CN102595483B - Resource state reporting method and base station - Google Patents

Resource state reporting method and base station Download PDF

Info

Publication number
CN102595483B
CN102595483B CN201210061859.4A CN201210061859A CN102595483B CN 102595483 B CN102595483 B CN 102595483B CN 201210061859 A CN201210061859 A CN 201210061859A CN 102595483 B CN102595483 B CN 102595483B
Authority
CN
China
Prior art keywords
base station
measurement
resource status
message
failure cause
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210061859.4A
Other languages
Chinese (zh)
Other versions
CN102595483A (en
Inventor
岳然
吴松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Haiyun Technology Co. Ltd.
Original Assignee
New Postcom Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by New Postcom Equipment Co Ltd filed Critical New Postcom Equipment Co Ltd
Priority to CN201210061859.4A priority Critical patent/CN102595483B/en
Publication of CN102595483A publication Critical patent/CN102595483A/en
Application granted granted Critical
Publication of CN102595483B publication Critical patent/CN102595483B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a resource state reporting method and a base station. The resource state reporting method comprises the following steps: a first base station sends a resource state request message to a second base station; the second base station judges whether the first base station is optional for a second base station measurement ID cell; if so, under the condition that the base station cannot initiate corresponding measurement according to the resource state request message, the second base station sends a resource state failure message to the first base station, omits the second base station measurement ID in the resource state failure message and allocates a corresponding failure reason; and if not, under the condition that the second base station cannot initiate the corresponding measurement according to the resource state request message, the second base station sends the resource state failure message to the first base station, allocates a corresponding failure reason in the resource state failure message and allocates the second base station measurement ID. According to the technical scheme provided by the invention, the expenditure of signaling resources in the resource state reporting process can be reduced.

