105,否则执行步骤1106。In step 1104, it is judged whether the passive detection comprehensive evaluation index value β is less than 10, and if so, go to step 1105, otherwise go to step 1106.

在步骤1105,说明被动孤岛检测对分布式发电系统检测结果为正常并网运行,此时启用主动孤岛检测流程对被动孤岛检测的结果进行复核,执行步骤1006;In step 1105, it indicates that the detection result of the distributed power generation system by the passive island detection is normal grid-connected operation, and at this time, the active island detection process is started to review the result of the passive island detection, and step 1006 is executed;

在步骤1106,因β>10,说明分布式发电系统已处于孤岛状态,此时系统DSP发出PWM波驱动断路控制器,将分布式发电系统从电网切除。In step 1106, because β>10, it means that the distributed generation system is in an island state. At this time, the system DSP sends out a PWM wave to drive the circuit breaker controller to disconnect the distributed generation system from the grid.

在步骤1107,结束。In step 1107, end.

在步骤1006,利用主动移频法进行主动孤岛检测,如图15所示。该流程开始于步骤1501。在步骤1502,改变逆变器输出电流iinv的角频率ω,In step 1006, active islanding detection is performed by using the active frequency shift method, as shown in FIG. 15 . The process starts at step 1501 . In step 1502, the angular frequency ω of the inverter output current i inv is changed,

在步骤1503,采集PCC节点处的三相电压、电流值,并计算扰动后的电压、电流的相位角

Figure BDA0000146854500000089
和扰动后的PCC节点处的角频率值ωP,其中,ωp=2πfp。In step 1503, collect the three-phase voltage and current values at the PCC node, and calculate the phase angle of the voltage and current after the disturbance
Figure BDA0000146854500000089
and the perturbed angular frequency value ω P at the PCC node, where ω p =2πf p .

在步骤1504:计算分布式发电系统的阻抗角,公式如下:In step 1504: Calculate the impedance angle of the distributed generation system, the formula is as follows:

如果分布式发电系统处于孤岛状态,则PCC节点处的电压、电流的相位角

Figure BDA00001468545000000811
的差等于负载阻抗角
Figure BDA00001468545000000812
即有:
Figure BDA00001468545000000813
If the distributed generation system is in an island state, the phase angle of the voltage and current at the PCC node
Figure BDA00001468545000000811
The difference is equal to the load impedance angle
Figure BDA00001468545000000812
That is:
Figure BDA00001468545000000813

在步骤1505,计算主动移频法的频移范围ωmax和ωmin,公式如下:In step 1505, calculate the frequency shift range ω max and ω min of the active frequency shift method, the formula is as follows:

Figure BDA0000146854500000091
Figure BDA0000146854500000091

Figure BDA0000146854500000092
Figure BDA0000146854500000092

在步骤1506,比较PCC节点处的角频率ωP,如果ωP不满足关系常ωmin<ωP<ωmax,说明被动检测的结果不正确,执行步骤1508,否则执行步骤1507。In step 1506, compare the angular frequency ω P at the PCC node, if ω P does not satisfy the relation constant ω minPmax , it means that the result of passive detection is incorrect, go to step 1508, otherwise go to step 1507.

在步骤1507,明被动检测的结果是正确的,执行步骤1509。In step 1507, it is determined that the result of the passive detection is correct, and step 1509 is executed.

在步骤1508,此时,DSP发出PWM波驱动断路控制器,将分布式发电系统从电网切除,并执行步骤1509;In step 1508, at this time, the DSP sends a PWM wave to drive the circuit breaker controller to disconnect the distributed generation system from the grid, and execute step 1509;

在步骤1509结束。End in step 1509.

在步骤1007,分布式发电系统处于孤岛运行状态,利用通讯单元与上位机进行远程通讯,向操作人员提示系统已从电网切除。In step 1007, the distributed generation system is in an island operation state, and the communication unit is used to communicate remotely with the upper computer, prompting the operator that the system has been disconnected from the power grid.

在步骤1008,储存在数据储存单元的数据通过显示单元进行分布式发电系统的状态显示,向系统检修人员提供检修依据。In step 1008, the data stored in the data storage unit is used to display the status of the distributed power generation system through the display unit, providing maintenance basis for system maintenance personnel.

