CN102587917A - 一种胀裂法破煤工艺 - Google Patents

一种胀裂法破煤工艺 Download PDF

Info

Publication number
CN102587917A
CN102587917A CN2012101022850A CN201210102285A CN102587917A CN 102587917 A CN102587917 A CN 102587917A CN 2012101022850 A CN2012101022850 A CN 2012101022850A CN 201210102285 A CN201210102285 A CN 201210102285A CN 102587917 A CN102587917 A CN 102587917A
Authority
CN
China
Prior art keywords
spalling
coal
pipe
sebific duct
breaking process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101022850A
Other languages
English (en)
Inventor
张云彭
张传国
秦志体
唐德柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yantai Fugang Logistics Co., Ltd.
Original Assignee
张云彭
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 张云彭 filed Critical 张云彭
Priority to CN2012101022850A priority Critical patent/CN102587917A/zh
Publication of CN102587917A publication Critical patent/CN102587917A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本发明提供了一种胀裂法破煤工艺,其包括以下过程:(1)在采煤工作面煤壁沿倾斜方向打出多个胀裂孔;(2)在每个胀裂孔里放置胀裂管和封堵管,胀裂管由内部的胀裂胶管钢骨架和外层的胀裂胶管组成,封堵管与供液管连接,供液管与加压泵连接,在供液管与加压泵中间安有阀门。本工艺前期投资少,胀裂法破煤与机械投资比前期投资不到机械破煤的1%;采煤出块率高,胀裂法破煤出块率可达到60%以上;适应条件广,适用于许多薄煤层、地质条件复杂的煤层;破煤安全,胀裂法破煤没有爆破崩落的现象,因此现场作业比较安全;破煤成本低,胀裂法破煤的破煤成本是炸药放炮破煤成本的20%左右;装煤工作量少;煤炭损失率低。

Description

一种胀裂法破煤工艺
技术领域
本发明属于煤碳技术领域,具体地说涉及一种胀裂法破煤工艺。
背景技术
目前国内外采煤的破煤方法主要分为两类,一类是机械破煤;一类炸药放炮破煤。机械破煤工艺主要用于煤层赋存条件较好、煤层较厚等赋存条件的煤层,炸药放炮破煤主要用于煤层较薄、煤层赋存条件较差的煤层。但这两种破煤工艺存在以下缺陷:1、出块率低,机械破煤的出块率一般在20%以下,炸药放炮破煤出块率为10%左右;2、破煤成本较高;3、受条件限制,机械破煤只能用于煤层赋存条件较好、煤层较厚等赋存条件的煤层,虽然炸药放炮破煤可以用于煤层较薄、煤层赋存条件较差的煤层,但安全性差。
发明内容
本发明提供了一种胀裂法破煤工艺,解决了背景技术中机械破煤和炸药破煤出块率低、成本高、安全性差的缺点。
本发明的技术方案是这样实现的:一种胀裂法破煤工艺,其包括以下过程:(1)在采煤工作面煤壁沿倾斜方向打出多个胀裂孔;(2)在每个胀裂孔里放置胀裂管和封堵管,胀裂管由内部的胀裂胶管钢骨架和外层的胀裂胶管组成,封堵管与供液管连接,供液管与加压泵连接,在供液管与加压泵中间安有阀门;(3)检查全部连接准确无误后,开动加压泵向胀裂管高压送液,在高压液体的压力下首先封堵管开始膨胀,把整个胀裂孔全部封堵密实,继续向胀裂管供液,此时高压液体通过胀裂胶管钢骨架的孔向外部的胀裂胶管供液而导致胀裂胶管膨胀,封堵管、膨胀胶管均膨胀充满整个胀裂孔后,继续向胀裂管供液加压膨胀,直到煤体胀裂开为止,此时一个胀裂破煤循环完成。
本发明的有益效果是:本工艺前期投资少,胀裂法破煤与机械投资比前期投资不到机械破煤的1%;采煤出块率高,胀裂法破煤出块率可达到60%以上;适应条件广,适用于许多薄煤层、地质条件复杂的煤层;破煤安全,胀裂法破煤没有爆破崩落的现象,因此现场作业比较安全;破煤成本低,胀裂法破煤的破煤成本是炸药放炮破煤成本的20%左右;装煤工作量少;煤炭损失率低。
附图说明
图1为本发明的破煤现场布置图;
图2为本发明图1的A-A剖面示意图;
图3为本发明的工作原理示意图;
图4为本发明的膨胀系统示意图;
图5为本发明的膨胀系统局部示意图。
说明:1、加压泵,2、阀门,3、供液管,4、封堵管,5、胀裂管,6、胀裂孔,7、备采区,8、作业区,9、煤壁,10、胀裂胶管钢骨架,11、胀裂胶管。
具体实施方式
为了更好地理解与实施,本发明结合附图1-5对本发明作进一步描述:一种胀裂法破煤工艺,包括以下过程:(1)在采煤工作面煤壁9沿倾斜方向打出多个胀裂孔6,如图1和图2所示;(2)在每个胀裂孔里放置胀裂管5和封堵管4,胀裂管5由内部的胀裂胶管钢骨架10和外层的胀裂胶管11组成,封堵管4与供液管3连接,供液管3与加压泵1连接,在供液管3与加压泵1中间安有阀门2,如图3、图4和图5所示;(3)检查全部连接准确无误后,开动加压泵1向胀裂管5高压送液,在高压液体的压力下首先封堵管4开始膨胀,把整个胀裂孔6全部封堵密实,继续向胀裂管5供液,此时高压液体通过胀裂胶管钢骨架10的孔向外部的胀裂胶管11供液而导致胀裂胶管11膨胀,封堵管4、膨胀胶管11均膨胀充满整个胀裂孔6后,继续向胀裂管5供液加压膨胀,直到煤体胀裂开为止,此时一个胀裂破煤循环完成。