Description

A kind of resource state reporting method and base station
Technical field
The present invention relates to communication technical field, particularly a kind of resource state reporting method and base station.
Background technology
In LTE system, introduce resource status reporting process, load balancing process can be applied to, mutual loading condition between the higher cell-of-origin of load and its neighbor cell, and then the Target cell selecting suitable load transfer.Specifically, said process is by resource status request message, resource status response message, cell resource status failed message and follow-up periodic resources state updating etc.
According to X2AP agreement regulation, in resource status failure response message China, force to carry the information unit IE such as the measurement ID distributed in failure cause and Target cell, according to the various possible failure cause of the information analysis of carrying in resource status failure response message.
In sum, in prior art, in resource status failed message, carry the measurement ID that Target cell is distributed, add unnecessary signaling consumption, cause the wasting of resources to a certain extent.
Summary of the invention
A kind of resource state reporting method provided by the invention, method provided by the invention can reduce the expense of signal resource in resource status reporting process.
The invention discloses a kind of resource state reporting method, the method comprises:
First base station sends resource status request message to the second base station;
Second base station judges that the first base station whether be the second base station measurement ID cell is optional base station after receiving the resource status request message that the first base station sends;
If the first base station is the second base station measurement ID cell is optional base station, when the second base station can not initiate to measure accordingly according to described resource status request message, then the second base station sends resource status failed message to the first base station, in described resource status failed message, omit the second base station measurement ID, configure corresponding failure cause;
If the first base station is not the second base station measurement ID cell is optional base station, when the second base station can not initiate to measure accordingly according to described resource status request message, then the second base station sends resource status failed message to the first base station, in described resource status failed message, configure corresponding failure cause, configure the second base station measurement ID.
In the above-mentioned methods, described second base station comprises to the first base station transmission resource status failed message:
When in resource status request message report the value of object cell IE to be 0 time, then the second base station is in the resource status failed message of feedback, omits the second base station measurement ID, and failure cause corresponding to configuration be not for having measuring object;
When the value of object IE that reports in resource status request message is not 0, and when not carrying report cycle IE, then the second base station is in the resource status failed message of feedback, omits the second base station measurement ID, and the failure cause of configuration correspondence is not for having report cycle;
When the value of the registration request IE in resource status request message is for stopping, and when not carrying the second base station measurement ID, then the second base station is in the resource status failed message of feedback, omits the second base station measurement ID, and the failure cause of configuration correspondence is unknown base station measurement ID;
When the value of the registration request IE in resource status request message is for starting, and when the corresponding ongoing load measure of the first base station measurement ID is reported, then the second base station is in the resource status failed message of feedback, omitting the second base station measurement ID, for there is measurement ID in the failure cause of configuration correspondence.
In the above-mentioned methods, when the described failure cause when configuring measures ID for existing, the method comprises further:
Second base station proceeds already present measurement of measuring corresponding to ID.
In the above-mentioned methods, described in resource status failed message, configure corresponding failure cause, configure the second base station measurement ID and comprise:
If the failure cause of configuration is for exist measurement ID, be then the second base station measurement ID corresponding with already present first base station measurement ID by configuring the second base station measurement ID in resource status failed message;
If the failure cause of configuration is not there is measurement ID, be then a still unappropriated value by configuring the second base station measurement ID in resource status failed message.
In the above-mentioned methods, describedly judge that the first base station whether be the second base station measurement ID cell is that optional base station comprises:
The configuration information of the first base station that the second base station is preserved according to this locality, judges that the first base station whether be the second base station measurement ID cell is optional base station.
The invention provides a kind of base station, the expense of signal resource in resource status reporting process can be reduced in base station provided by the invention.
The invention discloses a kind of base station, this base station comprises: receiver module, control and measurement module, sending module; Wherein,
Receiver module, for the resource status request message that receiving neighbor bs sends, sends to control and measurement module by the resource status request message received;
Controlling and measurement module, sending resource status request message for receiving receiver module, whether the adjacent base station judging this resource status request message of transmission is the second base station measurement ID cell is optional base station;
If described adjacent base station is the second base station measurement ID cell is optional base station, then when can not initiate corresponding measurement according to described resource status request message, resource allocation state failed message; In described resource status failed message, omit the second base station measurement ID, configure corresponding failure cause;
If described adjacent base station is not the second base station measurement ID cell is optional base station, then when can not initiate corresponding measurement according to described resource status request message, resource allocation state failed message; In described resource status failed message, configure corresponding failure cause, configure the second base station measurement ID;
For the resource status configured failed message is sent to sending module;
Sending module, for receiving the resource status failed message of control and measurement module transmission, sends to corresponding adjacent base station by described resource status failed message.
In above-mentioned base station, described control and measurement module, for resource allocation state failed message, wherein,
When in resource status request message report the value of object cell IE to be 0 time,
Control and measurement module, in the resource status failed message of configuration, omit the second base station measurement ID, the failure cause of configuration correspondence is not for having measuring object;
