CN102606826A - High pressure rubber pipe assembly with large diameter - Google Patents
High pressure rubber pipe assembly with large diameter Download PDFInfo
- Publication number
- CN102606826A CN102606826A CN2012100840306A CN201210084030A CN102606826A CN 102606826 A CN102606826 A CN 102606826A CN 2012100840306 A CN2012100840306 A CN 2012100840306A CN 201210084030 A CN201210084030 A CN 201210084030A CN 102606826 A CN102606826 A CN 102606826A
- Authority
- CN
- China
- Prior art keywords
- pipe
- pressure rubber
- rubber pipe
- heavy caliber
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Rigid Pipes And Flexible Pipes (AREA)
Abstract
The invention belongs to the technical field of rubber pipe assemblies and discloses a high pressure rubber pipe assembly with large diameter used in oil exploration industry. The high pressure rubber pipe assembly is formed by a high pressure rubber pipe, a core pipe provided with a protruding ring in the middle, an outer sleeve, circumferential clamping petals, a front-end nut and a back-end nut. The outer wall faces at two ends of the outer sleeve are both provided with external threads, and the inner wall of the outer sleeve is of a slope shape. The front-end nut and the back-end nut are provided with an inner ring respectively. The core pipe is divided into a connection end used for being connected with other parts and a pipe connection section inserted in the end portion of the rubber pipe, the right lateral face of the protruding ring and the outer wall of the pipe connection section of the core pipe are configured to be of the slope-shaped structure, the circumferential clamping petal is clamped in from the end portion of the outer sleeve, and the front-end nut and the back-end nut provided with the inner ring are connected at two ends of the outer sleeve in rotating mode. The high pressure rubber pipe connector assembly can satisfy the requirement that a manifold can be used in the environment with 35-140MPa-320Mpa without dropping the head and can achieve onsite assembly and maintenance of the pipe connector assembly more importantly, thereby greatly saving using and maintaining cost.
Description
Technical field
the invention belongs to the pipe joint technical field, disclose a kind of heavy caliber high-pressure rubber pipe assembly that the oil exploration industry sebific duct connects that is used for.
Background technique
along with world oil exploration industrial expansion, the drilling well of petroleum gas is more and more darker, and is increasingly high to the performance requirement of the flexible manifold of heavy caliber, ultrahigh pressure.In drilling process because of high pressure, high strong vibration and the rubber hose coupling that hydraulic equipment causes in construction come off and the major accident that leads to of common occurrence.Chinese patent number is that 200720150340.8 patent of invention discloses a kind of pipe joint.The structure of this pipe joint comprises core pipe and sheath, and core Guan Yiduan inserts an end of connected sebific duct, outside sebific duct, installs sheath additional, is provided with several grades of steps in the end of core pipe, on this step, is provided with the scrobicular ring along circumference; Between sheath and sebific duct, be provided with middle cover, the inner peripheral surface that overlaps in this is provided with the convex annular groove along circumference, and the inboard of in this, overlapping is provided with several locking rings spaced apart vertically, and the position of this locking ring is corresponding with the scrobicular ring of said core tube end.The pipe joint of this structure has the characteristics of sealing, tightness, integrity; Basically satisfy manifold and in the high pressure Environmental Conditions of 35~140Mpa ~ 320Mpa, do not taken off a requirement; But the tube head of this structure and sebific duct assembling constitute the pipe joint assembly and must use pipe locking machine to realize; Be difficult to satisfy assembled on site and maintenance, brought great inconvenience for the use in the oil exploration.
Summary of the invention
the object of the invention just provides a kind of heavy caliber high-pressure rubber pipe assembly that special tool can be at the scene fits together pipe joint and sebific duct that need not.
For realizing above-mentioned purpose, the technological scheme that the present invention adopts is:
a kind of heavy caliber high-pressure rubber pipe assembly is made up of heavy caliber high-pressure rubber pipe and the pipe connector that is connected its end; The structure of said pipe connector comprises: the middle part is provided with bulge loop and inserts the core pipe of said heavy caliber high-pressure rubber pipe, and the two ends of outer wall are provided with outside thread, inwall is the overcoat of slope shape, and week, the round lobe that blocks constituted with the front and back ends nut that is provided with interior annulus; Wherein to be the boundary with described core pipe be divided into is used for connecting end that is connected with other pipe fittings and the pipe linkage section that inserts heavy caliber high-pressure rubber pipe end with described bulge loop; The pipe linkage section outer wall of described bulge loop right flank and said core pipe is set to the slope shape structure; Described week, round card lobe was snapped in by said overcoat end, and described front and back ends nut is screwed in the two ends of overcoat.
