CN102616643B CN201210017961.4A CN201210017961A CN102616643B CN 102616643 B CN102616643 B CN 102616643B CN 201210017961 A CN201210017961 A CN 201210017961A CN 102616643 B CN102616643 B CN 102616643B
Authority
CN
China
Prior art keywords
suspension bracket
wind turbine
wind power
rotation
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210017961.4A
Other languages
Chinese (zh)
Other versions
CN102616643A (en
Inventor
吴元良
周湘桥
任继新
熊壮
谢继伟
张宝宏
张熠
张雁
刘波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Wuhan Bridge Industries Ltd
Wuhan Bridge Heavy Industries Group Co Ltd
Original Assignee
China Railway Wuhan Bridge Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Wuhan Bridge Industries Ltd filed Critical China Railway Wuhan Bridge Industries Ltd
Priority to CN201210017961.4A priority Critical patent/CN102616643B/en
Publication of CN102616643A publication Critical patent/CN102616643A/en
Application granted granted Critical
Publication of CN102616643B publication Critical patent/CN102616643B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The present invention relates to a rotation arm type lifting tool system for installing a marine wind turbine of a marine wind power engineering ship, and belongs to the field of marine wind power installation engineering equipment. According to the rotation arm type lifting tool system, two rotation arms of an upper hanger is driven to radially open and close by a screw drive mechanism, the middle part inside the hanger is provided with an installation empty space corresponding to the upper part of the marine wind turbine body requiring installation, and hydraulic clamping devices tightly clamp the upper part of the marine wind turbine body requiring installation on the middle part while closing; two rotation arms of a lower hanger is driven to radially open and close by a screw drive mechanism, the center inside the hanger is provided with an installation empty space corresponding to the root part of the marine wind turbine body requiring installation, and the lower hanger is corresponding to a bracket and tightly clamps the root part of the marine wind turbine body; a bearing bracket is arranged on the top of the wind turbine foundation piles and forms a fastening connection to perform the installation. With the present invention, the accurate, efficient, safe and new integral lifting construction equipment is provided for the installation of the marine wind turbine unit, such that the marine wind turbine installation is more flexible, the efficiency and the safety of the engineering operation are significantly improved, the versatility of the lifting tool is good, and the lifting tool system is convenient to install and disassemble.

