CN102571453A - Facility resource pool management method and system - Google Patents

Facility resource pool management method and system Download PDF

Info

Publication number
CN102571453A
CN102571453A CN2012100391877A CN201210039187A CN102571453A CN 102571453 A CN102571453 A CN 102571453A CN 2012100391877 A CN2012100391877 A CN 2012100391877A CN 201210039187 A CN201210039187 A CN 201210039187A CN 102571453 A CN102571453 A CN 102571453A
Authority
CN
China
Prior art keywords
resource
equipment
amount
treating
time period
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100391877A
Other languages
Chinese (zh)
Other versions
CN102571453B (en
Inventor
陆峰
刘成平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rizhao Inspur Cloud Computing Co ltd
Original Assignee
Inspur Beijing Electronic Information Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inspur Beijing Electronic Information Industry Co Ltd filed Critical Inspur Beijing Electronic Information Industry Co Ltd
Priority to CN201210039187.7A priority Critical patent/CN102571453B/en
Publication of CN102571453A publication Critical patent/CN102571453A/en
Application granted granted Critical
Publication of CN102571453B publication Critical patent/CN102571453B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a facility resource pool management method and a facility resource pool management system. According to the method, a facility resource pool provides various resources for various facilities, wherein the method comprises the steps of: counting the occupied information of each facility on various resources; obtaining the minimum occupied quantity value of each facility on the same resource in the same time period according to the obtained the occupied information; and allocating various resources required by each facility during operation according to the minimum occupied quantity value of each facility on the same resource in the same time period.

Description

The management method in device resource pond and system
Technical field
The present invention relates to computer application field, relate in particular to the management method and the system in a kind of device resource pond.
Background technology
Current, the applied more and more of resource pool managing power consumption is because traditional managing power consumption can't just carry out managing power consumption in the device resource pond to large-scale device resource only to the individual equipment resource.But in practical application, when particularly large-scale resource pool being carried out managing power consumption, traditional managing power consumption can't reach user demand, and the efficiency of management is low too, can't reach outstanding role, the just energy-conserving and environment-protective of managing power consumption.
Various bottlenecks and problem when in order to solve extensive resource pool being carried out managing power consumption make, and we propose a kind of based on the device resource pond, rationally, the energy consumption management method of efficient, energy-conserving and environment-protective.
Summary of the invention
The present invention provides the management method and the system in a kind of device resource pond, and how rationally the technical problem that solve is, efficiently the large-scale equipment resource pool is carried out managing power consumption.
For solving the problems of the technologies described above, the invention provides following technical scheme:
The management method in a kind of device resource pond, said device resource pond are that a plurality of equipment provide multiple resource, and wherein said method comprises:
Add up the occupied information of each equipment to various resources;
According to the occupied information that obtains, obtain the minimum value of interior each equipment of same time period to resource occupation amount of the same race;
To the minimum value of resource occupation amount of the same race, various resources required during to each equipment operation are distributed according to each equipment in the same time period.
Preferably, said method also has following characteristics: to the minimum value of resource occupation amount of the same race, various resources required during to each equipment operation are distributed, and comprising according to each equipment in the same time period:
Be each equipment disposition pairing priority when taking resource of the same race;
When receiving a plurality of whens request of taking of treating operation equipment to resource of the same race; According to all treating the occupancy minimum value of operation equipment, obtain this kind resource in the said device resource pond and satisfying said free time amount after all waiting to move hold facility amount minimum value this kind resource;
Pairing priority when all waiting to move this kind of hold facility resource is distributed to the operation equipment of treating with the free time amount of this kind resource, is resource that this equipment provided with distributing the resulting resource of idle amount each equipment of back as this device resource pond.
Preferably, said method also has following characteristics: the free time amount of this kind resource is distributed to treated operation equipment, comprising:
Obtain and treat that the optimal values of operation equipment to this kind resource occupation, wherein said optimal values are that this equipment performance change amplitude in this time period is maximum and take the minimum numerical value of this kind resource quantity;
According to treating the optimal values of operation equipment, the free time amount of this kind resource is distributed to the operation equipment of treating to this kind resource occupation.
Preferably, said method also has following characteristics: said optimal values is obtained through following mode, comprising:
In this time period, increase the sendout of this kind resource, performance information and the changes of properties information of recording equipment under different numerical value for equipment;
According to said performance information and changes of properties information, obtain said optimal values.
The management system in a kind of device resource pond, said device resource pond are that a plurality of equipment provide multiple resource, and wherein said system comprises:
Statistic device is used to add up the occupied information of each equipment to various resources;
Deriving means links to each other with said statistic device, is used for according to the occupied information that obtains, and obtains the minimum value of interior each equipment of same time period to resource occupation amount of the same race;
Distributor links to each other with said deriving means, is used for according to each equipment in the same time period the minimum value of resource occupation amount of the same race, and various resources required during to each equipment operation are distributed.
Preferably, said system also has following characteristics: said distributor comprises:
Configuration module is used to each equipment disposition pairing priority when taking resource of the same race;
Acquisition module; Link to each other with said configuration module; Be used for when receiving a plurality of whens request of taking of treating operation equipment resource of the same race; According to all treating the occupancy minimum value of operation equipment, obtain this kind resource in the said device resource pond and satisfying said free time amount after all waiting to move hold facility amount minimum value this kind resource;
Distribution module; Link to each other with said acquisition module; Be used for pairing priority when all waiting to move this kind of hold facility resource; The free time amount of this kind resource is distributed to the operation equipment of treating, is the resource that this equipment provided with distributing the resulting resource of idle amount each equipment of back as this device resource pond.
Preferably, said system also has following characteristics: said distribution module comprises:
Acquiring unit is used to obtain and treats that the optimal values of operation equipment to this kind resource occupation, wherein said optimal values are that this equipment performance change amplitude in this time period is maximum and take the minimum numerical value of this kind resource quantity;
Allocation units are used for according to treating the optimal values of operation equipment to this kind resource occupation the free time amount of this kind resource being distributed to the operation equipment of treating.
Preferably, said system also has following characteristics: the optimal values that said acquiring unit obtained is obtained through following mode, comprising:
In this time period, increase the sendout of this kind resource, performance information and the changes of properties information of recording equipment under different numerical value for equipment;
According to said performance information and changes of properties information, obtain said optimal values.
Embodiment provided by the invention; Broken the traditional method that can only carry out managing power consumption to the individual equipment resource; Parameters such as the task workload accounting through each device resource in the analytical equipment resource pool, performance situation, service time; Realization distributes, manages the energy consumption of each device resource in the device resource pond, accomplishes the managing power consumption to the entire equipment resource pool, and then improves the efficient of entire equipment resource pool managing power consumption and the purpose of realization energy-conserving and environment-protective.
Description of drawings
Fig. 1 is the schematic flow sheet of the management method embodiment in device resource provided by the invention pond;
Fig. 2 is the structural representation of the management system embodiment in device resource provided by the invention pond.
Embodiment
For making the object of the invention, technical scheme and advantage clearer, will combine accompanying drawing and specific embodiment that the present invention is made further detailed description below.Need to prove that under the situation of not conflicting, embodiment among the application and the characteristic among the embodiment be combination in any each other.
Fig. 1 is the schematic flow sheet of the management method embodiment in device resource provided by the invention pond.Among the method embodiment shown in Figure 1, said device resource pond is that a plurality of equipment provide multiple resource, and wherein said method comprises:
Step 101, add up the occupied information of each equipment to various resources;
Said resource is processor resource, memory source and bandwidth resources etc.
Different with the required resource of different application in the statistics individual equipment in the prior art, statistics is this equipment integral to the conditions of demand of resource separately here.Specifically, the various device resources in the resource pool is analyzed, series of parameters such as the task workload accounting through obtaining each device resource, performance, life-span service time analyzes the energy consumption accounting of each device resource in the device resource pond.
The occupied information that step 102, basis obtain, each equipment is to the minimum value of resource occupation amount of the same race in the same time period;
Wherein, how many divisions of time period can divide according to the device processes task.
According to occupied information, be condition with the temporal information, occupied information is classified, carry out secondary classification according to resource again, can draw the minimum value of each equipment occupancy when resource occupation of the same race.
Step 103, according to each equipment in the same time period to the minimum value of resource occupation amount of the same race, various resources required during to each equipment operation are distributed.
Needed only to each devices allocation to be moved the minimum value of resource requirement, just can guarantee that the application on this equipment can normally move, thereby this equipment just can the outside operation of normal response.
Preferably, can bring into play best disposal ability in order to make equipment component, this equipment just need obtain more resources, therefore proposes following improvement means, specifically comprises:
Be each equipment disposition pairing priority when taking resource of the same race;
When receiving a plurality of whens request of taking of treating operation equipment to resource of the same race; According to the minimum value of treating that all operation equipment is required to this kind resource, obtain this kind resource in the said device resource pond and satisfying said free time amount after all treating the required minimum value of operation equipment;
Pairing priority when all waiting to move this kind of hold facility resource is distributed to the operation equipment of treating with the free time amount of this kind resource, is resource that this equipment provided with distributing the resulting resource of idle amount each equipment of back as this device resource pond.
Need to prove, can normally move in this time period, the time for this kind of devices allocation resource to be moved in order to guarantee this equipment; At first to satisfy and respectively treat of the minimum requirements of operation equipment, also have under the remaining situation, according to the take priority of each equipment this resource in this kind resource to this kind resource; The free time amount of this resource is distributed again; Thereby make the resource of this type at utmost used, guaranteed the maximum use of resource on the one hand, on the other hand by equipment; After equipment obtained sufficient resources, disposal ability obtained maximum performance.
The equipment of considering not is to take more resources, and its disposal ability is big more, specifically; If it is very few to get access to this resource exactly, often can not give play to best disposal ability, it is too much to get access to this resource; The amplitude that the device processes ability improves not is very big or can change, its essence is for certain resource, when the resource that gets access to is in some specific intervals; This equipment can have best disposal ability; Therefore through experiment, in this time period, be the sendout of this kind of equipment increase resource, the performance information and the changes of properties information of recording equipment under different numerical value; According to said performance information and changes of properties information, obtain said optimal values, wherein said optimal values is that this equipment performance change amplitude in this time period is maximum and take the minimum numerical value of this kind resource quantity.
And then free time of this kind resource amount is being distributed to when waiting to move equipment; Can obtain and treat the optimal values of operation equipment this kind resource occupation; Again according to treating the optimal values of operation equipment to this kind resource occupation; The free time amount of this kind resource is distributed to the operation equipment of treating, thereby the optimum that guarantees resource uses.
Fig. 2 is the structural representation of the management system embodiment in device resource provided by the invention pond.In conjunction with method shown in Figure 1, said device resource pond is that a plurality of equipment provide multiple resource, and wherein said system comprises:
Statistic device 201 is used to add up the occupied information of each equipment to various resources;
Deriving means 202 links to each other with said statistic device 201, is used for according to the occupied information that obtains, and obtains the minimum value of interior each equipment of same time period to resource occupation amount of the same race;
Distributor 203 links to each other with said deriving means 202, is used for according to each equipment in the same time period the minimum value of resource occupation amount of the same race, and various resources required during to each equipment operation are distributed.
Preferably, said distributor 203 comprises:
Configuration module is used to each equipment disposition pairing priority when taking resource of the same race;
Acquisition module; Link to each other with said configuration module; Be used for when receiving a plurality of whens request of taking of treating operation equipment resource of the same race; According to all treating the occupancy minimum value of operation equipment, obtain this kind resource in the said device resource pond and satisfying said free time amount after all waiting to move hold facility amount minimum value this kind resource;
Distribution module; Link to each other with said acquisition module; Be used for pairing priority when all waiting to move this kind of hold facility resource; The free time amount of this kind resource is distributed to the operation equipment of treating, is the resource that this equipment provided with distributing the resulting resource of idle amount each equipment of back as this device resource pond.
Preferably, said distribution module comprises:
Acquiring unit is used to obtain and treats that the optimal values of operation equipment to this kind resource occupation, wherein said optimal values are that this equipment performance change amplitude in this time period is maximum and take the minimum numerical value of this kind resource quantity;
Allocation units are used for according to treating the optimal values of operation equipment to this kind resource occupation the free time amount of this kind resource being distributed to the operation equipment of treating.
Wherein, the optimal values that said acquiring unit obtained is obtained through following mode, comprising:
In this time period, increase the sendout of this kind resource, performance information and the changes of properties information of recording equipment under different numerical value for equipment;
According to said performance information and changes of properties information, obtain said optimal values.
Embodiment provided by the invention; Broken the traditional method that can only carry out managing power consumption to the individual equipment resource; Parameters such as the task workload accounting through each device resource in the analytical equipment resource pool, performance situation, service time; Realization distributes, manages the energy consumption of each device resource in the device resource pond, accomplishes the managing power consumption to the entire equipment resource pool, and then improves the efficient of entire equipment resource pool managing power consumption and the purpose of realization energy-conserving and environment-protective.
The above; Be merely embodiment of the present invention, but protection scope of the present invention is not limited thereto, any technical staff who is familiar with the present technique field is in the technical scope that the present invention discloses; Can expect easily changing or replacement, all should be encompassed within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the described protection range of claim.