The additional technical feature that constitutes above-mentioned heavy caliber high-pressure rubber pipe assembly comprises:
---the outer wall of described core pipe pipe linkage section slope shape is provided with at least one step annular groove or concavo-convex annular groove, and the internal face of its external sleeve is provided with at least one corresponding step annular groove or convex-concave annular groove simultaneously;
---the convex-concave annular groove and the concavo-convex corresponding setting of the concavo-convex annular groove on the said core tube wall of said overcoat;
---said core pipe slope shape structure outer wall side is the pawl shape along the scrobicular ring of circumference;
---insert sebific duct in the said pipe linkage section and be inner glue layer and the steel wire casing ply removed behind the outer glue-line; This inner glue layer and steel wire casing ply protrude in the bulge loop at said high-pressure rubber pipe pipe joint middle part, and all circles are wedged some chocks in said steel wire casing ply.
---described week, the round lobe that blocks was made up of three lobes, pintongs or five lobes.
---said core pipe slope shape structure outer wall side is the pawl shape along the scrobicular ring of circumference;
---the internal diameter of described core pipe is identical with the internal diameter of the sebific duct that is connected;
---circumference is provided with at least two the pawl of holding on the described nut outer wall;
---circumference is provided with at least two pawl nest on the described nut outer wall.
heavy caliber high-pressure rubber pipe assembly provided by the present invention compared with prior art has the following advantages; One of which; Since the structure of this heavy caliber high-pressure rubber pipe assembly by the middle part be provided with bulge loop the core pipe, be provided with externally threaded overcoat and the front end and back end nut constitutes; When assembling; Only need the end of core pipe slope shape is inserted in the sebific duct end, its end withstood on the side of annular convex ring, then with overcoat one end be pushed into the removal that is inserted in core pipe slope shape the steel of outer glue-line compile and twine on the framework layer; With week circle card lobe insertion overcoat one end, again the front end and back end nut is tightened the assembling that can realize high-pressure rubber hose coupling assembly and sebific duct with the overcoat two ends simultaneously again.The assembling of this pipe joint assembly need not to use special pipe locking machine, therefore can realize the assembled on site and the maintenance of pipe joint assembly, can practice thrift user cost and maintenance cost greatly; Its two, the joint of sebific duct is a curved shape in the structure of this heavy caliber high-pressure rubber pipe assembly, has improved the join strength of sebific duct and high-pressure rubber pipe assembly greatly, can satisfy manifold and in the high pressure Environmental Conditions of 35~140Mpa ~ 320Mpa, not take off a requirement.
Description of drawings
Fig. 1 is the structural representation of first kind of heavy caliber high-pressure rubber pipe assembly;
Fig. 2 is the structural representation of second kind of heavy caliber high-pressure rubber pipe assembly;
Fig. 3 is for constituting the structural representation of above-mentioned first and second kind heavy caliber high-pressure rubber pipe assembly front and back ends nut;
Fig. 4 is for constituting second kind of structural representation of above-mentioned front and back ends nut;
Fig. 5 is for constituting the structural representation of above-mentioned first and second kind heavy caliber high-pressure rubber pipe assembly card lobe;
Fig. 6 is the third structural representation of heavy caliber high-pressure rubber pipe assembly.
Embodiment
explain further details below in conjunction with the structure and the use principle of accompanying drawing to high-pressure rubber pipe assembly provided by the invention.
are illustrated in figure 1 as the structural representation that utilizes first kind of pipe joint provided by the invention to reach the high-pressure rubber pipe assembly that constitutes with linking together of heavy caliber high-pressure rubber pipe.Its pipe connector structure comprises that the middle part is provided with 12 the core pipe 2 that is preferably bulge loop (also can be the projection ring that projection at interval constitutes) 1 and inserts the heavy caliber high-pressure rubber pipe; The two ends of outer wall are provided with outside thread 3, inwall is the overcoat 5 of slope 4 shapes, and the week circle card lobe 6 that snaps in overcoat one end constitutes with front end nut of being inserted in the overcoat two ends 7 and back end nut 8.Being the boundary with bulge loop or projection ring 1 wherein is divided into the core pipe connecting end 9 that is used for being connected with other pipe fittings and can inserts the pipe linkage section 10 of sebific duct end; Pipe linkage section 10 outer walls of above-mentioned bulge loop or projection ring 1 right flank and this core pipe are set to the slope shape structure; This core pipe pipe linkage section 10 that is the slope shape structure inserts removes sebific duct 12 1 ends that outer glue-line 11 backs are made up of inner glue layer and steel wire casing ply 18; And be that the overcoat 5 of slope 4 shapes is inserted in inwall; The week circle card lobe 6 that is made up of five lobes (three lobes, pintongs or six lobes) as shown in Figure 5 is snapped in overcoat 5 sebific duct side ends, and the front and back ends nut 7,8 of annulus 13 is screwed in the two ends of overcoat in being provided with.
