CN102566431A - Method for dispatching and controlling fuzzy parameter operation workshop under dynamic disturbance based on improved genetic algorithm - Google Patents

Method for dispatching and controlling fuzzy parameter operation workshop under dynamic disturbance based on improved genetic algorithm Download PDF

Info

Publication number
CN102566431A
CN102566431A CN2012100121971A CN201210012197A CN102566431A CN 102566431 A CN102566431 A CN 102566431A CN 2012100121971 A CN2012100121971 A CN 2012100121971A CN 201210012197 A CN201210012197 A CN 201210012197A CN 102566431 A CN102566431 A CN 102566431A
Authority
CN
China
Prior art keywords
workpiece
scheduling
window
individuality
machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100121971A
Other languages
Chinese (zh)
Inventor
陈勇
盛家君
邱晓杰
吴云翔
潘益菁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Technology ZJUT
Original Assignee
Zhejiang University of Technology ZJUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Technology ZJUT filed Critical Zhejiang University of Technology ZJUT
Priority to CN2012100121971A priority Critical patent/CN102566431A/en
Publication of CN102566431A publication Critical patent/CN102566431A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a method for solving the dispatching and controlling of an operation workshop under a complex production environment based on an improved genetic algorithm. The method comprises the following steps that: (1) a dispatching model of the operation workshop with a fuzzy parameter can be set, and a maximized satisfaction degree and a minimized satisfaction degree of all the products are used as a target function; and (2) the target function can be solved by adopting the improved genetic algorithm, (2.1) a code based on a working procedure can be adopted, (2.2) an initial population can be generated by operating a G&T algorithm repeatedly, (2.3) a unity can be evaluated by adopting the target function as a fitness function, (2.4) the operations of selecting and intersecting can be carried out, (2.5) a reversal variation technology can be adopted,(2.6) a population of each group can be combined and can be continuously evolved until being astringed when the unity of each group is astringed to a certain degree, and (2.7) a preset maximum evolution algebra Nmax is used as a stop condition, a solution which is the best one at present is used as an optimal solution, and thus a dispatching scheme of the operation workshop under the complex production environment can be obtained. The method disclosed by the invention has the advantages of good accuracy, better reliability and strong practicability.

