CN102577885A - Arched beam of greenhouse and method for manufacturing same - Google Patents

Arched beam of greenhouse and method for manufacturing same Download PDF

Info

Publication number
CN102577885A
CN102577885A CN2012100225190A CN201210022519A CN102577885A CN 102577885 A CN102577885 A CN 102577885A CN 2012100225190 A CN2012100225190 A CN 2012100225190A CN 201210022519 A CN201210022519 A CN 201210022519A CN 102577885 A CN102577885 A CN 102577885A
Authority
CN
China
Prior art keywords
aggregate
monomer
housing
booth
arched girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100225190A
Other languages
Chinese (zh)
Inventor
梁维新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2012100225190A priority Critical patent/CN102577885A/en
Publication of CN102577885A publication Critical patent/CN102577885A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Landscapes

  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The invention relates to a building material and a method for manufacturing the building material. The building material is formed by connecting two single beams with radian, beam connecting hoops and stainless steel screws. Each single beam comprises a rounded rectangle tubular shell and a filling material accommodated in the shell; the filling material consists of magnesium oxychloride cement and aggregate; and the aggregate comprises glass fiber mesh fabric and a bamboo sheet from outside to inside in sequence, or the aggregate comprises the glass fiber mesh fabric, the bamboo sheet and a plastic foam board from outside to inside in sequence. The method for manufacturing the building material comprises the steps of preparing materials, filling, curing, assembling and the like. Compared with the prior art, the arched beam of the greenhouse has higher tensile and compressive strength and lighter overall weight. The method for manufacturing the arched beam of the greenhouse has the advantages of being easy and convenient to operate, reducing the quality defects of the generation of a hollow cavity and guaranteeing the consistent quality easily.

