CN102621957A - 电力隧道运营监控与维护一体化系统 - Google Patents
电力隧道运营监控与维护一体化系统 Download PDFInfo
- Publication number
- CN102621957A CN102621957A CN2012100859054A CN201210085905A CN102621957A CN 102621957 A CN102621957 A CN 102621957A CN 2012100859054 A CN2012100859054 A CN 2012100859054A CN 201210085905 A CN201210085905 A CN 201210085905A CN 102621957 A CN102621957 A CN 102621957A
- Authority
- CN
- China
- Prior art keywords
- data acquisition
- acquisition module
- electric power
- power tunnel
- switch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 25
- 238000012423 maintenance Methods 0.000 title claims abstract description 10
- 230000000737 periodic effect Effects 0.000 claims abstract description 11
- 230000007613 environmental effect Effects 0.000 claims description 6
- 238000006073 displacement reaction Methods 0.000 claims description 3
- 239000002689 soil Substances 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 3
- 230000007774 longterm Effects 0.000 description 3
- 238000011160 research Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000003745 diagnosis Methods 0.000 description 2
- 201000010099 disease Diseases 0.000 description 2
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 241000272165 Charadriidae Species 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Alarm Systems (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100859054A CN102621957A (zh) | 2012-03-27 | 2012-03-27 | 电力隧道运营监控与维护一体化系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100859054A CN102621957A (zh) | 2012-03-27 | 2012-03-27 | 电力隧道运营监控与维护一体化系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102621957A true CN102621957A (zh) | 2012-08-01 |
Family
ID=46561922
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100859054A Pending CN102621957A (zh) | 2012-03-27 | 2012-03-27 | 电力隧道运营监控与维护一体化系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102621957A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103472774A (zh) * | 2013-08-21 | 2013-12-25 | 国家电网公司 | 一种电力隧道实时监测系统及方法 |
CN103471648A (zh) * | 2013-08-21 | 2013-12-25 | 国家电网公司 | 一种顶管隧道的扰动施工监测方法 |
CN105422177A (zh) * | 2015-12-22 | 2016-03-23 | 上海市地下空间设计研究总院有限公司 | 一种盾构法隧道结构健康监测及安全预警系统 |
CN108303143A (zh) * | 2018-03-29 | 2018-07-20 | 何满潮 | 地下中子能电站监测系统及方法 |
CN105422177B (zh) * | 2015-12-22 | 2018-08-31 | 上海市地下空间设计研究总院有限公司 | 一种盾构法隧道结构健康监测及安全预警系统 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1820262A (zh) * | 2003-06-09 | 2006-08-16 | 范拉诺公司 | 事件监控及管理 |
CN101685012A (zh) * | 2008-09-27 | 2010-03-31 | 上海市机械施工有限公司 | 地铁隧道断面的测量与计算方法 |
US20100128637A1 (en) * | 2008-11-21 | 2010-05-27 | Qualcomm Incorporated | Network-centric determination of node processing delay |
CN201800737U (zh) * | 2010-09-21 | 2011-04-20 | 中国铁道科学研究院电子计算技术研究所 | 铁路防灾安全监控系统 |
CN202494917U (zh) * | 2012-03-27 | 2012-10-17 | 上海市电力公司 | 电力隧道运营监控与维护一体化系统 |
-
2012
- 2012-03-27 CN CN2012100859054A patent/CN102621957A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1820262A (zh) * | 2003-06-09 | 2006-08-16 | 范拉诺公司 | 事件监控及管理 |
CN101685012A (zh) * | 2008-09-27 | 2010-03-31 | 上海市机械施工有限公司 | 地铁隧道断面的测量与计算方法 |
US20100128637A1 (en) * | 2008-11-21 | 2010-05-27 | Qualcomm Incorporated | Network-centric determination of node processing delay |
CN201800737U (zh) * | 2010-09-21 | 2011-04-20 | 中国铁道科学研究院电子计算技术研究所 | 铁路防灾安全监控系统 |
CN202494917U (zh) * | 2012-03-27 | 2012-10-17 | 上海市电力公司 | 电力隧道运营监控与维护一体化系统 |
Non-Patent Citations (2)
Title |
---|
"RTK系统、全站仪及CASS软件在地形测绘中的应用探讨", 《SCIENCE OF SURVEYING AND MAPPING》, 28 February 2009 (2009-02-28) * |
覃智敏: "免棱镜全站仪在危岩崩塌监测中的应用", 《矿山测量》, no. 6, 31 December 2010 (2010-12-31) * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103472774A (zh) * | 2013-08-21 | 2013-12-25 | 国家电网公司 | 一种电力隧道实时监测系统及方法 |
CN103471648A (zh) * | 2013-08-21 | 2013-12-25 | 国家电网公司 | 一种顶管隧道的扰动施工监测方法 |
CN103472774B (zh) * | 2013-08-21 | 2015-12-02 | 国家电网公司 | 一种电力隧道实时监测系统及方法 |
CN105422177A (zh) * | 2015-12-22 | 2016-03-23 | 上海市地下空间设计研究总院有限公司 | 一种盾构法隧道结构健康监测及安全预警系统 |
CN105422177B (zh) * | 2015-12-22 | 2018-08-31 | 上海市地下空间设计研究总院有限公司 | 一种盾构法隧道结构健康监测及安全预警系统 |
CN108303143A (zh) * | 2018-03-29 | 2018-07-20 | 何满潮 | 地下中子能电站监测系统及方法 |
WO2019184930A1 (zh) * | 2018-03-29 | 2019-10-03 | 何满潮 | 地下中子能电站监测系统及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103152823B (zh) | 一种无线室内定位方法 | |
CN103235981B (zh) | 一种风电电能质量趋势预测方法 | |
CN103067941B (zh) | 基于无线传感网络的多变量分布式在线监测系统 | |
Erol-Kantarci et al. | Wireless multimedia sensor and actor networks for the next generation power grid | |
CN102565542B (zh) | 基于iec61850-9-2标准的容性设备介质损耗在线监测方法 | |
CN202494917U (zh) | 电力隧道运营监控与维护一体化系统 | |
Chen et al. | Application of internet of things in power-line monitoring | |
CN104794755B (zh) | 一种高压电缆三维管线场景构建方法 | |
CN101539396B (zh) | 一种监测隧道应力形变的应用系统 | |
CN201277062Y (zh) | 矿井水害监测智能预警系统 | |
CN104008218A (zh) | 电力工程三维一体化设计平台 | |
CN202816127U (zh) | 无线燃气表抄表系统 | |
CN106023561A (zh) | “四表合一”能源管理一体化服务系统 | |
CN102621957A (zh) | 电力隧道运营监控与维护一体化系统 | |
CN203982592U (zh) | 分布式物联网停车场系统 | |
CN104269937A (zh) | 一种分布式光伏电站的运行监控系统 | |
CN110134750A (zh) | 一种城市地下管线信息系统 | |
CN201408076Y (zh) | 基于Zigbee技术的无线环境噪声处理模块及其监测节点、监测系统 | |
CN104331504A (zh) | 变电站维护现场三维效果图构建的系统 | |
CN103700241A (zh) | 微震监测数据无线传输系统 | |
CN103017824B (zh) | 使用测量机器人的监测系统 | |
CN103472774B (zh) | 一种电力隧道实时监测系统及方法 | |
CN103440754A (zh) | 一种无线分布式网络数据监测系统 | |
CN210924670U (zh) | 基于bim的机电施工管理系统 | |
Cao et al. | Application of Internet of things based on wireless sensor in tunnel construction monitoring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA SHANGHAI POWER COM Free format text: FORMER OWNER: SHANGHAI JIULONG ELECTRIC POWER SCIENCE + TECHNOLOGY CO., LTD. Effective date: 20121228 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20121228 Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122 Applicant after: Shanghai Electric Power Corporation Applicant after: State Grid Corporation of China Applicant after: Shanghai Electric Power Communication Co., Ltd. Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122 Applicant before: Shanghai Electric Power Corporation Applicant before: Shanghai Jiulong Electric Power Co., Ltd. |
|
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120801 |