Description

A kind of based on the obfuscation parameter job shop dispatch control method under the dynamic disturbances of improving genetic algorithm
Technical field
The present invention relates to job shop scheduling controlling technical field, job shop dispatch control method under especially a kind of solution complicated production environment.
Background technology
In recent years to JSP (job-shop scheduling problem (Job-Shop Scheduling Problem; JSP)) research; Broken through original operational research category; All there is the scholar to carry out fruitful research work in fields such as management science, kybernetics, artificial intelligence, Industrial Engineering, systems engineerings, thereby promotes the development and the fusion of various optimized Algorithm with domain knowledge separately.Along with development of advanced manufacturing, the implication of job-shop scheduling problem is expanded to some extent, has increased attributes such as randomness, dynamic, uncertainty, binding character, multiple goal property, and itself and practical condition are more approaching.
There is following problem mostly in research to job-shop scheduling problem at present:
(1) regards the parameters in the production run as deterministic exact value.The research work majority in past concentrates on confirms the type job-shop scheduling problem, and promptly the process time of workpiece and delivery date all are known quantitative really.And in fact, because various enchancement factors,, seldom can obtain accurate process time and delivery date like influences such as mechanical disorder, operator's skill level, environmental parameters, people can only estimate the variation range at process time or delivery date.Therefore, manufacturing parameter representes that with non-perfect number more accords with production is actual in the scheduling, promptly fuzzy job-shop scheduling problem.
(2) production system is used as the system of a static state, is ignored the appearance of various emergency situations in the actual production process.Interrupt failure conditions owing to the former scheduling that workpiece to be processed continuously arrives, machine tool damages suddenly or quilt is repaired, the appearance of various situations such as the workman is sick, rush order produces, should take in the scheduling, promptly dynamic job shop scheduling.
Existing job shop scheduling research is often simplified production models greatly, and is far away with the actual production situation distance, not exclusively is fit to working condition and changes frequent, working conditions change manufacturing enterprise greatly.
Summary of the invention
In order to overcome the deficiency that accuracy is relatively poor, reliability is relatively poor, practicality is relatively poor of existing job shop dispatching technique, the present invention provide that a kind of accuracy is good, reliability is better, practical based on the obfuscation parameter job shop dispatch control method under the dynamic disturbances of improving genetic algorithm.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of based on the obfuscation parameter job shop dispatch control method under the dynamic disturbances of improving genetic algorithm, said control method may further comprise the steps:
1), confirms the objective function of obfuscation parameter job shop scheduling
The objective function of fuzzy job-shop scheduling problem is: ask one to satisfy z *Workpiece processing order, make:
z *=max(z′) (4)
z ′ = y 1 z 1 + y 2 z 2 max z 1 = Σ i = 1 n w i AI i max z 2 = AI min = min i = 1 , Λn AI i Σ i = 1 n w i = 1 y 1 + y 2 = 1 - - - ( 4 - 1 )
2), adopt the said objective function of improved genetic algorithm for solving, detailed process is following:
(2.1) coding: the workpiece in the scheduling window is adopted the coding based on operation;
(2.2) generation of initial population: repeatedly move the G&T algorithm and produce an initial population;
(2.3) adopt objective function individuality to be estimated as fitness function;
(2.4) selection and interlace operation:
Adopt interlace operation from two parents, to produce a filial generation, specific as follows:
Step 2.4.1. selects the 1st road operation of all workpiece, adds set C; Suppose that machine can process any a plurality of operation at synchronization, respectively operate O among the set of computations C IjkThe fuzzy deadline of ∈ C, note is done
Figure BDA0000131223240000031
According to the comparison criterion of Triangular Fuzzy Number, confirm the operation O of least confusion deadline among the set C I*j*k*, will with the operation O I*j*k*Use same machine M K*Operation O Ijk*∈ C constitutes set G.Because operation O Ijk*With operation O I*j*k*Running time on have overlappingly, set G is conflict set;
Step 2.4.2. chooses body one by one wantonly with 50% equal probabilities from two parent individualities; In the set G that conflicts, select to have the operation of least confusion deadline, use the individual replacement of the parent of selecting and be expressed as
Figure BDA0000131223240000032
Step 2.4.3. is with the selected benchmark that is operating as among the step 2.4.2., through the EC of other operations in the set of the big operation of getting of fuzzy number update inconsistency successively 1, EC 2And EC 3Value is removed operation from set C
Figure BDA0000131223240000033
Its next process is added set C, and calculate its corresponding fuzzy deadline;
Obtained a new offspring individual through above operation, carried out c above operation and obtain c new offspring individual.
For keeping the individuality that has merit in (c+2) individuals of forming by c filial generation and 2 parents, the individuality that when hereditary next time, remains with two of following method selections:
A. in c filial generation individuality, selecting to have the individuality of maximum target functional value, also is that local rank is selected;
B. in remaining (c+1) individuals, select to have the individuality of maximum target functional value;
(2.5) mutation operation: adopt the counter-rotating variation;
(2.6) population structure: when the individuality of each group all converges to some spending, each group population is merged continuation evolve up to convergence;
(2.7) with predefined maximum evolutionary generation N MaxAs stop condition, with best separating so far as optimum solution;
3) when dynamic event takes place, dispatch, concrete steps are following again:
Step 1. initialization scheduling times n=0, the time t that begins to dispatch 0=0, the maximum number Lw of workpiece puts into window with workpiece to be processed in the given window, and establishing the workpiece window is N w, having accomplished the workpiece collection is N c
Workpiece in the step 2. pair current window is carried out and is improved genetic algorithm, selects to make the optimum chromosome of objective function as scheduling result, produces scheduling scheme;
When step 3. takes place as following dynamic event, carry out once scheduling again, establish dynamic event t takes place to do constantly c
1. start once scheduling again as inserting when single workpiece arrives, change step 4;
2. when the workpiece expiration time changes, start once scheduling again, change step 4;
3. when the machine breakdown incident takes place, start once scheduling again, change step 4;
Step 4. is revised item capable of using, with completed operation from workpiece window N wMove into and accomplish workpiece collection N c, produce the scheduling scheme of having accomplished operation; The order of not accomplishing operation in advance, with the residue operation as the new process of not dispatching:
1. will insert single workpiece and add workpiece window N wAnd do not accomplish operation and form new operation to be processed, carry out scheduling again.If when slotting single workpiece arrived, certain machine was being processed certain procedure, then the automatically delaying certain hour is carried out scheduling again after this procedure is accomplished;
When 2. the workpiece expiration time changes, upgrade the workpiece information in the workpiece window, carry out scheduling again;