Claims (1)

1.一种胀裂法破煤工艺,其特征是包括以下过程:
(1)在采煤工作面煤壁9沿倾斜方向打出多个胀裂孔6;
(2)在每个胀裂孔里放置胀裂管5和封堵管4,胀裂管5由内部的胀裂胶管钢骨架10和外层的胀裂胶管11组成,封堵管4与供液管3连接,供液管3与加压泵1连接,在供液管3与加压泵1中间安有阀门2;
(3)检查全部连接准确无误后,开动加压泵1向胀裂管5高压送液,在高压液体的压力下首先封堵管4开始膨胀,把整个胀裂孔6全部封堵密实,继续向胀裂管5供液,此时高压液体通过胀裂胶管钢骨架10的孔向外部的胀裂胶管11供液而导致胀裂胶管11膨胀,封堵管(4)膨胀胶管11均膨胀充满整个胀裂孔6后,继续向胀裂管5供液加压膨胀,直到煤体胀裂开为止,此时一个胀裂破煤循环完成。
CN2012101022850A 2012-04-10 2012-04-10 一种胀裂法破煤工艺 Pending CN102587917A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101022850A CN102587917A (zh) 2012-04-10 2012-04-10 一种胀裂法破煤工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101022850A CN102587917A (zh) 2012-04-10 2012-04-10 一种胀裂法破煤工艺

Publications (1)

Publication Number Publication Date
CN102587917A true CN102587917A (zh) 2012-07-18

Family

ID=46477084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101022850A Pending CN102587917A (zh) 2012-04-10 2012-04-10 一种胀裂法破煤工艺

Country Status (1)

Country Link
CN (1) CN102587917A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106089210A (zh) * 2016-07-20 2016-11-09 纪新刚 一种环保型矿山洞采方法
CN114165198A (zh) * 2021-12-09 2022-03-11 中国矿业大学(北京) 一种定向水力裂切煤层卸压增透装置及卸压增透方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU398744A1 (ru) * 1971-10-22 1973-09-27 М. Удк Ударный трубопровод гидроимпульсатора
SU565990A1 (ru) * 1974-12-31 1977-07-25 Предприятие П/Я М-5903 Мультипликатор высокого давлени
CN1060334A (zh) * 1991-10-05 1992-04-15 中国矿业大学 液压胀裂方法及其装置
CN2253776Y (zh) * 1996-01-12 1997-05-07 大连经济技术开发区八方实业发展总公司 动压水力采石装置
RU2278973C1 (ru) * 2004-12-14 2006-06-27 Дальневосточный государственный технический университет Способ скважинной разработки подземных формаций полезного ископаемого
CN101666238A (zh) * 2009-08-28 2010-03-10 枣庄矿业集团付村煤业有限公司 一种采煤工作面煤体注水封孔方法及其注水封孔装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU398744A1 (ru) * 1971-10-22 1973-09-27 М. Удк Ударный трубопровод гидроимпульсатора
SU565990A1 (ru) * 1974-12-31 1977-07-25 Предприятие П/Я М-5903 Мультипликатор высокого давлени
CN1060334A (zh) * 1991-10-05 1992-04-15 中国矿业大学 液压胀裂方法及其装置
CN2253776Y (zh) * 1996-01-12 1997-05-07 大连经济技术开发区八方实业发展总公司 动压水力采石装置
RU2278973C1 (ru) * 2004-12-14 2006-06-27 Дальневосточный государственный технический университет Способ скважинной разработки подземных формаций полезного ископаемого
CN101666238A (zh) * 2009-08-28 2010-03-10 枣庄矿业集团付村煤业有限公司 一种采煤工作面煤体注水封孔方法及其注水封孔装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106089210A (zh) * 2016-07-20 2016-11-09 纪新刚 一种环保型矿山洞采方法
CN114165198A (zh) * 2021-12-09 2022-03-11 中国矿业大学(北京) 一种定向水力裂切煤层卸压增透装置及卸压增透方法
CN114165198B (zh) * 2021-12-09 2022-07-05 中国矿业大学(北京) 一种定向水力裂切煤层卸压增透装置及卸压增透方法

Similar Documents

Publication Publication Date Title
CN113250670B (zh) 单孔多段同步控制压裂煤体增透系统及方法
AU2014336858A1 (en) Method for enhanced fuel gas extraction by coal mine underground gas-liquid dual-phase alternating phase-driven fracturing of coal body
CN204609832U (zh) 一种煤矿瓦斯带压快速注浆封孔器
CN103306714B (zh) 近距离煤层群底抽巷钻孔一孔三用的瓦斯治理方法
CN102383828A (zh) 深孔水力致裂驱赶瓦斯浅孔抽采的增透与消突方法
CN107842352B (zh) 一种提高煤矿井下水力压裂增透增产效果的方法
CN204252941U (zh) 矿用带压封孔瓦斯封孔器
CN103306657B (zh) 一种煤层割缝卸压增透和缝槽保持装置及方法
CN104405434B (zh) 一种低渗煤层区井筒气相压裂快速揭煤的方法及其装置
CN102966372A (zh) 一种复杂煤层割缝诱喷卸压增透方法
CN105372134A (zh) 一种增压系统集成式钢管水压试验机充水装置
CN208619156U (zh) 煤矿瓦斯钻孔分组抽采管路系统
CN205858333U (zh) 一种三塞式水压致裂法地应力测试系统
CN210798914U (zh) 钻孔多段封堵、致裂、注浆、注水一体化设备
CN102587917A (zh) 一种胀裂法破煤工艺
CN103573193B (zh) 一体化钻割钻杆装置
CN112343570A (zh) 一种煤矿多孔水力压裂系统及控制方法
CN103376032A (zh) 液压岩石爆破器
CN104179657A (zh) 一种煤矿井下无源气动增压装置
CN109973051A (zh) 一种高压水转换控制装置和应力测量系统
CN103940307B (zh) 一种爆破方法
CN113638764A (zh) 一种空气脉冲循环动力作用疏堵增透装置及方法
CN204402550U (zh) 一种低渗煤层区井筒气相压裂快速揭煤装置
CN203335016U (zh) 一种带防止反浆装置的注浆封孔器
CN203335020U (zh) 一种带防止反浆装置的带压式注浆封孔器

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: YANTAI FUGANG LOGISTICS CO., LTD.

Free format text: FORMER OWNER: ZHANG YUNPENG

Effective date: 20130418

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 264100 YANTAI, SHANDONG PROVINCE TO: 264000 YANTAI, SHANDONG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20130418

Address after: 264000 No. 18-58, Tong Tong Road, Muping District, Shandong, Yantai

Applicant after: Yantai Fugang Logistics Co., Ltd.

Address before: 264100 No. 889 Xincheng street, Muping District, Shandong, Yantai

Applicant before: Zhang Yunpeng

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120718