Description

Booth arched girder and preparation method thereof
Technical field
The present invention relates to a kind of building materials and preparation method thereof, relate in particular to arched girder of a kind of large-scale plastic tunnel that is mainly used in mariculture, growing vegetables, fruit production and preparation method thereof.
Background technology
The most of iron and steel that uses of the arched girder of existing large-scale plastic tunnel is processed because ambient humidity is big in the booth, especially mariculture in booth in the air salinity big, iron and steel is easy to corrosion, influences service life, and iron and steel arched girder cost is also higher.Other has a kind of arched girder to use the curing of magnesia oxychloride cement adding glass fibre to form, though cost greatly reduces, efflorescence easily, the anti-halogen that makes moist in wet environment descend its intensity, and might take place ruptures suddenly collapses, and causes potential safety hazard.In order to solve these technical problems; Go into carried out some useful explorations; Like publication number is that the Chinese invention patent " new waterproof greenhouse bracket and preparation method thereof " of CN101305680B discloses a kind of technical scheme; Draw in the pvc pipe material gradually glass fiber mesh and the magnesia oxychloride cement of filling simultaneously, form through 4-7 hour curing.But because behind the glass fiber mesh entering pvc pipe material; Its fold the pipe in distribution be at random with uncontrollable; Especially when the pvc pipe material axially be bending the time during when appearance making arched girder; Glass fiber mesh is will be at the lower edge place of bending intensive and almost do not have at other positions, causes whole arched girder intensity everywhere inconsistent, is easy to rupture at weakness; Because the charges major part in the pvc pipe material by the magnesia oxychloride cement filling, makes manufactured goods very heavy, be unfavorable for transportation and construction simultaneously; Also owing to the charges in the pvc pipe material just are made up of magnesia oxychloride cement and glass fiber mesh; When in the large-scale plastic tunnel that compression and tensile strength is had relatively high expectations, using in order to satisfy requirement of strength; Certainly will want the enlarging section size, and this has further caused the raising of waste, transportation and difficulty of construction of raising and the raw material of cost.
Summary of the invention
The objective of the invention is to solve the deficiency of prior art and develop a kind of in light weight, compression and tensile strength booth arched girder that intensity is consistent and preparation method thereof greatly, everywhere.
For realizing above-mentioned purpose, technical scheme provided by the invention is:
The booth arched girder; Monomer beam 10, Lian Liang hoop 11, stainless steel screw 12 two band radians are formed by connecting; Monomer beam 10 comprises the inserts that round rectangle tubular shell 1 and housing 1 contain; Inserts is made up of chloro-magnesium cement and aggregate, and described aggregate comprises glass fiber mesh 3, bamboo chip 4-1, reinforcing bar 4-2, steel pipe 4-3, plastic foamboard 5.
In order to improve compression strength weight reduction simultaneously, described housing 1 is the PVC section bar, and the height in its cross section is greater than width.
Preferred version is that described that to connect beam hoop 11 be one section axial curvature, cross sectional shape is identical with monomer beam 10 and can hold monomer beam 10 and insert the PVC section bar of cooperations.
For the ease of installing, described that to connect beam hoop 11 be one section axial curvature is identical with monomer beam 10 and can hold the U-shaped PVC section bar of monomer beam 10 insertions.
In order to further facilitate installation and to reduce cost, described even beam hoop 11 is two height and the corresponding PVC sheet material of monomer beam 10 depth of sections.
The preparation method of booth arched girder comprises the steps:
Get the raw materials ready: housing 1 heating is bent to arch; With soft do a bamboo chip 4-1 with iron wire tie up the back or the both sides up and down of plastic foamboard fit at least one bamboo chip 4-1 or at least one reinforcing bar 4-2 or at least one steel pipe 4-3 and tie up with iron wire after; Again with glass fiber mesh twine the 2-4 circle form with housing 1 length quite, Gao Kuanjun is less than the high wide aggregate aggregate of housing 1 internal diameter, and connects a stay cord 6 at an end of aggregate aggregate; Configure the chloro-magnesium cement slurry of magnesium chloride and magnesia mixing according to conventional method;
Filling: the free end of stay cord 6 is passed housing 1 and pulls out from the other end, make the aggregate aggregate get into housing 1, the chloro-magnesium cement slurry is injected housing 1 on one side, starch and aggregate is full of the inside of whole housing 1 until chloro-magnesium cement Yi Bian spur stay cord 6 then;
Solidify: leave standstill at normal temperatures and formed monomer beam 10 in 7-14 days;
Assembling a: end of two monomer beams 10 is cut into interengageable end face according to curvature, binds round 11 with few four stainless steel screws 12 and Lian Liang again two monomer beams 10 are connected into an integral body.
In order to prevent that end face exposed after 10 interceptings of monomer beam from producing anti-halogen, efflorescence, behind brushing waterproof coating on the end face, bind round 11 with at least four stainless steel screws 12 and Lian Liang again two monomer beams 10 are connected into an integral body.
The present invention compared with prior art owing to adopt bamboo chip and glass fiber mesh as aggregate, had not only increased the tension compression strength of booth arched girder but also had alleviated the overall weight of booth arched girder; Foamed plastics is placed into the center of booth arched girder, and not only having alleviated the overall weight of booth arched girder greatly but also made the booth arched girder form waller effect has increased compression strength; The depth of section of employing beam can satisfy the overall weight that compression strength can reduce the material usage amount again, reduce the booth arched girder greater than the technical scheme of width; Use independent preparation to accomplish the monomer beam and then be assembled into the booth arched girder, process the booth arched girder because length reduces half than disposable, easy to operate simple, reduce mass defects such as producing cavity simultaneously, easily the quality assurance unanimity.
Description of drawings
Fig. 1 is that the present invention has the structural representation that insertion cooperates the embodiment that connects the beam hoop;
Fig. 2 is that the present invention has the structural representation that U-shaped connects the embodiment of beam hoop;
Fig. 3 is that the present invention has the structural representation that sheet material connects the embodiment of beam hoop;
Fig. 4 is an A-A cutaway view among Fig. 1;
Fig. 5 is a B-B cutaway view among Fig. 2;
Fig. 6 is the cutaway view at C-C place when having bamboo chip and cystosepiment, Fig. 3 inside;
Fig. 7 is the cutaway view at C-C place when having reinforcing bar and cystosepiment, Fig. 3 inside;
Fig. 8 is the cutaway view at C-C place when having steel pipe and cystosepiment, Fig. 3 inside.
Embodiment
In conjunction with accompanying drawing, specify the present invention, and provide specific embodiment, be used to further specify the present invention.
Embodiment one: referring to Fig. 1 and Fig. 4.With 15 meters long, high * wide be that 25 * 6 centimeters, wall thickness are that PVC section bar 1 heating of the round rectangle tubulose of 1mm bends to arch housing 1; Wide 3 centimeters bamboo chip is tied up that bamboo chip can continue and twined 2 circles with glass fiber mesh with the back iron wire that is layering successively; The total length of the aggregate aggregate after tying up be 15.2 meters, height be 18 centimeters, wide be 3.5 centimeters, connect a stay cord 6 at an end of aggregate aggregate; Configure the chloro-magnesium cement slurry of magnesium chloride and magnesia mixing according to conventional method;
The free end of stay cord 6 is passed housing 1 and pulls out from the other end, make aggregate get into housing 1, the chloro-magnesium cement slurry is injected housing 1 on one side, starch and aggregate is full of the inside of whole housing 1 until chloro-magnesium cement Yi Bian spur stay cord 6 then;
Leave standstill at normal temperatures and formed monomer beam 10 in 7 days;
One end of two monomer beams 10 is cut into interengageable end face according to curvature; The end coating waterproofing agent of organosilicon; Two ports of company's beam hoop 11 of long 40 centimeters of usefulness, high 26.1 centimeters, wide 6.1 centimeters of internal diameter, 1.5 centimeters of wall thickness insert an end of two monomer beams 10 respectively again; Pass the hole of 11 and two monomer beams 10 of Lian Liang hoop then with 6 in electric drill, with 6 stainless steel screws 12 with connect into an integral body.
Embodiment two: referring to Fig. 2 and Fig. 5.With 10 meters long, high * wide be that 18 * 5 centimeters, wall thickness are that PVC section bar 1 heating of the round rectangle tubulose of 1mm bends to arch housing 1; 10 centimeters rectangular both sides up and down that thick 2 centimeters plastic foamboard is cut into wide 2 centimeters bamboo chip of fitting is tied up the back plastic foamboard with iron wire and is enclosed with bamboo chip can continue and twine 3 with glass fiber mesh; The total length of the aggregate aggregate after tying up be 10.1 meters, height be 15 centimeters, wide be 2.5 centimeters, connect a stay cord 6 at an end of aggregate aggregate; Configure the chloro-magnesium cement slurry of magnesium chloride and magnesia mixing according to conventional method;
The free end of stay cord 6 is passed housing 1 and pulls out from the other end, make aggregate get into housing 1, the chloro-magnesium cement slurry is injected housing 1 on one side, starch and aggregate is full of the inside of whole housing 1 until chloro-magnesium cement Yi Bian spur stay cord 6 then;
Leave standstill at normal temperatures and formed monomer beam 10 in 12 days;
One end of two monomer beams 10 is cut into interengageable end face according to curvature; End coating JS composite water-proof paint; U-shaped with 35 centimeters of length, high 17 centimeters, wide 5 centimeters of internal diameter, 1 centimeter of wall thickness connects the end that beam hoop 11 embeds two monomer beams 10 from bottom to top again; Pass the hole of 11 and two monomer beams 10 of Lian Liang hoop then with 4 in electric drill, with 4 stainless steel screws 12 with connect into an integral body.
Embodiment three: referring to Fig. 3 and Fig. 6.With 6 meters long, high * wide be that 12 * 4 centimeters, wall thickness are that PVC section bar 1 heating of the round rectangle tubulose of 1mm bends to arch housing 1; 6 centimeters rectangular both sides up and down that thick 1.5 centimeters plastic foamboard is cut into wide 1.5 centimeters bamboo chip of fitting is tied up the back plastic foamboard with iron wire and is enclosed with bamboo chip can continue and twine 4 with glass fiber mesh; The total length of the aggregate aggregate after tying up be 6.05 meters, height be 10 centimeters, wide be 2 centimeters, connect a stay cord 6 at an end of aggregate aggregate; Configure the chloro-magnesium cement slurry of magnesium chloride and magnesia mixing according to conventional method;
The free end of stay cord 6 is passed housing 1 and pulls out from the other end, make aggregate get into housing 1, the chloro-magnesium cement slurry is injected housing 1 on one side, starch and aggregate is full of the inside of whole housing 1 until chloro-magnesium cement Yi Bian spur stay cord 6 then;
Leave standstill at normal temperatures and formed monomer beam 10 in 14 days;
One end of two monomer beams 10 is cut into interengageable end face according to curvature; The end coating polyurethane water-proof paint; Connect the end that beam hoop 11 is fitted in two monomer beams 10 with 30 centimeters of length, two high 12 centimeters, thick 1 centimeter PVC sheet material sheets again; Pass the hole of 11 and two monomer beams 10 of Lian Liang hoop then with 8 in electric drill, with 8 stainless steel screws 12 with connect into an integral body.
Embodiment four: referring to Fig. 3 and Fig. 7.Other only replace two bamboo chip 4-1 with four reinforcing bar 4-2 with embodiment three.
Embodiment five: referring to Fig. 3 and Fig. 8.Other only replace bamboo chip 4-1 with steel pipe 4-3 with embodiment three.
It is understandable that though only provided several kinds of embodiments of the present invention in this specification, according to above-mentioned principle, the present invention can also carry out suitable change and modification to above-mentioned embodiment.Therefore, the embodiment that discloses and describe above the present invention is not limited to also should fall into modifications more of the present invention and change in the protection domain of claim of this patent.In addition, although used some specific terms in this specification, these terms are explanation for ease just, the present invention is not constituted any restriction.

Claims (7)

1. booth arched girder; Monomer beam (10), Lian Liang hoop (11), stainless steel screw (12) two band radians are formed by connecting; Monomer beam (10) comprises the inserts that round rectangle tubular shell (1) and housing (1) contain; Inserts is made up of chloro-magnesium cement and aggregate, it is characterized in that described aggregate comprises glass fiber mesh (3), bamboo chip (4-1), reinforcing bar (4-2), steel pipe (4-3), plastic foamboard (5).
2. booth arched girder according to claim 1 is characterized in that described housing (1) is the PVC section bar, and the height in its cross section is greater than width.
3. booth arched girder according to claim 1 is characterized in that the described beam hoop (11) that connects is that one section axial curvature, cross sectional shape are identical with monomer beam (10) and can hold the PVC section bar that monomer beam (10) inserts cooperation.
4. booth arched girder according to claim 1 is characterized in that the described beam hoop (11) that connects is that one section axial curvature is identical with monomer beam (10) and can hold the U-shaped PVC section bar of monomer beam (10) insertion.
5. booth arched girder according to claim 1 is characterized in that described even beam hoop (11) is two height and the corresponding PVC sheet material of monomer beam (10) depth of section.
6. the preparation method of booth arched girder comprises the steps:
A) get the raw materials ready: housing (1) heating is bent to arch; With soft do a bamboo chip (4-1) with iron wire tie up the back or the both sides up and down of plastic foamboard fit respectively at least one bamboo chip (4-1) or at least one reinforcing bar (4-2) or at least one steel pipe (4-3) and tie up with iron wire after; Again with glass fiber mesh twine the 2-4 circle form with housing (1) length quite, Gao Kuanjun is less than the high wide aggregate aggregate of housing (1) internal diameter, and connects a stay cord (6) at an end of aggregate aggregate; Configure the chloro-magnesium cement slurry of magnesium chloride and magnesia mixing according to conventional method;
B) filling: the free end of stay cord (6) is passed housing (1) and pulls out from the other end; Spurring stay cord (6) then on one side makes the aggregate aggregate get into housing (1); On one side the chloro-magnesium cement slurry is injected housing (1), be full of the inside of whole housing (1) until chloro-magnesium cement slurry and aggregate;
C) solidify: leave standstill at normal temperatures and formed monomer beam (10) in 7-14 days;
D) assembling a: end of two monomer beams (10) is cut into interengageable end face according to curvature, uses at least four stainless steel screws (12) again and connect beam hoop (11) two monomer beams (10) are connected into an integral body.
7. the preparation method of booth arched girder according to claim 6; After it is characterized in that in the described number of assembling steps that a end with two monomer beams (10) is cut into interengageable end face according to curvature; Behind brushing waterproof coating on the end face, use at least four stainless steel screws (12) again and connect beam hoop (11) two monomer beams (10) are connected into an integral body.
CN2012100225190A 2012-01-19 2012-01-19 Arched beam of greenhouse and method for manufacturing same Pending CN102577885A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100225190A CN102577885A (en) 2012-01-19 2012-01-19 Arched beam of greenhouse and method for manufacturing same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100225190A CN102577885A (en) 2012-01-19 2012-01-19 Arched beam of greenhouse and method for manufacturing same

Publications (1)

Publication Number Publication Date
CN102577885A true CN102577885A (en) 2012-07-18

Family

ID=46467575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100225190A Pending CN102577885A (en) 2012-01-19 2012-01-19 Arched beam of greenhouse and method for manufacturing same

Country Status (1)