3. during machine breakdown, the workpiece of just on this machine, processing is shifted out the workpiece window, remaining workpiece is carried out scheduling again; When simulation clock runs to the residue workpiece and needs the operation in this machining, this workpiece is shifted out the workpiece window, the residue workpiece is carried out scheduling again; When machine is repaired, the workpiece that shifts out the workpiece window is moved into again, carry out scheduling again;
Repeat step 4 according to scheduling events again, accomplish, produce final scheduling scheme up to all workpiece processing.
Technical conceive of the present invention is: on the basis of at present domestic and international job-shop scheduling problem As-Is analysis; Consider uncertainty machined parameters and dynamic disturbances factor in the actual production scheduling process; The ecotopia that job-shop scheduling problem is limited from strictness is extended to the complicated production environment of reality, makes it have dirigibility and practicality.
This paper is defined as the job shop scheduling research under the complicated production environment with the job shop scheduling of machined parameters uncertainty and the generation of dynamic disturbance incident.More meet the actual condition of production just because of the scheduling of the workshop under the complicated production environment, therefore study the job-shop scheduling problem under the complicated production environment, have more important significance for theories and practical value.
Job-shop scheduling problem is a typical NP-hard difficult problem, and mostly there is following problem in the research of existing job-shop scheduling problem: the one, regard various machined parameters in the production system as deterministic exact value; The 2nd, production system is used as the system of a static state, ignored the various emergency situations in the actual process.The actual demand of this paper production function and management under the complicated production environment; Consider the influence of factors such as machined parameters uncertainty exact value in the production run, dynamic disturbances, carried out the research work of the job-shop scheduling problem under the complicated production environment based on improving genetic algorithm.
Genetic algorithm be a kind of use for reference highly-parallel that organic sphere natural selection and evolutionary mechanism grow up, at random, self-adaptive search algorithm, all obtained challenging achievement in fields such as problem solving, optimization and search, Based Intelligent Control, pattern-recognition and artificial lifes.Especially suitable for the insoluble complicacy of those traditional searching algorithms particularly with nonlinear problem.At present, evolutionary computation has become new research direction---computational intelligence with artificial neural network, fuzzy system theory.Likewise, in the Job Shop Scheduling field, also become the focus of research based on the research of genetic algorithm even computational intelligence.
The Fuzzy Set Theory basis: set theory is at first founded 19 end of the centurys by Germany mathematics man Qiao Kangtuo (George Contor).So-called set generally is meant all of object with certain particular community.The object (or things) of forming set is called element, and these elements are corresponding to any one object on the territory, and the relation between the set can only be the relation that belongs to or do not belong to.Progress and science and technology development along with human society; People have been fully recognized that the set theory of utilizing Contor is to describe complicated and diversified real world fully accurately; This just requires the set theory of Contor is expanded; Be about to the value whether an object belong to certain characteristic function of a set and not only be restricted to 0 and 1 liang of number, and should be any one value that to get between 0 and 1.Only be about to 0, and among the 1} fundamental function of value be extended for can be in [0,1] subordinate function of value.
The G&T algorithm: the concrete steps of G&T algorithm are following:
Step 1. is selected the 1st road operation (operation) of all workpiece, adds set C;
Step 2. supposition machine can be processed any a plurality of operation at synchronization, respectively operates O among the set of computations C IjkThe fuzzy deadline of ∈ C, note is done
Figure BDA0000131223240000061
Step 3. is confirmed the operation O of least confusion deadline among the set C according to the comparison criterion of Triangular Fuzzy Number I*j*k*, will with the operation O I*j*k*Use same machine M K*Operation O Ijk*∈ C constitutes set G.Because operation O Ijk*With operation O I*j*k*Running time on have overlappingly, therefore gather G and be called the conflict set;
Step 4. is selected an operation at random from set G
The EC of step 5. selected benchmark that is operating as in the above step, the add operation through big operation of getting of fuzzy number (to the adjustment of processing start time of operation) and fuzzy number (to the adjustment of time that machines of operation) other operations during update inconsistency is gathered successively 1, EC 2And EC 3Value (because every machine synchronization can only be processed a workpiece, so must adjust) to the determined Fuzzy Time of step 2.From set C, remove operation its next process is added set C, and calculate its corresponding fuzzy deadline.
Step 6. repeating step 3-5 is up to all operation completion of processing.
Just can obtain a chromosome like this through above step, carry out the G&T algorithm n time, just can obtain n bar chromosome.Active scheduling collection can be the search volume of problem be limited to this initial population, thereby the operation efficiency of genetic algorithm can be improved as genetic algorithm.
Simulated annealing: the simulated annealing solution procedure that adopts here is described below:
Step 1. is selected to produce a scheduling scheme (current separating) in the 4th step of G&T algorithm at random, uses X cExpression, calculating target function value F (x c).The setting initial temperature is T 0
Step 2. is with the current X that separates of corresponding matrix representation cThe workpiece processing order of every machine, select a machine M at random kSelect two workpiece on this machine at random and exchange.For example, in 3 * 3 the scheduling problem, as the 1st workpiece (J of machine 2 2) and the 3rd workpiece (J 3) when being selected, the result after the exchange is just shown in Fig. 4 (b).
After step 3. exchanges through above-mentioned workpiece, obtain new workpiece processing order, the individuality conflict in the 4th step of G&T algorithm will obtain dismissing, and produce a new scheduling scheme (separating).If separating before separating of obtaining and workpiece exchange is different, then establishes current separating and be one and separate X, and get into next step; If not, returning for the 2nd step selects a new exchange right;
Step 4. is then accepted exchange, and is made X if the current target function value of separating is optimized c=X.If not, whether accept exchange with following substep decision;
1. calculate current goal functional value F (x) and target function value F (x c) difference DELTA f, calculating probability value exp (Δ f/T);
2. generate the random number between (0,1), and compare with exp (Δ f/T);
3. if exp (Δ f/T)>random (0,1) then accepts exchange, make X c=X; Otherwise, exchange and will do not accepted;
, exchange gets into next step when accepting.Otherwise it is right to return the next exchange of the 2nd step searching.
Step 5. is carried out the equilibrium state check.Whether inspection is enough little through the variation of the target function value that certain number of times exchange back obtains.The number of times of equilibrium state check is defined as from generation to generation.Carry out the equilibrium state check by four following steps.
1. repeating step 2 to 4, reach quantity from generation to generation up to exchange.Carry out following operation then;
(2) calculation of the current generation of the average value of the objective function
Figure BDA0000131223240000071
, and after an exchange after the average value of the objective function