When the value of object IE that reports in resource status request message is not 0, and when not carrying report cycle IE,
Control and measurement module, in the resource status failed message of configuration, omit the second base station measurement ID, the failure cause of configuration correspondence is not for having report cycle;
When the value of the registration request IE in resource status request message is for stopping, and when not carrying the second base station measurement ID,
Control and measurement module, in the resource status failed message of configuration, omit the second base station measurement ID, the failure cause of configuration correspondence is unknown base station measurement ID;
When the value of the registration request IE in resource status request message is for starting, and when the corresponding ongoing load measure of the first base station measurement ID is reported,
Controlling and measurement module, in the resource status failed message of configuration, omit the second base station measurement ID, for there is measurement ID in the failure cause of configuration correspondence.
In above-mentioned base station, be when there is measurement ID at the failure cause controlled and measurement module configures,
Control and measurement module, for proceeding the measurement corresponding to already present measurement ID.
In above-mentioned base station, described control and measurement module, for when configure failure cause be existed measure ID, in resource status failed message, configure the second base station measurement ID is the second base station measurement ID corresponding with already present first base station measurement ID;
For when configure failure cause be not existed measure ID, in resource status failed message, configure the second base station measurement ID is a still unappropriated value.
In above-mentioned base station, control and measurement module, for the configuration information of adjacent base station preserved according to this locality, whether the adjacent base station judging transmission resource status request message is the second base station measurement ID cell is optional base station.
In sum, the invention provides the method and system of a kind of resource status report, technical scheme provided by the invention is by first judging that adjacent base station whether be the second base station measurement ID cell is optional base station, when the first base station, the second base station be all the second base station measurement ID cell are optional base station, in the resource status failed message sent, omit the second base station measurement ID cell, reduce the expense of system resource signaling.And to have at least one not to be the second base station measurement ID cell in the first base station, the second base station be optional base station, if the failure cause of configuration is for exist measurement ID, in resource status failed message, configure the second base station measurement ID is the second base station measurement ID that already present first base station measurement ID is corresponding; If other failure cause, then in the second base station measurement ID cell of resource status failed message, configure one not yet by the value of the second base station measurement ID used; And when failure cause be existed measure ID, configure the measurement event that the second base station proceeds corresponding to already present second base station measurement ID.Technical scheme provided by the invention, reduces the expense of the signal resource in resource status reporting process.
Accompanying drawing explanation
Fig. 1 is the flow chart of a kind of resource state reporting method in the present invention,
Fig. 2 is the signaling process figure of a kind of resource status report message in the present invention,
Fig. 3 is the structural representation of a kind of base station in the present invention.
Embodiment
For making the object, technical solutions and advantages of the present invention clearly, below in conjunction with accompanying drawing, embodiment of the present invention is described further in detail.
The invention discloses a kind of resource state reporting method, the method can reduce the expense of the signal resource in resource status reporting process.
Fig. 1 is the flow chart of a kind of resource state reporting method in the present invention, as shown in Figure 1,
Step 101, the first base station sends resource status request message to the second base station;
Step 102, the second base station judges that the first base station whether be the second base station measurement ID cell is optional base station after receiving the resource status request message that the first base station sends;
Step 103, if the first base station is the second base station measurement ID cell is optional base station, when the second base station can not initiate to measure accordingly according to described resource status request message, then the second base station sends resource status failed message to the first base station, in described resource status failed message, omit the second base station measurement ID, configure corresponding failure cause;
Step 104, if the first base station is not the second base station measurement ID cell is optional base station, when the second base station can not initiate to measure accordingly according to described resource status request message, then the second base station sends resource status failed message to the first base station, in described resource status failed message, configure corresponding failure cause, configure the second base station measurement ID.
Wherein, in a step 102, the base station information that the second base station configures according to high level, learns that adjacent base station whether be the second base station measurement ID cell is optional base station; The base station configuration information of this base station and adjacent base station is preserved in the second base station side, namely the second base station can know that the first base station sending with it resource status request message whether be the second base station measurement ID cell is optional base station, be specially: the configuration information of the first base station that the second base station is preserved according to this locality, judge that the first base station whether be the second base station measurement ID cell is optional base station.Wherein, the second base station mentioned in the present invention is the second base station measurement ID is optional base station.
Fig. 2 is the signaling process figure of a kind of resource status report message in the present invention, as shown in Figure 2,
Step 201, the first base station sends resource status request message to the second base station, initiates resource status report start-up course.
In step 201, the resource status request message sent comprises: the request of resource status: as the service condition of Physical Resource Block PRB; And the request of loading condition, as the load condition of transport network layer and hardware.Wherein, the content of carrying in resource status request message is as shown in table 1,
Table 1
The resource status request message that second base station sends according to the first base station, prepares to measure accordingly; If the second base station can start when measuring accordingly, carry out step 202, otherwise carry out step 203;
Step 202, the second base station sends resource status response message to the first base station, in described resource status response message, carries the second base station measurement ID of the second base station assigns.