在步骤1009,对于已从电网切除的分布式发电系统,孤岛检测装置会通过主动孤岛检测对分布式发电系统进行主动检测,判断分布式发电系统是否满足重新并网运行的要求,如果满足,则DSP发出PWM波驱动断路控制器使分布式发电系统重新并网运行。In step 1009, for the distributed generation system that has been disconnected from the grid, the islanding detection device will actively detect the distributed generation system through active island detection, and judge whether the distributed generation system meets the requirements for reconnecting to the grid. If so, then The DSP sends out PWM waves to drive the circuit breaker controller to make the distributed generation system reconnect to the grid.

在图10到图15所述的一个或者更多的流程图的基础上,对于一个本技术领域内熟练的技术人员无需创造性的工作即可开发出一个或者更多的软件。这样开发出的软件将执行图10到图14所述的被动孤岛检测流程,图15所示的主动孤岛检测流程。所述的软件保存在主控单元(DSP)内。On the basis of one or more flowcharts described in Fig. 10 to Fig. 15, one or more software can be developed for a person skilled in the art without creative work. The software developed in this way will execute the passive islanding detection process described in FIGS. 10 to 14 and the active islanding detection process shown in FIG. 15 . The software is stored in the main control unit (DSP).

虽然以上描述了本发明的具体实施方式,但是本技术领域内的熟练技术人员应当理解,这些仅是举例说明,可以对这些实施方式做出多种变更或修改,而不背离本发明的原理和实质。本发明的范围仅由所附权利要求书限定。Although the specific embodiments of the present invention have been described above, those skilled in the art should understand that these are only examples, and various changes or modifications can be made to these embodiments without departing from the principles and principles of the present invention. substance. The scope of the invention is limited only by the appended claims.

Claims (4)