Figure BDA0000131223240000072
3 Comparison and
Figure BDA0000131223240000074
The relative error
Figure BDA0000131223240000075
with the given tolerance values ε size;
4. when relative error during less than tolerance value; Promptly
Figure BDA0000131223240000076
then thinks and reaches equilibrium state in this temperature, gets into next step.Otherwise, remove calculating from generation to generation, get back to the 2nd step repetition workpiece exchange flow process;
Step 6. is confirmed the decay temperature of simulated annealing, T New=α * T Old, (α is the simulated annealing attenuation coefficient, generally gets about 0.8-0.9)
If step 7. exchange logarithm reaches predetermined quantity, algorithm finishes, and obtains the scheduling problem approximate solution.
Repeat above operation and stop up to algorithm, obtain separate in the separating of selection optimal objective function value.
Beneficial effect of the present invention mainly shows: the machined parameters of uncertainty is represented to complicated production environment in (1) with fuzzy number.Based on the satisfaction notion, be objective function with the minimum satisfaction of single workpiece with all product customer satisfactions, set up the job shop scheduling model of obfuscation parameter.
(2) the G&T algorithm is applied to the generation of genetic algorithm initial chromosome, the obfuscation parameter model of being set up is found the solution, through with the comparison of simulated annealing, verified the validity and the stability of algorithm, model is had finds the solution effect preferably.
(3) set up dynamic dispatching model based on the obfuscation parameter; Three kinds of dynamic disturbances incidents such as urgent arrival, machine breakdown and reparation of inserting single workpiece, workpiece expiration time change have been gone through; With improving genetic algorithm model is verified, and it is good and bad to have compared the scheduling scheme of carrying out scheduling again and unexecuted scheduling again after dynamic event takes place.
(4) be example with the TYDQ machine shop,, set up the dynamic dispatching model of obfuscation parameter in conjunction with the workshop practical condition, through with the comparison of primitive scheduling scheme, obtained result preferably.
Description of drawings
Fig. 1 is that similarity is calculated synoptic diagram.
Fig. 2 is the synoptic diagram of upset mutation operator.
Fig. 3 is the synoptic diagram of population structure.
Fig. 4 is the workpiece processing order and the synoptic diagram that exchanges of 3 * 3 scheduling problems, wherein is somebody's turn to do, (a) for before the workpiece exchange; (b) for after the workpiece exchange.
Embodiment
Below in conjunction with accompanying drawing the present invention is further described.
With reference to Fig. 1~Fig. 4, a kind of based on the obfuscation parameter job shop dispatch control method under the dynamic disturbances of separating that improves genetic algorithm, said control method may further comprise the steps:
1), confirms the objective function of obfuscation parameter job shop scheduling
Satisfy customer demand and client have different satisfactions to different product situation in order more relevantly to react job shop scheduling maximization; The job shop scheduling model of obfuscation parameter is proposed; Is objective function to maximize all product customer satisfactions with the minimum satisfaction of maximization, promptly
max z 1 = Σ i = 1 n w i AI i - - - ( 1 )
max z 2 = AI min = min i = 1 , Λn AIi - - - ( 2 )
Wherein, W=(w 1, w 2, Λ, w n) be the weight coefficient of each product satisfaction at delivery date, w 1The significance level that the expression client requires product i delivery date, Objective function z 1, z 2Represent all product customer satisfactions and minimum satisfaction respectively.
Order
z′=y 1z 1+y 2z 2 (3)
Y=(y 1, y 2) be z 1And z 2Weight coefficient, y 1+ y 2=1.
Like this, the objective function of fuzzy job-shop scheduling problem is: ask one to satisfy z *Workpiece processing order, make:
z *=max(z′) (4)
z ′ = y 1 z 1 + y 2 z 2 max z 1 = Σ i = 1 n w i AI i max z 2 = AI min = min i = 1 , Λn AI i Σ i = 1 n w i = 1 y 1 + y 2 = 1 - - - ( 4 - 1 )
2), improved genetic algorithm
(2.1) coding
Reasonably designing encoding mechanism has very big influence to the quality and benefits of genetic algorithm, when carrying out genetic algorithm encoding, must consider chromosomal legitimacy, feasibility, validity and the integrality that the problem solution space is characterized.
Here adopt coding based on operation, the problem of 3 workpiece, 3 machines for example, putative chromosomal is [1 23 11 322 3], wherein 1 represents workpiece J 1, 2 represent workpiece J 2, 3 represent workpiece J 3Because each workpiece has three process, so each workpiece occurs in chromosome three times.The order that the corresponding workpiece of the operation of workpiece occurs in chromosome.1 represent workpiece J like first 1The 1st procedure, represent workpiece J for second 1 1The 2nd procedure.Represent with Triangular Fuzzy Number the process time of each operation.
During Code And Decode, because of dispatching the thought that has adopted the rolling window in dynamic workshop, so the Code And Decode here all is to carry out to the workpiece in the scheduling window.
(2.2) generation of initial population
Repeatedly move the G&T algorithm and can produce an initial population.Because the 4th step of its G&T is to select at random, is the diversity that guarantees initial population, require the similarity of initial population can not be too big.Through the research of Sakawa, when individual similarity 0.8 or following the time, the initial population of generation has maximum stability.Here require the individual similarity of initial population can not be greater than 0.8.
JSP with 4 * 4 is that example is introduced individual calculation of similarity degree method.Workpiece processing sequence table on every machine of individual 1 and individual 2 is shown in Fig. 3-4.For individuality 1, on machine 1, the right of priority of workpiece is respectively 1,2,4,3.For individuality 2, the workpiece right of priority on the machine 1 is 2,1,4,3.Contrast two individuals with the workpiece on machine order, the workpiece that has an identical precedence relationship with workpiece 1 on the machine 1 is 3 and 4, so assignment is 2.In like manner, the workpiece that has an identical precedence relationship with workpiece 2 on the machine 1 is 3 and 4, so assignment 2.Have 1,2 and 4 with workpiece that workpiece 3 has an identical precedence relationship on the machine 1, so an assignment 3, the workpiece that has an identical precedence relationship with workpiece 4 on the machine 1 is 1,2 and 3, assignment 3.Workpiece assignment on the machine 1 adds up to 2+2+3+3=10 like this.Same method is handled other machine, and computation process is as shown in Figure 1.Through this method, the similarity that can obtain individuality 1 and individuality 2 is 0.917.
(2.3) fitness function design
Fitness function is used for individuality is estimated, and also is simultaneously the foundation of optimizing process development.Here adopt objective function individuality to be estimated as fitness function.
(2.4) selection and interlace operation
Selection operation is used to avoid the loss of effective gene, makes the big individuality of fitness be able to bigger probability survival to of future generation, thereby improves global convergence and counting yield.Interlace operation is used to produce a new individuality, and the merit of parent is inherited in the assurance filial generation as far as possible.Based on the G&T algorithm, the interlace operation below adopting produces a filial generation from two parents.
Step 2.4.1. carries out the 1st to 3 step of G&T algorithm, obtains set C and conflict set G;
Step 2.4.2. chooses body one by one wantonly with 50% equal probabilities from two parent individualities.In the set G that conflicts, select to have the operation of least confusion deadline, use the individual replacement of the parent of selecting and be expressed as
Figure BDA0000131223240000111
Step 2.4.3. carries out the 5th and the 6th step of G&T algorithm.