are in the structure of the pipe assembly of above-mentioned high-pressure rubber hose coupling and sebific duct formation; Back end nut 8 is screwed in the overcoat 5; Annulus 13 will advance all circle card lobes 6 to insert along the slope of overcoat 5 inner side surfaces in it, make the sebific duct that is inserted in the core pipe 10 be extruded distortion; Front end nut 7 and the overcoat left end of annulus 13 are when being threaded in being provided with simultaneously; Not only make and be inserted in sebific duct in the core pipe 10 by jam-packed; The follow-up of back end nut simultaneously further advances week circle card lobe 6 to insert along the slope of overcoat 5 inner side surfaces, sebific duct in the centre is out of shape strengthens the function that resistance to plucking takes off and seals.
are illustrated in figure 2 as the structural representation of second kind of heavy caliber high-pressure rubber pipe assembly.Promptly constitute on the outer wall of above-mentioned first kind of heavy caliber high-pressure rubber pipe assembly core pipe pipe linkage section 10 slope shape three (can set one or more as required) step annular groove or concavo-convex annular grooves 14 are set; The internal face of its external sleeve is provided with three (can set one or more as required) corresponding step annular groove or convex-concave annular groove 15 simultaneously; Make the sebific duct that is compressed in core tube wall step annular groove or the concavo-convex annular groove 14 be curved shape; Improve the join strength of sebific duct and pipe joint assembly greatly, strengthened the function that resistance to plucking takes off and seals greatly.
In the structure of the heavy caliber high-pressure rubber pipe assembly of above-mentioned Fig. 1 and Fig. 2:
---as shown in Figure 6; In order to improve the join strength of extremely thick high-pressure rubber pipe of tube wall and pipe joint; Removed outer glue-line 11 backs and protruded in the bulge loop 1 at high-pressure rubber pipe pipe joint middle part by inner glue layer and steel wire casing ply 18, and in steel wire casing ply 18 week circle wedge some chocks 19.By the front end nut 7 of annulus 13 in being provided with overcoat 5 is screwed again.
---the internal diameter of core pipe 2 is identical with the internal diameter of the sebific duct that is connected 12; The heavy caliber high-pressure rubber pipe assembly of this structure can solve effectively in the existing technology that to compare the sebific duct internal diameter that is connected little owing to constitute pipe joint core pipe diameter, and causes the liquid in pipe flow velocity to stop up the problem that causes flow to diminish at the pipe joint place;
---in the structure of above-mentioned heavy caliber high-pressure rubber pipe assembly; Formation core pipe 2 slope shape structure outer wall sides can also be the pawl shape along the step annular groove or the concavo-convex annular groove 14 of circumference; Make to be compressed on that the sebific duct tube wall is runcinate extruding bending in core tube wall side step annular groove or the concavo-convex annular groove 14, can avoid sebific duct from its pipe joint, to extract fully;
---what circumference was provided with at least two (preferably three) as shown in Figure 3 on the outer wall of front and back ends nut 7,8 holds pawl 16; Be that available hand is screwed in the front and back ends nut with the overcoat that constitutes the high-pressure rubber hose coupling assembly, need not to use special tool can realize the assembled on site of high-pressure pipe connector assembly.Can certainly be on the outer wall of front and back ends nut 7,8 circumference be provided with the pawl nest 17 of at least two (preferably three) as shown in Figure 4, can use simple tools to realize the assembled on site of high-pressure pipe connector assembly.