1.一种多进程的孤岛效应检测方法,过程如下:1. A multi-process islanding detection method, the process is as follows: 步骤1:将采集到的三相电压、电流和频率进行滤波、降噪、变压处理和模数转换,并对转换后的数字信号进行归一化处理,送至数据存储器单元保存;Step 1: Perform filtering, noise reduction, voltage transformation processing and analog-to-digital conversion on the collected three-phase voltage, current and frequency, and normalize the converted digital signal, and send it to the data memory unit for storage; 步骤2:初始化系统参数,所述的系统参数包括系统的电阻值R、电感值L和电容值C;Step 2: Initialize system parameters, the system parameters include system resistance value R, inductance value L and capacitance value C; 步骤3:利用步骤1存储的数据,计算系统的有功功率P和无功功率Q,并将有功功率值和无功功率值存入数据存储器单元保存;Step 3: Using the data stored in step 1, calculate the active power P and reactive power Q of the system, and store the active power value and reactive power value in the data memory unit for preservation; 其特征在于:还包括以下步骤:It is characterized in that: it also includes the following steps: 步骤4:将数据储存器中的数据送入DSP的CPU,进行被动孤岛检测,判断孤岛是否发生,方法为:(1)利用过欠压/过欠频检测法计算有功功率和无功功率的不平衡度;(2)利用相位突变检测法计算电压电流相位差角;(3)利用功率/频率变化率检测法计算有功功率变换率、无功功率变换率及频率的变换率;利用上述(1)(2)(3)的结果,计算被动检测综合评价指标值,若该值小于或等于10,说明分布式发电系统为正常并网运行状态,利用主动孤岛检测流程对被动孤岛检测的结果进行复核,执行步骤5;该值大于10,说明分布式发电系统已处于孤岛状态,此时系统DSP发出PWM波驱动断路控制器,将分布式发电系统从电网切除;Step 4: Send the data in the data storage to the CPU of the DSP, and perform passive islanding detection to determine whether the islanding occurs. Unbalance degree; (2) Utilize phase mutation detection method to calculate voltage and current phase difference angle; (3) Utilize power/frequency change rate detection method to calculate active power conversion rate, reactive power conversion rate and frequency conversion rate; use the above ( 1) From the results of (2) and (3), calculate the comprehensive evaluation index value of passive detection. If the value is less than or equal to 10, it means that the distributed power generation system is in the normal grid-connected operation state. Use the active island detection process to detect the results of passive island Check and execute step 5; if the value is greater than 10, it means that the distributed generation system is in an island state. At this time, the system DSP sends out a PWM wave to drive the circuit breaker controller to cut off the distributed generation system from the grid; 步骤5:主动孤岛检测,方法为:利用主动移频法计算频移的最大值ωmax和最小值ωmin,公式如下:Step 5: Active island detection, the method is: use the active frequency shift method to calculate the maximum value ω max and the minimum value ω min of the frequency shift, the formula is as follows:
Figure FDA0000146854490000011
Figure FDA0000146854490000011
式中,
Figure FDA0000146854490000013
为电压相位角;
Figure FDA0000146854490000014
为电流相位角;
In the formula,
Figure FDA0000146854490000013
is the voltage phase angle;
Figure FDA0000146854490000014
is the current phase angle;
计算分布式发电系统与电网节点处的角频率ωP,且有ωp=2πfp,如果不满足ωmin<ωP<ωmax,说明被动检测的结果不正确,此时DSP发出PWM波驱动断路控制器,将分布式发电系统从电网切除;否则,说明被动检测的结果是正确的,执行步骤6;Calculate the angular frequency ω P at the node between the distributed generation system and the power grid, and there is ω p = 2πf p , if ω minPmax is not satisfied, it means that the result of passive detection is incorrect. At this time, the DSP sends out a PWM wave to drive The circuit breaker controller disconnects the distributed generation system from the grid; otherwise, it means that the result of the passive detection is correct, and proceed to step 6; 步骤6:分布式发电系统处于孤岛运行状态,利用通讯单元与上位机进行远程通讯,向操作人员提示系统已从电网切除;Step 6: The distributed power generation system is in an island operation state, and the communication unit is used to communicate with the upper computer remotely, and the operator is prompted that the system has been disconnected from the grid; 步骤7:储存在数据储存单元的数据通过显示单元进行分布式发电系统的状态显示,向系统检修人员提供检修依据;Step 7: The data stored in the data storage unit is used to display the status of the distributed power generation system through the display unit, and provide maintenance basis for system maintenance personnel; 步骤8:对于已从电网切除的分布式发电系统,孤岛检测装置会通过主动孤岛检测对分布式发电系统进行主动检测,判断分布式发电系统是否满足重新并网运行的要求,如果满足,则DSP发出PWM波驱动断路控制器使分布式发电系统重新并网运行。Step 8: For the distributed generation system that has been disconnected from the grid, the island detection device will actively detect the distributed generation system through active island detection, and judge whether the distributed generation system meets the requirements for reconnecting to the grid. If so, DSP A PWM wave is sent out to drive the circuit breaker controller so that the distributed generation system can be connected to the grid again.
2.根据权利要求1所述的多进程的孤岛效应检测方法,其特征在于:步骤4所述的被动孤岛检测,包括以下步骤:2. The multi-process islanding detection method according to claim 1, characterized in that: the passive islanding detection in step 4 comprises the following steps: 步骤4-1:利用过欠压/过欠频检测法,计算分布式发电系统与电网节点(PCC节点)处的有功功率不平衡度
Figure FDA0000146854490000021
与无功功率
Figure FDA0000146854490000022
的不平衡度,公式如下:
Step 4-1: Calculate the active power imbalance between the distributed generation system and the grid node (PCC node) by using the over-undervoltage/over-underfrequency detection method
Figure FDA0000146854490000021
and reactive power
Figure FDA0000146854490000022
The imbalance degree, the formula is as follows:
&Delta;P&Delta;P PP == 11 -- uu pp 22 uu gg 22 ,, &Delta;Q&Delta;Q QQ == &omega;&omega; gg &omega;&omega; PP &Delta;P&Delta;P PP -- (( &omega;&omega; gg &omega;&omega; PP -- 11 )) QQ ZZ QQ -- &omega;&omega; gg &omega;&omega; PP ++ 11 式中:ωg为电网角频率,且有ωg=2πfg,fg为电网频率;ωp为PCC处角频率,且有ωp=2πfp,fp为PCC节点处频率;ug为电网电压;up为PCC节点处电压;QZ为谐振电容上的无功,且有 Q Z = &omega; g Cu g 2 ; In the formula: ω g is the angular frequency of the grid, and ω g = 2πf g , f g is the grid frequency; ω p is the angular frequency at the PCC, and ω p = 2πf p , f p is the frequency at the PCC node; u g is the grid voltage; u p is the voltage at the PCC node; Q Z is the reactive power on the resonant capacitor, and there is Q Z = &omega; g Cu g 2 ; 步骤4-2:将计算出的有功功率不平衡度
Figure FDA0000146854490000026
和无功功率不平衡度
Figure FDA0000146854490000027
储存至数据存储器单元;
Step 4-2: The calculated active power unbalance
Figure FDA0000146854490000026
and reactive power unbalance
Figure FDA0000146854490000027
storing to the data memory unit;
步骤4-3:利用相位突变检测法,计算电压相位角和电流相位角:Step 4-3: Using the phase mutation detection method, calculate the voltage phase angle and current phase angle: 通过电压传感器测出相隔
Figure FDA0000146854490000028
的两个电压瞬时值un,un-1,电流传感器测出相隔
Figure FDA0000146854490000029
的两个电流瞬时值in,in-1,计算出电压相位角和电流相位角,公式如下:
The separation is measured by the voltage sensor
Figure FDA0000146854490000028
Two voltage instantaneous values u n , u n-1 , measured by the current sensor are separated by
Figure FDA0000146854490000029
The two current instantaneous values i n , i n-1 , calculate the voltage phase angle and current phase angle, the formula is as follows:
Figure FDA00001468544900000210
Figure FDA00001468544900000210
步骤4-4:步骤4-3计算出的
Figure FDA00001468544900000212
Figure FDA00001468544900000213
代入公式
Figure FDA00001468544900000214
得到电压与电流上位相位差角θ;
Step 4-4: Calculated in Step 4-3
Figure FDA00001468544900000212
Figure FDA00001468544900000213
Into the formula
Figure FDA00001468544900000214
Get the voltage and current upper phase difference angle θ;
步骤4-5:将步骤:4-4计算得到的电压电流相位差角θ存入数据存储单元;Step 4-5: storing the voltage and current phase difference angle θ calculated in step: 4-4 into the data storage unit; 步骤4-6:利用功率/频率变化率检测法,计算PCC节点处的有功功率的变化率、无功功率的变化率和频率的变化率,公式如下:Step 4-6: Using the power/frequency rate of change detection method, calculate the rate of change of active power, the rate of change of reactive power and the rate of change of frequency at the PCC node, the formula is as follows: &PartialD;&PartialD; PP &PartialD;&PartialD; tt == PP nno -- PP nno -- 11 &Delta;t&Delta;t ,, &PartialD;&PartialD; QQ &PartialD;&PartialD; tt == QQ nno -- QQ nno -- 11 &Delta;t&Delta;t ,, &PartialD;&PartialD; ff PP &PartialD;&PartialD; tt == ff PnPn -- ff PnPn -- 11 &Delta;t&Delta;t 式中,n,n-1分别代表第n次和第n-1次采样得到的系统数据;Δt表示第n次与第n-1次采样的时间间隔;
Figure FDA0000146854490000031
为第n次采集到的PCC节点处的频率,
Figure FDA0000146854490000032
为第n-1次采集到的PCC节点处的频率;
In the formula, n and n-1 respectively represent the system data obtained from the nth and n-1th sampling; Δt represents the time interval between the nth and n-1th sampling;
Figure FDA0000146854490000031
is the frequency at the PCC node collected for the nth time,
Figure FDA0000146854490000032
is the frequency at the PCC node collected for the n-1th time;
步骤4-7:将计算得到的有功功率的变化率
Figure FDA0000146854490000033
无功功率的变化率
Figure FDA0000146854490000034
和频率的变化率存入数据存储单元。
Step 4-7: Calculate the rate of change of active power
Figure FDA0000146854490000033
Rate of change of reactive power
Figure FDA0000146854490000034
and the rate of change of frequency into the data storage unit.
3.根据权利要求1所述的多进程的孤岛效应检测方法,其特征在于:步骤4所述的被动检测综合评价指标值的计算公式如下:3. the islanding effect detection method of multi-process according to claim 1, is characterized in that: the calculation formula of the passive detection comprehensive evaluation index value described in step 4 is as follows: &beta;&beta; == &theta;&theta; 22 &pi;&pi; (( &Delta;P&Delta;P // PP )) 22 coscos &theta;&theta; (( 11 ++ (( &PartialD;&PartialD; QQ // &PartialD;&PartialD; tt )) lnln (( &PartialD;&PartialD; PP // &PartialD;&PartialD; tt )) )) ++ (( &Delta;Q&Delta;Q // QQ )) 22 coscos &theta;&theta; (( 11 ++ (( &PartialD;&PartialD; ff PP // &PartialD;&PartialD; tt )) lnln (( &PartialD;&PartialD; PP // &PartialD;&PartialD; tt )) )) 4.实现权利要求1所述的多进程的孤岛效应检测方法的装置,其特征在于:包括:4. realize the device of the islanding effect detection method of multi-process described in claim 1, it is characterized in that: comprise: 信号采集单元:用于采集分布式发电系统与电网节点处的三相电压、电流和频率并对采集到的信号进行滤波、降噪、变压处理;Signal collection unit: used to collect the three-phase voltage, current and frequency at the nodes of the distributed power generation system and the power grid, and perform filtering, noise reduction and voltage transformation processing on the collected signals; 主控单元:用于对信号采集单元采集到的信号进一步处理,进行被动孤岛检测和主动孤岛检测,并依据检测结果,控制分布式发电系统与电网的连接和关断;Main control unit: used to further process the signal collected by the signal acquisition unit, perform passive island detection and active island detection, and control the connection and shutdown of the distributed power generation system and the power grid according to the detection results; 数据存储器单元:用于存储有功功率和无功功率的不平衡度、电压电流相位差角、有功功率变换率、无功功率变换率及频率的变换率;Data memory unit: used to store the unbalance degree of active power and reactive power, voltage and current phase difference angle, active power conversion rate, reactive power conversion rate and frequency conversion rate; 通讯单元:用于实现孤岛效应检测装置与上位机的网络通讯。Communication unit: used to realize the network communication between the island effect detection device and the host computer.
CN201210082158.9A 2012-03-26 2012-03-26 Multi-process island effect detection device and method Expired - Fee Related CN102624027B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210082158.9A CN102624027B (en) 2012-03-26 2012-03-26 Multi-process island effect detection device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210082158.9A CN102624027B (en) 2012-03-26 2012-03-26 Multi-process island effect detection device and method