Obtained a new offspring individual through above operation, carried out c above operation and just can obtain c new offspring individual.
For keeping the individuality that has merit in (c+2) individuals of forming by c filial generation and 2 parents, the individuality that when hereditary next time, remains with two of following method selections.
A. in c filial generation individuality, selecting to have the individuality of maximum target functional value, also is that local rank is selected;
B. in remaining (c+1) individuals (2 parent with (c-1) individual filial generation) select to have the individuality of maximum target functional value.
Above-mentioned intersection and selection operation, because bigger c value means bigger progeny population, the generation probability of good filial generation will become than higher.Yet because these filial generations are to be produced by identical parent, the similarity between filial generation also will become than higher.Therefore in this algorithm, c is set at 5.
(2.5) mutation operation
No longer evolve when offspring's fitness that interlace operation produces, do not develop toward the good aspect, just mean the precocity convergence of algorithm.Mutation operation is exactly to overcome this situation to a certain extent.Here, adopt more common counter-rotating variation (Inversion Mutation), promptly select two gene locations at random, the gene of this position is exchanged each other.For example, choosing gene location for the individual parent1 of parent is that 1 and 6 gene exchanges reaching the purpose of variation, thereby obtains making a variation offspring individual son1, as shown in Figure 2.
(2.6) population structure
In service in genetic algorithm, must prevent to get into locally optimal solution.For preventing to converge to local solution, the population building method that adopts Sakawa to propose [71,72]Suppose to have 3 groups of populations, every group produces 10 individuals based on similarity.When the individuality of each group all converges to some spending, each group population is merged continuation evolve up to convergence, as shown in Figure 3.
(2.7) algorithm end condition
Owing in practical problems, use genetic algorithm, never allow to let it ceaselessly search for down, the optimum solution of problem is also unknown usually simultaneously, and therefore must design some approximate convergence criterions stops the algorithm process.Here with predefined maximum evolutionary generation N MaxAs stop condition, with best separating so far as optimum solution.
3), dispatches again dynamic event when taking place:
Step 1. initialization scheduling times n=0, the time t that begins to dispatch 0=0, the maximum number L of workpiece in the given window w, workpiece to be processed is put into window, establishing the workpiece window is N w, having accomplished the workpiece collection is N c
Workpiece in the step 2. pair current window is carried out and is improved genetic algorithm, selects to make the optimum chromosome of objective function as scheduling result, produces scheduling scheme;
When step 3. takes place as following dynamic event, carry out once scheduling again, establish dynamic event t takes place to do constantly c
1. start once scheduling again as inserting when single workpiece arrives, change step 4;
2. when the workpiece expiration time changes, start once scheduling again, change step 4;
3. when the machine breakdown incident takes place, start once scheduling again, change step 4;
Step 4. is revised item capable of using, with completed operation from workpiece window N wMove into and accomplish workpiece collection N c, produce the scheduling scheme of having accomplished operation; The order of not accomplishing operation shifts to an earlier date, with remaining operation as the new process of not dispatching.
1. will insert single workpiece and add workpiece window N wAnd do not accomplish operation and form new operation to be processed, carry out scheduling again.If when slotting single workpiece arrived, certain machine was being processed certain procedure, then the automatically delaying certain hour is carried out scheduling again after this procedure is accomplished;
When 2. the workpiece expiration time changes, upgrade the workpiece information in the workpiece window, carry out scheduling again;
3. during machine breakdown, the workpiece of just on this machine, processing is shifted out the workpiece window, remaining workpiece is carried out scheduling again.When simulation clock runs to the residue workpiece and needs the operation in this machining, this workpiece is shifted out the workpiece window, the residue workpiece is carried out scheduling again.When machine is repaired, the workpiece that shifts out the workpiece window is moved into again, carry out scheduling again.
Repeat step 4 according to scheduling events again, accomplish, produce final scheduling scheme up to all workpiece processing.
This programme to the dynamic disturbances situation in actual job workshop, has considered that the workpiece expiration time changes, inserts three dynamic events such as single workpiece arrival and machine breakdown on the basis of last one scheme-obfuscation parameter scheduling model; Set up the dynamic dispatching model of obfuscation parameter; Find the solution with the improvement genetic algorithm, calculate and checking with example at last, and compare with the scheme of not dispatching again; The result shows that model can embody the actual dynamic event in workshop, and produces scheduling scheme preferably.
The practice of this method:
Step 1. is not used M 1, M 2..., M 11Represent various production machines.
Step 2. is represented the time of different product at the line workstation with fuzzy number.
Step 3. is represented the installation and removal time of different product with fuzzy number.
Step 4. is represented the process time of the corresponding machinery of different product with fuzzy number.
Step 5. is represented the oil sealing vanning time of different product with fuzzy number.
Step 6. counting yield completion date.
Step 7. obtains product delivery date (sky make into hour).
The foundation of step 8. scheduling model
Before setting up the instance scheduling model, confirm some basic parameters earlier:
t Ih-workpiece line workstation time;
t Ip-workpiece processing the time (comprising set-up time and take-down time);
t If-oil sealing vanning the time;
The dynamic dispatching model of setting up like this under the obfuscation parameter of machine shop is following:
z *=max(z′) (1)
z ′ = y 1 z 1 + y 2 z 2 max z 1 = Σ i = 1 n w i AI i max z 2 = AI min = min i = 1 , Λn AIi AI i = area ( C ~ i ∩ D ~ i ) area C ~ i C ~ i = t ih + t ip + t if Σ i = 1 n w i = 1 y 1 + y 2 = 1 - - - ( 4 - 2 )
In this model; Wherein, general machining the time is consistent in and the preceding surface model.Be that the time of machining has been carried out specific processing in instance model, be divided into line time, machining time and oil sealing vanning time.In the model, y 1Be made as 0.7, y 3Be made as 0.3, expression enterprise pursues the satisfaction maximum of integral product emphatically.
Step 9. is confirmed the satisfaction evaluation value of client to each product.
Step 10. is confirmed each product customer satisfaction weight coefficient.
Step 11. dynamic event is described
11.1 confirm the damage and the reparation obfuscation time of machine
11.2 promptly insert single workpiece arrival time ambiguityization
The emulation of step 13. model and interpretation of result.
When system take place to insert single workpiece arrival dynamic event, optimal objective function value was 0.058 if do not dispatch then again, and again after the scheduling optimal objective function value be 0.181.
When system's generation machine breakdown and reparation dynamic event, optimal objective function value is 0.093 if do not dispatch then again, and scheduling back optimal objective function value is 0.234 again.
The model of present embodiment can obtain the scheduling scheme of good embodiment dynamic perfromance under the situation of higher target function value.Machine breakdown and reparation, slotting single workpiece arrive and can both in scheduling scheme, take into account, and the production that has met enterprise is actual.

