CN102592390A CN2012100272632A CN201210027263A CN102592390A CN 102592390 A CN102592390 A CN 102592390A CN 2012100272632 A CN2012100272632 A CN 2012100272632A CN 201210027263 A CN201210027263 A CN 201210027263A CN 102592390 A CN102592390 A CN 102592390A
Authority
CN
China
Prior art keywords
forecast
day
transmission line
condition
judgement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100272632A
Other languages
English (en)
Other versions
CN102592390B (zh
Inventor
陆佳政
杨莉
张红先
方针
李波
徐勋建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Disaster Prevention and Mitigation Center of State Grid Hunan Electric Power Co Ltd
Hunan Xiangdian Test Research Institute Co Ltd
Original Assignee
Hu'nan Huicui Electric Power Technology Co Ltd
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Hunan Xiangdian Test Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hu'nan Huicui Electric Power Technology Co Ltd, Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd, Hunan Xiangdian Test Research Institute Co Ltd filed Critical Hu'nan Huicui Electric Power Technology Co Ltd
Priority to CN201210027263.2A priority Critical patent/CN102592390B/zh
Publication of CN102592390A publication Critical patent/CN102592390A/zh
Application granted granted Critical
Publication of CN102592390B publication Critical patent/CN102592390B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明介绍了一种输电线路山火预报方法,该方法为下述步骤:(1)、气象数据采集;(2.1)、工农业用火条件分析;(2.2)、降水条件分析;(2.3)、无雨日数条件分析;(2.4)、气温条件分析;(2.5)、湿度条件分析;(3)、作出预报结论;(4)、发布预报结论。本方法的有益效果是:1、可对未来两日的电网山火区域进行输电线路山火预报;2、本发明实用性强,操作方便;3、预报输电线路山火的准确率高。4、对输电线路运行人员制定山火防治措施有指导意义,对维护电网的安全稳定及减轻灾害损失有重要作用。