The method step that utilizes high-pressure rubber hose coupling assembly provided by the present invention and sebific duct to constitute the pipe joint assembly is:
(1) at first will constitute the overcoat of heavy caliber high-pressure rubber pipe assembly and the compacting connecting end that the rear end nut is inserted in large-bore hose;
(2) sebific duct is suppressed the outer glue-line of connecting end and peel off the length that is equivalent to core pipe slope shape outer wall (or overcoat), steel is compiled the winding framework layer and is exposed;
(3) insert the end of core pipe slope shape in the sebific duct pipe end, make its end withstand on the outer side surface of side or annular convex ring of annular convex ring the some chocks of week circle wedging in steel wire casing ply;
(4) with described overcoat one end be pushed into the removal that is inserted in core pipe slope shape the steel of outer glue-line compile and twine on the framework layer;
(6) will snap in overcoat 5 sebific duct side ends by the week circle card lobe 6 that three lobes, pintongs or five lobes constitute, and simultaneously back end nut and overcoat will be screwed into through screw thread; Simultaneously front end nut is inserted in the core pipe by the left side of core pipe, overcoat one end is inserted wherein, can realize the assembling of high-pressure rubber hose coupling assembly and sebific duct then through the front end and back end nut of screwing.
Claims (9)
1. a heavy caliber high-pressure rubber pipe assembly is made up of heavy caliber high-pressure rubber pipe and the pipe connector that is connected its end; It is characterized in that:
The structure of said pipe connector comprises: the middle part is provided with bulge loop and inserts the core pipe of said heavy caliber high-pressure rubber pipe, and the two ends of outer wall are provided with outside thread, inwall is the overcoat of slope shape, and week, the round lobe that blocks constituted with the front and back ends nut that is provided with interior annulus; Wherein to be the boundary with described core pipe be divided into is used for connecting end that is connected with other pipe fittings and the pipe linkage section that inserts heavy caliber high-pressure rubber pipe end with described bulge loop; The pipe linkage section outer wall of described bulge loop right flank and said core pipe is set to the slope shape structure; Described week, round card lobe was snapped in by said overcoat end, and described front and back ends nut is screwed in the two ends of overcoat.
2. a kind of heavy caliber high-pressure rubber pipe assembly according to claim 1; It is characterized in that: the outer wall of described core pipe pipe linkage section slope shape is provided with at least one step annular groove or concavo-convex annular groove, and the internal face of its external sleeve is provided with at least one corresponding step annular groove or convex-concave annular groove simultaneously.
3. a kind of heavy caliber high-pressure rubber pipe assembly according to claim 2 is characterized in that: the convex-concave annular groove of said overcoat and the concavo-convex corresponding setting of the concavo-convex annular groove on the said core tube wall.
4. according to claim 2 or 3 described a kind of heavy caliber high-pressure rubber pipe assemblies, it is characterized in that: said core pipe slope shape structure outer wall side is the pawl shape along the scrobicular ring of circumference.
5. a kind of high-pressure rubber hose coupling assembly according to claim 1; It is characterized in that: insert sebific duct in the said pipe linkage section and be inner glue layer and the steel wire casing ply removed behind the outer glue-line; This inner glue layer and steel wire casing ply protrude in the bulge loop at said high-pressure rubber pipe pipe joint middle part, and all circles are wedged some chocks in said steel wire casing ply.
6. a kind of heavy caliber high-pressure rubber pipe assembly according to claim 1 is characterized in that: described week, the round lobe that blocks was made up of three lobes, pintongs or five lobes.
7. a kind of heavy caliber high-pressure rubber pipe assembly according to claim 1, it is characterized in that: the internal diameter of described core pipe is identical with the internal diameter of the sebific duct that is connected.
8. a kind of high-pressure rubber hose coupling assembly according to claim 1 is characterized in that: circumference is provided with at least two the pawl of holding on the described nut outer wall.
