CN102590886A - Method for determining initial destroy of baseboard of coal mine roadway immediately - Google Patents

Method for determining initial destroy of baseboard of coal mine roadway immediately Download PDF

Info

Publication number
CN102590886A
CN102590886A CN2012100229596A CN201210022959A CN102590886A CN 102590886 A CN102590886 A CN 102590886A CN 2012100229596 A CN2012100229596 A CN 2012100229596A CN 201210022959 A CN201210022959 A CN 201210022959A CN 102590886 A CN102590886 A CN 102590886A
Authority
CN
China
Prior art keywords
base plate
hydraulic
baseboard
observation instrument
distortion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100229596A
Other languages
Chinese (zh)
Other versions
CN102590886B (en
Inventor
潘立友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201210022959.6A priority Critical patent/CN102590886B/en
Publication of CN102590886A publication Critical patent/CN102590886A/en
Application granted granted Critical
Publication of CN102590886B publication Critical patent/CN102590886B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses a method for determining the initial destroy of a baseboard of a coal mine roadway immediately. The method comprises the steps of firstly delineating an area where the baseboard is possibly destroyed, then making a transformed amplification observation instrument, and finally performing observations by using the transformed amplification observation instrument, so as to predicate the initial destroy situation of the baseboard in advance. According to the method, the situation of baseboard destroy can be immediately discovered in the roadway construction and a back way in a construction area with large burial depth and heavy stress, so that measures can be taken to avoid serious destroy.

Description

The instant method of judging the initial destruction of coal mine roadway base plate
Technical field
The invention belongs to the coal mining technical field.
Background technology
Along with the increase of the pit mining degree of depth, the boundary condition of exploitation complicated, the tunnel pucking that tectonic structure, tomography etc. cause is more and more serious.At present, the tunnel cross method that lays out pile is generally adopted in the monitoring of pucking, through long observation, obtains the Changing Pattern of pucking.Obviously, pucking is preceding, observation after, the tunnel of back observation is difficult to administer in advance.Particularly for the tunnel in the dangerous coal seam of rock burst; The place ahead of meeting head on of tunnelling process usually is attended by that structure, coal rock layer textural anomaly, dynamic stress change greatly, gas is unusual etc.; The dangerous constantly increase that structure type rock burst when occurring in tunnelling causes; If foresee the slight change of base plate in advance, the control rock burst had positive role.Before big pucking distortion does not also take place in the tunnel, can find that base plate begins to destroy, take the necessary measures then, be the best measure of administering the tunnel pucking.
Therefore the determination methods in advance of tunnelling under tectonic province, heavily stressed, the big buried depth condition and way of escape coal seam floor failure is significant to the deep tunnel hazard management.
Summary of the invention
The objective of the invention is, invent a kind of amplification principle that adopts and judge the initial method of destroying of roadway floor immediately.
Technical scheme of the present invention is:
The first step: the zone that the delineation base plate possibly destroy
In the soft-rock tunnel tunneling process of infrastructure complicacy; Adopt the terrestrial stress practical observation method to observe and obtain the terrestrial stress data; The structure spread situation that occurs according to driving is again carried out analogy, analysis, the judgement of roadway deformation presentation attributes, obtains the terrestrial stress size and Orientation; Combine the ore deposit to press rule then, mark off the zone that coal seam floor failure possibly take place in the tunnel.
Second step: make a distortion and amplify observation instrument
It is to connect a high-pressure liquid tube in the bottom of hydraulic jack that observation instrument is amplified in distortion, connects a hydraulic displacement meter on the high-pressure liquid tube.
The 3rd step: amplify observation instrument with distortion and observe
On the base plate in the zone of above-mentioned delineation, excavate out the square column body opening that a degree of depth reaches complete rock stratum, the long and wide 0.5m that is in hole; Dark 0.5-1.0m, the hydraulic jack that will amplify observation instrument then places in the hole, and piston is stretched out; Be full of hydraulic oil in the oil cylinder; The oil cylinder horizontal is at the bottom of the hole, and its piston is buried underground with the cement pouring facing to stress direction; Notice that the piston extension can not bury reality, the hydraulic displacement meter stretches out outside the hole;
When floor strata stress increased, the piston pressurized moved, and power is passed to the hydraulic displacement meter, and according to hydraulic principle, the hydraulic displacement meter amplifies the distortion of base plate, demonstrates reading, thereby predicts the initial destruction situation of base plate in advance.
Good effect of the present invention is: 1. through observation, the analogy of terrestrial stress, the zone of destruction takes place in the preliminary judgement base plate.2. adopt the initial destruction situation of amplifying the instant perception base plate of observation instrument, significant to the control pucking.
Description of drawings
Below in conjunction with description of drawings enforcement of the present invention.
Fig. 1 amplifies observation instrument to arrange synoptic diagram.
Embodiment
The technical staff in present technique field can implement based on technical scheme and distortion amplification observation instrument layout sketch map shown in Figure 1, no longer repeats at this.