Description

输电线路山火预报方法
技术领域
本发明属于电气工程技术领域,尤其涉及一种输电线路山火预报方法。
背景技术
受干旱少雨等气象因素的影响,中国南方地区森林火灾频发,而输电线路跨越山火易发地段,遍布崇山峻岭,一旦发生山火,其产生的污秽或者引发的空气放电将导致输电线路跳闸。仅2009年2月一个月内,湖南电网因山火造成的线路跳闸多达12次,占该时段线路总跳闸总数的64.3%,其中有8次发生在2月11日至12日两天之内,山火跳闸次数之多,密集程度之高,实属罕见。输电线路因山火引起跳闸后,由于受绝缘子积污的影响,线路重新合闸难以成功,往往造成电网永久性故障,严重影响供电质量。目前,针对输电线路的山火预报工作尚未开展。而随着国民经济的快速发展,各行各业对电力的需求量越来越大,对供电部门提供电力供应的稳定性、不间断性等质量要求也越来越高,电网运行的安全性显得尤为重要。为此,必须开展针对输电线路的山火预报工作,为运行维护单位及时制定防范措施提供有效指导,保证输电线路安全稳定运行,实现供电可靠性提高、经济损失降低和社会效益同步提高的目的。
发明内容
本发明要解决的技术问题是:针对目前输电线路山火预报工作的落后现状,提供一种输电线路山火预报方法,使用该方法可以预报至少未来两日输电线路的山火发生情况,故该方法思路新颖、流程清晰、准确率高。
本发明的解决方案是,所提供的这种输电线路山火预报方法,系充分考虑人为活动对于山火火源的影响以及气象条件对于山火发展的作用,建立了基于工农业活动用火时期、降水、无雨日数、气温、湿度五个因素的电网山火预报方法,通过判断预报时间对于工农业活动用火时期条件的满足程度,以及根据气象预报判断预报日对于降水、无雨日数、气温、湿度等方面设定条件的满足程度,形成电网山火发生状况的预报结论,该方法执行时为下述具体步骤:
(1)、气象数据采集。从预报地区的天气预报中,采集当天预报地区的地面实时气象数据及预报日的预报气象数据,包含工农业用火数据、降水数据、无雨日日数数据、气温数据、湿度数据、露点温度数据;
(2.1)、工农业用火条件分析。根据步骤(1)采集的工农业用火数据,使用常规方法形成预报地区工农业活动用火的高发时期,例如春节、清明、春耕、秋收时期,亦即容易生成野外火源的重点日期。判断预报日是否处在这些工农业活动用火的高发时期之内,若预报日处于工农业活动用火的高发时期之内,则作出工农业用火条件成立的判断,否则,作出工农业用火条件不成立的判断;
(2.2)、降水条件分析。根据步骤(1)采集的降水数据,判断预报地区的预报日是否有降水,若预报地区的预报日降雨量为零,则作出降水条件成立的判断,否则,作出降水条件不成立的判断;
(2.3)、无雨日数条件分析。根据步骤(1)采集的无雨日日数数据,使用常规方法计算预报地区截至预报日当天的过去连续无降水日日数。若无雨日日数大于三日,则作出无雨日日数条件成立的判断,否则,作出无雨日日数条件不成立的判断;
(2.4)、气温条件分析。根据步骤(1)采集的气温数据,判断预报地区的预报日地面最高温度是否大于山火发生警戒温度。若判断结果表明预报地区的预报日地面温度高于山火发生警戒温度,则作出气温条件成立的判断,否则,作出气温条件不成立的判断;
(2.5)、湿度条件分析。根据步骤(1)采集的湿度数据,采用当天14时的实时地面温度和露点温度,使用常规方法计算预报地区当天的相对湿度。若预报地区当天最大相对湿度小于40%,则作出湿度条件成立的判断,否则,作出湿度条件不成立的判断;
(3)、作出预报结论。依据步骤(2.1)~(2.5)作出的判断,按照下列规则作出输电线路山火预报结论。所述下列规则是:
规则A、若步骤(2.1)~(2.5)所判断的条件均成立,则作出预报地区电网的输电线路预报日将有山火发生的结论;
规则B、若步骤(2.1)~(2.5)所判断的条件中有任何一个条件不成立,则作出预报地区电网的输电线路预报日将无山火发生的结论;
(4)、发布预报结论。利用互联网地理信息平台,将预报地区的山火预报情况汇同电网地理界接线图,使用常规方法形成预报地区电网的输电线路山火预报图,通过互联网的山火预报信息发布网页,发布上述步骤(3)所作出的预报地区电网的输电线路山火预报结论。
本发明的有益效果是:
1、可对未来两日的电网山火区域进行输电线路山火预报;
2、本发明实用性强,操作方便;
3、预报输电线路山火的准确率高。
4、对输电线路运行人员制定山火防治措施有指导意义,对维护电网的安全稳定及减轻灾害损失有重要作用。
具体实施方式
实施例1:
(1)、从预报地区的天气预报中,采集当天预报地区的地面实时气象数据及预报日的预报气象数据,包含工农业用火数据、降水数据、无雨日日数数据、气温数据、湿度数据、露点温度数据;
(2.1)、根据步骤(1)采集的工农业用火数据,使用常规方法形成预报地区工农业活动用火的高发时期。判断预报日是否处在这些工农业活动用火的高发时期之内,判断结果表明预报日处于工农业活动用火的高发时期之内,作出工农业用火条件成立的判断;
(2.2)、根据步骤(1)采集的降水数据,判断预报地区的预报日是否有降水,判断结果表明预报地区的预报日降雨量为零,作出降水条件成立的判断;
(2.3)、根据步骤(1)采集的无雨日日数数据,使用常规方法计算预报地区截至预报日当天的过去连续无降水日日数。判断结果表明无雨日日数大于三日,作出无雨日日数条件成立的判断;
(2.4)、根据步骤(1)采集的气温数据,判断预报地区的预报日地面最高温度是否大于山火发生警戒温度。判断结果表明预报地区的预报日地面温度高于山火发生警戒温度,作出气温条件成立的判断;
(2.5)、根据步骤(1)采集的湿度数据,采用当天14时的实时地面温度和露点温度,使用常规方法计算预报地区当天的相对湿度,计算结果表明预报地区当天最大相对湿度小于40%,作出湿度条件成立的判断;
(3)、依据步骤(2.1)~(2.5)作出的判断,表明判断结果符合规则A,按照规则A作出预报地区电网的输电线路预报日将有山火发生的结论;
(4)、利用互联网地理信息平台,将预报地区的山火预报情况汇同电网地理界接线图,使用常规方法形成预报地区电网的输电线路山火预报图,通过互联网的山火预报信息发布网页,发布上述步骤(3)所作出的预报地区电网的输电线路山火预报结论。
实施例2:
步骤(1)同实施例1;
(2.1)、根据步骤(1)采集的工农业用火数据,使用常规方法形成预报地区工农业活动用火的高发时期。判断预报日是否处在这些工农业活动用火的高发时期之内,判断结果表明预报日不处于工农业活动用火的高发时期之内,作出工农业用火条件不成立的判断;
(2.2)、根据步骤(1)采集的降水数据,判断预报地区的预报日是否有降水,判断结果表明预报地区的预报日降雨量不为零,作出降水条件不成立的判断;
(2.3)、根据步骤(1)采集的无雨日日数数据,使用常规方法计算预报地区截至预报日当天的过去连续无降水日日数。判断结果表明无雨日日数小于三日,作出无雨日日数条件不成立的判断;
(2.4)、根据步骤(1)采集的气温数据,判断预报地区的预报日地面最高温度是否大于山火发生警戒温度。判断结果表明预报地区的预报日地面温度低于山火发生警戒温度,作出气温条件不成立的判断;
(2.5)、根据步骤(1)采集的湿度数据,采用当天14时的实时地面温度和露点温度,使用常规方法计算预报地区当天的相对湿度,计算结果表明预报地区当天最大相对湿度大于40%,作出湿度条件不成立的判断;
(3)、依据步骤(2.1)~(2.5)作出的判断,表明判断结果符合规则B,按照规则B作出预报地区电网的输电线路预报日将无山火发生的结论;
步骤(4)同实施例1。

