CN102607278A - Lead feeding system - Google Patents
Lead feeding system Download PDFInfo
- Publication number
- CN102607278A CN102607278A CN2012100560894A CN201210056089A CN102607278A CN 102607278 A CN102607278 A CN 102607278A CN 2012100560894 A CN2012100560894 A CN 2012100560894A CN 201210056089 A CN201210056089 A CN 201210056089A CN 102607278 A CN102607278 A CN 102607278A
- Authority
- CN
- China
- Prior art keywords
- lead
- plumbous
- guide rail
- alloy
- cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention discloses a lead feeding system, which comprises a lead feeding guide rail, a cylinder lifting module and a first detection module. The lead feeding guide rail is used for holding alloy lead. The first detection module is used for detecting the level height of liquid in a lead smelting furnace, and sending a signal of adding alloy lead to the cylinder lifting module when detecting no preset liquid level. The cylinder lifting module starts to convey the alloy lead on the lead feeding guide rail into the lead smelting furnace when receiving the signal of adding the alloy lead. Compared with the prior art, the lead feeding system in an embodiment is provided with a sensing probe, the probe is used for detecting the level height of the liquid in the lead smelting furnace so that the alloy lead is automatically added, and accordingly the level height of the liquid in the lead smelting furnace is guaranteed within a normal range, the temperature of the lead smelting furnace is kept within a constant range, uniformity of slab lattices quality in slab casting is guaranteed, and the properties of lead-acid batteries are improved.
Description
Technical field
The invention belongs to the lead-acid accumulator technical field, be specifically related to a kind of confession lead system.
Background technology
The employed pole plate of lead-acid accumulator comprises grid and active material two parts.Wherein, grid plays afflux, confluxes and fails stream and make electric current be evenly distributed to the important function in the active material as carrier, the electric current conductor of active material.So it is very high to its hardness and requirement of strength in the process of grid casting.
The grid foundry production all is artificial mode of adding alloy lead toward lead melting furnace at present; Cause the too high or too low variation significantly that causes temperature of liquid level in the lead melting furnace easily; The uniformity of the quality of the grid that comes out of casting is poor like this, and then has influence on the performance of lead-acid accumulator.
Summary of the invention
The technical problem underlying that the present invention will solve provides a kind of confession lead system; Liquid level through detecting in the lead melting furnace is controlled automatic interpolation alloy lead; Thereby guaranteed liquid level in the lead melting furnace; Make the temperature of lead melting furnace remain in the constant scope, guarantee the uniformity of the quality of grid in the cast panel process.
For solving the problems of the technologies described above, the present invention provides a kind of confession lead system, comprises supplying plumbous guide rail, cylinder module and first detecting module, wherein supplies plumbous guide rail to be used to place alloy lead; Said first detecting module is used to detect the liquid level in the lead melting furnace, if when detecting module is surveyed less than predetermined level, sends and adds the plumbous signal of alloy and give the cylinder module; Said cylinder up-down module is received to add and is started carrying behind the plumbous signal of alloy and supply alloy on the plumbous guide rail plumbous and be transported in the lead melting furnace.
Further, the plumbous guide rail of said confession comprises that first supplies plumbous guide rail and second to supply plumbous guide rail, and said second supplies the height of the height of plumbous guide rail greater than the plumbous guide rail of said first confession, and said second supplies plumbous guide rail to be arranged on and can alloy lead to be transported to the position in the lead melting furnace.
Said cylinder module is active in said first and supplies plumbous guide rail and second to supply between the plumbous guide rail, further comprise be used for upper and lower to first cylinder of motion control, be used for second cylinder of the plumbous usefulness of clamping gold and alloy lead pushed the 3rd cylinder in the lead melting furnace.
Further, said first supply an end of plumbous guide rail to be fixed with second detecting module that is used to survey the plumbous position of alloy.
Said first detecting module and second detecting module are the infra-red detection module.
Compared with prior art; The confession lead system that the embodiment of the invention provides adopts inductive probe to record the liquid level in the lead melting furnace; Automatically it is plumbous to add alloy, thereby has guaranteed that liquid level makes the temperature of lead melting furnace remain in the constant scope in normal range (NR) in the lead melting furnace; Guarantee the uniformity of the quality of grid in the cast panel process, and then promote the performance of lead-acid accumulator.
Description of drawings
A kind of confession lead system sketch map that Fig. 1 provides for the embodiment of the invention.