In step 202., the second base station sends resource status request message according to the first base station, measures accordingly; Second base station measurement ID of the second base station assigns is sent to the first base station by resource status response.
Step 203, the second base station sends resource status failed message to the first base station, carries the first base station measurement ID, omit the second base station measurement ID in described resource status failed message, the failure cause that configuration is corresponding.
In step 203, when second base station can not initiate to measure accordingly according to described resource status request message, then to the first base station feedback resource status failed message, relevant information is carried in described resource status failed message, wherein, the content of carrying in resource status failed message is as shown in table 2
Cell title Exist Scope IE type and reference Describe
Type of message M
First base station measurement ID M The measurement ID of the first base station assigns
Second base station measurement ID O The measurement ID of the second base station assigns
Failure cause M Failed reason
Critical diagnosis O
Table 2
As shown in table 2, in the present invention, the attribute configuration of the second base station measurement ID is become option, when the second base station feedback resource status failed message, under specific failure cause, do not send the second base station measurement ID cell, reduce signaling consumption to a certain extent; And can not impact normal Signalling exchange.
Associative list 1, table 2, in step 201, the first base station sends resource status request message to the second base station, carries the first base station measurement ID in this resource status request message;
In step 202., the the first base station measurement ID carried in the resource status request message that second base station sends according to the first base station, the second base station measurement ID corresponding with the first base station measurement ID is set, the second base station measurement ID of the first base station measurement ID and correspondence is kept at the local measurement table of comparisons; Wherein, in the described measurement table of comparisons, the first base station measurement ID and the second base station measurement ID one_to_one corresponding.And the second base station measurement ID is sent to the first base station by resource status response message, first base station is kept at after receiving the resource status response message carrying the first base station measurement ID and the second corresponding base station measurement ID in the local measurement table of comparisons, wherein, the described measurement table of comparisons is synchronous with the measurement table of comparisons in the second base station.
In an embodiment of the present invention, first base station is the second base station measurement ID cell is optional base station, namely when the first base station and the second base station are all the base stations of identical type, when the second base station can not initiate to measure accordingly according to described resource status request message, then the second base station sends resource status failed message to the first base station, in described resource status failed message, omit the second base station measurement ID, configure corresponding failure cause.
In a kind of specific embodiment of the present invention, the relevant information of carrying in the resource status request message that the second base station sends according to the first base station carries out corresponding feedback, wherein,
The value of object cell IE that reports of carrying in the resource status request message that the first base station sends is 0, then the second base station sends resource status failed message to the first base station, in described resource status failed message, configure corresponding first base station measurement ID, omit the second base station measurement ID, the failure cause of configuration correspondence is not for having measuring object; After the first base station receives the resource status failed message of the second base station transmission, first base station reconfigures measuring object according to the first base station measurement ID, the resource status request message configured is sent to the second base station again, and operation is measured accordingly according to described resource status request message in the second base station.
Carrying the value reporting object IE in the resource status request message that first base station sends is not 0, and do not carry report cycle IE, then the second base station is in the resource status failed message of the first base station feedback, configure corresponding first base station measurement ID, omit the second base station measurement ID, the failure cause of configuration correspondence is not for having report cycle.After the first base station receives the resource status failed message of the second base station transmission, first base station reconfigures report cycle according to the first base station measurement ID, the resource status request message configured is sent to the second base station again, and operation is measured accordingly according to described resource status request message in the second base station.
The value of the registration request IE carried in the resource status request message that the first base station sends is for stopping, and do not carry the second base station measurement ID, the first base station measurement ID is configured in the resource status failed message of then the second base station feedback, omit the second base station measurement ID, the failure cause of configuration correspondence is unknown base station measurement ID.After the first base station receives the resource status failed message of the second base station transmission, first base station reconfigures the second corresponding base station measurement ID according to the first base station measurement ID, the resource status request message configured is sent to the second base station again, and operation is measured accordingly according to described resource status request message in the second base station.
The value of the registration request IE carried in the resource status request message that the first base station sends is for starting, and when the corresponding ongoing load measure of the first base station measurement ID is reported, in the resource status failed message of then the second base station feedback, configure the first base station measurement ID, omit the second base station measurement ID, the failure cause of configuration correspondence is existed to measure ID after the first base station receives the resource status failed message of the second base station transmission, and the second base station proceeds there is the load measure measured corresponding to ID.Namely occur that failure cause is when there is measurement ID, the measurement that the second base station measurement ID that the second base station proceeds to have existed is corresponding and corresponding resource status renewal process.First base station abandons the measurement event this time measured corresponding to ID, continues configuration pin to the resource status request message of other measurement event.
