CN102562106A - 特厚煤层高位充填长臂开采方法 - Google Patents

特厚煤层高位充填长臂开采方法 Download PDF

Info

Publication number
CN102562106A
CN102562106A CN2011102407184A CN201110240718A CN102562106A CN 102562106 A CN102562106 A CN 102562106A CN 2011102407184 A CN2011102407184 A CN 2011102407184A CN 201110240718 A CN201110240718 A CN 201110240718A CN 102562106 A CN102562106 A CN 102562106A
Authority
CN
China
Prior art keywords
coal
face
intake
seam
along
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102407184A
Other languages
English (en)
Inventor
高九华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011102407184A priority Critical patent/CN102562106A/zh
Publication of CN102562106A publication Critical patent/CN102562106A/zh
Pending legal-status Critical Current

Links

Images

Abstract

特厚煤层高位充填长臂开采方法,是在所开采煤层的底板上沿工作面走向布置进风巷道、采煤工作面、回风巷道,在进风巷道安装运煤设备,在采煤工作面安装采煤机、刮板输送机和充填开采支架等组成,其特征在于:在所开采的煤层的顶板,沿着工作面的走向在布置顶板进风巷道、回风巷道,沿煤层的顶板布置的进风巷道、回风巷道与采空区相贯通,采用锚索、锚杆与金属网组和支护,采煤工作面向前推进过程中,在采煤工作面沿顶板打锚索支护,采用此方法可以减少采煤后地表塌陷对自然环境的破坏。

Description

特厚煤层高位充填长臂开采方法
技术领域
本发明涉及煤矿开采技术,特别涉及煤矿厚煤层开采领域。
背景技术
图1、图2、图3、图4为现有厚煤放顶煤技术采煤工作面布置示意图,采煤工作面由进风巷道10、回风巷道120、采煤工作面90构成,在进风巷道10内安装运煤皮带机20、运煤转载机30、破碎机40、端头支架50,在采煤工作面90内安装运煤刮板输送机70、采煤机110和放顶煤支架80和过渡支架60等组成,现有技术采煤工作面沿底板布置,采煤机110割煤工作面向前推进,放顶煤支架80支护并后部放煤,利用顶板140自然跨落破煤并充填采空区,这种采煤方法存在以下问题:
(1)利用顶板自然跨落破煤并充填采空区造成地表塌陷破坏环境。
(2)顶板自然跨落充填采空区造成地下水位沉降破坏生态环境。
(3)雨季到来沿自然跨落区域地表裂隙向井下漏水引发事故。
(4)对于村庄、河流、湖泊建筑物下煤炭不能回收。
发明内容
本发明采煤方法与技术所要解决的技术问题在于提供在高厚煤层的顶板沿工作面走向在布置进风巷道和回风巷道,巷道布置在煤层内与采空区相贯通,在巷道内安装用于充填开采的运输设备,在回采煤炭过程中,将地面垃圾、废料及土石方等充填材料充填到煤炭采出后的采空区内,在回采与充填过程中同时利用锚索、锚杆等加固顶板使其不破断跨落,本发明技术克服了现有技术存在的顶板自然跨落对自然环境的破坏等述缺陷。
由于本发明采煤方法,与现有采煤技术方法相比有如下优点:
(1)煤炭采出后地表不下沉,不会造成地表自然环境破坏。
(2)不会造成地表水位下降。
(3)可以回收村庄、河流、湖泊建筑物下的煤炭,村庄不用搬迁。
(4)可以有效的防治瓦斯。
附图说明
下面结合附图和实施例对本发明做进一步描述。
图1、图2、图3、图4为现有技术采煤方法布置示意图;
图5、图6、图7、图8、图9、图10为本发明技术采煤方法布置示意图。
具体实施方式
下面将结合附图对本发明作进一步详述,以进一步了解本发明之目的、方案及功效,但并不作为对本发明权利要求保护范围的限制。
本发明公开特厚煤层高位充填长臂开采方法,在所开采的煤层13的底板布置进风巷道1和回风巷道12,及采煤工作面9,在进风巷道1内安装运煤皮带2、运煤转载机3、破碎机4和端头支架5,在采煤工作面9内安装采煤机11、运煤刮板输送机7、充填支架8和过渡支架6等设备用于采煤,在所开采的煤层13和煤层顶板19之间布置顶板进风巷道14和顶板回风巷道18,顶板进风巷道14和顶板回风巷道18与采空区贯通,顶板进风巷道14和顶板回风巷道18采用锚索、锚杆与金属网组合支护,在顶板进风巷道14内安装充填运输皮带15和充填转载机16,工作面充填支架的后部吊挂充填刮板输送机17,充填材料10从充填运输皮带15、充填转载机16和充填刮板输送机17运送到采空区,通过充填支架8压实,在工作面9向前推进过程中沿工作面补打锚索21加固顶板。
采用此方法;
(1)煤炭采出后顶板19不破断,地表不下沉,不会造成自然环境破坏。
(2)不会造成地表水位下降。
(3)煤层13上部为村庄、河流、湖泊建筑物等不用搬迁。
(4)煤层13为高瓦斯时通过顶板回风巷道18排走,可以有效的防治瓦斯。
虽然本发明已以一较佳实施例揭露如上,然其并非用以限定本发明,在不背离本发明精神及其实质的情况下,熟悉本领域的技术人员当可根据本发明作出各种相应的改变和变形,但这些相应的改变和变形都应属于本发明所附的权利要求的保护范围。