Description

Turning arm type sling system for the installation of offshore wind farm auxiliary vessel aerogenerator body
Technical field
The present invention, for the turning arm type sling system of offshore wind farm auxiliary vessel aerogenerator body installation, belongs to offshore wind power installation engineering equipment field.
Background technology
The mounting hanger pattern of existing offshore wind turbine is generally symmetrical balance beam type top suspension bracket, bottom suspension bracket, bearing fabricate block.
The top suspension bracket of suspender, bottom suspension bracket are formed by connecting through manual operation bolt mode symmetry by identical left and right two and half frameworks.Installation works, accessory equipment facility and working out that the use of this suspender defines offshore wind turbine are large, its design has the following disadvantages: the upper and lower suspension bracket combining is all interior space-closed and fixed-size framework, and suspender internal diameter can only adapt to a kind of offshore wind turbine of specification; During suspender handling, its half and half framework need assist loop wheel machine successively to hang and send; Suspender handling need complete on large-scale cushion cap; Wind power generating set is at sea during vertical transport, and suspension bracket must be close to the top and the bottom of barge upper support frame, and high-altitude manual operation is frequent; Suspender volume is large and heavy, and transportation and lifting center of gravity skew great Yi wave; Wind power generating set exchange process between barge and wind turbine installation vessel requires wind turbine installation vessel crane tool for the two arms of large-scale interlock and the leveling of synchronizeing, and lifts location difficulty precision low and easily bump and tilt; The large-scale cushion cap that the application force that bearing fabricate block is subject to need to be possessed by wind power generating set basis is born.
Summary of the invention
The object of the invention is to provide with a kind of in the turning arm type sling system of offshore wind farm auxiliary vessel aerogenerator body installation, for the installation of offshore wind turbine provides a kind of accurate, efficient and safe brand-new integral hoisting construction equipment.
The technical scheme that realizes the object of the invention is as follows:
Turning arm type sling system of the present invention, comprise suspension bracket and bearing support, suspension bracket is by top suspension bracket, bottom suspension bracket is with fixed length, isometric steel cable flexible connects, upper and lower corresponding setting of bottom suspension bracket and bearing support, the two capable of regulating positioning seat exactitude position by bottom suspension bracket locating dowel pin and bearing support is connected, bottom suspension bracket is provided with hydraulic buffer system, bearing support is provided with corresponding load transfer mechanism, feature is: top suspension bracket, bottom suspension bracket comprises respectively fixedly jib, rotation jib and screw mechanism, suspension bracket two rotation jibs in top are subject to screw drives mechanism to drive radially folding, in it, there is the installation room corresponding with wind power generating set body to be installed top at middle part, while closing up, hydraulic clamping device is held wind power generating set body to be lifted top, middle part tightly, suspension bracket two rotation jibs in bottom are subject to screw drives mechanism to drive radially folding, there is the installation room corresponding with wind power generating set body root to be installed at Jia Nei center, the corresponding rest of seam of suspension bracket inner side, bottom is also held this wind power generating set body root tightly, bearing support is placed in wind power generating set foundation pile top and is fastenedly connected with it, implements to install.
Two rotation jibs of above-mentioned top suspension bracket are sold axle and are connected to fixed mount two ends, two cover screw mechanism symmetries are connected between two rotation jibs and fixed mount, screw mechanism is connected with screw drives mechanism, and hydraulic clamping device is radially arranged on rotation jib the inner and screw mechanism middle part.
Two rotation jibs of above-mentioned bottom suspension bracket are connected to fixedly jib both sides by screw mechanism, screw mechanism is connected with screw drives mechanism, in frame, radially jib, rotation jib node are fixedly connected with respectively with fixedly in hack lever outer end, the even circle distribution of suspender seam is in bottom suspension bracket fixedly jib and rotation jib inner side, and the lifting seam of replaceable lifting adapter substitute is connected with wind power generating set body.
Turning arm type sling system design science of the present invention, for the installation of offshore wind turbine provides a kind of accurate, efficient and safe brand-new integral hoisting construction equipment, makes offshore wind turbine that works are installed more flexible.The commonality of suspender is good, and it is very convenient to load and unload, and safety performance is high, and operating efficiency obviously improves, and accessory equipment facility demand and working out obviously reduce, and effectively reduce manufacture, difficulty of construction and cost.The top suspension bracket of suspension bracket, bottom suspension bracket are all that the hydraulic-driven under full-automation is controlled is rotated radially folding, and suspender can adapt to the offshore wind turbine of plurality of specifications; Suspension bracket without disintegrating, only need once hang to send and just can realize suspender integral body and embrace or depart from wind power generating set in Assembly &Disassembly process, saves auxiliary loop wheel machine, has simplified operating process; Bottom suspension bracket is connected with wind power generating set body root, after bearing support is placed in wind power generating set foundation pile top and is fastenedly connected, directly implement to install, without build separately roomy wind power generating set shoring of foundation cushion cap as prior art, the present invention can adapt to the installation of the offshore wind turbine of multiple basic pattern; Wind turbine installation vessel utilizes this suspender to complete offshore wind turbine handling, without separately joining barge and artificial aloft work operation link; Suspender volume is little of heavy and light, and it is high that lifting center of gravity is offset little degree of stability; The simple operation breadth of installation ship crane structure is little, and lifting positioning precision is high and be easy to control difficult collision; Be installed on the impact acceleration that the hydraulic buffer system of bottom suspension bracket and the load transfer mechanism on bearing support can effectively cushion wind power generating set descending motion, Fast Correction wind power generating set body attitude, compensating swinging, effectively reduce sharp impacts and cause the damage to wind power generating set.
Accompanying drawing explanation