In other embodiments of the invention, the first base station is not the second base station measurement ID cell is optional base station, and the second base station is the second base station measurement ID cell when being optional base station; When corresponding measurement can not be initiated according to described resource status request message in the second base station, then the second base station sends resource status failed message to the first base station, in described resource status failed message, configure corresponding failure cause, configure the second base station measurement ID.
Wherein, if the failure cause of configuration is for exist measurement ID, be then the second base station measurement ID corresponding with already present first base station measurement ID by configuring the second base station measurement ID in resource status failed message; If the failure cause of configuration is not there is measurement ID, the failure cause namely configured is other the failure cause except existing except ID, as not having measuring object, does not have report cycle, unknown base station measurement ID etc.; Be then a still unappropriated value by configuring the second base station measurement ID in resource status failed message.Wherein, described still unappropriated value refers to, from existing first base station measurement ID, value that the second base station measurement ID is different, namely base station side is not yet kept at the value measured in the table of comparisons.
The invention also discloses a kind of base station, Fig. 3 is the structural representation of a kind of base station in the present invention, and as shown in Figure 3, this base station comprises: receiver module 301, control and measurement module 302, sending module 303; Wherein,
Receiver module 301, for the resource status request message that receiving neighbor bs sends, sends to control and measurement module 302 by the resource status request message received;
Controlling and measurement module 302, sending resource status request message for receiving receiver module 301, judge that the adjacent base station of this resource status request message of transmission whether be the second base station measurement ID cell is optional base station;
If described adjacent base station is the second base station measurement ID cell is optional base station, then when can not initiate corresponding measurement according to described resource status request message, resource allocation state failed message; In described resource status failed message, omit the second base station measurement ID, configure corresponding failure cause;
If described adjacent base station is not the second base station measurement ID cell is optional base station, then when can not initiate corresponding measurement according to described resource status request message, resource allocation state failed message; In described resource status failed message, configure corresponding failure cause, configure the second base station measurement ID;
For the resource status configured failed message is sent to sending module 303;
Sending module 303, for receiving the resource status failed message of control and measurement module 302 transmission, sends to corresponding adjacent base station by described resource status failed message.
In above-mentioned base station, described control and measurement module 302, for resource allocation state failed message, wherein,
When in resource status request message report the value of object cell IE to be 0 time,
Control and measurement module 302, in the resource status failed message of configuration, omit the second base station measurement ID, the failure cause of configuration correspondence is not for having measuring object;
When the value of object IE that reports in resource status request message is not 0, and when not carrying report cycle IE,
Control and measurement module 302, in the resource status failed message of configuration, omit the second base station measurement ID, the failure cause of configuration correspondence is not for having report cycle;
When the value of the registration request IE in resource status request message is for stopping, and when not carrying the second base station measurement ID,
Control and measurement module 302, in the resource status failed message of configuration, omit the second base station measurement ID, the failure cause of configuration correspondence is unknown base station measurement ID;
When the value of the registration request IE in resource status request message is for starting, and when the corresponding ongoing load measure of the first base station measurement ID is reported,
Controlling and measurement module 302, in the resource status failed message of configuration, omit the second base station measurement ID, for there is measurement ID in the failure cause of configuration correspondence.
In above-mentioned base station, be when there is measurement ID at the failure cause controlled and measurement module 302 configures,
Control and measurement module 302, for proceeding the measurement corresponding to already present measurement ID.
In above-mentioned base station, described control and measurement module 302, for when configure failure cause be existed measure ID, in resource status failed message, configure the second base station measurement ID is the second base station measurement ID corresponding with already present first base station measurement ID;
For when configure failure cause be not existed measure ID, in resource status failed message, configure the second base station measurement ID is a still unappropriated value.
In above-mentioned base station, control and measurement module 302, for the configuration information of adjacent base station preserved according to this locality, whether the adjacent base station judging transmission resource status request message is the second base station measurement ID cell is optional base station.
The invention provides the method and system of a kind of resource status report, technical scheme provided by the invention is by first judging that adjacent base station whether be the second base station measurement ID cell is optional base station, when the first base station, the second base station be all the second base station measurement ID cell are optional base station, in the resource status failed message sent, omit the second base station measurement ID cell, reduce the expense of system resource signaling.And to have at least one not to be the second base station measurement ID cell in the first base station, the second base station be optional base station, if the failure cause of configuration is for exist measurement ID, in resource status failed message, configure the second base station measurement ID is the second base station measurement ID that already present first base station measurement ID is corresponding; If other failure cause, then in the second base station measurement ID cell of resource status failed message, configure one not yet by the value of the second base station measurement ID used; And when failure cause be existed measure ID, configure the measurement event that the second base station proceeds corresponding to already present second base station measurement ID.Technical scheme provided by the invention, reduces the expense of the signal resource in resource status reporting process; And solve when to feed back the second base station measurement ID in resource status failed message, cause the problem that the measurement event corresponding to existing second base station measurement ID stops.
The foregoing is only preferred embodiment of the present invention, be not intended to limit protection scope of the present invention.All any amendments done within the spirit and principles in the present invention, equivalent replacement, improvement etc., be all included in protection scope of the present invention.