Claims (1)

1. one kind based on the obfuscation parameter job shop dispatch control method under the dynamic disturbances of improving genetic algorithm, and it is characterized in that: said control method may further comprise the steps:
1), confirms the objective function of obfuscation parameter job shop scheduling
The objective function of fuzzy job-shop scheduling problem is: ask one to satisfy z *Workpiece processing order, make:
z *=max(z′) (4)
z ′ = y 1 z 1 + y 2 z 2 max z 1 = Σ i = 1 n w i AI i max z 2 = AI min = min i = 1 , Λn AI i Σ i = 1 n w i = 1 y 1 + y 2 = 1 - - - ( 4 - 1 )
2), adopt the said objective function of improved genetic algorithm for solving, detailed process is following:
(2.1) coding: the workpiece in the scheduling window is adopted the coding based on operation;
(2.2) generation of initial population: repeatedly move the G&T algorithm and produce an initial population;
(2.3) adopt objective function individuality to be estimated as fitness function;
(2.4) selection and interlace operation:
Adopt interlace operation from two parents, to produce a filial generation, specific as follows:
Step 2.4.1. selects the 1st road operation of all workpiece, adds set C; Suppose that machine can process any a plurality of operation at synchronization, respectively operate O among the set of computations C IjkThe fuzzy deadline of ∈ C, note is done According to the comparison criterion of Triangular Fuzzy Number, confirm the operation O of least confusion deadline among the set C I*j*k*, will with the operation O I*j*k*Use same machine M K*Operation O Ijk*∈ C constitutes set G.Because operation O Ijk*With operation O I*j*k*Running time on have overlappingly, set G is conflict set;
Step 2.4.2. chooses body one by one wantonly with 50% equal probabilities from two parent individualities; In the set G that conflicts, select to have the operation of least confusion deadline, use the individual replacement of the parent of selecting and be expressed as
Figure FDA0000131223230000013
Step 2.4.3. is with the selected benchmark that is operating as among the step 2.4.2., through the EC of other operations in the set of the big operation of getting of fuzzy number update inconsistency successively 1, EC 2And EC 3Value is removed operation from set C
Figure FDA0000131223230000014
Its next process is added set C, and calculate its corresponding fuzzy deadline;
Obtained a new offspring individual through above operation, carried out c above operation and obtain c new offspring individual.
For keeping the individuality that has merit in (c+2) individuals of forming by c filial generation and 2 parents, the individuality that when hereditary next time, remains with two of following method selections:
A. in c filial generation individuality, selecting to have the individuality of maximum target functional value, also is that local rank is selected;
B. in remaining (c+1) individuals, select to have the individuality of maximum target functional value;
(2.5) mutation operation: adopt the counter-rotating variation;
(2.6) population structure: when the individuality of each group all converges to some spending, each group population is merged continuation evolve up to convergence;
(2.7) with predefined maximum evolutionary generation N MaxAs stop condition, with best separating so far as optimum solution;
3) when dynamic event takes place, dispatch, concrete steps are following again:
Step 1. initialization scheduling times n=0, the time t that begins to dispatch 0=0, the maximum number Lw of workpiece puts into window with workpiece to be processed in the given window, and establishing the workpiece window is N w, having accomplished the workpiece collection is N c
Workpiece in the step 2. pair current window is carried out and is improved genetic algorithm, selects to make the optimum chromosome of objective function as scheduling result, produces scheduling scheme;
When step 3. takes place as following dynamic event, carry out once scheduling again, establish dynamic event t takes place to do constantly c
1. start once scheduling again as inserting when single workpiece arrives, change step 4;
2. when the workpiece expiration time changes, start once scheduling again, change step 4;
3. when the machine breakdown incident takes place, start once scheduling again, change step 4;
Step 4. is revised item capable of using, with completed operation from workpiece window N wMove into and accomplish workpiece collection N c, produce the scheduling scheme of having accomplished operation; The order of not accomplishing operation in advance, with the residue operation as the new process of not dispatching:
1. will insert single workpiece and add workpiece window N wAnd do not accomplish operation and form new operation to be processed, carry out scheduling again.If when slotting single workpiece arrived, certain machine was being processed certain procedure, then the automatically delaying certain hour is carried out scheduling again after this procedure is accomplished;
When 2. the workpiece expiration time changes, upgrade the workpiece information in the workpiece window, carry out scheduling again;
3. during machine breakdown, the workpiece of just on this machine, processing is shifted out the workpiece window, remaining workpiece is carried out scheduling again; When simulation clock runs to the residue workpiece and needs the operation in this machining, this workpiece is shifted out the workpiece window, the residue workpiece is carried out scheduling again; When machine is repaired, the workpiece that shifts out the workpiece window is moved into again, carry out scheduling again;
Repeat step 4 according to scheduling events again, accomplish, produce final scheduling scheme up to all workpiece processing.
CN2012100121971A 2012-01-16 2012-01-16 Method for dispatching and controlling fuzzy parameter operation workshop under dynamic disturbance based on improved genetic algorithm Pending CN102566431A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100121971A CN102566431A (en) 2012-01-16 2012-01-16 Method for dispatching and controlling fuzzy parameter operation workshop under dynamic disturbance based on improved genetic algorithm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100121971A CN102566431A (en) 2012-01-16 2012-01-16 Method for dispatching and controlling fuzzy parameter operation workshop under dynamic disturbance based on improved genetic algorithm