Publications (2)

Publication Number Publication Date
CN102624027A true CN102624027A (en) 2012-08-01
CN102624027B CN102624027B (en) 2014-03-05

Family

ID=46563768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210082158.9A Expired - Fee Related CN102624027B (en) 2012-03-26 2012-03-26 Multi-process island effect detection device and method

Country Status (1)

Country Link
CN (1) CN102624027B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103091578A (en) * 2013-01-11 2013-05-08 天津理工大学 Island detection method of photovoltaic grid-connected system
CN103199563A (en) * 2013-04-11 2013-07-10 东南大学 Initiative frequency shift type island detection method of low-output-current harmonic content
CN103217595A (en) * 2013-02-18 2013-07-24 华为技术有限公司 Detection method, equipment and system of one-phase island of three-phase grid-connected inverter
CN103389421A (en) * 2013-06-26 2013-11-13 国家电网公司 Island detection method and device based on GOOSE communication
CN103969534A (en) * 2014-05-23 2014-08-06 国家电网公司 Islanding testing method for wind generating set
CN104218606A (en) * 2014-09-02 2014-12-17 南方电网科学研究院有限责任公司 Micro-grid central controller
CN104865479A (en) * 2015-06-15 2015-08-26 江苏方天电力技术有限公司 Islanding detecting method
CN106019010A (en) * 2016-05-23 2016-10-12 南昌大学 Mixed island detection method based on combination of slide mode frequency shift method and passive method
US9520819B2 (en) 2014-02-28 2016-12-13 General Electric Company System and method for controlling a power generation system based on a detected islanding event
CN107976609A (en) * 2017-11-27 2018-05-01 王建安 A kind of isolated network identifying system and method
CN112198391A (en) * 2020-12-04 2021-01-08 国网智慧能源交通技术创新中心(苏州)有限公司 Island detection system, detection method and hybrid detection system of V2G charging pile

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050057950A1 (en) * 2003-09-11 2005-03-17 Colby Roy Stephen Power regulator for power inverter
CN102255329A (en) * 2011-04-14 2011-11-23 东南大学 Island detection method of photovoltaic grid connected system
CN102270854A (en) * 2011-08-05 2011-12-07 华北电力大学 Islanding Detection Method Based on Positive Feedback of Voltage Harmonic Distortion Rate

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050057950A1 (en) * 2003-09-11 2005-03-17 Colby Roy Stephen Power regulator for power inverter
CN102255329A (en) * 2011-04-14 2011-11-23 东南大学 Island detection method of photovoltaic grid connected system
CN102270854A (en) * 2011-08-05 2011-12-07 华北电力大学 Islanding Detection Method Based on Positive Feedback of Voltage Harmonic Distortion Rate