Claims (1)

1.一种输电线路山火预报方法,该方法为下述步骤:
(1)、从预报地区的天气预报中,采集当天预报地区的地面实时气象数据及预报日的预报气象数据,包含工农业用火数据、降水数据、无雨日日数数据、气温数据、湿度数据、露点温度数据;
(2.1)、根据步骤(1)采集的工农业用火数据,使用常规方法形成预报地区工农业活动用火的高发时期,判断预报日是否处在这些工农业活动用火的高发时期之内,若预报日处于工农业活动用火的高发时期之内,则作出工农业用火条件成立的判断,否则,作出工农业用火条件不成立的判断;
(2.2)、根据步骤(1)采集的降水数据,判断预报地区的预报日是否有降水,若预报地区的预报日降雨量为零,则作出降水条件成立的判断,否则,作出降水条件不成立的判断;
(2.3)、根据步骤(1)采集的无雨日日数数据,使用常规方法计算预报地区截至预报日当天的过去连续无降水日日数,若无雨日日数大于三日,则作出无雨日日数条件成立的判断,否则,作出无雨日日数条件不成立的判断;
(2.4)、根据步骤(1)采集的气温数据,判断预报地区的预报日地面最高温度是否大于山火发生警戒温度,若判断结果表明预报地区的预报日地面温度高于山火发生警戒温度,则作出气温条件成立的判断,否则,作出气温条件不成立的判断;
(2.5)、根据步骤(1)采集的湿度数据,采用当天14时的实时地面温度和露点温度,使用常规方法计算预报地区当天的相对湿度,若预报地区当天最大相对湿度小于40%,则作出湿度条件成立的判断,否则,作出湿度条件不成立的判断;
(3)、依据步骤(2.1)~(2.5)作出的判断,按照下列规则作出输电线路山火预报结论,所述下列规则是:
规则A、若步骤(2.1)~(2.5)所判断的条件均成立,则作出预报地区电网的输电线路预报日将有山火发生的结论;
规则B、若步骤(2.1)~(2.5)所判断的条件中有任何一个条件不成立,则作出预报地区电网的输电线路预报日将无山火发生的结论;
(4)、发布预报结论,利用互联网地理信息平台,将预报地区的山火预报情况汇同电网地理界接线图,使用常规方法形成预报地区电网的输电线路山火预报图,通过互联网的山火预报信息发布网页,发布上述步骤(3)所作出的预报地区电网的输电线路山火预报结论。
CN201210027263.2A 2012-02-08 2012-02-08 输电线路山火预报方法 Active CN102592390B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210027263.2A CN102592390B (zh) 2012-02-08 2012-02-08 输电线路山火预报方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210027263.2A CN102592390B (zh) 2012-02-08 2012-02-08 输电线路山火预报方法