Claims (6)

1. a resource state reporting method, is characterized in that, the method comprises:
First base station sends resource status request message to the second base station;
After second base station receives the resource status request message that the first base station sends, the configuration information of the first base station that the second base station is preserved according to this locality, judges that the first base station whether be the second base station measurement ID cell is optional base station;
If the first base station is the second base station measurement ID cell is optional base station, when the second base station can not initiate to measure accordingly according to described resource status request message, then the second base station sends resource status failed message to the first base station, in described resource status failed message, omit the second base station measurement ID, configure corresponding failure cause;
If the first base station is not the second base station measurement ID cell is optional base station, when the second base station can not initiate to measure accordingly according to described resource status request message, then the second base station sends resource status failed message to the first base station, in described resource status failed message, configure corresponding failure cause, configure the second base station measurement ID;
Wherein, described second base station comprises to the first base station transmission resource status failed message:
When in resource status request message report the value of object cell IE to be 0 time, then the second base station is in the resource status failed message of feedback, omits the second base station measurement ID, and failure cause corresponding to configuration be not for having measuring object;
When the value of object IE that reports in resource status request message is not 0, and when not carrying report cycle IE, then the second base station is in the resource status failed message of feedback, omits the second base station measurement ID, and the failure cause of configuration correspondence is not for having report cycle;
When the value of the registration request IE in resource status request message is for stopping, and when not carrying the second base station measurement ID, then the second base station is in the resource status failed message of feedback, omits the second base station measurement ID, and the failure cause of configuration correspondence is unknown base station measurement ID;
When the value of the registration request IE in resource status request message is for starting, and when the corresponding ongoing load measure of the first base station measurement ID is reported, then the second base station is in the resource status failed message of feedback, omitting the second base station measurement ID, for there is measurement ID in the failure cause of configuration correspondence.
2. method according to claim 1, is characterized in that, when the described failure cause when configuring measures ID for existing, the method comprises further:
Second base station proceeds already present measurement of measuring corresponding to ID.
3. method according to claim 2, is characterized in that, described in resource status failed message, configures corresponding failure cause, configures the second base station measurement ID and comprises:
If the failure cause of configuration is for exist measurement ID, be then the second base station measurement ID corresponding with already present first base station measurement ID by configuring the second base station measurement ID in resource status failed message;
If the failure cause of configuration is not there is measurement ID, be then a still unappropriated value by configuring the second base station measurement ID in resource status failed message.
4. a base station, is characterized in that, this base station comprises: receiver module, control and measurement module, sending module; Wherein,
Receiver module, for the resource status request message that receiving neighbor bs sends, sends to control and measurement module by the resource status request message received;
Controlling and measurement module, sending resource status request message for receiving receiver module, according to the configuration information of the adjacent base station that this locality is preserved, whether the adjacent base station judging this resource status request message of transmission is the second base station measurement ID cell is optional base station;
If described adjacent base station is the second base station measurement ID cell is optional base station, then when can not initiate corresponding measurement according to described resource status request message, resource allocation state failed message; In described resource status failed message, omit the second base station measurement ID, configure corresponding failure cause;
If described adjacent base station is not the second base station measurement ID cell is optional base station, then when can not initiate corresponding measurement according to described resource status request message, resource allocation state failed message; In described resource status failed message, configure corresponding failure cause, configure the second base station measurement ID;
For the resource status configured failed message is sent to sending module;
Sending module, for receiving the resource status failed message of control and measurement module transmission, sends to corresponding adjacent base station by described resource status failed message;
Wherein, described control and measurement module, for resource allocation state failed message, wherein,
When in resource status request message report the value of object cell IE to be 0 time,
Control and measurement module, in the resource status failed message of configuration, omit the second base station measurement ID, the failure cause of configuration correspondence is not for having measuring object;
When the value of object IE that reports in resource status request message is not 0, and when not carrying report cycle IE,
Control and measurement module, in the resource status failed message of configuration, omit the second base station measurement ID, the failure cause of configuration correspondence is not for having report cycle;
When the value of the registration request IE in resource status request message is for stopping, and when not carrying the second base station measurement ID,
Control and measurement module, in the resource status failed message of configuration, omit the second base station measurement ID, the failure cause of configuration correspondence is unknown base station measurement ID;
When the value of the registration request IE in resource status request message is for starting, and when the corresponding ongoing load measure of the first base station measurement ID is reported,
Controlling and measurement module, in the resource status failed message of configuration, omit the second base station measurement ID, for there is measurement ID in the failure cause of configuration correspondence.
5. base station according to claim 4, is characterized in that, is when there is measurement ID at the failure cause controlled and measurement module configures,
Control and measurement module, be further used for proceeding already present measurement of measuring corresponding to ID.
6. base station according to claim 5, is characterized in that,
Described control and measurement module, for when configure failure cause be existed measure ID, in resource status failed message, configure the second base station measurement ID is the second base station measurement ID corresponding with already present first base station measurement ID;
For when configure failure cause be not existed measure ID, in resource status failed message, configure the second base station measurement ID is a still unappropriated value.
CN201210061859.4A 2012-03-09 2012-03-09 Resource state reporting method and base station Active CN102595483B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210061859.4A CN102595483B (en) 2012-03-09 2012-03-09 Resource state reporting method and base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210061859.4A CN102595483B (en) 2012-03-09 2012-03-09 Resource state reporting method and base station