Fig. 1 is that the wind power generating set body that connected of the present invention is about to schematic diagram in place.
Fig. 2 is the structural representation of top of the present invention suspension bracket.
Fig. 3 is above-mentioned Fig. 2 top suspension bracket birds-eye view.
Fig. 4 is the schematic diagram that bottom of the present invention suspension bracket and bearing support are about to enter cooperating.
Fig. 5 is the lifting seam enlarged diagram of the replaceable lifting adapter substitute of bottom of the present invention suspension bracket.
Fig. 6 is bottom of the present invention suspension bracket enlarged diagram.
Fig. 7 is the bottom suspension bracket schematic top plan view of above-mentioned Fig. 6.
Fig. 8 is bearing support structural representation of the present invention.
The specific embodiment
How below in conjunction with accompanying drawing, further illustrate the present invention implements:
Sling system of the present invention has top suspension bracket 1, bottom suspension bracket 2, bearing support 3, referring to Fig. 1.
On top suspension bracket 1, bottom suspension bracket 2, be provided with hanger, and utilize steel rope to link up, referring to Fig. 1.
Top suspension bracket 1 is by fixed mount 1-1, two rotation jib 1-2, four groups of hydraulic clamping device 1-3, room 1-4 to be installed, two cover screw mechanism 1-5, the Liang Tao screw drives 1-6 of mechanism, two bearing pin 1-7 form, room 1-4 to be installed and the corresponding combination in wind power generating set body A top that the middle part of top suspension bracket 1 arranges, two ends, fixed mount 1-1 left and right are connected with bearing pin 1-7 with rotation jib 1-2 end points, screw mechanism 1-5 two ends are connected in fixed mount 1-1 middle part and the 1-6 of screw drives mechanism, rotation jib 1-2 middle part is provided with the 1-6 of screw drives mechanism, play connection driving and screw mechanism 1-5 effect, inside rotation jib 1-2, top and fixed mount 1-1 middle part arrange respectively hydraulic clamping device 1-3, two rotation jib 1-2Shou screw drives mechanisms drive radially folding, while closing up, four groups of hydraulic clamping device 1-3 hold wind power generating set body A to be lifted top, middle part tightly, referring to Fig. 2 and Fig. 3.
Bottom suspension bracket 2 by eight cushion cylinder 2-1, lifting seam 2-2, fixedly the jib 2-3,Liang Tao screw drives 2-4 of mechanism, two rotation jib 2-5, two cover screw mechanism 2-6, bearing pin 2-7, lift that adapter substitute 2-8, locating dowel pin 2-9, eight load are accepted base 2-10, room 2-11 to be installed, two bearing pin 2-12 form.Room 2-11 to be installed and the corresponding combination of wind power generating set body A root that the middle part of bottom suspension bracket 2 arranges, fixedly the outer ledge of jib 2-3 and rotation jib 2-5 all arranges hydraulic cushion oil cylinder 2-1 and load is accepted base 2-10, fixedly outside two ends, jib 2-3 left and right, middle side part is connected with bearing pin 2-12 with middle side part outside two rotation jib 2-5 two ends respectively, screw mechanism 2-6 two ends are connected to fixedly middle side part and the outer middle side part of rotation jib 2-5 outside jib 2-3 two ends, the upper close fixedly side of jib 2-3 of screw mechanism 2-6 arranges the 2-4 of screw drives mechanism connection driving and screw mechanism 2-6, two rotation jib 2-5 are driven respectively around radially folding of bearing pin 2-12 by screw mechanism, while closing up, insert the bearing pin 2-7 be placed on rotation jib 2-5 to be fixedly connected with two rotation jib 2-5, lifting seam 2-2 holds and is positioned at wind power generating set body root lateral process and goes out snap ring and hold wind power generating set body root tightly to hold, lifting adapter substitute 2-8 on replacing lifting seam 2-2 is to adapt to the wind power generating set body A of different size, referring to Fig. 4, Fig. 5, Fig. 6, Fig. 7.
Bearing support 3 members comprise and are arranged on eight of its tip edge buffering base 3-1, eight load transfer oil cylinder 3-2, two capable of regulating positioning seat 3-3, two groups of vertical sideslip oil cylinder 3-4 and room 3-5 to be installed.The interior ring of bearing support 3 being positioned over is from top to bottom positioned at wind power generating set foundation pile C top B, and with its snap ring, B-1 is fastenedly connected.Referring to Fig. 4,8.
Eight hydraulic cushion oil cylinder 2-1 of bottom suspension bracket and eight buffering base 3-1 corresponding combination one by one on bearing support, eight load of bottom suspension bracket are accepted base 2-10 and eight load transfer oil cylinder 3-2 corresponding combinations one by one on bearing support.Referring to Fig. 4, Fig. 5, Fig. 8.
Adopt sling system of the present invention to carry out offshore wind turbine installation, its step is as follows:
1, the assembled good offshore wind turbine body A in base;
2, bearing support 3 is placed in to wind power generating set foundation pile C top B, and holds connection tightly by its snap ring B-1.Top suspension bracket 1 is placed in to the top of offshore wind turbine body A, the 1-6 of screw drives mechanism drives screw mechanism 1-5 sliding rotary arm 1-2, and each rotates to predetermined station around bearing pin 1-7, top suspension bracket 1 is enclosed within outside offshore wind turbine body A, with hydraulic clamping device 1-3, holds offshore wind turbine body A top tightly; Bottom suspension bracket 2 is placed in to offshore wind turbine body A root, the 2-4 of screw drives mechanism drives two pivot arm 2-5 of screw mechanism 2-6 push-and-pull to be closed to predetermined station and makes 2 armfuls, bottom suspension bracket wind power generating set body A root at sea, insert bearing pin 2-7 and fix, utilize lifting seam 2-2 to hold up and hold tightly offshore wind turbine body A root;
3, crane ship by the whole marine vertical handling of offshore wind turbine body A, suspension bracket the top to the top B of wind power generating set foundation pile C;
4, wind power generating set body A starts to decline, and decline process is subject to respectively the priority effect that hydraulic cushion oil cylinder 2-1 and corresponding buffering base 3-1, load transfer hydraulic ram 3-2 and corresponding load accept this two cover system of base 2-10 and obtains buffer deceleration and correct attitude; Two locating dowel pin 2-9 of bottom suspension bracket all insert after the positioning seat 3-3 of corresponding bearing support, have realized Primary Location;
5,, by the X-Y coordinate of vertical sideslip oil cylinder 3-4 positioning seat 3-3, after the bolt hole on the bolt hole after adjustment accurately on docking offshore wind turbine body A and the top B of wind power generating set foundation pile C, by bolted, complete accurate location;
6, the hydraulic clamping device 1-3 on top suspension bracket 1 discharges, the 1-6 of screw drives mechanism drives screw mechanism 1-5 to make pivot arm 1-2 discharge offshore wind turbine body A top, the 2-4 of screw drives mechanism drives screw mechanism 2-6 to make pivot arm 2-5 discharge offshore wind turbine body A root, top suspension bracket 1, bottom suspension bracket 2 depart from aerogenerator body simultaneously, remove bearing support 3, complete whole suspender dismounting.