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103091578A (en) * 2013-01-11 2013-05-08 天津理工大学 Island detection method of photovoltaic grid-connected system
CN103217595A (en) * 2013-02-18 2013-07-24 华为技术有限公司 Detection method, equipment and system of one-phase island of three-phase grid-connected inverter
CN103217595B (en) * 2013-02-18 2015-11-25 华为技术有限公司 A kind of detection method of one-phase island of three-phase grid-connected inverter, equipment and system
CN103199563B (en) * 2013-04-11 2015-09-09 东南大学 A kind of Active Frequency Drift Islanding Detection Method of low output current harmonics content
CN103199563A (en) * 2013-04-11 2013-07-10 东南大学 Initiative frequency shift type island detection method of low-output-current harmonic content
CN103389421A (en) * 2013-06-26 2013-11-13 国家电网公司 Island detection method and device based on GOOSE communication
US9520819B2 (en) 2014-02-28 2016-12-13 General Electric Company System and method for controlling a power generation system based on a detected islanding event
CN103969534A (en) * 2014-05-23 2014-08-06 国家电网公司 Islanding testing method for wind generating set
CN103969534B (en) * 2014-05-23 2016-01-20 国家电网公司 A kind of Wind turbines isolated island method of testing
CN104218606A (en) * 2014-09-02 2014-12-17 南方电网科学研究院有限责任公司 Micro-grid central controller
CN104865479A (en) * 2015-06-15 2015-08-26 江苏方天电力技术有限公司 Islanding detecting method
CN104865479B (en) * 2015-06-15 2018-06-01 江苏方天电力技术有限公司 A kind of island detection method
CN106019010A (en) * 2016-05-23 2016-10-12 南昌大学 Mixed island detection method based on combination of slide mode frequency shift method and passive method
CN107976609A (en) * 2017-11-27 2018-05-01 王建安 A kind of isolated network identifying system and method
CN112198391A (en) * 2020-12-04 2021-01-08 国网智慧能源交通技术创新中心(苏州)有限公司 Island detection system, detection method and hybrid detection system of V2G charging pile
CN112198391B (en) * 2020-12-04 2021-02-26 国网智慧能源交通技术创新中心(苏州)有限公司 Island detection system, detection method and hybrid detection system of V2G charging pile

Also Published As

Publication number Publication date
CN102624027B (en) 2014-03-05

Similar Documents

Publication Publication Date Title
CN102624027A (en) A multi-process islanding effect detection device and method
CN102270854B (en) Island detecting method based on positive feedback of voltage harmonic distortion
CN103259287B (en) Bidirectional grid-connected inversion device and method of distributed new energy power generation system
CN103323711B (en) A kind of low-pressure grid-connection pick-up unit of distributed new electricity generation system and method
CN105375498A (en) Three-phase phase-change switch device
CN105720590B (en) Power distribution station reactive-load compensation flexible control device and method
CN104330612B (en) A kind of resonance overvoltage monitoring system and method
CN101576743A (en) Distributed ring main unit monitor terminal
CN102222932A (en) Isolated island detecting device and method based on load characteristic
CN105762829A (en) Microgrid inverter grid disconnection/connection seamless switching control method based on phase angle estimation
CN103683507B (en) Distributed generation micro-grid control and electric energy quality monitoring integrated device and method
CN105914760B (en) A kind of power distribution station power-less compensation control method and device can inhibit resonance
CN202166714U (en) An overhead intelligent fault indicator device
CN107026496A (en) A kind of bidirectional electric automobile charge and discharge device and method based on auto-disturbance rejection technology
CN204992761U (en) Electric energy quality is synthesized and is observed and controled appearance
CN102832696A (en) High voltage power supply rapid switching system based on power electronic switch and control method of system
CN105591371A (en) Anti-islanding protection control system and anti-islanding protection control method based on photovoltaic power station power control system
CN203039336U (en) Breaker electronic type controller
CN202276135U (en) Comprehensive protection controller for wireless intelligent motor
CN104362689A (en) Direct-current emergency power supply device with supercapacitor module
CN103336476A (en) Intelligent phase selection control system and implementation method of transient characteristic testing system
CN202713164U (en) Thickened oil electric thermal recovery heating power supply with fault diagnosing and warning functions
CN206658052U (en) A kind of low-voltage intelligent capacitor controller and reactive compensation system
CN116794448A (en) Intelligent detection device and method for safe electricity utilization of client side
CN205583690U (en) An Active Power Filter with GPRS

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140305

Termination date: 20160326