Publications (2)

Publication Number Publication Date
CN102595483A CN102595483A (en) 2012-07-18
CN102595483B true CN102595483B (en) 2014-12-24

Family

ID=46483584

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210061859.4A Active CN102595483B (en) 2012-03-09 2012-03-09 Resource state reporting method and base station

Country Status (1)

Country Link
CN (1) CN102595483B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104469730B (en) * 2013-09-16 2017-12-26 上海贝尔股份有限公司 A kind of method for configuring resource status report message
CN107534573B (en) * 2015-05-27 2020-02-14 华为技术有限公司 Base station service state detection method, network operation and maintenance management system and base station

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101577927A (en) * 2009-01-15 2009-11-11 华为技术有限公司 Load measuring method, evolution base station and load measuring system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050262266A1 (en) * 2002-06-20 2005-11-24 Niclas Wiberg Apparatus and method for resource allocation
CN101541041A (en) * 2009-04-23 2009-09-23 华为技术有限公司 Method for sharing load, device and system thereof

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101577927A (en) * 2009-01-15 2009-11-11 华为技术有限公司 Load measuring method, evolution base station and load measuring system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
3GPP.Evolved Universal Terrestrial Radio Access Network (E-UTRAN) X2 application protocol (X2AP).《3GPP TS 36.423 v10.4.0》.2011,第25页子章节8.3.6.3,第41,42页子章节9.1.2.13. *

Also Published As

Publication number Publication date
CN102595483A (en) 2012-07-18

Similar Documents

Publication Publication Date Title
EP2381715B1 (en) Resource measurement and reporting method in long term evolution system
US8977325B2 (en) Method and system for processing cell sleeping
JP2020167716A (en) Communication processing method and apparatus in the case of tight interworking between lte and 5g
US20200296694A1 (en) Method for configuring uplink semi-persistent scheduling, terminal, and network side device
US10433297B2 (en) Communication processing method, communication processing apparatus and base station
WO2018014661A1 (en) Data or signaling sending and transmitting method and device
CN102143522A (en) Method and equipment for processing radio link failure
CN102595529B (en) Switching method and switching system based on multipoint coordination
US10362549B2 (en) Method and apparatus for setting up interface between access points
WO2015096088A1 (en) Channel measurement configuration method, channel measurement method, device and communication system
CN103313406A (en) Method for carrying out D2D (device-to-device) communication between different cells by adopting signaling interaction of X2 interfaces
CN102056240B (en) Load balancing method between cells and base station
CN103703832A (en) User equipment management method, apparatus and system
CN102595483B (en) Resource state reporting method and base station
CN104753749B (en) A kind of multi-host communication method and communication system
US8374598B2 (en) Method for drift radio network controller to report that cell does not support transmission interval
WO2019138359A1 (en) Next generation radio access network wireless device rejection indication
KR20150008420A (en) Mobile setting negotiation method and device
CN108307544B (en) Method and device for judging whether UE needs to support connection state mobility and method and device for sending information
WO2020251443A1 (en) Ensuring user equipment measurement freshness
US20160360523A1 (en) Access system, device and method
CN106465189A (en) Resource scheduling method, device and system
EP3059998B1 (en) Resource status obtaining method, apparatus, system and computer storage medium
CN102625478B (en) Wireless meshy Mesh link aggregation method and MPs
CN102595457A (en) Method and system for maintaining CoMP (Cooperative Multi-Point) transmission of user terminal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170831

Address after: 100070, No. 188, building 25, No. eighteen, South Fourth Ring Road, Fengtai District, Beijing, 1, 101

Patentee after: Beijing Haiyun Technology Co. Ltd.

Address before: 510663, No. 3, color road, Science City, Guangzhou Development Zone, Guangdong

Patentee before: New Post Communication Equipment Co., Ltd.

TR01 Transfer of patent right