Country Link
CN (1) CN102577885A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453270A (en) * 2014-11-26 2015-03-25 中铁城建集团北京工程有限公司 Reinforcing device for special-shaped steel reinforced concrete member and construction method
CN111576735A (en) * 2020-04-15 2020-08-25 湖州职业技术学院 Steel pipe-recombined bamboo composite structural part and production method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1276148A (en) * 1999-06-03 2000-12-13 李鑫 Formulation and manufacture of plastic-steel magnesite arch truss for greenhouse without waist columns
CN101305680A (en) * 2007-05-14 2008-11-19 天津博楠珂节能环保科技有限公司 New waterproof greenhouse bracket and its making process
CN201176666Y (en) * 2008-04-17 2009-01-07 刘峰 High-strength booth frame
CN201398336Y (en) * 2009-04-18 2010-02-10 伍世军 Backbone-free plastic greenhouse framework
JP2010268733A (en) * 2009-05-22 2010-12-02 Toto Kogyo Co Ltd Joint
CN202496251U (en) * 2012-01-19 2012-10-24 梁维新 Greenhouse arched beam

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1276148A (en) * 1999-06-03 2000-12-13 李鑫 Formulation and manufacture of plastic-steel magnesite arch truss for greenhouse without waist columns
CN101305680A (en) * 2007-05-14 2008-11-19 天津博楠珂节能环保科技有限公司 New waterproof greenhouse bracket and its making process
CN201176666Y (en) * 2008-04-17 2009-01-07 刘峰 High-strength booth frame
CN201398336Y (en) * 2009-04-18 2010-02-10 伍世军 Backbone-free plastic greenhouse framework
JP2010268733A (en) * 2009-05-22 2010-12-02 Toto Kogyo Co Ltd Joint
CN202496251U (en) * 2012-01-19 2012-10-24 梁维新 Greenhouse arched beam

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453270A (en) * 2014-11-26 2015-03-25 中铁城建集团北京工程有限公司 Reinforcing device for special-shaped steel reinforced concrete member and construction method
CN104453270B (en) * 2014-11-26 2016-08-24 中铁城建集团北京工程有限公司 The bracing means of a kind of deformed bar concrete component and construction method
CN111576735A (en) * 2020-04-15 2020-08-25 湖州职业技术学院 Steel pipe-recombined bamboo composite structural part and production method thereof

Similar Documents

Publication Publication Date Title
EP2773819B1 (en) Construction-unit for immediate or permanent shelter
CN101817227B (en) Method for processing composite fiber material spiral stirrup
CN108640601A (en) A kind of straw building block or wallboard product and its corresponding production method of environmental protection antidetonation
WO2011136515A3 (en) Block deck using concrete
CN102577885A (en) Arched beam of greenhouse and method for manufacturing same
CN202496251U (en) Greenhouse arched beam
CN205153276U (en) Composite heat -insulating wall board
CN202787542U (en) Netlike reinforcing composite foam cement slab
CN106812224B (en) The process units of the construction material of glass composite construction
CN208235846U (en) A kind of art of architecture decorative wall
WO2003093596A1 (en) Light prefabricated module made from natural reed and used as a construction element
ES2375050T3 (en) VEGETABLE BASED CONSTRUCTION MATERIAL AND PROCEDURE FOR MANUFACTURING.
CN202324249U (en) Building structure of heat-preserving wall body
ATE530721T1 (en) CAPSULES MADE OF INDIVIDUAL WOUND FIBERS WITH A COVER OF ADHESIVE, METHOD OF THEIR PRODUCTION AND METHOD OF PRODUCING REINFORCED CONCRETE USING THESE CAPSULES
CN107882264A (en) A kind of flexible light weight sound absorption thermal-insulating waterproof Side fascia of anti-knock shock resistance for building
CN104230293B (en) A kind of basalt fibre and glass fiber reinforced gypsum
CN201044585Y (en) New type water-proof booth bracket
CN201109965Y (en) Integral hollow gypsum partition plate
CN207878782U (en) The flexible light weight sound absorption thermal-insulating waterproof Side fascia of anti-knock shock resistance for building
CN101363166A (en) Enhancement type fiberglas chopped strand mat and preparation method thereof
CN201865274U (en) Heat-preservation and decoration integrated board
CN206538905U (en) A kind of modern hen house insulation fire prevention protection against rodents assembled combined wall for building
CN206256572U (en) A kind of frame mode structure and complex heat-preservation lightweight integral wall
CN204491986U (en) A kind of novel wood-plastic combined wall board
CN208397467U (en) A kind of sweep-up pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120718