CN102570446B - 电网重建的增强的机组级支持 - Google Patents
电网重建的增强的机组级支持 Download PDFInfo
- Publication number
- CN102570446B CN102570446B CN201110388837.4A CN201110388837A CN102570446B CN 102570446 B CN102570446 B CN 102570446B CN 201110388837 A CN201110388837 A CN 201110388837A CN 102570446 B CN102570446 B CN 102570446B
- Authority
- CN
- China
- Prior art keywords
- load
- load step
- generators
- generator
- enhanced
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- H02J3/40—Synchronisation of generators for connection to a network or to another generator
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/001—Arrangements for handling faults or abnormalities, e.g. emergencies or contingencies
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- H02J3/46—Controlling the sharing of generated power between the generators, sources or networks
- H02J3/466—Scheduling or selectively controlling the operation of the generators or sources, e.g. connecting or disconnecting generators to meet a demand
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- User Interface Of Digital Computer (AREA)
- Control Of Eletrric Generators (AREA)
- Engine Equipment That Uses Special Cycles (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US12/947,910 US8565929B2 (en) | 2010-11-17 | 2010-11-17 | Enhanced plant level support of grid reconstruction |
| US12/947910 | 2010-11-17 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102570446A CN102570446A (zh) | 2012-07-11 |
| CN102570446B true CN102570446B (zh) | 2015-08-19 |
Family
ID=45400883
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201110388837.4A Active CN102570446B (zh) | 2010-11-17 | 2011-11-17 | 电网重建的增强的机组级支持 |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US8565929B2 (enExample) |
| EP (1) | EP2456037B1 (enExample) |
| JP (1) | JP5956739B2 (enExample) |
| CN (1) | CN102570446B (enExample) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2494658A (en) * | 2011-09-14 | 2013-03-20 | Bae Systems Plc | Power distribution algorithm |
| US9163828B2 (en) * | 2011-10-31 | 2015-10-20 | Emerson Process Management Power & Water Solutions, Inc. | Model-based load demand control |
| CN103944166B (zh) * | 2014-05-02 | 2016-07-06 | 上海交通大学 | 基于单一变电站供电方式集的地区电网重构方法 |
| CN105243427B (zh) * | 2015-09-02 | 2019-10-25 | 南京航空航天大学 | 飞机电网动态规划管理方法 |
| US10635066B2 (en) | 2016-12-19 | 2020-04-28 | Kohler Co. | Generator system architecture |
| EP3486439B1 (en) * | 2017-11-21 | 2023-01-04 | Ansaldo Energia S.p.A. | M+n combined cycle power plant and method of controlling a m+n combined cycle power plant |
| CN108988346B (zh) * | 2018-09-19 | 2020-05-05 | 四川大学 | 电网中减少无效解的网络重构预处理方法及预处理系统 |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1658466A (zh) * | 2005-01-21 | 2005-08-24 | 刘渝根 | 电力系统中性点复合运行方法 |
| CN101236575A (zh) * | 2008-01-30 | 2008-08-06 | 山东大学 | 黑启动辅助决策支持/训练系统及其方法 |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4103178A (en) * | 1977-03-11 | 1978-07-25 | Westinghouse Electric Corp. | Black start system for large steam powered electric generation plants |
| JPS58222730A (ja) * | 1982-06-18 | 1983-12-24 | 株式会社東芝 | 発電プラントの運転装置 |
| JP2907946B2 (ja) * | 1990-05-09 | 1999-06-21 | 中部電力株式会社 | 電力系統事故復旧支援装置 |
| US7536364B2 (en) | 2005-04-28 | 2009-05-19 | General Electric Company | Method and system for performing model-based multi-objective asset optimization and decision-making |
| US8065022B2 (en) * | 2005-09-06 | 2011-11-22 | General Electric Company | Methods and systems for neural network modeling of turbine components |