The specific embodiment
For making the object of the invention, technical scheme and advantage clearer, the present invention is made further detailed description below in conjunction with accompanying drawing and embodiment.
See also shown in Figure 1, a kind of confession lead system sketch map that Fig. 1 provides for the embodiment of the invention, this system comprises and supplies plumbous guide rail, cylinder module and first detecting module, wherein supplies plumbous guide rail to be used to place alloy lead.First detecting module is used to detect the liquid level in the lead melting furnace, if when first detecting module is surveyed less than the predetermined level height, sends and adds the plumbous signal of alloy and give the cylinder module.Cylinder up-down module is received to add and is started carrying behind the plumbous signal of alloy and supply alloy on the plumbous guide rail plumbous and be transported in the lead melting furnace.
The lead melting furnace position is all higher usually in the reality; So supply plumbous guide rail to comprise that further first supplies plumbous guide rail and second to supply plumbous guide rail in the present embodiment; Second supplies the height of the height of plumbous guide rail greater than the plumbous guide rail of said first confession, and second supplies plumbous guide rail to be arranged on and can alloy lead to be transported to the position in the lead melting furnace.
The cylinder module is active in first and supplies plumbous guide rail and second to supply between the plumbous guide rail, its further comprise be used for upper and lower to first cylinder of motion control, be used for second cylinder of the plumbous usefulness of clamping gold and alloy lead pushed the 3rd cylinder in the lead melting furnace.
Further, an end of the plumbous guide rail of first confession is fixed with second detecting module that is used to survey the plumbous position of alloy in the present embodiment.Such as supplying the end of plumbous guide rail to fix second detecting module first among the embodiment, the benefit that is provided with endways is that the plumbous guide rail of first confession can be accomplished maximum utilization.When first supplied to have alloy lead to be transported to end on the plumbous guide rail, second detecting module detected the back and produces the out-of-work signal of the first plumbous guide rail of confession, quit work after the plumbous guide rail of first confession is received out-of-work signal, waited for the second cylinder gripping.
In the present embodiment, first detecting module and second detecting module are the infra-red detection module.
The embodiment of the invention adopts inductive probe to record the interior liquid level of lead melting furnace and temperature control adds automatically alloy lead, thereby has guaranteed liquid level in the lead melting furnace, has eliminated the too high or too low wasting of resources that causes because of liquid level.Also eliminate the variation significantly of temperature, made the temperature of lead melting furnace remain in the constant scope, guaranteed the uniformity of the quality of grid in the cast panel process, and then promoted the performance of lead-acid accumulator.
Above content is to combine concrete embodiment to the further explain that the present invention did, and can not assert that practical implementation of the present invention is confined to these explanations.For the those of ordinary skill of technical field under the present invention, under the prerequisite that does not break away from the present invention's design, can also make some simple deduction or replace, all should be regarded as belonging to protection scope of the present invention.
Claims (5)
1. one kind supplies lead system, it is characterized in that, comprises supplying plumbous guide rail, cylinder module and first detecting module, wherein supplies plumbous guide rail to be used to place alloy lead; Said first detecting module is used to detect the liquid level in the lead melting furnace, if when detecting module is surveyed less than predetermined level, sends and adds the plumbous signal of alloy and give the cylinder module; Said cylinder up-down module is received to add and is started carrying behind the plumbous signal of alloy and supply alloy on the plumbous guide rail plumbous and be transported in the lead melting furnace.
2. confession lead system according to claim 1; It is characterized in that; The plumbous guide rail of said confession comprises that first supplies plumbous guide rail and second to supply plumbous guide rail; Said second supplies the height of the height of plumbous guide rail greater than the plumbous guide rail of said first confession, and said second supplies plumbous guide rail to be arranged on and can alloy lead to be transported to the position in the lead melting furnace.
3. confession lead system according to claim 2; It is characterized in that; Said cylinder module is active in said first and supplies plumbous guide rail and second to supply between the plumbous guide rail, further comprise be used for upper and lower to first cylinder of motion control, be used for second cylinder of the plumbous usefulness of clamping gold and alloy lead pushed the 3rd cylinder in the lead melting furnace.
4. confession lead system according to claim 2 is characterized in that, said first supplies an end of plumbous guide rail to be fixed with second detecting module that is used to survey the plumbous position of alloy.
5. according to each described confession lead system of claim 1 to 5, it is characterized in that said first detecting module and second detecting module are the infra-red detection module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100560894A CN102607278A (en) | 2012-03-05 | 2012-03-05 | Lead feeding system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100560894A CN102607278A (en) | 2012-03-05 | 2012-03-05 | Lead feeding system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102607278A true CN102607278A (en) | 2012-07-25 |
Family
ID=46524892
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100560894A Pending CN102607278A (en) | 2012-03-05 | 2012-03-05 | Lead feeding system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102607278A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4456229A (en) * | 1981-12-07 | 1984-06-26 | Preh Elektrofeinmechanische Werke Jakob Preh Nachf. Gmbh & Co. | Pig-charging apparatus for a hot-chamber pressure-diecasting machine |
US5073183A (en) * | 1990-10-05 | 1991-12-17 | Frazier-Simplex, Inc. | Hydraulically operated blanket batch charger |
CN2924451Y (en) * | 2006-04-27 | 2007-07-18 | 王涛 | Automatic feeding device of metal ingot for melting furnace |
CN201215440Y (en) * | 2008-04-29 | 2009-04-01 | 正英工业燃烧设备(上海)有限公司 | Material feeding device for metal melting furnace |
CN201708093U (en) * | 2010-06-25 | 2011-01-12 | 厦门顶科电子有限公司 | Relay automatic tin feeding and wetting device |
CN201871845U (en) * | 2010-11-12 | 2011-06-22 | 深圳Tcl新技术有限公司 | Automatic tin feeding device |
-
2012
- 2012-03-05 CN CN2012100560894A patent/CN102607278A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4456229A (en) * | 1981-12-07 | 1984-06-26 | Preh Elektrofeinmechanische Werke Jakob Preh Nachf. Gmbh & Co. | Pig-charging apparatus for a hot-chamber pressure-diecasting machine |
US5073183A (en) * | 1990-10-05 | 1991-12-17 | Frazier-Simplex, Inc. | Hydraulically operated blanket batch charger |
CN2924451Y (en) * | 2006-04-27 | 2007-07-18 | 王涛 | Automatic feeding device of metal ingot for melting furnace |
CN201215440Y (en) * | 2008-04-29 | 2009-04-01 | 正英工业燃烧设备(上海)有限公司 | Material feeding device for metal melting furnace |
CN201708093U (en) * | 2010-06-25 | 2011-01-12 | 厦门顶科电子有限公司 | Relay automatic tin feeding and wetting device |
CN201871845U (en) * | 2010-11-12 | 2011-06-22 | 深圳Tcl新技术有限公司 | Automatic tin feeding device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
PH12015502286A1 (en) | Electrolytic cell for metal electrowinning | |
CN102607278A (en) | Lead feeding system | |
CN105215513A (en) | A kind of fully automatic wire feeding device | |
JP2016074982A (en) | Remelting furnace with gravimetry cell | |
CN104315853A (en) | Electric furnace burden feeding conveyance device | |
CN203518608U (en) | Iron powdered ore feeding device for sintering and pelletizing | |
CN104668526B (en) | Improve the method for steel ingot ingot quality | |
CN205274659U (en) | Defective work unloader of battery module kludge | |
CN203631544U (en) | Static removing apparatus | |
CN204216165U (en) | Battery stationary fixture | |
CN102874633A (en) | Automatic adjustment mechanism for steel band material receiving roller | |
CN103811820A (en) | Battery formation assembly line as well as operation technology for battery formation | |
CN203316903U (en) | Novel projection welding electrode | |
CN211814669U (en) | Automatic height measuring device for anode and replacing device thereof | |
CN201732697U (en) | Coating transitional device for producing multi-layered ceramic elements by curtain coating method | |
CN204400206U (en) | AOD furnace feeding device | |
CN206420507U (en) | A kind of water level flow monitor | |
KR101586640B1 (en) | Strap molding apparatus and control method thereof | |
CN205133770U (en) | Automatic barrel -plating device | |
CN205037967U (en) | Sediment vibration detection device under ladle | |
CN102441855A (en) | Vertical flange installation hole coaxility clamp | |
CN213013043U (en) | Spheroidizing inoculation system for nodular cast iron roller | |
CN206673174U (en) | A kind of wiring harden structure of sustainable mobile phone | |
CN202250039U (en) | Current-loop-based externally-powering measurement while drilling device | |
CN205099014U (en) | Automatic add alloy machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |