CN102587277A - Mobile equipment special for construction and maintenance of bridge barriers - Google Patents
Mobile equipment special for construction and maintenance of bridge barriers Download PDFInfo
- Publication number
- CN102587277A CN102587277A CN2012100988411A CN201210098841A CN102587277A CN 102587277 A CN102587277 A CN 102587277A CN 2012100988411 A CN2012100988411 A CN 2012100988411A CN 201210098841 A CN201210098841 A CN 201210098841A CN 102587277 A CN102587277 A CN 102587277A
- Authority
- CN
- China
- Prior art keywords
- rail
- construction
- vehicle frame
- movable type
- type bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 43
- 238000012423 maintenance Methods 0.000 title claims abstract description 12
- 230000004888 barrier function Effects 0.000 title 1
- 235000004443 Ricinus communis Nutrition 0.000 claims 2
- 239000000725 suspension Substances 0.000 claims 1
- 229910000831 Steel Inorganic materials 0.000 abstract description 4
- 239000010959 steel Substances 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 2
- 238000005265 energy consumption Methods 0.000 abstract description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 238000009415 formwork Methods 0.000 description 2
- 238000003825 pressing Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000003028 elevating effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明涉及一种移动式桥梁护栏施工维修专用设备,包括带有脚轮的车架体,所述车架体的上侧部横向设置有长度大于车架体宽度的支架梁和钢轨,所述钢轨上设置有可沿钢轨横向移动的第一电动小车和第二电动小车,所述第一电动小车和第二电动小车的下方分别设置有第一电动葫芦和第二电动葫芦,所述第一电动葫芦上吊装有用于施工的吊篮,所述第二电动葫芦上设置有用于吊装重物的吊钩。本发明具有以下特点:结构简单、使用方便、节省施工空间,便于组织施工;制作简单、造价低廉;使用能耗低,达到节能减排的效果;重量轻,降低损伤在建桥梁的可能性。
The invention relates to a special equipment for construction and maintenance of mobile bridge guardrails, which comprises a frame body with casters, and a support beam and a steel rail whose length is greater than the width of the frame body are horizontally arranged on the upper side of the frame body, and the rails The first electric trolley and the second electric trolley that can move laterally along the rail are arranged on the top, and the first electric hoist and the second electric hoist are respectively arranged under the first electric trolley and the second electric trolley. A hanging basket for construction is hoisted on the hoist, and a hook for hoisting heavy objects is arranged on the second electric hoist. The invention has the following characteristics: simple structure, convenient use, saving construction space, and convenient construction; simple manufacture and low cost; low energy consumption, achieving the effect of energy saving and emission reduction; light weight, reducing the possibility of damaging bridges under construction.
Description
技术领域 technical field
本发明涉及一种新型施工设备,具体涉及一种可同时提供移动施工平台和起吊重物的小型施工设备。 The invention relates to a new type of construction equipment, in particular to a small construction equipment that can simultaneously provide a mobile construction platform and lift heavy objects.
背景技术 Background technique
桥梁结构护栏施工中,施工人员必须在桥梁外侧操作。为完成施工作业,通常以下两种解决方案:一是从桥下搭设脚手架作为操作平台,由桥面上的吊车提供模板。该方案的优点是安全性较高,缺点是护栏为线形结构物,需要搭设的脚手架较长,在桥梁较高时浪费人力物力,而且桥下为水塘、河沟、通道时不具备搭设支架的条件;二是从桥面上采用吊车悬挂吊篮为操作人员提供操作平台,另一台吊车提供模板。该方案能够解决第一种方案的缺陷;缺点是护栏施工同时需要两台吊车,成本较大;另外,常规移动式吊车体积和重量较大,施工时需要占用较大的施工空间,还可能给在建桥梁结构带来不必要的损伤。 During the construction of the bridge structure guardrail, the construction personnel must operate on the outside of the bridge. In order to complete the construction work, there are usually two solutions: one is to build a scaffold from under the bridge as an operating platform, and the crane on the bridge provides the formwork. The advantage of this scheme is high safety, but the disadvantage is that the guardrail is a linear structure, and the scaffolding that needs to be erected is relatively long, which wastes manpower and material resources when the bridge is high, and there is no support for erecting supports when there are ponds, river ditches, and passages under the bridge The second is to use a crane to hang the gondola from the bridge deck to provide an operating platform for the operator, and another crane to provide the formwork. This solution can solve the defects of the first solution; the disadvantage is that two cranes are required for the construction of the guardrail at the same time, and the cost is relatively high; in addition, the conventional mobile crane has a large volume and weight, and it needs to occupy a large construction space during construction. Unnecessary damage to bridge structures under construction.
发明内容 Contents of the invention
本发明目的在于克服上述现有技术的不足之处,提供一种适用于桥梁护栏等不便搭设施工平台结构施工的设备,该设备可同时提供移动的施工平台和起吊重物。 The purpose of the present invention is to overcome the disadvantages of the above-mentioned prior art, and provide a kind of equipment suitable for the construction of bridge guardrails and other inconvenient construction platform structures. The equipment can provide a mobile construction platform and lift heavy objects at the same time.
本发明的技术方案在于:一种移动式桥梁护栏施工维修专用设备,包括带有脚轮的车架体,其特征在于:所述车架体上设置有用于吊装施工人员的升降施工平台系统,所述车架体上还设置有用于向升降施工平台系统吊送重物的吊装系统。 The technical solution of the present invention is: a mobile bridge guardrail construction and maintenance special equipment, including a frame body with casters, characterized in that: the frame body is provided with a lifting construction platform system for hoisting construction personnel, so The frame body is also provided with a hoisting system for hoisting heavy objects to the lifting construction platform system.
在一较佳实施例中,所述车架体的上侧部横向设置有长度大于车架体宽度的支架梁和钢轨,所述升降施工平台系统包括设置在钢轨上并且可沿钢轨横向移动的第一电动小车,所述第一电动小车下方设置有第一电动葫芦,所述第一电动葫芦上吊装有用于施工的吊篮;所述吊装系统包括设置在钢轨上并且可沿钢轨横向移动的第二电动小车,所述第二电动小车的下方设置有第二电动葫芦,所述所述第二电动葫芦上设置有用于吊装重物的吊钩。 In a preferred embodiment, the upper side of the frame body is laterally provided with support beams and rails whose length is greater than the width of the frame body, and the elevating construction platform system includes The first electric trolley, a first electric hoist is arranged under the first electric trolley, and a hanging basket for construction is hoisted on the first electric hoist; The second electric trolley, a second electric hoist is arranged under the second electric trolley, and a hook for lifting heavy objects is arranged on the second electric hoist.
在一较佳实施例中,上述钢轨的两端部设置有用于防止第一电动小车和第二电动小车滑出钢轨的制动块。 In a preferred embodiment, brake blocks for preventing the first electric trolley and the second electric trolley from slipping off the rail are provided at both ends of the steel rail.
在一较佳实施例中,上述脚轮为万向轮。 In a preferred embodiment, the above-mentioned casters are universal wheels.
在一较佳实施例中,上述钢轨上设置有配重块。 In a preferred embodiment, the above-mentioned rails are provided with counterweights.
在一较佳实施例中,上述车架体上设置有配重块。 In a preferred embodiment, the above-mentioned frame body is provided with counterweights.
在一较佳实施例中,上述第一电动葫芦的控制端放置在吊篮内,所述第二电动葫芦的放置在车架体上。 In a preferred embodiment, the control end of the first electric hoist is placed in the hanging basket, and the control end of the second electric hoist is placed on the frame body.
在一较佳实施例中,上述车架体包括底盘,所述底盘下部安装四个万向轮,所述底盘上部焊接有四根支架柱,带有钢轨的两根支架梁焊接在支架柱的上端部上。 In a preferred embodiment, the above-mentioned frame body includes a chassis, four universal wheels are installed on the lower part of the chassis, four support columns are welded on the upper part of the chassis, and two support beams with steel rails are welded on the support columns. on the upper end.
与现有技术相比,本发明的优点在于:一是结构简单、使用方便、节省施工空间,便于组织施工;二是制作简单、造价低廉;三是使用能耗低,达到节能减排的效果;四是重量轻,降低损伤在建桥梁的可能性。 Compared with the prior art, the present invention has the following advantages: firstly, the structure is simple, easy to use, saves construction space, and is convenient for organizing construction; secondly, it is simple to manufacture and low in cost; thirdly, it is low in energy consumption and achieves the effect of energy saving and emission reduction ; Fourth, it is light in weight, which reduces the possibility of damaging the bridge under construction.
附图说明 Description of drawings
图1是本发明的移动式桥梁护栏施工维修专用设备的结构示意图。 Fig. 1 is a structural schematic diagram of the special equipment for construction and maintenance of the mobile bridge guardrail of the present invention.
图中:1—底盘,21—第一电动葫芦,22—第二电动葫芦,31—第一电动小车,32—第二电动小车,4—按钮,5—吊钩,6—支架梁,7—钢轨,8—制动块,9—支架柱,10—配重块,11—吊篮,12—万向轮,13—按钮。 In the figure: 1—chassis, 21—first electric hoist, 22—second electric hoist, 31—first electric trolley, 32—second electric trolley, 4—button, 5—hook, 6—support beam, 7 - rail, 8 - brake block, 9 - support column, 10 - counterweight, 11 - hanging basket, 12 - universal wheel, 13 - button.
具体实施方式 Detailed ways
为让本发明的上述特征和优点能更明显易懂,下文特举实施例,并配合附图,作详细说明如下。 In order to make the above-mentioned features and advantages of the present invention more comprehensible, the following specific embodiments are described in detail with reference to the accompanying drawings.
参照图1,本发明的移动式桥梁护栏施工维修专用设备包括底盘1、支架柱9、支架梁6、钢轨7、第一电动小车31和第二电动小车32、第一电动葫芦21和第二电动葫芦22、吊篮11和相应配重块10等;所述四根支架柱9焊接在底盘1上,带有钢轨7的两根支架梁6焊接在支架柱9上;安装有电动葫芦2的电动小车3可在钢轨7上移动;第一电动葫芦21上吊装用于施工的吊篮11,第二电动葫芦22通过吊钩5用于吊装重物;为防止第一电动小车31和第二电动小车32从钢轨7端部滑落,在钢轨7或支架梁6的两端分别焊接制动块8;底盘1下部安装四个万向轮12。
Referring to Fig. 1, the mobile bridge guardrail construction maintenance special equipment of the present invention comprises chassis 1, support column 9,
吊有吊篮11的小车和电动葫芦由站在吊篮中的施工人员按动控制端按钮4进行操作;吊装重物的小车和电动葫芦由站在桥面的施工人员按动控制端按钮13操作;整台设备的移动通过站在桥面的施工人员直接推动。
The trolley and electric hoist with hanging basket 11 are operated by the construction workers standing in the hanging basket by pressing the control terminal button 4; the trolley and electric hoist for lifting heavy objects are operated by the construction personnel standing on the bridge deck pressing the
以上所述仅为本发明的较佳实施例,凡依本发明申请专利范围所做的均等变化与修饰,皆应属本发明的涵盖范围。 The above descriptions are only preferred embodiments of the present invention, and all equivalent changes and modifications made according to the scope of the patent application of the present invention shall fall within the scope of the present invention.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012100988411A CN102587277A (en) | 2012-04-06 | 2012-04-06 | Mobile equipment special for construction and maintenance of bridge barriers |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012100988411A CN102587277A (en) | 2012-04-06 | 2012-04-06 | Mobile equipment special for construction and maintenance of bridge barriers |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN102587277A true CN102587277A (en) | 2012-07-18 |
Family
ID=46476471
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2012100988411A Pending CN102587277A (en) | 2012-04-06 | 2012-04-06 | Mobile equipment special for construction and maintenance of bridge barriers |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102587277A (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103952973A (en) * | 2013-12-12 | 2014-07-30 | 中铁航空港建设集团北京有限公司 | Multifunctional moving trolley |
| CN106087730A (en) * | 2016-08-01 | 2016-11-09 | 江苏月生达机械制造有限公司 | A kind of formwork of bridge rail dismounting dedicated trolley |
| CN106917351A (en) * | 2017-04-10 | 2017-07-04 | 王本勋 | A kind of road and bridge guardrail maintenance car |
| CN107098269A (en) * | 2017-05-16 | 2017-08-29 | 李阳 | It is a kind of well to move the road and bridge crane of fixed and various latch connection |
| CN107201719A (en) * | 2017-04-19 | 2017-09-26 | 上海市政建设有限公司 | Overpass anti-collision wall formwork hoisting conveyance and anti-collision wall construction method |
| CN108193603A (en) * | 2018-04-10 | 2018-06-22 | 北京鼎翰科技有限公司 | A kind of bridge construction hanging device |
| CN108330840A (en) * | 2018-02-28 | 2018-07-27 | 庄玉琼 | A kind of bridge inverse buckling wheel balancing device for municipal science of bridge building |
| CN113638312A (en) * | 2021-07-28 | 2021-11-12 | 中交路桥建设有限公司 | Multi-functional bridge railing construction trolley |
| CN118329496A (en) * | 2024-06-14 | 2024-07-12 | 天津通广集团专用设备有限公司 | Electric hoist braking gliding amount detection device |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20020009830A (en) * | 2000-07-27 | 2002-02-02 | 전장열 | A self propelled working platform for construction and maintenance of bridge |
| KR20040039919A (en) * | 2002-11-05 | 2004-05-12 | 노윤근 | Fabricated inspecting support of bridge using steel bar and installing method thereof |
| CN201721451U (en) * | 2010-07-08 | 2011-01-26 | 中铁二院工程集团有限责任公司 | Variable-height continuous steel truss railway bridge inspection vehicle |
| CN201850507U (en) * | 2010-11-16 | 2011-06-01 | 成都市新筑路桥机械股份有限公司 | A chord inspection vehicle for steel truss bridges |
| CN202023158U (en) * | 2011-03-31 | 2011-11-02 | 武汉理工大学 | Movable maintenance device for bridge |
-
2012
- 2012-04-06 CN CN2012100988411A patent/CN102587277A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20020009830A (en) * | 2000-07-27 | 2002-02-02 | 전장열 | A self propelled working platform for construction and maintenance of bridge |
| KR20040039919A (en) * | 2002-11-05 | 2004-05-12 | 노윤근 | Fabricated inspecting support of bridge using steel bar and installing method thereof |
| CN201721451U (en) * | 2010-07-08 | 2011-01-26 | 中铁二院工程集团有限责任公司 | Variable-height continuous steel truss railway bridge inspection vehicle |
| CN201850507U (en) * | 2010-11-16 | 2011-06-01 | 成都市新筑路桥机械股份有限公司 | A chord inspection vehicle for steel truss bridges |
| CN202023158U (en) * | 2011-03-31 | 2011-11-02 | 武汉理工大学 | Movable maintenance device for bridge |
Cited By (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103952973A (en) * | 2013-12-12 | 2014-07-30 | 中铁航空港建设集团北京有限公司 | Multifunctional moving trolley |
| CN106087730A (en) * | 2016-08-01 | 2016-11-09 | 江苏月生达机械制造有限公司 | A kind of formwork of bridge rail dismounting dedicated trolley |
| CN106917351B (en) * | 2017-04-10 | 2018-12-07 | 重庆市祥贵源生态旅游开发有限公司 | A kind of road and bridge guardrail maintenance car |
| CN106917351A (en) * | 2017-04-10 | 2017-07-04 | 王本勋 | A kind of road and bridge guardrail maintenance car |
| CN107201719A (en) * | 2017-04-19 | 2017-09-26 | 上海市政建设有限公司 | Overpass anti-collision wall formwork hoisting conveyance and anti-collision wall construction method |
| CN107098269B (en) * | 2017-05-16 | 2019-04-12 | 张晓锋 | A kind of road and bridge crane that can well move fixed and various bolt connection |
| CN107098269A (en) * | 2017-05-16 | 2017-08-29 | 李阳 | It is a kind of well to move the road and bridge crane of fixed and various latch connection |
| CN108330840A (en) * | 2018-02-28 | 2018-07-27 | 庄玉琼 | A kind of bridge inverse buckling wheel balancing device for municipal science of bridge building |
| CN108193603B (en) * | 2018-04-10 | 2018-11-27 | 上海绿地建设(集团)有限公司 | A kind of bridge construction hanging device |
| CN108193603A (en) * | 2018-04-10 | 2018-06-22 | 北京鼎翰科技有限公司 | A kind of bridge construction hanging device |
| CN113638312A (en) * | 2021-07-28 | 2021-11-12 | 中交路桥建设有限公司 | Multi-functional bridge railing construction trolley |
| CN113638312B (en) * | 2021-07-28 | 2024-04-19 | 中交路桥建设有限公司 | Multifunctional bridge guardrail construction trolley |
| CN118329496A (en) * | 2024-06-14 | 2024-07-12 | 天津通广集团专用设备有限公司 | Electric hoist braking gliding amount detection device |
| CN118329496B (en) * | 2024-06-14 | 2024-08-16 | 天津通广集团专用设备有限公司 | Electric hoist braking gliding amount detection device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102587277A (en) | Mobile equipment special for construction and maintenance of bridge barriers | |
| CN106012824A (en) | Movable bridge anti-collision guardrail construction operation trolley | |
| CN104444865A (en) | Lifting equipment | |
| CN103274315A (en) | Installing and hoisting device for side plate and upright of gas chamber | |
| JP2017048635A (en) | Bridge dismantling method using erection girder | |
| CN203833540U (en) | Movable heavy object hoisting device | |
| CN203247031U (en) | Hoisting device for curtain board transporting | |
| CN205170209U (en) | A type gate -type hoisting apparatus | |
| CN103498418B (en) | Device for shifting hanging basket assembly pieces and construction method | |
| CN104692299A (en) | Telescopic hydraulic lifting device of cable trench cover plates | |
| CN202729645U (en) | Tower crane with elevator | |
| CN101664963B (en) | Multifunctional operating platform for large-volume prestressed concrete box girder tensioning | |
| CN2848801Y (en) | Single main beam up and down two trolley gantry crane | |
| CN110668332A (en) | High stability cantilever crane for building | |
| CN205369033U (en) | Gallows formula bridge tool car | |
| CN105731268B (en) | A kind of cargo transport lifts transporter | |
| CN103552936B (en) | A kind of double girder gantry crane | |
| CN203602253U (en) | Double-beam portal crane | |
| CN206769343U (en) | It is a kind of to be used for the travelling bridge that guardrail is constructed that builds a bridge | |
| CN207434895U (en) | A kind of harbour container loop wheel machine | |
| CN201660377U (en) | Special gantry crane for overlength and large-tonnage parts | |
| CN205472201U (en) | Assembled water and electricity maintenance platform | |
| CN107386138B (en) | Totally-enclosed sound insulation screen construction vehicle and totally-enclosed sound insulation screen installation method | |
| CN104555751B (en) | A walking transfer device | |
| CN204690594U (en) | A kind of simple and easy door frame of the Slidable for the installation of framing type steel box-girder crossbeam |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C12 | Rejection of a patent application after its publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120718 |