Claims (1)

1. judge the initial method of destroying of coal mine roadway base plate immediately for one kind, it is characterized in that step is following:
The first step: the zone that the delineation base plate possibly destroy
In the soft-rock tunnel tunneling process of infrastructure complicacy; Adopt the crustal stress practical observation method to observe and obtain the crustal stress data; The structure spread situation that occurs based on driving is carried out analogy, analysis, the judgement of roadway deformation presentation attributes again, obtains the crustal stress size and Orientation; Combine the ore deposit to press rule then, mark off the zone that coal seam floor failure possibly take place in the tunnel;
Second step: make a distortion and amplify observation instrument
It is to connect a high-pressure liquid tube in the bottom of hydraulic jack that observation instrument is amplified in distortion, connects a hydraulic displacement meter on the high-pressure liquid tube;
The 3rd step: amplify observation instrument with distortion and observe
On the base plate in the zone of above-mentioned delineation, excavate out the square column body opening that a degree of depth reaches complete rock stratum, the long and wide 0.5m that is in hole; Dark 0.5-1.0m, the hydraulic jack that will amplify observation instrument then places in the hole, and piston is stretched out; Be full of hydraulic oil in the oil cylinder; The oil cylinder horizontal is at the bottom of the hole, and its piston is buried underground with the cement pouring facing to stress direction; Notice that the piston extension can not bury reality, the hydraulic displacement meter stretches out outside the hole;
When floor strata stress increased, the piston pressurized moved, and power is passed to the hydraulic displacement meter, and according to hydraulic principle, the hydraulic displacement meter amplifies the distortion of base plate, demonstrates reading, thereby predicts the initial destruction situation of base plate in advance.
CN201210022959.6A 2012-01-12 2012-01-12 Method for determining initial destroy of baseboard of coal mine roadway immediately Expired - Fee Related CN102590886B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210022959.6A CN102590886B (en) 2012-01-12 2012-01-12 Method for determining initial destroy of baseboard of coal mine roadway immediately

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210022959.6A CN102590886B (en) 2012-01-12 2012-01-12 Method for determining initial destroy of baseboard of coal mine roadway immediately

Publications (2)

Publication Number Publication Date
CN102590886A true CN102590886A (en) 2012-07-18
CN102590886B CN102590886B (en) 2014-02-19

Family

ID=46479791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210022959.6A Expired - Fee Related CN102590886B (en) 2012-01-12 2012-01-12 Method for determining initial destroy of baseboard of coal mine roadway immediately

Country Status (1)

Country Link
CN (1) CN102590886B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103808282A (en) * 2014-03-17 2014-05-21 重庆交通大学 Anchorage structure displacement monitoring device and method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001053658A2 (en) * 2000-01-24 2001-07-26 Jaroslav Dvorak Method and devices for preventing rock bursts, especially for use in underground works
CN101581234B (en) * 2009-06-29 2011-12-07 张平松 Comprehensive underground test method for deformation and damage of terranes of mining top plate and mining bottom plate of coal bed

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001053658A2 (en) * 2000-01-24 2001-07-26 Jaroslav Dvorak Method and devices for preventing rock bursts, especially for use in underground works
CN101581234B (en) * 2009-06-29 2011-12-07 张平松 Comprehensive underground test method for deformation and damage of terranes of mining top plate and mining bottom plate of coal bed

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
潘立友: "采场松软底板岩体侵入破坏规律", 《岩土工程学报》, vol. 20, no. 5, 30 September 1998 (1998-09-30), pages 37 - 40 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103808282A (en) * 2014-03-17 2014-05-21 重庆交通大学 Anchorage structure displacement monitoring device and method

Also Published As

Publication number Publication date
CN102590886B (en) 2014-02-19

Similar Documents

Publication Publication Date Title
CN103512693B (en) Coal and rock mass stress orientation monitoring method and device
CN104132761B (en) Multiple spot coal and rock stress real-time monitoring device and method
CN101581231B (en) Gas drainage method for loosening coal body through cross layer boring and hydraulic fracture
CN104481587B (en) The comprehensive coal working face top plate sandstone fissure water of putting of large mining depth, large span visits anti-method
CN107389898A (en) Dynamic current Flooding in Borehole consolidation grouting Diffusion Law visual Simulation experimental provision and method
CN110346216A (en) Three axis load testing machine of coal and rock and method in the case of a kind of simulation driving disturbance
CN103306713B (en) A kind of high prominent coal seam layer-through drilling networking reinforcement means
CN104462659B (en) A kind of hard overlying strata grandidierite pressure shows analysis method
CN102587983A (en) Comprehensive early-warning observation method for coal mine rock burst
CN203519230U (en) Coal-rock mass stress directional monitoring device
CN103899348A (en) Method for fast extracting gas on coalface
CN105736022A (en) Layered supporting method based on deep rectangular coal roadway with tender composite roof
CN107725020A (en) A kind of cherry coal rises to hydraulic fracturing anatonosis device and method step by step
CN103850678A (en) Hydraulic fracturing ground stress testing system for panoramic drill hole inspection instrument
CN109653800A (en) Deep rich water overlying strata thick coal-layer mining composite power disaster monitoring and early-warning system and method
Xu et al. Mining-induced movement properties and fissure time-space evolution law in overlying strata
CN105179014A (en) Coal mine water inrush disaster pre-warning method and device
CN113090274B (en) Automatic cruise shield advance geological prediction system based on big data and working method
CN104373154A (en) Stability monitoring method of roadway top plate
CN102777180A (en) Method for actively and regionally preventing and controlling rock burst in coal mines
CN102383728A (en) Coal mine rockburst defect segmentation and control method
CN106405678B (en) A kind of mining overburden height of water flowing fractured zone detection method based on stress monitoring
CN108086977A (en) A kind of coal seam prevents water-resisting floor coal-mining method for water-bearing layer
Qiu et al. Determination of hydraulic flushing impact range by DC resistivity test method
CN109323971A (en) A kind of rock stratum bottom plate seepage flow gushing water experimental rig and test method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140219

Termination date: 20220112