| JP4577232B2 (ja) * | 2006-02-22 | 2010-11-10 | 株式会社日立製作所 | 発電所運用計画作成装置およびその方法 |
| JP2007270659A (ja) * | 2006-03-30 | 2007-10-18 | Toho Gas Co Ltd | コジェネレーションシステムの最適化方法および設備提案システム |
| US7394166B2 (en) | 2006-10-04 | 2008-07-01 | General Electric Company | Method, apparatus and computer program product for wind turbine start-up and operation without grid power |
| US7966102B2 (en) * | 2007-10-30 | 2011-06-21 | General Electric Company | Method and system for power plant block loading |
-
2010
- 2010-11-17 US US12/947,910 patent/US8565929B2/en active Active
-
2011
- 2011-11-08 JP JP2011244052A patent/JP5956739B2/ja active Active
- 2011-11-08 EP EP11188192.6A patent/EP2456037B1/en active Active
- 2011-11-17 CN CN201110388837.4A patent/CN102570446B/zh active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1658466A (zh) * | 2005-01-21 | 2005-08-24 | 刘渝根 | 电力系统中性点复合运行方法 |
| CN101236575A (zh) * | 2008-01-30 | 2008-08-06 | 山东大学 | 黑启动辅助决策支持/训练系统及其方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| US8565929B2 (en) | 2013-10-22 |
| JP5956739B2 (ja) | 2016-07-27 |
| EP2456037B1 (en) | 2019-10-16 |
| JP2012120424A (ja) | 2012-06-21 |
| EP2456037A2 (en) | 2012-05-23 |
| US20120123601A1 (en) | 2012-05-17 |
| EP2456037A3 (en) | 2017-08-30 |
| CN102570446A (zh) | 2012-07-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102570446B (zh) | 电网重建的增强的机组级支持 | |
| US11949232B2 (en) | System of critical datacenters and behind-the-meter flexible datacenters | |
| US11275427B2 (en) | Methods and systems for distributed power control of flexible datacenters | |
| US20240275167A1 (en) | Resilience enhancement-oriented energy storage control method and system for distributed generator (dg) in distribution network | |
| Golshani et al. | Incorporating wind energy in power system restoration planning | |
| TW201714378A (zh) | 虛擬電廠 | |
| CN115514016B (zh) | 电力系统机组组合确定方法、装置及设备 | |
| CN111262279B (zh) | 基于松弛邻域搜索的电力系统机组组合优化方法及装置 | |
| CN111327052B (zh) | 一种电力系统机组组合加速优化方法及装置 | |
| Becker et al. | Opportunities to support the restoration of electrical grids with little numbers of large power plants through converter‐connected generation and storages | |
| Singh et al. | Microgrid energy management system integration with advanced distribution management system | |
| Abbaszadeh et al. | General stochastic Petri net approach for the estimation of power system restoration duration | |
| CN116822928B (zh) | 输电线路检修方法、装置、计算机设备及存储介质 | |
| CN118554443A (zh) | 考虑扰动风险的微电网调度优化方法及相关装置 | |
| Zhu et al. | Prepare to meet the challenges in regional transmission planning and development | |
| Chen et al. | Fully distributed risk-based robust multi-area dynamic economic dispatch | |
| CN102694392B (zh) | 风电场的调度方法 | |
| CN115373373B (zh) | 一种风电机组主场控软件测试方法 | |
| Wang et al. | Coordinated Restoration for Interdependent Power and Natural Gas Systems by Decentralized Scheme | |
| Skok et al. | Synchronized IoT based digital twin management platform for flexible wind farm operation–sync-twinwind academic project | |
| Tróndheim | Power System Regulation and Modelling Theory | |
| Ferreira et al. | Managing intelligent self-sustained electrical micro-grids | |
| Yunqi et al. | A novel control strategy based on multi-agent for wind farm power dispatching | |
| JP2023050920A (ja) | プラント最適運用計画装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20231226 Address after: Swiss Baden Patentee after: GENERAL ELECTRIC CO. LTD. Address before: New York, United States Patentee before: General Electric Co. |
|
| TR01 | Transfer of patent right |