9. a kind of high-pressure rubber hose coupling assembly according to claim 1 is characterized in that: circumference is provided with at least two pawl nest on the described nut outer wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100840306A CN102606826A (en) | 2012-03-27 | 2012-03-27 | High pressure rubber pipe assembly with large diameter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100840306A CN102606826A (en) | 2012-03-27 | 2012-03-27 | High pressure rubber pipe assembly with large diameter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102606826A true CN102606826A (en) | 2012-07-25 |
Family
ID=46524462
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100840306A Pending CN102606826A (en) | 2012-03-27 | 2012-03-27 | High pressure rubber pipe assembly with large diameter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102606826A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107477294A (en) * | 2016-06-07 | 2017-12-15 | 天津格特斯检测设备技术开发有限公司 | A kind of steel pipe inner wall quick seal coupling and technique |
CN108426121A (en) * | 2018-05-23 | 2018-08-21 | 新疆义和德润工程技术有限公司 | Continuous hose inner liner pipe-repairing special joint and pipe repairing method |
CN110792861A (en) * | 2019-10-31 | 2020-02-14 | 刘锡多 | Internal support device of pipeline crimping connector and full-bore crimping connection method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3127672A (en) * | 1959-03-07 | 1964-04-07 | Kessler & Co Tech Chem Gmbh | Method of assembling a hose fitting |
CN2099235U (en) * | 1991-07-03 | 1992-03-18 | 钱克农 | Quick insertion type leakproof pipe connector |
CN2430601Y (en) * | 2000-03-02 | 2001-05-16 | 河南油田开源实业总公司 | Refractory pressure resistant thermal insulation soft pipe |
CN2918944Y (en) * | 2006-07-12 | 2007-07-04 | 王国林 | Screw-threaded pipe joint |
CN201062697Y (en) * | 2007-06-14 | 2008-05-21 | 刘堪金 | Pipe connection |
CN202484492U (en) * | 2012-03-27 | 2012-10-10 | 刘堪金 | Large-caliber high pressure rubber tube assembly |
-
2012
- 2012-03-27 CN CN2012100840306A patent/CN102606826A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3127672A (en) * | 1959-03-07 | 1964-04-07 | Kessler & Co Tech Chem Gmbh | Method of assembling a hose fitting |
CN2099235U (en) * | 1991-07-03 | 1992-03-18 | 钱克农 | Quick insertion type leakproof pipe connector |
CN2430601Y (en) * | 2000-03-02 | 2001-05-16 | 河南油田开源实业总公司 | Refractory pressure resistant thermal insulation soft pipe |
CN2918944Y (en) * | 2006-07-12 | 2007-07-04 | 王国林 | Screw-threaded pipe joint |
CN201062697Y (en) * | 2007-06-14 | 2008-05-21 | 刘堪金 | Pipe connection |
CN202484492U (en) * | 2012-03-27 | 2012-10-10 | 刘堪金 | Large-caliber high pressure rubber tube assembly |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107477294A (en) * | 2016-06-07 | 2017-12-15 | 天津格特斯检测设备技术开发有限公司 | A kind of steel pipe inner wall quick seal coupling and technique |
CN108426121A (en) * | 2018-05-23 | 2018-08-21 | 新疆义和德润工程技术有限公司 | Continuous hose inner liner pipe-repairing special joint and pipe repairing method |
CN110792861A (en) * | 2019-10-31 | 2020-02-14 | 刘锡多 | Internal support device of pipeline crimping connector and full-bore crimping connection method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105156813B (en) | A kind of oil pipe quick connector and its installation, method for dismounting | |
CN104620033A (en) | Press fitting and joint assembly with such a press fitting | |
CN102853190A (en) | Fast joint | |
CN205562117U (en) | U -shaped heat exchange tube hydrostatic test is with stopper that rises | |
US10309163B2 (en) | Pipe coupling | |
CN102606826A (en) | High pressure rubber pipe assembly with large diameter | |
CN202469311U (en) | High-pressure rubber pipe assembly | |
CN203297796U (en) | Pipeline connecting device | |
CN202561326U (en) | Self-locking high-pressure hose assembly | |
CN104455815B (en) | Tapered sealing pipe connector for excavator | |
CN202484492U (en) | Large-caliber high pressure rubber tube assembly | |
CN211449982U (en) | Clamping and pressing structure for copper pipe fitting | |
CN208579051U (en) | A kind of sewage treatment Pipe couplings | |
CN100575759C (en) | The metal pipe connection structure on a kind of separate unit rank | |
CN104006248B (en) | A kind of direct insertion slip-knot Fast-mounting tube fitting | |
CN212178149U (en) | Novel connecting valve | |
CN201858454U (en) | Splicing pipe connecting pipe fitting with bushing | |
CN103195991A (en) | Seal connection structure for metal pipes | |
CN210687423U (en) | Composite pipe metal joint | |
CN102494219A (en) | Connecting pipe fitting | |
CN103115211A (en) | Detachable pipe connector | |
CN203757242U (en) | Pipeline fast connector | |
CN102620079A (en) | Fire resistant rubber pipe assembly | |
CN203189904U (en) | Sealing connecting structure of metal pipe | |
CN203297814U (en) | Rapid movable connector for hose connection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: 053500 Chengxi Industrial Zone, Hengshui, Hebei, Jingxian County Applicant after: Hebei Jingbo Petroleum Machinery Co., Ltd. Address before: 053500 Jingxian County Development Zone, Hebei, Hengshui Applicant before: Jingbo Petroleum Machinery Co., Ltd., Jingxian County Hebei Province |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: HEBEI JINGXIAN COUNTY JINGBO PETROLEUM MACHINERY CO., LTD. TO: HEBEI JINGBO PETROLEUM MACHINERY CO., LTD. |
|
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120725 |