Publications (2)

Publication Number Publication Date
CN102592390A true CN102592390A (zh) 2012-07-18
CN102592390B CN102592390B (zh) 2014-01-08

Family

ID=46480966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210027263.2A Active CN102592390B (zh) 2012-02-08 2012-02-08 输电线路山火预报方法

Country Status (1)

Country Link
CN (1) CN102592390B (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103473611A (zh) * 2013-09-06 2013-12-25 国家电网公司 一种基于五因子的输电线路山火等级预报方法
CN103971177A (zh) * 2014-05-08 2014-08-06 国家电网公司 多因素引发输电线路山火发生的预测方法
CN103961825A (zh) * 2014-05-08 2014-08-06 国家电网公司 基于火行为特征分析的输电线路山火智能应急处置方法
CN104143245A (zh) * 2014-07-29 2014-11-12 华南理工大学 一种输电线路的山火监测系统及其方法
CN104268655A (zh) * 2014-09-30 2015-01-07 国家电网公司 一种输电线路山火预警方法
CN104820875A (zh) * 2015-05-19 2015-08-05 湖南省湘电试研技术有限公司 一种输电线路山火精细化密度预报方法
CN104850919A (zh) * 2015-06-15 2015-08-19 国家电网公司 一种输电线路山火数值预测方法
CN107067683A (zh) * 2017-04-14 2017-08-18 湖南省湘电试研技术有限公司 一种输电线路山火聚类定量预报方法及系统
CN111583567A (zh) * 2020-06-01 2020-08-25 江西憶源多媒体科技有限公司 一种森林防火预警方法及装置
CN112819356A (zh) * 2021-02-08 2021-05-18 国网山西省电力公司电力科学研究院 一种基于梯度提升树的输电线路山火风险等级预报方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5734335A (en) * 1989-12-20 1998-03-31 Finmeccanica S.P.A. Forest surveillance and monitoring system for the early detection and reporting of forest fires
CN101620451A (zh) * 2008-06-30 2010-01-06 中国林业科学研究院森林生态环境与保护研究所 森林火险等级快速查算尺
CN101964130A (zh) * 2009-07-22 2011-02-02 顾海勇 测温式电气火灾监控系统

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5734335A (en) * 1989-12-20 1998-03-31 Finmeccanica S.P.A. Forest surveillance and monitoring system for the early detection and reporting of forest fires
CN101620451A (zh) * 2008-06-30 2010-01-06 中国林业科学研究院森林生态环境与保护研究所 森林火险等级快速查算尺
CN101964130A (zh) * 2009-07-22 2011-02-02 顾海勇 测温式电气火灾监控系统