Publications (1)

Publication Number Publication Date
CN102566431A true CN102566431A (en) 2012-07-11

Family

ID=46412084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100121971A Pending CN102566431A (en) 2012-01-16 2012-01-16 Method for dispatching and controlling fuzzy parameter operation workshop under dynamic disturbance based on improved genetic algorithm

Country Status (1)

Country Link
CN (1) CN102566431A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104077630A (en) * 2014-05-26 2014-10-01 浙江工业大学 Workshop layout method for complex job of simulating human cell evolution
CN105320105A (en) * 2014-08-04 2016-02-10 中国科学院沈阳自动化研究所 Optimal scheduling method of parallel batch processing machines
CN105825303A (en) * 2016-03-17 2016-08-03 合肥工业大学 Drop and pull transport task allocation method
CN107194073A (en) * 2017-05-24 2017-09-22 郑州航空工业管理学院 The fuzzy fitness value interactive evolution optimization method designed for indoor wall clock
CN107544452A (en) * 2017-10-19 2018-01-05 西安航空学院 Promptly add job shop Digit Control Machine Tool centralized dispatching method under one-state
CN107831745A (en) * 2017-11-09 2018-03-23 西南交通大学 A kind of flexible job shop inserts single action state method for optimizing scheduling
CN108053152A (en) * 2018-01-30 2018-05-18 陕西科技大学 The method that improved adaptive GA-IAGA based on polychromatic sets solves dynamic job shop scheduling
CN111813054A (en) * 2019-04-11 2020-10-23 阜阳师范学院 Dynamic scheduling method and system for rail guided vehicle
CN112257296A (en) * 2020-11-27 2021-01-22 西南交通大学 Improved genetic algorithm-based job shop scheduling method with cache constraint
CN112965374A (en) * 2021-02-02 2021-06-15 郑州轻工业大学 Method for disassembling and scheduling in consideration of random demand and operation time under resource constraint
CN113238531A (en) * 2021-04-30 2021-08-10 重庆长安汽车股份有限公司 Dynamic scheduling method for reworked vehicle re-online in welding workshop

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104077630B (en) * 2014-05-26 2017-04-12 浙江工业大学 Workshop layout method for complex job of simulating human cell evolution
CN104077630A (en) * 2014-05-26 2014-10-01 浙江工业大学 Workshop layout method for complex job of simulating human cell evolution
CN105320105A (en) * 2014-08-04 2016-02-10 中国科学院沈阳自动化研究所 Optimal scheduling method of parallel batch processing machines
CN105320105B (en) * 2014-08-04 2017-09-29 中国科学院沈阳自动化研究所 A kind of parallel batch processing machines Optimization Scheduling
CN105825303A (en) * 2016-03-17 2016-08-03 合肥工业大学 Drop and pull transport task allocation method
CN107194073B (en) * 2017-05-24 2020-08-28 郑州航空工业管理学院 Fuzzy adaptive value interactive evolution optimization method for indoor wall clock design
CN107194073A (en) * 2017-05-24 2017-09-22 郑州航空工业管理学院 The fuzzy fitness value interactive evolution optimization method designed for indoor wall clock
CN107544452A (en) * 2017-10-19 2018-01-05 西安航空学院 Promptly add job shop Digit Control Machine Tool centralized dispatching method under one-state
CN107544452B (en) * 2017-10-19 2019-11-08 西安航空学院 Promptly add processing workshop numerically-controlled machine tool centralized dispatching method under one-state
CN107831745A (en) * 2017-11-09 2018-03-23 西南交通大学 A kind of flexible job shop inserts single action state method for optimizing scheduling
CN107831745B (en) * 2017-11-09 2019-06-07 西南交通大学 A kind of slotting single action state method for optimizing scheduling of flexible job shop
CN108053152A (en) * 2018-01-30 2018-05-18 陕西科技大学 The method that improved adaptive GA-IAGA based on polychromatic sets solves dynamic job shop scheduling
CN111813054A (en) * 2019-04-11 2020-10-23 阜阳师范学院 Dynamic scheduling method and system for rail guided vehicle
CN112257296A (en) * 2020-11-27 2021-01-22 西南交通大学 Improved genetic algorithm-based job shop scheduling method with cache constraint
CN112965374A (en) * 2021-02-02 2021-06-15 郑州轻工业大学 Method for disassembling and scheduling in consideration of random demand and operation time under resource constraint
CN112965374B (en) * 2021-02-02 2022-11-01 郑州轻工业大学 Method for disassembling and scheduling in consideration of random demand and operation time under resource constraint
CN113238531A (en) * 2021-04-30 2021-08-10 重庆长安汽车股份有限公司 Dynamic scheduling method for reworked vehicle re-online in welding workshop

Similar Documents

Publication Publication Date Title
CN102566431A (en) Method for dispatching and controlling fuzzy parameter operation workshop under dynamic disturbance based on improved genetic algorithm
CN102609805B (en) Control method for solving scheduling of operating workshops under complex production environment based on improved genetic algorithm
Gupta et al. Branch and bound experiments in convex nonlinear integer programming
CN110084405B (en) Throughput flexible intelligent assembly logistics path planning method
CN110058573B (en) Huff and puff flexible intelligent assembly logistics path planning platform
CN109598416A (en) A kind of the Dynamic Scheduling system and scheduled production method in multiple material workshop
CN104408518B (en) Based on the neural network learning optimization method of particle swarm optimization algorithm
CN103676902A (en) Flow shop rescheduling method
CN101833709A (en) Mixing intelligent optimizing method for semiconductor production line production plan
CN110163436A (en) Intelligent workshop production optimization method based on bottleneck prediction
CN104842564A (en) NSGA-II-based three-dimensional printing multi-task optimal scheduling method
CN110991784B (en) Method and system for dispatching abnormal low-voltage transformer area
CN106295857A (en) A kind of ultrashort-term wind power prediction method
CN106125684A (en) Based on the multiple target Flow Shop under uncertain environment against dispatching method
Suer et al. Evaluation of manufacturing cell loading rules for independent cells
CN102542411A (en) Method for carrying out dispatching control on multi-variety multi-process manufacturing enterprise workshop on basis of ACA (Automatic Circuit Analyzer) model
Acar Yildirim et al. Time-cost optimization model proposal for construction projects with genetic algorithm and fuzzy logic approach
Kaveh et al. Fuzzy-multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using ENSCBO
Nagar et al. An AHP-based approach for the selection of HFMS: an Indian perspective
CN104281917A (en) Fuzzy job-shop scheduling method based on self-adaption inheritance and clonal selection algorithm
Fujii et al. Facility layout planning of central kitchen in food service industry: application to the real-scale problem
CN103177403A (en) Control method of integrative interruption maintenance plan
CN106033217B (en) Dispatching system and work dispatching method
Afshari et al. Distribution-service network design: an agent-based approach
Greitemann et al. Quantitative model of the technology lifecycle for forecasting the maturity of manufacturing technologies

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120711