Claims (3)

1.特厚煤层高位充填长臂开采方法,是在所开采煤层的底板上沿工作面走向布置进风巷道、采煤工作面、回风巷道,在进风巷道安装运煤设备,在采煤工作面安装采煤机、刮板输送机和充填开采支架等组成,其特征在于:在所开采的煤层的顶板,沿着工作面的走向在布置顶板进风巷道、回风巷道,沿煤层的顶板布置的进风巷道、回风巷道与采空区相贯通,采用锚索、锚杆与金属网组和支护。
2.根据权利要求1所述的采煤工作面向前推进过程中,在采煤工作面沿顶板打锚索支护。
3.根据权利要求1在所开采的煤层沿煤层的顶板在布置进风巷道、回风巷道安装冲填料运输设备。
CN2011102407184A 2011-08-20 2011-08-20 特厚煤层高位充填长臂开采方法 Pending CN102562106A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102407184A CN102562106A (zh) 2011-08-20 2011-08-20 特厚煤层高位充填长臂开采方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102407184A CN102562106A (zh) 2011-08-20 2011-08-20 特厚煤层高位充填长臂开采方法

Publications (1)

Publication Number Publication Date
CN102562106A true CN102562106A (zh) 2012-07-11

Family

ID=46408540

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102407184A Pending CN102562106A (zh) 2011-08-20 2011-08-20 特厚煤层高位充填长臂开采方法

Country Status (1)

Country Link
CN (1) CN102562106A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422870A (zh) * 2013-07-26 2013-12-04 王绍华 特厚煤层采全高顶板支护方法
CN104564139A (zh) * 2014-12-29 2015-04-29 新汶矿业集团有限责任公司 密实充填系统及充填方法
CN114635726A (zh) * 2022-04-01 2022-06-17 冀中能源峰峰集团有限公司 一种综放工作面上端头双错布置方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422870A (zh) * 2013-07-26 2013-12-04 王绍华 特厚煤层采全高顶板支护方法
CN103422870B (zh) * 2013-07-26 2015-09-16 王绍华 特厚煤层采全高顶板支护方法
CN104564139A (zh) * 2014-12-29 2015-04-29 新汶矿业集团有限责任公司 密实充填系统及充填方法
CN104564139B (zh) * 2014-12-29 2017-06-13 新汶矿业集团有限责任公司 密实充填系统及充填方法
CN114635726A (zh) * 2022-04-01 2022-06-17 冀中能源峰峰集团有限公司 一种综放工作面上端头双错布置方法

Similar Documents

Publication Publication Date Title
CN101725352B (zh) 一种固体充填综采回收房式煤柱方法
AU2013358812B2 (en) Solid-filling coal mining method with two pre-excavated tunnels for advancing
CN107387084B (zh) 一种沿空留巷减少切顶深度的施工方法
CN102562066B (zh) 急倾斜煤层伪斜支撑式可伸缩柔性掩护支架机械化采煤法
CN103742148B (zh) 一种急倾斜煤层柔掩支护下行矸石充填的采煤法
CN102155260B (zh) 一种急倾斜煤层采空区充填方法
CN101942999A (zh) 一种急倾斜薄煤层采煤方法
CN109488301A (zh) 一种矿山采选充处开采方法
CN103104260B (zh) 复杂地质条件下综—机对拉面采煤方法
CN105952453B (zh) 长壁前进式煤层工作面机械化无巷开采成套设备
CN102418527B (zh) 一种缓倾斜极薄沉积型地下铁矿床开采方法
CN104632220A (zh) 缓倾斜中厚矿体条柱再造采场结构尺寸可调可控采矿方法
CN104653182A (zh) 一种含厚夹矸煤层煤矸分采的采煤方法
CN110410076A (zh) 一种用于老房柱采空区遗留煤柱回收的充填开采方法
CN103557001B (zh) 一种低段高无底柱留矿嗣后充填采矿法
CN108397195B (zh) 急倾斜厚煤层机械化采煤系统及采煤方法
CN105240012B (zh) 一种实现煤柱同采的f型区段采煤方法
CN102562106A (zh) 特厚煤层高位充填长臂开采方法
CN1782326B (zh) 煤矿井下矸石处理方法
CN110578523A (zh) 特大倾角中厚煤层放顶煤开采方法及系统
CN102808624B (zh) 煤矸同采系统及方法
CN105134212B (zh) 一种三软厚煤层巷道沿顶掘进综放开采保证回采率的方法
CN203962014U (zh) 综采充填两用工作面液压支架
CN103061767A (zh) 下向水平分层干式充填采矿法
CN109184784B (zh) 基于减轻采煤塌陷程度的综采煤矸石同步充填系统及方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120711