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103473611A (zh) * 2013-09-06 2013-12-25 国家电网公司 一种基于五因子的输电线路山火等级预报方法
CN103971177A (zh) * 2014-05-08 2014-08-06 国家电网公司 多因素引发输电线路山火发生的预测方法
CN103961825A (zh) * 2014-05-08 2014-08-06 国家电网公司 基于火行为特征分析的输电线路山火智能应急处置方法
CN103961825B (zh) * 2014-05-08 2015-03-18 国家电网公司 基于火行为特征分析的输电线路山火智能应急处置方法
CN104143245A (zh) * 2014-07-29 2014-11-12 华南理工大学 一种输电线路的山火监测系统及其方法
CN104268655B (zh) * 2014-09-30 2016-05-25 国家电网公司 一种输电线路山火预警方法
CN104268655A (zh) * 2014-09-30 2015-01-07 国家电网公司 一种输电线路山火预警方法
CN104820875A (zh) * 2015-05-19 2015-08-05 湖南省湘电试研技术有限公司 一种输电线路山火精细化密度预报方法
CN104850919A (zh) * 2015-06-15 2015-08-19 国家电网公司 一种输电线路山火数值预测方法
CN107067683A (zh) * 2017-04-14 2017-08-18 湖南省湘电试研技术有限公司 一种输电线路山火聚类定量预报方法及系统
CN107067683B (zh) * 2017-04-14 2018-01-09 湖南省湘电试研技术有限公司 一种输电线路山火聚类定量预报方法及系统
CN111583567A (zh) * 2020-06-01 2020-08-25 江西憶源多媒体科技有限公司 一种森林防火预警方法及装置
CN112819356A (zh) * 2021-02-08 2021-05-18 国网山西省电力公司电力科学研究院 一种基于梯度提升树的输电线路山火风险等级预报方法
CN112819356B (zh) * 2021-02-08 2022-10-14 国网山西省电力公司电力科学研究院 一种基于梯度提升树的输电线路山火风险等级预报方法

Also Published As

Publication number Publication date
CN102592390B (zh) 2014-01-08

Similar Documents

Publication Publication Date Title
CN102592390B (zh) 输电线路山火预报方法
CN102590651B (zh) 基于雷电实测数据的输电线路故障概率评估方法
CN104376510B (zh) 一种输电线路因山火跳闸的风险等级预测评估方法
CN103207340B (zh) 一种输电线路雷电绕击跳闸在线预警方法
CN103383798A (zh) 一种基于电网gis山火灾害监测与预警分析方法及系统
CN106501656A (zh) 一种配电线路故障波形的在线采集系统
CN103106764A (zh) 基于卫星遥感的输电线路走廊火情监测系统
CN203422438U (zh) 配电网架空线路实时监测及故障定位系统
CN104952212A (zh) 一种基于电网gis的地质灾害预警方法及装置
CN106501671A (zh) 一种配电网架空线路故障的监测方法
CN105243459B (zh) 综合气象及人工防火措施的输电线路山火跳闸风险控制方法
CN103440599A (zh) 一种基于gis平台的电网输电线路山火火点分布图绘制方法
CN103700039A (zh) 电网实时风险评估及预控方法
CN202662054U (zh) 一种基于电网gis山火灾害监测与预警分析系统
CN103914951A (zh) 基于gis电网自然灾害数据信息挖掘与预警响应分析方法
CN106501657A (zh) 一种配电网架空线路故障的监测系统
CN103383744A (zh) 公网气象数据在电网防灾减灾中应用的方法及系统
CN104392327A (zh) 一种输电线路典型灾害因素评估方法
CN105470954B (zh) 一种输电线路动态增容系统
Zhou et al. Studies on big data mining techniques in wildfire prevention for power system
CN102508321B (zh) 电网覆冰预报方法
CN110210769A (zh) 一种输电线路山火蔓延风险预测方法及系统
CN111027827B (zh) 保底通信网运行风险分析的方法、装置及计算机设备
CN103955618A (zh) 大范围智能预测输电线路山火的方法
CN102590639A (zh) 一种雷电事故预警方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HU NAN XIANGDIAN TRIAL RESEARCH TECHNOLOGY CO., LT