Claims (8)

1. the management method in a device resource pond is characterized in that, said device resource pond is that a plurality of equipment provide multiple resource, and wherein said method comprises:
Add up the occupied information of each equipment to various resources;
According to the occupied information that obtains, obtain the minimum value of interior each equipment of same time period to resource occupation amount of the same race;
To the minimum value of resource occupation amount of the same race, various resources required during to each equipment operation are distributed according to each equipment in the same time period.
2. method according to claim 1 is characterized in that, to the minimum value of resource occupation amount of the same race, various resources required during to each equipment operation are distributed, and comprising according to each equipment in the same time period:
Be each equipment disposition pairing priority when taking resource of the same race;
When receiving a plurality of whens request of taking of treating operation equipment to resource of the same race; According to all treating the occupancy minimum value of operation equipment, obtain this kind resource in the said device resource pond and satisfying said free time amount after all waiting to move hold facility amount minimum value this kind resource;
Pairing priority when all waiting to move this kind of hold facility resource is distributed to the operation equipment of treating with the free time amount of this kind resource, is resource that this equipment provided with distributing the resulting resource of idle amount each equipment of back as this device resource pond.
3. method according to claim 2 is characterized in that, the free time amount of this kind resource is distributed to treated operation equipment, comprising:
Obtain and treat that the optimal values of operation equipment to this kind resource occupation, wherein said optimal values are that this equipment performance change amplitude in this time period is maximum and take the minimum numerical value of this kind resource quantity;
According to treating the optimal values of operation equipment, the free time amount of this kind resource is distributed to the operation equipment of treating to this kind resource occupation.
4. method according to claim 3 is characterized in that, said optimal values is obtained through following mode, comprising:
In this time period, increase the sendout of this kind resource, performance information and the changes of properties information of recording equipment under different numerical value for equipment;
According to said performance information and changes of properties information, obtain said optimal values.
5. the management system in a device resource pond is characterized in that, said device resource pond is that a plurality of equipment provide multiple resource, and wherein said system comprises:
Statistic device is used to add up the occupied information of each equipment to various resources;
Deriving means links to each other with said statistic device, is used for according to the occupied information that obtains, and obtains the minimum value of interior each equipment of same time period to resource occupation amount of the same race;
Distributor links to each other with said deriving means, is used for according to each equipment in the same time period the minimum value of resource occupation amount of the same race, and various resources required during to each equipment operation are distributed.
6. system according to claim 5 is characterized in that, said distributor comprises:
Configuration module is used to each equipment disposition pairing priority when taking resource of the same race;
Acquisition module; Link to each other with said configuration module; Be used for when receiving a plurality of whens request of taking of treating operation equipment resource of the same race; According to all treating the occupancy minimum value of operation equipment, obtain this kind resource in the said device resource pond and satisfying said free time amount after all waiting to move hold facility amount minimum value this kind resource;
Distribution module; Link to each other with said acquisition module; Be used for pairing priority when all waiting to move this kind of hold facility resource; The free time amount of this kind resource is distributed to the operation equipment of treating, is the resource that this equipment provided with distributing the resulting resource of idle amount each equipment of back as this device resource pond.
7. system according to claim 6 is characterized in that, said distribution module comprises:
Acquiring unit is used to obtain and treats that the optimal values of operation equipment to this kind resource occupation, wherein said optimal values are that this equipment performance change amplitude in this time period is maximum and take the minimum numerical value of this kind resource quantity;
Allocation units are used for according to treating the optimal values of operation equipment to this kind resource occupation the free time amount of this kind resource being distributed to the operation equipment of treating.
8. system according to claim 7 is characterized in that the optimal values that said acquiring unit obtained is obtained through following mode, comprising:
In this time period, increase the sendout of this kind resource, performance information and the changes of properties information of recording equipment under different numerical value for equipment;
According to said performance information and changes of properties information, obtain said optimal values.
CN201210039187.7A 2012-02-20 2012-02-20 Facility resource pool management method and system Active CN102571453B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210039187.7A CN102571453B (en) 2012-02-20 2012-02-20 Facility resource pool management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210039187.7A CN102571453B (en) 2012-02-20 2012-02-20 Facility resource pool management method and system

Publications (2)

Publication Number Publication Date
CN102571453A true CN102571453A (en) 2012-07-11
CN102571453B CN102571453B (en) 2015-04-29

Family

ID=46415979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210039187.7A Active CN102571453B (en) 2012-02-20 2012-02-20 Facility resource pool management method and system

Country Status (1)

Country Link
CN (1) CN102571453B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106557471A (en) * 2015-09-24 2017-04-05 上海汽车集团股份有限公司 Method for scheduling task and device
CN106776041A (en) * 2016-12-30 2017-05-31 广东欧珀移动通信有限公司 A kind of data processing method and device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1798053A (en) * 2004-12-22 2006-07-05 中兴通讯股份有限公司 Method for assigning bandwidth in broadband wireless access system complied with IEEE802.16 standard
CN101765209A (en) * 2008-12-25 2010-06-30 鼎桥通信技术有限公司 Uplink resource allocation method
CN102036378A (en) * 2009-09-24 2011-04-27 中兴通讯股份有限公司 Method and device for allocating channels as well as method for allocating available resources of base station

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1798053A (en) * 2004-12-22 2006-07-05 中兴通讯股份有限公司 Method for assigning bandwidth in broadband wireless access system complied with IEEE802.16 standard
CN101765209A (en) * 2008-12-25 2010-06-30 鼎桥通信技术有限公司 Uplink resource allocation method
CN102036378A (en) * 2009-09-24 2011-04-27 中兴通讯股份有限公司 Method and device for allocating channels as well as method for allocating available resources of base station

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106557471A (en) * 2015-09-24 2017-04-05 上海汽车集团股份有限公司 Method for scheduling task and device
CN106776041A (en) * 2016-12-30 2017-05-31 广东欧珀移动通信有限公司 A kind of data processing method and device
CN106776041B (en) * 2016-12-30 2020-01-14 Oppo广东移动通信有限公司 Data processing method and device

Also Published As

Publication number Publication date
CN102571453B (en) 2015-04-29

Similar Documents

Publication Publication Date Title
CN103229125B (en) Dynamic power balance between blade server in cabinet
CN104468407A (en) Method and device for performing service platform resource elastic allocation
CN103763343A (en) Method and device for processing service access
CN106817499A (en) A kind of resources for traffic dispatching method and forecast dispatching device
CN103366022B (en) Information handling system and disposal route thereof
CN104735095A (en) Method and device for job scheduling of cloud computing platform
CN104239154B (en) Job scheduling method and job scheduler in a kind of Hadoop clusters
CN107483981B (en) Resource Calculation monitoring distribution method, storage medium, electronic equipment and system is broadcast live
CN103986766A (en) Self-adaptation load balancing job task scheduling method and device
CN105389206A (en) Method for rapidly configuring virtual machine resources in cloud computing data center
CN101374077A (en) Method and system for forwarding network management alarm
CN104468737A (en) Storage hierarchical scheduling method and system based on service type characteristics
CN103713955A (en) Method and device for managing resource dynamic allocation
CN102208986A (en) Cluster power consumption distribution and control method
CN102629220A (en) Dynamic task allocation and management method
CN113886034A (en) Task scheduling method, system, electronic device and storage medium
CN106681475A (en) Method for reducing power consumption of mobile terminal and mobile terminal
CN105320565B (en) A kind of computer scheduling of resource method for a variety of application software
EP2654359A3 (en) Fast efficient resource distribution in long term evolution communication network scheduling
CN107122235A (en) Public infrastructure resource regulating method based on application priority
CN102571453A (en) Facility resource pool management method and system
CN104111876A (en) Dynamic resource management device and method based on Oracle resource plan
CN103176850A (en) Electric system network cluster task allocation method based on load balancing
CN105446812A (en) Multitask scheduling configuration method
CN103281254A (en) Method for bandwidth dynamic allocation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180817

Address after: 200436 Room 411, No. three, JIANGCHANG Road, Jingan District, Shanghai, 411

Patentee after: SHANGHAI INSPUR CLOUD CALCULATING SERVICE CO.,LTD.

Address before: 100085 floor 1, C 2-1, No. 2, Shang Di Road, Haidian District, Beijing.

Patentee before: INSPUR (BEIJING) ELECTRONIC INFORMATION INDUSTRY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221103

Address after: Room 1602, Floor 16, High tech Zone Management Committee Building, No. 177, Gaoxin 6th Road, Rizhao, Shandong 276800

Patentee after: Rizhao Inspur Cloud Computing Co.,Ltd.

Address before: 200436 Room 411, No. three, JIANGCHANG Road, Jingan District, Shanghai, 411

Patentee before: SHANGHAI INSPUR CLOUD CALCULATING SERVICE CO.,LTD.

TR01 Transfer of patent right