Claims (1)

1. for the turning arm type sling system of offshore wind farm auxiliary vessel wind power generating set installation, comprise suspension bracket and bearing support, suspension bracket is by top suspension bracket, bottom suspension bracket is with fixed length, isometric steel cable flexible connects, upper and lower corresponding setting of bottom suspension bracket and bearing support, the two capable of regulating positioning seat exactitude position by bottom suspension bracket locating dowel pin and bearing support is connected, bottom suspension bracket is provided with hydraulic buffer system, bearing support is provided with corresponding load transfer mechanism, it is characterized in that top suspension bracket, bottom suspension bracket comprises respectively fixedly jib, rotation jib and screw mechanism, two rotation jibs of top suspension bracket are sold axle and are connected to fixed mount two ends, two cover screw mechanism symmetries are connected between two rotation jibs and fixed mount, screw mechanism is connected with screw drives mechanism, hydraulic clamping device is radially arranged on rotation jib the inner and screw mechanism middle part, suspension bracket two rotation jibs in top are subject to screw drives mechanism to drive radially folding, in it, there is the installation room corresponding with wind power generating set body to be installed top at middle part, while closing up, hydraulic clamping device is held wind power generating set body to be lifted top, middle part tightly, two rotation jibs of bottom suspension bracket are connected to fixedly jib both sides by screw mechanism, screw mechanism is connected with screw drives mechanism, in frame radially hack lever outer end respectively with fixing jib, rotation jib node is fixedly connected with, the even circle distribution of suspender seam is in bottom suspension bracket fixedly jib and rotation jib inner side, the lifting seam of replaceable lifting adapter substitute is connected with wind power generating set body, suspension bracket two rotation jibs in bottom are subject to screw drives mechanism to drive radially folding, there is the installation room corresponding with wind power generating set body root to be installed at Jia Nei center, the corresponding rest of seam of suspension bracket inner side, bottom is also held this wind power generating set body root tightly, bearing support is placed in wind power generating set foundation pile top and is fastenedly connected with it, implement to install.
CN201210017961.4A 2012-01-19 2012-01-19 Rotation arm type lifting tool system for installing wind turbine body of marine wind power engineering ship Active CN102616643B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210017961.4A CN102616643B (en) 2012-01-19 2012-01-19 Rotation arm type lifting tool system for installing wind turbine body of marine wind power engineering ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210017961.4A CN102616643B (en) 2012-01-19 2012-01-19 Rotation arm type lifting tool system for installing wind turbine body of marine wind power engineering ship

Publications (2)