Free format text: FORMER OWNER: HU NAN XIANGDIAN TRIAL RESEARCH TECHNOLOGY CO., LTD. HU NAN HUICUI ELECTRIC TECHNOLOGY CO., LTD.

Effective date: 20121018

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121018

Address after: 410007 No. 79 hydroelectric power street, east pond, Hunan, Changsha

Applicant after: Science Research Institute of Hunan Electric Power Co., Ltd.

Applicant after: Hunan Xiangdian Electric Power Text & Research Co., Ltd.

Applicant after: State Grid Corporation of China

Applicant after: Hu'nan Huicui Electric Power Technology Co., Ltd.

Address before: 410007 No. 79 hydroelectric power street, east pond, Hunan, Changsha

Applicant before: Science Research Institute of Hunan Electric Power Co., Ltd.

Applicant before: Hunan Xiangdian Electric Power Text & Research Co., Ltd.

Applicant before: Hu'nan Huicui Electric Power Technology Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: HU NAN ELECTRIC POWER COMPANY RESEARCH ACADEMY

Effective date: 20140606

Owner name: INSTITUTE OF ELECTRIC POWER SCIENCES OF STATE GRID

Free format text: FORMER OWNER: HU NAN XIANGDIAN TRIAL RESEARCH TECHNOLOGY CO., LTD. STATE GRID CORPORATION OF CHINA HU NAN HUICUI ELECTRIC POWER TECHNOLOGY CO., LTD.

Effective date: 20140606

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 410007 CHANGSHA, HUNAN PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20140606

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Electric Power Research Institute, State Grid Hunan Electric Power Company

Address before: 410007 No. 79 hydroelectric power street, east pond, Hunan, Changsha

Patentee before: Science Research Institute of Hunan Electric Power Co., Ltd.

Patentee before: Hunan Xiangdian Electric Power Text & Research Co., Ltd.

Patentee before: State Grid Corporation of China

Patentee before: Hu'nan Huicui Electric Power Technology Co., Ltd.

ASS Succession or assignment of patent right

Owner name: STATE GRID HUNAN ELECTRIC POWER COMPANY DISASTER P

Free format text: FORMER OWNER: INSTITUTE OF ELECTRIC POWER SCIENCES OF STATE GRID HUNAN ELECTRIC POWER COMPANY

Effective date: 20150527

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150527

Address after: 100033 West Chang'an Avenue, Beijing, No. 86, No.

Patentee after: State Grid Corporation of China

Patentee after: State Grid Hunan Electric Power Company

Patentee after: State Grid Hunan Electric Power Company prevents and reduces natural disasters center

Address before: 100033 West Chang'an Avenue, Beijing, No. 86, No.

Patentee before: State Grid Corporation of China

Patentee before: Electric Power Research Institute, State Grid Hunan Electric Power Company

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20161009

Address after: 410007 Shaoshan North Road, Hunan, No. 388, No.

Patentee after: State Grid Hunan Electric Power Company

Patentee after: State Grid Hunan Electric Power Company prevents and reduces natural disasters center

Patentee after: State Grid Corporation of China

Patentee after: Hunan Xiangdian Electric Power Text & Research Co., Ltd.

Address before: 100033 West Chang'an Avenue, Beijing, No. 86, No.

Patentee before: State Grid Corporation of China

Patentee before: State Grid Hunan Electric Power Company

Patentee before: State Grid Hunan Electric Power Company prevents and reduces natural disasters center