Publication Number Publication Date
CN102616643A CN102616643A (en) 2012-08-01
CN102616643B true CN102616643B (en) 2014-03-12

Family

ID=46556934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210017961.4A Active CN102616643B (en) 2012-01-19 2012-01-19 Rotation arm type lifting tool system for installing wind turbine body of marine wind power engineering ship

Country Status (1)

Country Link
CN (1) CN102616643B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106564819B (en) * 2016-11-02 2018-07-10 泰州三福船舶工程有限公司 A kind of heavy loop wheel machine peculiar to vessel and underwater mounting process
CN107420258B (en) * 2017-09-04 2023-09-19 山东中能华源海上风电集团有限公司 Offshore wind power generator and offshore wind power generation system
CN107740753B (en) * 2017-10-20 2024-03-15 中交三航(上海)新能源工程有限公司 Offshore wind generating set integral installation lower part positioning system and flexible installation system for single pile foundation
EP3683182B1 (en) * 2019-01-17 2023-05-03 Saipem S.p.A. Multi-functional clamp, system and method for the installation of a wind turbine on an offshore substructure
CN115467334A (en) * 2022-09-13 2022-12-13 中国铁建港航局集团有限公司 Construction method of sand cover around offshore wind power pile

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2434823A (en) * 2006-02-06 2007-08-08 Engineering Business Ltd Transport and installation of offshore structures
CN201176357Y (en) * 2007-12-24 2009-01-07 中国海洋石油总公司 Auxiliary structure for hoisting wind generating set
CN201428567Y (en) * 2009-05-25 2010-03-24 上海同韵环保能源科技有限公司 Integral installment automatic positioning aligning device of marine wind power generator set
CN102139829A (en) * 2010-01-29 2011-08-03 中交第三航务工程局有限公司 Flexible installation system for offshore wind turbine generator set and application thereof
CN101973501B (en) * 2010-10-20 2013-06-19 三一电气有限责任公司 Fan integral installation rotating holding mechanism
CN201989062U (en) * 2011-04-14 2011-09-28 君宇企业股份有限公司 Clamp capable of quickly adjusting span
CN202449716U (en) * 2012-01-19 2012-09-26 武桥重工集团股份有限公司 Rotating arm type sling system for installing body of wind driven generator of offshore wind power engineering vessel

Also Published As

Publication number Publication date
CN102616643A (en) 2012-08-01

Similar Documents

Publication Publication Date Title
CN102616643B (en) Rotation arm type lifting tool system for installing wind turbine body of marine wind power engineering ship
ES2811057T3 (en) System for assembling / disassembling wind turbines
US11390494B2 (en) Crane and method for positioning an object
US10322913B2 (en) Device and method for placing a rotor blade of a wind turbine
CN103723614B (en) A kind of wind generator set blade 30 degree of angle mounting hangers and hanging method thereof
CN110228752B (en) Adjustable marine large-scale wind power blade lifting appliance and lifting method thereof
CN106522643B (en) Multifunctional upright post robot
EP3394427B1 (en) Methods for mounting or dismounting a wind turbine component of a multirotor wind turbine
CN103738840B (en) Wind power generating set list blade right angle setting suspender and installation method thereof
EP3394426B1 (en) Methods for mounting or dismounting wind turbine components of a multirotor wind turbine
BRPI1104988A2 (en) wind turbine component handling equipment
PT1843964E (en) Lifting device for a wind turbine generator
CN103832933B (en) A kind of group tower tower crane with auxiliary
CN203715060U (en) 30-degree angle installation hanging tool of blade of wind generating set
WO2022175315A1 (en) Method and blade installation device for installing a blade of an offshore wind turbine
CN202449716U (en) Rotating arm type sling system for installing body of wind driven generator of offshore wind power engineering vessel
CN201857208U (en) Special lifting tool for wind generator variable-paddle cabinet
US20210163268A1 (en) A method of handling a wind turbine component and a wind turbine with a crane
CN208982630U (en) External clamping angle steel fixed pulley
CN211971573U (en) Double-arm tower crane
CN210176323U (en) Simple and easy installation device of fog dispersal tower heat exchanger
CN201882810U (en) Tower crane provided with jib loading boom lateral stay cables
CN202346650U (en) Suspension arm for 400 KN crane
CN112112764A (en) Offshore wind turbine complete machine installation tower with rotation and motion compensation capabilities
CN107827003B (en) Device for stabilizing a crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant